Projects
EBCF-4

EBIC Construction Forecast (27-Jan-07)

Data Date: 23-Apr-26
Plan: 22-Jan-25 – 27-Mar-29
Legend: Not Started In Progress Complete Critical Milestone Showing 1099 activities in E3B3 Construction × clear
Code
Activity
Start
Finish
Flt
%
EK000CK065
Compl. Layout of Temp. Facil. (including OCI)
29-Jan-25
01-Oct-25
100%
EK000CK075
Review Tech & Commercial Proposal - Field Fab Tank
16-Feb-25
02-Oct-25
100%
EK000CK060
Locate tie in pnts for temp water, phone, & pwr
26-Feb-25
16-Mar-25
100%
EK000CK100
Site Visit - Construction
26-Feb-25
16-Mar-25
100%
EK000CK005
OCI Subcontract - Executed
19-Mar-25
19-Nov-25
100%
EK000CK010
OCI Meeting to Define custom clearance requests
20-May-25
19-Jun-25
100%
EK000CK015
Define OCI's Point of Delivery & Liability
20-May-25
19-Jun-25
100%
EK000CV038
Select Geotech Vendor / Issue Award
20-May-25
17-Aug-25
100%
PO000MF000
Field Erected Tanks Subcontract - Prepare Inquiry, Bid, NTP
28-Jul-25
03-Jan-26
100%
EK000CV039
Geotech Conducts Soil Borings / Draft Prelim Report
24-Aug-25
17-Dec-25
100%
CO000GE105
Commence Admin. Building Design (OCI)
05-Oct-25
05-Oct-25
100%
CO000K0106
Mobilize Temporary Facilities (& Punchlist & Perm. Power)
09-Nov-25
27-Dec-26
40%
EK000GE150
Execute OCI Subcontract (KBR)
16-Nov-25
16-Nov-25
100%
PO000C0045
Purch/Fab/Deliver - Fencing Materials
01-Dec-25
15-Dec-25
100%
EK000GE170
Issue Material Supply PO to OCI (Elect, Struct, Insul)
11-Dec-25
11-Dec-25
100%
CK000YA306
Establish Tax Free Zone Status
13-Dec-25
31-Jan-26
100%
PO000C0050
Receive at Site - Fencing Materials
14-Dec-25
14-Dec-25
100%
CO000C0150
Perimeter Wall
15-Dec-25
29-Mar-27
27.0d
28%
WO010K0110
010 Site Prep - Perimeter Wall
15-Dec-25
29-Mar-27
27.0d
28%
PO000MF010
Field Erected Tanks Subcontract - Purchasing & Fabrication
04-Jan-26
27-Dec-26
31%
CO000M0100
Commence Engineering - Field Fab Tanks
04-Jan-26
04-Jan-26
100%
CO02HC0140
02H Form Pour Strip Fnds - Structure
21-Mar-26
27-Dec-26
12%
WO020C0100
020 Concrete & Excavation
21-Mar-26
23-Mar-27
215.0d
9%
CK01UU4150
01U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
164.0d
10%
CK02UU4150
02U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
164.0d
10%
CK03UU4150
03U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
164.0d
10%
CK05UU4150
05U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
318.0d
10%
CO000CK110
Set-Up KBR Pipe Fab Shop
24-Mar-26
27-Dec-26
11%
WO010C0100
010 Concrete & Excavation
27-Mar-26
04-May-27
149.0d
7%
CO01GC0150
01G Form, Pour, Strip Fnd - Control Building
27-Mar-26
01-Apr-26
100%
CO02JC0150
02J Form, Pour, Strip Fnd - 104-D2 (Low Temp Shift Converter)
30-Mar-26
27-Dec-26
9%
CO02JC0160
02J Form, Pour, Strip Fnd - 104-D1 (High Temp Shift Converter)
30-Mar-26
27-Dec-26
9%
CO01DC0150
01D Form, Pour, Strip Fnd - 2101-U (Cooling Tower)
31-Mar-26
27-Dec-26
9%
CO000A0110
Start Buildings - Admin, Canteen, Warehouse, Control
31-Mar-26
31-Mar-26
100%
CO000K0100
Start Construction
31-Mar-26
31-Mar-26
100%
CO02JC0110
02J Form, Pour, Strip Fnds - Major Fnds Gen'l
01-Apr-26
27-Dec-26
9%
CO000A0150
Install Guard Towers
01-Apr-26
14-Apr-26
100%
CO01GA0115
01G Erect Control Building (Columns & Parapet Only)
03-Apr-26
27-Dec-26
8%
CO02LC0150
02L Form, Pour, Strip Fnd - 101-E (CO2 Absorber)
03-Apr-26
27-Dec-26
8%
CO02MC0110
02M Form, Pour, Strip Fnds - Major Fnds Gen'l
03-Apr-26
27-Dec-26
8%
CO02MC0140
02M Form Pour Strip Fnds - Structure
03-Apr-26
27-Dec-26
8%
CO02KC0150
02K Form, Pour, Strip Fnd - 114-F (Benfield Solution Tank)
04-Apr-26
27-Dec-26
7%
CO03DC0110
03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank)
06-Apr-26
27-Dec-26
7%
WO030C0100
030 Concrete & Excavation
06-Apr-26
19-Mar-27
229.0d
5%
CO02BC0110
02B Form, Pour, Strip Fnds - Major Fnds
09-Apr-26
27-Dec-26
6%
CO000K0108
Start Foundations - Field Fab Tanks
09-Apr-26
09-Apr-26
100%
CO000K0110
Start Foundations - Equipment & Piperacks
09-Apr-26
09-Apr-26
100%
CO010K0120
010 Construct Perimeter Roads
15-Apr-26
28-Dec-26
5%
CO02AC0110
02A Form, Pour, Strip Fnds - Major Fnds
15-Apr-26
09-Mar-27
189.0d
5%
CO01BC0160
01B Form, Pour, Strip Fnd - 2001-FB (Water Storage Tank)
20-Apr-26
27-Dec-26
5%
CO02HC0150
02H Form, Pour, Strip Fnd - 103-D (Secondary Reformer)
21-Apr-26
27-Dec-26
5%
CO03CC0110
03C Form, Pour, Strip Fnds - Major Fnds
21-Apr-26
27-Dec-26
5%
WK000U4100
000 U/G Pipe Spool Fabrication
10-Aug-26
07-Dec-26
0%
CO000M0110
Mobilize Field Fab Tank Contractor
27-Dec-26
27-Dec-26
0%
CO01BC0110
01B Form, Pour, Strip Fnds - Major Fnds Gen'l
27-Dec-26
27-Dec-26
0%
CO01BC0150
01B Form, Pour, Strip Fnd - 2001-FA (Water Storage Tank)
27-Dec-26
27-Dec-26
0%
CO01DC0140
01D Form Pour Strip Fnds - Sleepers
27-Dec-26
27-Dec-26
0%
CO01YC0140
01Y Form Pour Strip Fnds - Pipe Rack
27-Dec-26
27-Dec-26
0%
CO02CC0160
02C Form, Pour, Strip Fnd - 103-JTC
27-Dec-26
27-Dec-26
0%
CO02CM0140
02C Set - 103-JTC Surface Condenser
27-Dec-26
27-Dec-26
0%
CO02EC0110
02E Form, Pour, Strip Fnds - Major Fnds Gen'l
27-Dec-26
27-Dec-26
0%
CO02EC0140
02E Form Pour Strip Fnds - Structure
27-Dec-26
27-Dec-26
0%
CO02GC0160
02G Form, Pour, Strip Fnd - 102-J Fd Gas Compr. & Aux.
27-Dec-26
27-Dec-26
0%
CO02HC0110
02H Form, Pour, Strip Fnds - 101B (Primary Reformer)
27-Dec-26
27-Dec-26
0%
CO02HC0160
02H Form, Pour, Strip Fnd - 156-F (Steam Blowdown Drum)
27-Dec-26
27-Dec-26
0%
CO02HM0140
02H Set - 156-F Steam Blowdown Drum
27-Dec-26
27-Dec-26
0%
CO02LC0160
02L Form, Pour, Strip Fnd - 102-E (CO2 Stripper)
27-Dec-26
27-Dec-26
0%
CO02MC0150
02M Form, Pour, Strip Fnd - 105-D (Ammonia Synthesis Converter)
27-Dec-26
27-Dec-26
0%
CO02NC0110
02N Form, Pour, Strip Fnds - Major Fnds
27-Dec-26
27-Dec-26
0%
CO02YC0140
02Y Form Pour Strip Fnds - Pipe Rack
27-Dec-26
27-Dec-26
0%
CO03CM0110
03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks
27-Dec-26
27-Dec-26
0%
CO03DC0150
03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps)
27-Dec-26
27-Dec-26
0%
CO03FC0110
03F Form, Pour, Strip Fnds - Package Boiler
27-Dec-26
27-Dec-26
0%
CO05AC0170
05A Install Test Piles
27-Dec-26
27-Dec-26
0%
PO000P0015
Purch/Fab/Delv - Temporary Testing Materials
27-Dec-26
27-Dec-26
0%
PO000P0020
Receive at Site - Temporary Testing Materials
27-Dec-26
27-Dec-26
0%
PO000V1000
Purch/Fab/Delv - Painting Materials
27-Dec-26
27-Dec-26
0%
PO000V1005
Receive at Site - Painting Materials
27-Dec-26
27-Dec-26
0%
PO020EL155
020 Issue E&I Cable/Bulks/JB Reqn (OCI)
27-Dec-26
27-Dec-26
0%
CK000P0110
000 Pipe Fabrication
28-Dec-26
31-May-27
49.0d
0%
CK000U4110
Start Pipe Fab
28-Dec-26
28-Dec-26
0%
CK01AP0110
01A A/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01BU4110
01B U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01CU4110
01C U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01DP0110
01D A/G Pipe Spool Fabrication
28-Dec-26
22-Mar-27
104.0d
0%
CK01DU4110
01D U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01EU4120
01E/F/G U/G Pipe Spool Fabrication (to Blg Stub Outs)
28-Dec-26
28-Dec-26
0%
CK01YP0110
01Y A/G Pipe Spool Fabrication
28-Dec-26
29-Jan-27
117.0d
0%
CK02AU4110
02A U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02BP0110
02B A/G Pipe Spool Fabrication
28-Dec-26
24-May-27
55.0d
0%
CK02BU4110
02B U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02CU4110
02C U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02DP0110
02D A/G Pipe Spool Fabrication
28-Dec-26
30-Apr-27
75.0d
0%
CK02DU4110
02D U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02EP0110
02E A/G Pipe Spool Fabrication
28-Dec-26
25-Feb-27
130.0d
0%
CK02EU4110
02E U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02FP0110
02F A/G Pipe Spool Fabrication
28-Dec-26
20-Apr-27
84.0d
0%
CK02FU4110
02F U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02GU4110
02G U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02HU4110
02H U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02JU4110
02J U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02KU4110
02K U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02LU4110
02L U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02MU4110
02M U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02NP0110
02N A/G Pipe Spool Fabrication
28-Dec-26
27-Mar-27
104.0d
0%
CK02PP0110
02P A/G Pipe Spool Fabrication
28-Dec-26
21-Apr-27
83.0d
0%
CK02UU4110
02U U/G Pipe Spool Fabrication (CW & Misc Headers)
28-Dec-26
28-Dec-26
0%
CK02YP0110
02Y A/G Pipe Spool Fabrication
28-Dec-26
29-Jan-27
27.0d
0%
CK03AU4110
03A U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03BU4110
03B U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03CP0110
03C A/G Pipe Spool Fabrication
28-Dec-26
17-Feb-27
137.0d
0%
CK03CU4110
03C U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03DU4110
03D U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03EU4110
03E U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03FU4110
03F U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03YP0110
03Y A/G Pipe Spool Fabrication
28-Dec-26
06-Feb-27
80.0d
0%
CK05AU4110
05A U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CO01AC0120
01A Form, Pour, Strip Fnds - Misc Fnds & Sumps...
28-Dec-26
09-Jan-27
247.0d
0%
CO01BC0120
01B Form, Pour, Strip Fnds - Misc Fnds
28-Dec-26
06-Jan-27
210.0d
0%
CO01BC0140
01B Form Pour Strip Fnds - Sleepers to Evap Pond
28-Dec-26
27-Jan-27
148.0d
0%
CO01BM0130
01B Tank Erection 2001-FA (Water Storage Tank)
28-Dec-26
21-Apr-27
9.0d
0%
CO01BM0140
01B Tank Erection 2001-FB (Water Storage Tank)
28-Dec-26
25-Mar-27
32.0d
0%
CO01DM0130
01D Erect 2101-U Cooling Tower
28-Dec-26
04-May-27
61.0d
0%
CO01GA0110
01G Erect Control Building (Continuation w/ Design Rev)
28-Dec-26
24-Jun-27
-14.0d
0%
CO01HC0110
01H Form, Pour, Strip Piers - Substation Building
28-Dec-26
06-Feb-27
112.0d
0%
CO01YU3110
01Y U/G Earthing Installation - Pipe Rack
28-Dec-26
06-Feb-27
134.0d
0%
CO02AU4120
02A U/G Piping Installation
28-Dec-26
29-Jan-27
222.0d
0%
CO02BU4120
02B U/G Piping Installation
28-Dec-26
29-Jan-27
219.0d
0%
CO02CC0110
02C Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
26-Jan-27
165.0d
0%
CO02CC0150
02C Form, Pour, Strip Fnd - 103/105-J & Table Tops
28-Dec-26
28-Dec-26
0%
CO02CM0110
02C Set Static Equipment - 128/167-C
28-Dec-26
28-Dec-26
0%
CO02CU4120
02C U/G Piping Installation
28-Dec-26
29-Jan-27
162.0d
0%
CO02DC0110
02D Form, Pour, Strip Fnds - Major Fnds
28-Dec-26
09-Jan-27
252.0d
0%
CO02DU4120
02D U/G Piping Installation
28-Dec-26
29-Jan-27
248.0d
0%
CO02EU4120
02E U/G Piping Installation
28-Dec-26
29-Jan-27
227.0d
0%
CO02FC0110
02F Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
234.0d
0%
CO02FU4120
02F U/G Piping Installation
28-Dec-26
29-Jan-27
234.0d
0%
CO02GC0150
02G Form, Pour, Strip Fnd - 101-J/JT & 2ea. Table Tops
28-Dec-26
01-Feb-27
134.0d
0%
CO02GM0140
02G Set/Install - 102-J Fd Gas Compr. & Aux.
28-Dec-26
22-Apr-27
188.0d
0%
CO02HU4120
02H U/G Piping Installation
28-Dec-26
29-Jan-27
162.0d
0%
CO02JU4120
02J U/G Piping Installation
28-Dec-26
29-Jan-27
211.0d
0%
CO02KC0110
02K Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
192.0d
0%
CO02KM0130
02K Tank Erection 114-F (Benfield Solution Tank)
28-Dec-26
08-Jan-27
97.0d
0%
CO02KU4120
02K U/G Piping Installation
28-Dec-26
29-Jan-27
214.0d
0%
CO02LC0110
02L Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
123.0d
0%
CO02LC0140
02L Form Pour Strip Fnds - 02L Structure
28-Dec-26
29-Jan-27
45.0d
0%
CO02MU4120
02M U/G Piping Installation
28-Dec-26
29-Jan-27
239.0d
0%
CO02UP0130
02U LB Pipe Erection (CW & Misc Headers)
28-Dec-26
29-Jan-27
71.0d
0%
CO02UV1110
02U Paint Fabricated Pipe Spools (CW & Misc Headers)
28-Dec-26
28-Dec-26
0%
CO02YU3110
02Y U/G Earthing Installation
28-Dec-26
29-Jan-27
100.0d
0%
CO03AC0110
03A Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
16-Jan-27
155.0d
0%
CO03BC0110
03B Form, Pour, Strip Fnds - Major Fnds (N/A)
28-Dec-26
28-Dec-26
0%
CO03BC0140
03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump
28-Dec-26
30-Dec-26
266.0d
0%
CO03DM0145
03D Tank Erection 2002-F (Demin Water Tank)
28-Dec-26
12-Jan-27
105.0d
0%
CO03DU4120
03D U/G Piping Installation
28-Dec-26
05-Jan-27
199.0d
0%
CO03EC0110
03E Form, Pour, Strip Fnds - 2001-U Water Treatment
28-Dec-26
20-Feb-27
126.0d
0%
CO03FM0110
03F Erect 2002-U Package Boiler
28-Dec-26
13-Mar-27
159.0d
0%
CO03YC0110
03Y Form, Pour, Strip Fnds - Sleeper Fnds
28-Dec-26
01-Jan-27
98.0d
0%
CO03YC0120
03Y Form, Pour, Strip Fnds - Pipe Rack Fnds
28-Dec-26
28-Dec-26
0%
CO04AV1100
04A Paint
28-Dec-26
25-May-27
148.0d
0%
CO05AC0175
05A Test Piles (Load Test)
28-Dec-26
09-Jan-27
-51.0d
0%
P002YS0010
02Y Recv at Site - Structural Steel (First Shipment)
28-Dec-26
28-Dec-26
0%
PO000E0000
Purch/Fab/Deliver - A/G Electrical Bulks (First)
28-Dec-26
10-Apr-27
20.0d
0%
PO000V2000
Purch/Fab/Delv - Insulation Materials
28-Dec-26
15-May-27
98.0d
0%
PO01BS0130
01B Fab & Ship Miscellaneous Steel
28-Dec-26
26-Feb-27
86.0d
0%
PO01DS0120
01D Fab & Ship Structural Steel
28-Dec-26
19-Feb-27
94.0d
0%
PO01DS0130
01D Fab & Ship Miscellaneous Steel
28-Dec-26
19-Feb-27
94.0d
0%
PO01EA0135
01E Guard House Design Drawings - Submit to KBR
28-Dec-26
02-Jan-27
200.0d
0%
PO01FA0135
01F Mosque Design Drawings - Submit to KBR
28-Dec-26
02-Jan-27
143.0d
0%
PO01HS0130
01H Fab & Ship Miscellaneous Steel
28-Dec-26
09-Apr-27
51.0d
0%
PO01YS0120
01Y Fab & Ship Structural Steel
28-Dec-26
29-Jan-27
39.0d
0%
PO02AS0120
02A Fab & Ship Structural Steel
28-Dec-26
09-Apr-27
103.0d
0%
PO02AS0130
02A Fab & Ship Miscellaneous Steel
28-Dec-26
09-Apr-27
115.0d
0%
PO02CS0130
02C Fab & Ship Miscellaneous Steel
28-Dec-26
26-Mar-27
83.0d
0%
PO02DS0120
02D Fab & Ship Structural Steel
28-Dec-26
02-Apr-27
93.0d
0%
PO02DS0130
02D Fab & Ship Miscellaneous Steel
28-Dec-26
02-Apr-27
105.0d
0%
PO02ES0120
02E Fab & Ship Structural Steel
28-Dec-26
16-Apr-27
127.0d
0%
PO02ES0130
02E Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
67.0d
0%
PO02FS0130
02F Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
133.0d
0%
PO02HS0120
02H Fab & Ship Structural Steel
28-Dec-26
26-Mar-27
92.0d
0%
PO02HS0130
02H Fab & Ship Miscellaneous Steel
28-Dec-26
26-Mar-27
78.0d
0%
PO02JS0120
02J Fab & Ship Structural Steel
28-Dec-26
16-Apr-27
98.0d
0%
PO02JS0130
02J Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
110.0d
0%
PO02LS0120
02L Fab & Ship Structural Steel
28-Dec-26
05-Mar-27
-15.0d
0%
PO02LS0130
02L Fab & Ship Miscellaneous Steel
28-Dec-26
05-Mar-27
93.0d
0%
PO02MS0120
02M Fab & Ship Structural Steel
28-Dec-26
19-Mar-27
123.0d
0%
PO02MS0130
02M Fab & Ship Miscellaneous Steel
28-Dec-26
19-Mar-27
147.0d
0%
PO02NMS100
02N Fab & Ship Miscellaneous Steel
28-Dec-26
30-Apr-27
67.0d
0%
PO02QMS100
02Q Fab & Ship Miscellaneous Steel
28-Dec-26
23-Apr-27
121.0d
0%
PO02YS0120
02Y Fab & Ship Structural Steel
28-Dec-26
05-Mar-27
-22.0d
0%
PO03AS0130
03A Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
56.0d
0%
PO03BS0130
03B Fab & Ship Miscellaneous Steel
28-Dec-26
09-Apr-27
169.0d
0%
PO03CS0130
03C Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
87.0d
0%
PO03DS0130
03D Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
98.0d
0%
PO03ES0130
03E Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
58.0d
0%
PO03YS0120
03Y Fab & Ship Structural Steel
28-Dec-26
29-Jan-27
39.0d
0%
WK000P0100
000 A/G Pipe Spool Fabrication
28-Dec-26
31-May-27
49.0d
0%
WO010A0100
010 Buildings
28-Dec-26
24-Jun-27
94.0d
0%
WO010M0100
010 Major Equipment
28-Dec-26
01-Sep-27
54.0d
0%
WO010U3100
010 Install U/G Electrical
28-Dec-26
27-Mar-27
170.0d
0%
WO020M0100
020 Major Equipment
28-Dec-26
16-Aug-27
156.0d
0%
WO020U3100
020 Install U/G Electrical
28-Dec-26
12-Mar-27
265.0d
0%
WO020U4100
020 U/G Piping Installation
28-Dec-26
26-Feb-27
224.0d
0%
WO030M0100
030 Major Equipment
28-Dec-26
26-Apr-27
192.0d
0%
WO030U4100
030 U/G Piping Installation
28-Dec-26
26-Feb-27
229.0d
0%
WO04AV1100
04A Paint
28-Dec-26
25-May-27
148.0d
0%
WO050C0110
050 Concrete Paving
28-Dec-26
28-Dec-26
0.0d
0%
WT010M0100
010 Tank Erection
28-Dec-26
21-Apr-27
9.0d
0%
WT020M0100
020 Tank Erection
28-Dec-26
08-Jan-27
97.0d
0%
WT030M0100
030 Tank Erection
28-Dec-26
12-Jan-27
105.0d
0%
SC01JT0120
01J RFSU
28-Dec-26
28-Dec-26
441.0d
0%
CK01BP0110
01B A/G Pipe Spool Fabrication
31-Dec-26
23-Mar-27
101.0d
0%
CO01AV1110
01A Paint Fabricated Pipe Spools
31-Dec-26
02-Jan-27
253.0d
0%
WO010V1100
010 Paint
31-Dec-26
05-Oct-27
131.0d
0%
CO02HM0200
02H Start Primary Reformer Erection (101-B)
02-Jan-27
02-Jan-27
108.0d
0%
CO02HM0210
02H Erect Radiant Section Shell (101-B)
02-Jan-27
02-Apr-27
108.0d
0%
CO02LU4120
02L U/G Piping Installation
02-Jan-27
29-Jan-27
123.0d
0%
PO03FS0130
03F Fab & Ship Miscellaneous Steel
02-Jan-27
09-Apr-27
88.0d
0%
EK01EA0140
01E Guard House Design Drawings - Approval
03-Jan-27
16-Jan-27
175.0d
0%
EK01FA0140
01F Mosque Design Drawings - Approval
03-Jan-27
16-Jan-27
119.0d
0%
PO01CS0130
01C Fab & Ship Miscellaneous Steel
04-Jan-27
09-Apr-27
106.0d
0%
PO02GS0130
02G Fab & Ship Miscellaneous Steel
04-Jan-27
26-Mar-27
107.0d
0%
CO01UP0150
01U LB Pipe Erection (Firewater Piping)
05-Jan-27
06-Feb-27
212.0d
0%
WO010U4100
010 U/G Piping Installation
05-Jan-27
26-Mar-27
171.0d
0%
CO02GU4120
02G U/G Piping Installation
06-Jan-27
26-Feb-27
159.0d
0%
CO03DC0120
03D Form, Pour, Strip Fnds - Misc Fnds
06-Jan-27
19-Jan-27
199.0d
0%
CK02QP0110
02Q A/G Pipe Spool Fabrication
11-Jan-27
13-Apr-27
90.0d
0%
EK05ACV210
05A COSMO Design Approval (Assuming No Change)
11-Jan-27
16-Jan-27
-51.0d
0%
CO02CM0125
02C Set - 103/105-J Compressors
12-Jan-27
16-Jan-27
167.0d
0%
CO02YS0110
02Y Erect Structural Steel - Pipe Rack
12-Jan-27
14-Jun-27
-35.0d
0%
WO020S0100
020 Erect Steel
12-Jan-27
07-Oct-27
69.0d
0%
CO02HU3110
02H U/G Earthing Installation
13-Jan-27
12-Feb-27
162.0d
0%
CO03YV1110
03Y Paint Fabricated Pipe Spools
13-Jan-27
13-Feb-27
154.0d
0%
WO030V1100
030 Paint
13-Jan-27
23-Aug-27
153.0d
0%
CO02CU3110
02C U/G Earthing Installation
14-Jan-27
12-Feb-27
168.0d
0%
CO03DU3110
03D U/G Earthing Installation
15-Jan-27
19-Jan-27
199.0d
0%
WO030U3100
030 Install U/G Electrical
15-Jan-27
12-Mar-27
229.0d
0%
PO05AS0120
05A Fab & Ship Structural Steel
15-Jan-27
04-Jun-27
23.0d
0%
PO05AS0130
05A Fab & Ship Miscellaneous Steel
15-Jan-27
04-Jun-27
27.0d
0%
CO02HC0120
02H Form, Pour, Strip Fnds - Misc Fnds
16-Jan-27
05-Feb-27
174.0d
0%
CO02LU3110
02L U/G Earthing Installation
16-Jan-27
12-Feb-27
129.0d
0%
CO02UP0150
02U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
CO03UP0150
03U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
CO02CM0130
02C Install - 103/105-J Compressors & Aux. Equip.
18-Jan-27
13-May-27
167.0d
0%
CO05AC0185
05A Procure Material & Mob Piling Contractor
18-Jan-27
30-Jan-27
-51.0d
0%
CO02AU3110
02A U/G Earthing Installation
20-Jan-27
05-Feb-27
228.0d
0%
CO02CV1110
02C Paint Fabricated Pipe Spools
20-Jan-27
27-Feb-27
245.0d
0%
WO020V1100
020 Paint
20-Jan-27
14-Feb-28
23.0d
0%
CO02GC0110
02G Form, Pour, Strip Fnds - Major Fnds Gen'l
23-Jan-27
26-Feb-27
159.0d
0%
CK02CP0110
02C A/G Pipe Spool Fabrication
25-Jan-27
20-Feb-27
134.0d
0%
CO01HU3110
01H U/G Earthing Installation
25-Jan-27
06-Feb-27
134.0d
0%
CO02JU3110
02J U/G Earthing Installation
25-Jan-27
12-Feb-27
211.0d
0%
PO05BS0130
05B Fab & Ship Miscellaneous Steel
25-Jan-27
12-Jun-27
87.0d
0%
CO02BM0110
02B Set Static Equipment
25-Jan-27
25-Jan-27
0%
CO02BV1130
02B Paint Touch-up - Equipment
25-Jan-27
01-Feb-27
300.0d
0%
CO02KU3110
02K U/G Earthing Installation
26-Jan-27
12-Feb-27
214.0d
0%
CO02EU3110
02E U/G Earthing Installation
28-Jan-27
12-Feb-27
227.0d
0%
CO01YV1110
01Y Paint Fabricated Pipe Spools
28-Jan-27
05-Feb-27
149.0d
0%
CO02FU3110
02F U/G Earthing Installation
29-Jan-27
12-Feb-27
234.0d
0%
CO01JP0230
01J U/G Pipe Erection - Piping to Corridor
29-Jan-27
26-Feb-27
160.0d
0%
CO04AU4120
04A U/G Piping Installation
29-Jan-27
09-Aug-27
108.0d
0%
WO04AE0100
04A Above Ground Electrical
29-Jan-27
01-Sep-27
108.0d
0%
WO04AI0100
04A Install Instruments & Test
29-Jan-27
01-Sep-27
108.0d
0%
WO04AM0100
04A Major Equipment
29-Jan-27
01-Sep-27
108.0d
0%
WO04AS0100
04A Erect Steel
29-Jan-27
01-Sep-27
108.0d
0%
WO04AU4100
04A U/G Piping Installation
29-Jan-27
01-Sep-27
108.0d
0%
CO02BC0120
02B Form, Pour, Strip Fnds - Misc Fnds
29-Jan-27
29-Jan-27
0%
PO01YS0000
01Y Recv at Site - Structural Steel
29-Jan-27
29-Jan-27
39.0d
0%
PO03YS0000
03Y Recv at Site - Structural Steel
29-Jan-27
29-Jan-27
39.0d
0%
CO01BU4120
01B U/G Piping Installation
30-Jan-27
10-Mar-27
173.0d
0%
CO01DU4120
01D U/G Piping Installation
30-Jan-27
02-Mar-27
49.0d
0%
CO01EU4130
01E/F/G U/G Piping Installation (to Bldg Stub Outs)
30-Jan-27
26-Mar-27
147.0d
0%
CO02CC0120
02C Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
19-Feb-27
162.0d
0%
CO02DC0120
02D Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
30-Jan-27
260.0d
0%
CO02EC0120
02E Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
227.0d
0%
CO02FC0120
02F Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
234.0d
0%
CO02FM0110
02F Set Static Equipment
30-Jan-27
26-Feb-27
241.0d
0%
CO02JC0120
02J Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
211.0d
0%
CO02KC0120
02K Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
214.0d
0%
CO02LC0120
02L Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
19-Feb-27
123.0d
0%
CO02MC0120
02M Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
239.0d
0%
CO02MU3110
02M U/G Earthing Installation
30-Jan-27
12-Feb-27
239.0d
0%
CO02YC0130
02Y Install Paving
30-Jan-27
17-Mar-27
71.0d
0%
CO03AU4120
03A U/G Piping Installation
30-Jan-27
18-Feb-27
135.0d
0%
CO03BU4120
03B U/G Piping Installation
30-Jan-27
17-Feb-27
237.0d
0%
CO03CU4120
03C U/G Piping Installation
30-Jan-27
18-Feb-27
166.0d
0%
CO03EU4120
03E U/G Piping Installation
30-Jan-27
26-Feb-27
121.0d
0%
CO03FU4120
03F U/G Piping Installation
30-Jan-27
18-Feb-27
155.0d
0%
WO020C0110
020 Concrete Paving
30-Jan-27
22-May-27
210.0d
0%
CO01HC0140
01H Form Pour Strip Fnds - Transformers & Generator
01-Feb-27
27-Feb-27
116.0d
0%
CO03DC0130
03D Install Paving
01-Feb-27
06-Feb-27
189.0d
0%
CO03FM0150
03F Install Chemical Injection System
01-Feb-27
13-Mar-27
159.0d
0%
CO05AC0150
05A Install Piling - 2101-F Ammonia Tank
01-Feb-27
19-Apr-27
-51.0d
0%
CO05AC0155
05A Install Piling - 2102-F Ammonia Tank
01-Feb-27
19-Apr-27
-40.0d
0%
PO000EL000
Electrical Heat Tracing - Purchase & Deliver Materials (By OCI)
01-Feb-27
04-May-27
108.0d
0%
WO030C0110
030 Concrete Paving
01-Feb-27
17-Apr-27
210.0d
0%
WO050C0100
050 Concrete & Excavation
01-Feb-27
30-Jul-27
152.0d
0%
CO02DU3110
02D U/G Earthing Installation
02-Feb-27
12-Feb-27
248.0d
0%
CO01EA0130
01E Erect Guard House
04-Feb-27
03-Mar-27
191.0d
0%
CO01FA0130
01F Erect Mosque
04-Feb-27
28-Apr-27
143.0d
0%
CO02YV1110
02Y Paint Fabricated Pipe Spools
05-Feb-27
19-Feb-27
131.0d
0%
CO01CC0110
01C Form, Pour, Strip Fnds - Major Fnds Gen'l
08-Feb-27
06-Mar-27
117.0d
0%
CO01YC0130
01Y Install Paving
08-Feb-27
27-Feb-27
134.0d
0%
WO010C0110
010 Concrete Paving
08-Feb-27
08-Jul-27
188.0d
0%
CK02GP0110
02G A/G Pipe Spool Fabrication
09-Feb-27
15-Mar-27
115.0d
0%
CO02BU3110
02B U/G Earthing Installation
10-Feb-27
12-Feb-27
289.0d
0%
CK03EP0110
03E A/G Pipe Spool Fabrication
12-Feb-27
02-Mar-27
126.0d
0%
CK03FP0110
03F A/G Pipe Spool Fabrication
12-Feb-27
23-Feb-27
132.0d
0%
CO02EV1110
02E Paint Fabricated Pipe Spools
12-Feb-27
04-Mar-27
250.0d
0%
CO03AC0120
03A Form, Pour, Strip Fnds - Misc Fnds
12-Feb-27
25-Feb-27
141.0d
0%
CO03CV1110
03C Paint Fabricated Pipe Spools
13-Feb-27
24-Feb-27
191.0d
0%
CO02GU3110
02G U/G Earthing Installation
15-Feb-27
12-Mar-27
159.0d
0%
CO02GV1110
02G Paint Fabricated Pipe Spools
16-Feb-27
22-Mar-27
230.0d
0%
CO03BC0120
03B Form, Pour, Strip Fnds - Misc Fnds
18-Feb-27
03-Mar-27
243.0d
0%
CO03CC0120
03C Form, Pour, Strip Fnds - Misc Fnds
19-Feb-27
04-Mar-27
166.0d
0%
CO03EV1110
03E Paint Fabricated Pipe Spools
19-Feb-27
09-Mar-27
171.0d
0%
CO03FC0120
03F Form, Pour, Strip Fnds - Misc Fnds
19-Feb-27
11-Mar-27
155.0d
0%
CO03FV1110
03F Paint Fabricated Pipe Spools
19-Feb-27
02-Mar-27
183.0d
0%
PO01DS0000
01D Recv at Site - Structural Steel
19-Feb-27
19-Feb-27
94.0d
0%
PO01DS0010
01D Recv at Site - Misc Steel
19-Feb-27
19-Feb-27
94.0d
0%
CK03AP0110
03A A/G Pipe Spool Fabrication
20-Feb-27
03-Mar-27
125.0d
0%
CO02CC0130
02C Install Paving
20-Feb-27
05-Mar-27
162.0d
0%
CO02LC0130
02L Install Paving
20-Feb-27
05-Mar-27
123.0d
0%
CO01CU4120
01C U/G Piping Installation
22-Feb-27
06-Mar-27
160.0d
0%
CO02HM0220
02H Erect Radiant Ducting / Burners (101-B)
22-Feb-27
20-Mar-27
151.0d
0%
PO02KS0130
02K Fab & Ship Miscellaneous Steel
22-Feb-27
09-Apr-27
120.0d
0%
CO03BU3110
03B U/G Earthing Installation
23-Feb-27
03-Mar-27
237.0d
0%
CK02JP0110
02J A/G Pipe Spool Fabrication
23-Feb-27
20-Mar-27
111.0d
0%
CO03CU3110
03C U/G Earthing Installation
24-Feb-27
04-Mar-27
166.0d
0%
CO03FU3110
03F U/G Earthing Installation
24-Feb-27
04-Mar-27
161.0d
0%
CO03AU3110
03A U/G Earthing Installation
26-Feb-27
04-Mar-27
135.0d
0%
CO02UDT110
02U Mechanical Completion
26-Feb-27
26-Feb-27
301.0d
0%
CO03UDT110
03U Mechanical Completion
26-Feb-27
26-Feb-27
301.0d
0%
PO01BS0010
01B Recv at Site - Misc Steel
26-Feb-27
26-Feb-27
86.0d
0%
SC02UT0120
02U RFSU
26-Feb-27
26-Feb-27
380.0d
0%
SC03UT0120
03U RFSU
26-Feb-27
26-Feb-27
380.0d
0%
CK03DP0110
03D A/G Pipe Spool Fabrication
27-Feb-27
04-Mar-27
124.0d
0%
CO02GC0120
02G Form, Pour, Strip Fnds - Misc Fnds
27-Feb-27
19-Mar-27
165.0d
0%
CO02GM0110
02G Set Static Equipment - Gen'l
27-Feb-27
31-Mar-27
208.0d
0%
CO03AV1110
03A Paint Fabricated Pipe Spools
27-Feb-27
10-Mar-27
148.0d
0%
CO03EC0120
03E Form, Pour, Strip Fnds - Misc Fnds
27-Feb-27
19-Mar-27
121.0d
0%
CO03EU3110
03E U/G Earthing Installation
27-Feb-27
12-Mar-27
127.0d
0%
CK01CP0110
01C A/G Pipe Spool Fabrication
27-Feb-27
06-Mar-27
123.0d
0%
CO01HC0120
01H Form, Pour, Strip Fnds - Misc Fnds
01-Mar-27
13-Mar-27
176.0d
0%
CO02JS0130
02J Pre-Install Misc Steel - 104-D2
01-Mar-27
15-Mar-27
103.0d
0%
CO02JS0140
02J Pre-Install Misc Steel - 104-D1
01-Mar-27
15-Mar-27
108.0d
0%
CO02LS0130
02L Pre-Install Misc Steel - 101-E
01-Mar-27
15-Mar-27
113.0d
0%
CO03BM0110
03B Set Static Equipment - Gen'l
01-Mar-27
02-Apr-27
212.0d
0%
CO03EM0110
03E Set Static Equipment - Gen'l
01-Mar-27
05-Apr-27
135.0d
0%
CO01DC0110
01D Form, Pour, Strip Fnds - Major Fnds Gen'l
03-Mar-27
13-Apr-27
49.0d
0%
CO01DU3110
01D U/G Earthing Installation
03-Mar-27
17-Mar-27
113.0d
0%
CO01EC0135
01E Install Paving - Guard House
04-Mar-27
17-Mar-27
285.0d
0%
CO03BC0130
03B Install Paving
04-Mar-27
17-Mar-27
237.0d
0%
CO01BU3110
01B U/G Earthing Installation
05-Mar-27
24-Mar-27
173.0d
0%
PO02LS0000
02L Recv at Site - Structural Steel
05-Mar-27
05-Mar-27
-15.0d
0%
PO02LS0010
02L Recv at Site - Misc Steel
05-Mar-27
05-Mar-27
93.0d
0%
PO02YS0000
02Y Recv at Site - Structural Steel (Last Shipment)
05-Mar-27
05-Mar-27
-14.0d
0%
CO01YS0110
01Y Erect Structural Steel - Pipe Rack
06-Mar-27
30-Apr-27
39.0d
0%
CO03DV1110
03D Paint Fabricated Pipe Spools
06-Mar-27
11-Mar-27
172.0d
0%
CO03YS0110
03Y Erect Structural Steel
06-Mar-27
26-Mar-27
39.0d
0%
WO010S0100
010 Erect Steel
06-Mar-27
11-Jun-27
94.0d
0%
WO030S0100
030 Erect Steel
06-Mar-27
25-Jun-27
157.0d
0%
CO01CV1110
01C Paint Fabricated Pipe Spools
06-Mar-27
13-Mar-27
174.0d
0%
CO01BV1110
01B Paint Fabricated Pipe Spools
08-Mar-27
30-Mar-27
153.0d
0%
CO01CC0120
01C Form, Pour, Strip Fnds - Misc Fnds
08-Mar-27
27-Mar-27
160.0d
0%
CO03AC0130
03A Install Paving
08-Mar-27
13-Mar-27
133.0d
0%
CO02GM0125
02G Set - 101-J/JT Air Compr.
08-Mar-27
05-Apr-27
105.0d
0%
CO02AC0120
02A Form, Pour, Strip Fnds - Misc Fnds
10-Mar-27
23-Mar-27
189.0d
0%
CO02AM0150
02A Set Rotating Equipment
10-Mar-27
06-Apr-27
207.0d
0%
CO01DV1110
01D Paint Fabricated Pipe Spools
11-Mar-27
29-Mar-27
142.0d
0%
CO02GC0130
02G Install Paving
13-Mar-27
26-Mar-27
159.0d
0%
CO01CU3110
01C U/G Earthing Installation
15-Mar-27
20-Mar-27
166.0d
0%
CO01GU3110
01G U/G Earthing Installation
15-Mar-27
27-Mar-27
146.0d
0%
CO03CC0130
03C Install Paving
15-Mar-27
20-Mar-27
158.0d
0%
CO02HM0250
02H Set Forced Draft Fan (101-B)
15-Mar-27
12-Apr-27
234.0d
0%
CO03CM0150
03C Set Rotating Equipment
15-Mar-27
22-Mar-27
146.0d
0%
CO03DM0150
03D Set Rotating Equipment
15-Mar-27
29-Mar-27
158.0d
0%
CO02HM0135
02H Give 30 Day notice to Manufacture Refractory (103-D)
16-Mar-27
16-Mar-27
-40.0d
0%
CO03FV1130
03F Paint Touch-up - Equipment
17-Mar-27
27-Mar-27
183.0d
0%
CO02YS0120
02Y Erect Misc Steel - Pipe Rack
19-Mar-27
14-Jun-27
102.0d
0%
PO02MS0000
02M Recv at Site - Structural Steel
19-Mar-27
19-Mar-27
123.0d
0%
PO02MS0010
02M Recv at Site - Misc Steel
19-Mar-27
19-Mar-27
147.0d
0%
CK02MP0110
02M A/G Pipe Spool Fabrication
22-Mar-27
07-Apr-27
95.0d
0%
CO02HM0246
02H Install Radiant Sect Coils (101-B)
22-Mar-27
17-Apr-27
151.0d
0%
CO03FC0130
03F Install Paving
22-Mar-27
03-Apr-27
147.0d
0%
CO02HM0255
02H Set Induced Draft Fan (101-B)
22-Mar-27
19-Apr-27
234.0d
0%
CO02KV1130
02K Paint Touch-up - Equipment
23-Mar-27
15-Apr-27
236.0d
0%
CO02AC0130
02A Install Paving
24-Mar-27
30-Mar-27
189.0d
0%
CO03CV1130
03C Paint Touch-up - Equipment
24-Mar-27
05-Apr-27
195.0d
0%
CO02CM0150
02C Set Rotating Equipment - 112-J/JA/JM
26-Mar-27
30-Mar-27
205.0d
0%
CO02GM0150
02G Set Rotating Equipment
26-Mar-27
10-Apr-27
199.0d
0%
CO02KM0150
02K Set Rotating Equipment
26-Mar-27
01-Apr-27
163.0d
0%
CO02LM0150
02L Set Rotating Equipment
26-Mar-27
27-Apr-27
170.0d
0%
CO03BM0150
03B Set Rotating Equipment
26-Mar-27
15-Apr-27
200.0d
0%
CO01UDT110
01U Mechanical Completion
26-Mar-27
26-Mar-27
277.0d
0%
PO02CS0010
02C Recv at Site - Misc Steel
26-Mar-27
26-Mar-27
83.0d
0%
PO02GS0010
02G Recv at Site - Misc Steel
26-Mar-27
26-Mar-27
107.0d
0%
PO02HS0000
02H Recv at Site - Structural Steel
26-Mar-27
26-Mar-27
92.0d
0%
PO02HS0010
02H Recv at Site - Misc Steel
26-Mar-27
26-Mar-27
78.0d
0%
SC01UT0120
01U RFSU
26-Mar-27
26-Mar-27
352.0d
0%
CO02HS0140
02H Install Misc Steel - 156-F
27-Mar-27
09-Apr-27
102.0d
0%
CO03YP0130
03Y LB Pipe Erection
27-Mar-27
09-Jul-27
39.0d
0%
WO030P0100
030 Above Ground Pipe
27-Mar-27
23-Aug-27
138.0d
0%
CO02JV1110
02J Paint Fabricated Pipe Spools
27-Mar-27
27-Mar-27
164.0d
0%
CK03BP0110
03B A/G Pipe Spool Fabrication
29-Mar-27
08-Apr-27
94.0d
0%
CO01CC0130
01C Install Paving
29-Mar-27
10-Apr-27
160.0d
0%
CO03AM0110
03A Set Static Equipment
29-Mar-27
26-Apr-27
95.0d
0%
CO02AV1130
02A Paint Touch-up - Equipment
30-Mar-27
20-Apr-27
232.0d
0%
CO01BM0110
01B Set Static Equipment
31-Mar-27
27-Apr-27
71.0d
0%
CO02MV1110
02M Paint Fabricated Pipe Spools
01-Apr-27
14-Apr-27
215.0d
0%
CO02NV1110
02N Paint Fabricated Pipe Spools
01-Apr-27
03-Apr-27
216.0d
0%
CO04AU3110
04A U/G Fiber Optic Cable Installation
01-Apr-27
10-Aug-27
137.0d
0%
WO04AU3100
04A Install U/G Electrical
01-Apr-27
10-Aug-27
137.0d
0%
CK02LP0110
02L A/G Pipe Spool Fabrication
02-Apr-27
22-May-27
32.0d
0%
CO02DM0150
02D Set Rotating Equipment
02-Apr-27
15-Apr-27
182.0d
0%
PO02DS0000
02D Recv at Site - Structural Steel
02-Apr-27
02-Apr-27
93.0d
0%
PO02DS0010
02D Recv at Site - Misc Steel
02-Apr-27
02-Apr-27
105.0d
0%
CK02KP0110
02K A/G Pipe Spool Fabrication
03-Apr-27
27-Apr-27
78.0d
0%
CO01BS0120
01B Erect Misc Steel
03-Apr-27
30-Apr-27
86.0d
0%
CO02HC0130
02H Install Paving
03-Apr-27
16-Apr-27
120.0d
0%
CO02HM0230
02H Set Convection Sections (101-B)
03-Apr-27
30-Apr-27
108.0d
0%
CO02HM0240
02H Set Stack for (101-B)
03-Apr-27
30-Apr-27
223.0d
0%
CO03YP0140
03Y SB Pipe Erection
03-Apr-27
16-Jul-27
45.0d
0%
CO02JC0130
02J Install Paving
05-Apr-27
10-Apr-27
168.0d
0%
CO03BV1110
03B Paint Fabricated Pipe Spools
05-Apr-27
15-Apr-27
223.0d
0%
CO03EC0130
03E Install Paving
05-Apr-27
17-Apr-27
108.0d
0%
CO01CM0110
01C Set Static Equipment - EDR Equipment
05-Apr-27
31-May-27
93.0d
0%
CO01CM0115
01C Set Rotating Equipment - EDR Equipment
05-Apr-27
31-May-27
99.0d
0%
CO02GM0130
02G Install - 101-J/JT Air Compr. & Gen. Turb. & Aux.
05-Apr-27
30-Jul-27
105.0d
0%
CO02HS0130
02H Pre-Install Misc Steel - 103-D
05-Apr-27
19-Apr-27
68.0d
0%
CO03DV1130
03D Paint Touch-up - Equipment (& 2002-F Tank)
06-Apr-27
12-Apr-27
189.0d
0%
CO02FV1110
02F Paint Fabricated Pipe Spools
09-Apr-27
27-Apr-27
204.0d
0%
CO02LV1110
02L Paint Fabricated Pipe Spools
09-Apr-27
29-May-27
162.0d
0%
PO01CS0010
01C Recv at Site - Misc Steel
09-Apr-27
09-Apr-27
106.0d
0%
PO01HS0010
01H Recv at Site - Misc Steel
09-Apr-27
09-Apr-27
51.0d
0%
PO02AS0000
02A Recv at Site - Structural Steel
09-Apr-27
09-Apr-27
103.0d
0%
PO02AS0010
02A Recv at Site - Misc Steel
09-Apr-27
09-Apr-27
115.0d
0%
PO02KS0010
02K Recv at Site - Misc Steel
09-Apr-27
09-Apr-27
120.0d
0%
PO03BS0010
03B Recv at Site - Misc Steel
09-Apr-27
09-Apr-27
169.0d
0%
PO03FS0010
03F Recv at Site - Misc Steel
09-Apr-27
09-Apr-27
88.0d
0%
CO02KV1110
02K Paint Fabricated Pipe Spools
10-Apr-27
04-May-27
181.0d
0%
CO02LS0110
02L Erect Structure
10-Apr-27
18-Jun-27
-15.0d
0%
PO000E0010
Receive at Site - A/G Electrical Bulks (First)
10-Apr-27
10-Apr-27
20.0d
0%
CO02KC0130
02K Install Paving
12-Apr-27
17-Apr-27
165.0d
0%
CO01HA0110
01H Set 2610-K Electrical Power House
12-Apr-27
03-May-27
76.0d
0%
CO02YP0130
02Y LB Pipe Erection
13-Apr-27
05-Oct-27
-35.0d
0%
WO020P0100
020 Above Ground Pipe
13-Apr-27
14-Feb-28
-1.0d
0%
CO01DC0120
01D Form, Pour, Strip Fnds - Misc Fnds
14-Apr-27
04-May-27
72.0d
0%
CO01DM0110
01D Set Static Equipment
14-Apr-27
25-May-27
49.0d
0%
CO02DV1130
02D Paint Touch-up - Equipment
15-Apr-27
29-Apr-27
224.0d
0%
CO02FM0150
02F Set Rotating Equipment
16-Apr-27
13-May-27
176.0d
0%
CO02QV1110
02Q Paint Fabricated Pipe Spools
16-Apr-27
20-Apr-27
210.0d
0%
PO02ES0000
02E Recv at Site - Structural Steel
16-Apr-27
16-Apr-27
127.0d
0%
PO02ES0010
02E Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
67.0d
0%
PO02FS0010
02F Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
133.0d
0%
PO02JS0000
02J Recv at Site - Structural Steel
16-Apr-27
16-Apr-27
98.0d
0%
PO02JS0010
02J Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
110.0d
0%
PO03AS0010
03A Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
56.0d
0%
PO03CS0010
03C Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
87.0d
0%
PO03DS0010
03D Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
98.0d
0%
PO03ES0010
03E Recv at Site - Misc Steel
16-Apr-27
16-Apr-27
58.0d
0%
CO020M0110
Mobilize / Assemble / Test Heavy Lift Crane
19-Apr-27
01-May-27
56.0d
0%
CO02EC0130
02E Install Paving
19-Apr-27
24-Apr-27
172.0d
0%
CO02HM0248
02H Install Effluent Transfer Line (107-D)
19-Apr-27
01-May-27
151.0d
0%
CO03BV1130
03B Paint Touch-up - Equipment
19-Apr-27
29-Apr-27
248.0d
0%
CK02HP0110
02H A/G Pipe Spool Fabrication
19-Apr-27
29-May-27
51.0d
0%
CO01HM0110
01H Set Static Equipment - 2303-J Emergency Pwr Gen.
19-Apr-27
31-May-27
86.0d
0%
CO02LS0140
02L Pre-Install Misc Steel - 102-E
19-Apr-27
03-May-27
76.0d
0%
CO05AC0160
05A Form, Pour, Strip Fnd - 2101-F Ammonia Tank
20-Apr-27
16-Jun-27
-51.0d
0%
CO05AC0165
05A Form, Pour, Strip Fnd - 2102-F Ammonia Tank
20-Apr-27
16-Jun-27
-40.0d
0%
CO02DV1110
02D Paint Fabricated Pipe Spools
23-Apr-27
07-May-27
177.0d
0%
CO04AC0110
04A Concrete (Valve Boxes & Paving)
23-Apr-27
23-Aug-27
130.0d
0%
WO04AC0100
04A Concrete (Valve Boxes & Paving)
23-Apr-27
23-Aug-27
130.0d
0%
PO02QMS110
02Q Recv at Site - Misc Steel
23-Apr-27
23-Apr-27
121.0d
0%
CO01YS0120
01Y Erect Misc Steel - Pipe Rack
24-Apr-27
21-May-27
39.0d
0%
CO02MS0110
02M Erect Structural Steel - Structure
24-Apr-27
14-May-27
123.0d
0%
CO02PV1110
02P Paint Fabricated Pipe Spools
24-Apr-27
28-Apr-27
199.0d
0%
CO02FC0130
02F Install Paving
26-Apr-27
01-May-27
173.0d
0%
CO02HV1110
02H Paint Fabricated Pipe Spools
26-Apr-27
05-Jun-27
54.0d
0%
CK05AP0110
05A A/G Pipe Spool Fabrication
28-Apr-27
31-May-27
49.0d
0%
CO04AU4130
04A Punchlist / Test U/G Piping
28-Apr-27
01-Sep-27
108.0d
0%
CO01FC0135
01F Install Paving - Mosque
29-Apr-27
19-May-27
203.0d
0%
PO02NMS110
02N Recv at Site - Misc Steel
30-Apr-27
30-Apr-27
67.0d
0%
CO01BM0150
01B Set Rotating Equipment
01-May-27
11-Jun-27
32.0d
0%
CO01DM0150
01D Set Rotating Equipment
01-May-27
11-Jun-27
34.0d
0%
CO01YP0130
01Y LB Pipe Erection - Pipe Rack
01-May-27
25-Jun-27
39.0d
0%
CO02CS0120
02C Erect Misc. Steel (Platforms)
01-May-27
02-Aug-27
83.0d
0%
CO02GS0130
02G Erect Misc. Steel (Platforms)
01-May-27
02-Aug-27
107.0d
0%
CO02HM0235
02H Erect Preheater (101-B)
01-May-27
25-Jun-27
175.0d
0%
WO010P0100
010 Above Ground Pipe
01-May-27
05-Oct-27
95.0d
0%
CO020M0120
Heavy Lift Crane Useage
03-May-27
04-Aug-27
56.0d
0%
CO02HM0130
02H Set (Heavy Lift) - 103-D (Secondary Reformer)
03-May-27
07-May-27
56.0d
0%
CO02HM0225
02H Erect Penthouse Roof, & Siding (101-B)
03-May-27
29-May-27
151.0d
0%
CO02MC0130
02M Install Paving
03-May-27
08-May-27
172.0d
0%
CO02KS0130
02K Pre-Install Misc Steel - Static Equipment
03-May-27
17-May-27
101.0d
0%
CO02GP0130
02G LB Pipe Erection
04-May-27
10-Sep-27
105.0d
0%
CK02AP0110
02A A/G Pipe Spool Fabrication
05-May-27
26-May-27
53.0d
0%
CO000E0500
Cathodic Protection - Installation
05-May-27
17-Oct-27
6.0d
0%
CO01DC0130
01D Install Paving
05-May-27
18-May-27
72.0d
0%
CO01DS0120
01D Erect Misc Steel
05-May-27
01-Jun-27
61.0d
0%
CO05AV1110
05A Paint Fabricated Pipe Spools
05-May-27
07-Jun-27
166.0d
0%
WO050V1100
050 Paint
05-May-27
12-Apr-28
12.0d
0%
WP000U3100
Cathodic Protection
05-May-27
17-Oct-27
6.0d
0%
CO02CP0130
02C LB Pipe Erection
08-May-27
08-Oct-27
83.0d
0%
CO02DS0110
02D Erect Structural Steel
08-May-27
28-May-27
93.0d
0%
CO02JM0130
02J Set (Heavy Lift) - 104-D2 (Low Temp Shift Converter)
08-May-27
13-May-27
56.0d
0%
CO02LS0120
02L Erect Misc Steel
08-May-27
04-Jun-27
39.0d
0%
CO02DC0130
02D Install Paving
10-May-27
15-May-27
175.0d
0%
CO02FV1130
02F Paint Touch-up - Equipment
10-May-27
27-May-27
200.0d
0%
CO02MS0130
02M Pre-Install Misc Steel - 105-D
10-May-27
24-May-27
63.0d
0%
CO02YP0140
02Y SB Pipe Erection
11-May-27
02-Nov-27
-29.0d
0%
CO05AC0120
05A Form, Pour, Strip Fnds - Sleeper & Rack
11-May-27
14-Jun-27
44.0d
0%
CO02GP0140
02G SB Pipe Erection
11-May-27
25-Sep-27
105.0d
0%
CO04AV2110
04A Insulation
12-May-27
28-Sep-27
108.0d
0%
WO04AV2100
04A Insulation
12-May-27
28-Sep-27
108.0d
0%
CO05AU4120
05A U/G Piping Installation
13-May-27
07-Jul-27
77.0d
0%
WO050U4100
050 U/G Piping Installation
13-May-27
30-Sep-27
135.0d
0%
CO02CV1130
02C Paint Touch-up - Equipment
14-May-27
22-Jun-27
190.0d
0%
CO02JM0140
02J Set (Heavy Lift) - 104-D1 (High Temp Shift Converter)
14-May-27
19-May-27
56.0d
0%
CO01CS0120
01C Erect Misc Steel
15-May-27
28-May-27
106.0d
0%
CO01HS0110
01H Erect Structural Steel - Stairs & Platform
15-May-27
11-Jun-27
51.0d
0%
CO02AS0110
02A Erect Structural Steel
15-May-27
04-Jun-27
103.0d
0%
CO02CP0140
02C SB Pipe Erection
15-May-27
15-Oct-27
83.0d
0%
CO02MM0110
02M Set Static Equipment - Gen'l
15-May-27
16-Jun-27
147.0d
0%
CO03BS0120
03B Erect Misc Steel - Structure
15-May-27
11-Jun-27
169.0d
0%
CO03FS0120
03F Erect Misc Steel
15-May-27
25-Jun-27
88.0d
0%
PO000V2005
Receive at Site - Insulation Materials
15-May-27
15-May-27
98.0d
0%
CO01BE0110
01B Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO01EE0110
01E Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
180.0d
0%
CO01FE0110
01F Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
152.0d
0%
CO01GE0130
01G Power Tray, Cable, Terminations
17-May-27
12-Jun-27
92.0d
0%
CO02BC0130
02B Install Paving
17-May-27
22-May-27
210.0d
0%
CO03CE0110
03C Lighting JB's, Stands, Tray & Cable
17-May-27
12-Jun-27
123.0d
0%
CO03DE0110
03D Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO03DE0130
03D Power/Control JB's, Tray, Cable, Termination
17-May-27
04-Jun-27
131.0d
0%
CO03EE0110
03E Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO03FE0110
03F Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
111.0d
0%
CO03YE0110
03Y Lighting JB's, Stands, Tray & Cable
17-May-27
07-Aug-27
162.0d
0%
CO03YE0130
03Y Power/Control JB's, Tray, Cable, Termination
17-May-27
07-Aug-27
32.0d
0%
CO03YI0120
03Y Instrument JB's, Field Instr, Tray, Cable
17-May-27
07-Aug-27
32.0d
0%
WO010E0100
010 Above Ground Electrical
17-May-27
05-Oct-27
131.0d
0%
WO030E0100
030 Above Ground Electrical
17-May-27
23-Aug-27
153.0d
0%
WO030I0100
030 Install Instruments & Test
17-May-27
17-Jan-28
41.0d
0%
CO02KM0110
02K Set Static Equipment - Gen'l
17-May-27
07-Jun-27
101.0d
0%
CO04AK0110
04A Site Prep (Leveling)
19-May-27
05-Oct-27
108.0d
0%
WO04AK0100
04A Site Prep (Leveling)
19-May-27
05-Oct-27
108.0d
0%
CO02AV1110
02A Paint Fabricated Pipe Spools
20-May-27
02-Jun-27
172.0d
0%
CO02LM0130
02L Set (Heavy Lift) - 101-E (CO2 Absorber)
20-May-27
25-May-27
56.0d
0%
CK05BP0110
05B A/G Pipe Spool Fabrication
22-May-27
31-May-27
49.0d
0%
CO01YE0110
01Y Lighting JB's, Stands, Tray & Cable
22-May-27
02-Jul-27
175.0d
0%
CO02ES0110
02E Erect Structural Steel
22-May-27
11-Jun-27
127.0d
0%
CO02ES0120
02E Erect Misc Steel
22-May-27
11-Jun-27
67.0d
0%
CO02FS0120
02F Erect Misc Steel
22-May-27
11-Jun-27
133.0d
0%
CO02JS0110
02J Erect Structural Steel - Structure
22-May-27
04-Jun-27
98.0d
0%
CO02MS0120
02M Erect Misc Steel - Structure
22-May-27
11-Jun-27
123.0d
0%
CO03AS0120
03A Erect Misc Steel - Structure
22-May-27
18-Jun-27
56.0d
0%
CO03CS0120
03C Erect Misc Steel
22-May-27
11-Jun-27
87.0d
0%
CO03DS0120
03D Erect Misc Steel
22-May-27
18-Jun-27
98.0d
0%
CO03ES0120
03E Erect Misc Steel - Structure
22-May-27
18-Jun-27
58.0d
0%
CO02BV1110
02B Paint Fabricated Pipe Spools
25-May-27
31-May-27
175.0d
0%
CO03FP0130
03F LB Pipe Erection
25-May-27
02-Jul-27
88.0d
0%
CO02LM0140
02L Set (Heavy Lift) - 102-E (CO2 Stripper)
26-May-27
31-May-27
56.0d
0%
CO02GE0130
02G Power/Control JB's, Tray, Cable, Termination
26-May-27
02-Oct-27
108.0d
0%
CO02GI0120
02G Instrument JB's, Field Instr, Tray, Cable
26-May-27
02-Oct-27
108.0d
0%
WO020E0100
020 Above Ground Electrical
26-May-27
14-Feb-28
23.0d
0%
WO020I0100
020 Install Instruments & Test
26-May-27
01-Mar-28
9.0d
0%
CO02CV2110
02C Insulate - Equipment
28-May-27
06-Jul-27
190.0d
0%
WO020V2100
020 Insulation
28-May-27
13-Mar-28
-1.0d
0%
CO01CE0110
01C Lighting JB's, Stands, Tray & Cable
29-May-27
18-Jun-27
124.0d
0%
CO01YP0140
01Y SB Pipe Erection - Pipe Rack
29-May-27
23-Jul-27
39.0d
0%
CO02DM0110
02D Set Static Equipment
29-May-27
11-Jun-27
133.0d
0%
CO02DS0120
02D Erect Misc Steel
29-May-27
18-Jun-27
93.0d
0%
CO02EP0130
02E LB Pipe Erection
29-May-27
06-Nov-27
67.0d
0%
CO02HM0260
02H Compete Installation of Ducts (101-B)
29-May-27
23-Jul-27
175.0d
0%
CO03AP0130
03A LB Pipe Erection
29-May-27
07-Jul-27
56.0d
0%
CO03CP0130
03C LB Pipe Erection
29-May-27
07-Jul-27
87.0d
0%
CO03EP0130
03E LB Pipe Erection
29-May-27
30-Jul-27
58.0d
0%
CO03YV1120
03Y Paint Touch-up - Piping
29-May-27
23-Jul-27
175.0d
0%
CO05BV1110
05B Paint Fabricated Pipe Spools
29-May-27
07-Jun-27
214.0d
0%
CO02HM0215
02H Erect Fuel Gas Lines (101-B)
31-May-27
26-Jun-27
151.0d
0%
CO02HM0227
02H Install Spring Hangers & Align (101-B)
31-May-27
10-Jul-27
186.0d
0%
CO02HM0245
02H Install Insulation (101-B)
31-May-27
24-Jul-27
174.0d
0%
CO01CA0110
01C Erect - EDR Shelter
31-May-27
21-Jun-27
98.0d
0%
CO01AK0150
01A Excavate Evaporation Pond
01-Jun-27
12-Jul-27
54.0d
0%
CO02CE0130
02C Power/Control JB's, Tray, Cable, Termination
01-Jun-27
22-Oct-27
88.0d
0%
CO02CI0120
02C Instrument JB's, Field Instr, Tray, Cable
01-Jun-27
22-Oct-27
88.0d
0%
CO02JM0110
02J Set Static Equipment - Gen'l
01-Jun-27
11-Jun-27
98.0d
0%
CO02MM0130
02M Set (Heavy Lift) - 105-D (Ammonia Converter)
01-Jun-27
05-Jun-27
56.0d
0%
CO03FP0140
03F SB Pipe Erection
01-Jun-27
09-Jul-27
88.0d
0%
WO010K0100
010 Site Prep
01-Jun-27
28-Jan-28
37.0d
0%
CO01DE0110
01D Lighting JB's, Stands, Tray & Cable
02-Jun-27
13-Jul-27
66.0d
0%
CO03YP0150
03Y Punchlist / Test Piping
02-Jun-27
23-Jul-27
139.0d
0%
CO01BV1130
01B Paint Touch-up - Equipment
03-Jun-27
25-Jun-27
100.0d
0%
PO05AS0000
05A Recv at Site - Structural Steel
04-Jun-27
04-Jun-27
23.0d
0%
PO05AS0010
05A Recv at Site - Misc Steel
04-Jun-27
04-Jun-27
27.0d
0%
CO02AM0110
02A Set Static Equipment
05-Jun-27
18-Jun-27
144.0d
0%
CO02JS0120
02J Erect Misc Steel - Structure
05-Jun-27
11-Jun-27
98.0d
0%
CO02LE0110
02L Lighting JB's, Stands, Tray & Cable
05-Jun-27
16-Jul-27
163.0d
0%
CO03AP0140
03A SB Pipe Erection
05-Jun-27
14-Jul-27
56.0d
0%
CO03CP0140
03C SB Pipe Erection
05-Jun-27
14-Jul-27
87.0d
0%
CO03EP0140
03E SB Pipe Erection
05-Jun-27
06-Aug-27
58.0d
0%
CO03FV2110
03F Insulate - Equipment
05-Jun-27
19-Jun-27
135.0d
0%
WO030V2100
030 Insulation
05-Jun-27
02-Oct-27
133.0d
0%
CO02FV2110
02F Insulate - Equipment
07-Jun-27
24-Jun-27
200.0d
0%
CO02MM0140
02M Set (Heavy Lift) - 121-C (Ammonia Conv./ Effl Exch.)
07-Jun-27
11-Jun-27
56.0d
0%
CO03DP0130
03D LB Pipe Erection
07-Jun-27
25-Jun-27
98.0d
0%
CO01CP0130
01C LB Pipe Erection
07-Jun-27
28-Jun-27
93.0d
0%
CO02KS0120
02K Erect Misc Steel
07-Jun-27
28-Jun-27
101.0d
0%
CO01DV1130
01D Paint Touch-up - Equipment
08-Jun-27
25-Jun-27
88.0d
0%
CO03FE0130
03F Power/Control JB's, Tray, Cable, Termination
08-Jun-27
16-Jul-27
97.0d
0%
CO03FI0120
03F Instrument JB's, Field Instr, Tray, Cable
08-Jun-27
16-Jul-27
97.0d
0%
CO02KV2110
02K Insulate - Equipment
10-Jun-27
05-Jul-27
192.0d
0%
CO01BP0130
01B LB Pipe Erection
12-Jun-27
21-Sep-27
32.0d
0%
CO01DP0130
01D LB Pipe Erection
12-Jun-27
13-Aug-27
34.0d
0%
CO01HE0110
01H Lighting JB's, Stands, Tray & Cable
12-Jun-27
02-Jul-27
69.0d
0%
CO02AS0120
02A Erect Misc Steel
12-Jun-27
02-Jul-27
103.0d
0%
CO02BE0110
02B Lighting JB's, Stands, Tray & Cable
12-Jun-27
25-Jun-27
193.0d
0%
CO02EE0110
02E Lighting JB's, Stands, Tray & Cable
12-Jun-27
09-Jul-27
175.0d
0%
CO02EM0110
02E Set Static Equipment
12-Jun-27
09-Jul-27
127.0d
0%
CO02FE0110
02F Lighting JB's, Stands, Tray & Cable
12-Jun-27
09-Jul-27
175.0d
0%
CO02JE0110
02J Lighting JB's, Stands, Tray & Cable
12-Jun-27
23-Jul-27
157.0d
0%
CO02JP0130
02J LB Pipe Erection
12-Jun-27
27-Sep-27
98.0d
0%
CO02ME0110
02M Lighting JB's, Stands, Tray & Cable
12-Jun-27
09-Jul-27
175.0d
0%
CO02MV1130
02M Paint Touch-up - Equipment
12-Jun-27
29-Jun-27
172.0d
0%
CO02NM0110
02N Set (Heavy Lift) - 120-C (Ammonia Unitized Chiller)
12-Jun-27
17-Jun-27
56.0d
0%
CO03AE0130
03A Power/Control JB's, Tray, Cable, Termination
12-Jun-27
21-Jul-27
56.0d
0%
CO03AI0120
03A Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
21-Jul-27
56.0d
0%
CO03BE0110
03B Lighting JB's, Stands, Tray & Cable
12-Jun-27
02-Jul-27
187.0d
0%
CO03CE0130
03C Power/Control JB's, Tray, Cable, Termination
12-Jun-27
21-Jul-27
87.0d
0%
CO03CI0120
03C Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
21-Jul-27
87.0d
0%
CO03EE0130
03E Power/Control JB's, Tray, Cable, Termination
12-Jun-27
13-Aug-27
61.0d
0%
CO03EI0120
03E Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
13-Aug-27
61.0d
0%
PO05BS0010
05B Recv at Site - Misc Steel
12-Jun-27
12-Jun-27
87.0d
0%
CO02BV2110
02B Insulate - Equipment
14-Jun-27
19-Jun-27
204.0d
0%
CO03CE0120
03C Lighting Fixture Installation/Termination
14-Jun-27
26-Jun-27
123.0d
0%
CO01CP0140
01C SB Pipe Erection
14-Jun-27
05-Jul-27
93.0d
0%
CO02PM0110
02P Set 101-U Dearator
15-Jun-27
28-Jun-27
103.0d
0%
CO02QM0110
02Q Set 101-F Steam Drum
15-Jun-27
21-Jun-27
101.0d
0%
CO05BC0110
05B Form, Pour, Strip Fnds - Sleepers
15-Jun-27
30-Jul-27
152.0d
0%
CO03DP0140
03D SB Pipe Erection
15-Jun-27
05-Jul-27
97.0d
0%
CO05AC0110
05A Form, Pour, Strip Fnds - Major Fnds Gen'l
17-Jun-27
07-Jul-27
77.0d
0%
CO05AU3110
05A U/G Earthing Installation
17-Jun-27
14-Jul-27
77.0d
0%
CO05UP0150
05U LB Pipe Erection (Firewater Piping)
17-Jun-27
30-Sep-27
135.0d
0%
WO050U3100
050 Install U/G Electrical
17-Jun-27
14-Jul-27
77.0d
0%
CO02NS0120
02N Erect Misc Steel
18-Jun-27
22-Jul-27
56.0d
0%
CO01BP0140
01B SB Pipe Erection
19-Jun-27
28-Sep-27
32.0d
0%
CO01CE0120
01C Lighting Fixture Installation/Termination
19-Jun-27
25-Jun-27
124.0d
0%
CO01DP0140
01D SB Pipe Erection
19-Jun-27
27-Aug-27
34.0d
0%
CO01HE0140
01H Set Transformers TR-100/ 103/ 104/ 105
19-Jun-27
02-Jul-27
33.0d
0%
CO01YE0130
01Y Power/Control JB's, Tray, Cable, Termination
19-Jun-27
30-Jul-27
39.0d
0%
CO01YI0120
01Y Instrument JB's, Field Instr, Tray, Cable
19-Jun-27
30-Jul-27
39.0d
0%
CO01YV1120
01Y Paint Touch-up - Piping
19-Jun-27
30-Jul-27
169.0d
0%
CO02DE0110
02D Lighting JB's, Stands, Tray & Cable
19-Jun-27
16-Jul-27
169.0d
0%
CO02JP0140
02J SB Pipe Erection
19-Jun-27
04-Oct-27
98.0d
0%
CO02LM0110
02L Set Static Equipment - Gen'l
19-Jun-27
21-Jul-27
103.0d
0%
CO02LM0120
02L Set Static Equipment - 02L Structure
19-Jun-27
30-Jul-27
-15.0d
0%
CO03AE0110
03A Lighting JB's, Stands, Tray & Cable
19-Jun-27
09-Jul-27
75.0d
0%
WO010I0100
010 Install Instruments & Test
19-Jun-27
03-Jan-28
53.0d
0%
CO01CE0130
01C Power/Control JB's, Tray, Cable, Termination
21-Jun-27
12-Jul-27
100.0d
0%
CO01CI0120
01C Instrument JB's, Field Instr, Tray, Cable
21-Jun-27
12-Jul-27
100.0d
0%
CO01CV1120
01C Paint Touch-up - Piping
21-Jun-27
12-Jul-27
93.0d
0%
CO01CV1130
01C Paint Touch-up - Equipment
21-Jun-27
12-Jul-27
93.0d
0%
CO02QS0120
02Q Erect Misc Steel
22-Jun-27
12-Jul-27
101.0d
0%
CO03DI0120
03D Instrument JB's, Field Instr, Tray, Cable
22-Jun-27
12-Jul-27
100.0d
0%
CO01GC0130
01G Install Paving - Control Building
25-Jun-27
08-Jul-27
70.0d
0%
CO01GE0110
01G Lighting JB's, Stands, Tray & Cable
25-Jun-27
05-Aug-27
28.0d
0%
CO01GE0140
01G Install UPS in Control Building
25-Jun-27
15-Jul-27
-8.0d
0%
CO01GI0150
01G Install DCS
25-Jun-27
25-Aug-27
-14.0d
0%
CO02AV2110
02A Insulate - Equipment
25-Jun-27
16-Jul-27
181.0d
0%
CO02DV2110
02D Insulate - Equipment
25-Jun-27
09-Jul-27
187.0d
0%
CO02NP0130
02N LB Pipe Erection
25-Jun-27
10-Nov-27
56.0d
0%
CO01BE0130
01B Power/Control JB's, Tray, Cable, Termination
26-Jun-27
05-Oct-27
32.0d
0%
CO01BI0120
01B Instrument JB's, Field Instr, Tray, Cable
26-Jun-27
05-Oct-27
32.0d
0%
CO01DE0130
01D Power/Control JB's, Tray, Cable, Termination
26-Jun-27
10-Sep-27
39.0d
0%
CO01DI0120
01D Instrument JB's, Field Instr, Tray, Cable
26-Jun-27
10-Sep-27
39.0d
0%
CO02BE0120
02B Lighting Fixture Installation/Termination
26-Jun-27
02-Jul-27
193.0d
0%
CO01BE0120
01B Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO01EE0120
01E Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
180.0d
0%
CO01FE0120
01F Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
152.0d
0%
CO02MP0130
02M LB Pipe Erection
28-Jun-27
08-Oct-27
92.0d
0%
CO03BP0130
03B LB Pipe Erection
28-Jun-27
04-Aug-27
138.0d
0%
CO03DE0120
03D Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO03EE0120
03E Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO03FE0120
03F Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
111.0d
0%
CO03FP0150
03F Punchlist / Test Piping
28-Jun-27
16-Jul-27
88.0d
0%
CO02KE0110
02K Lighting JB's, Stands, Tray & Cable
28-Jun-27
09-Aug-27
144.0d
0%
CO02PS0120
02P Erect Misc Steel
29-Jun-27
26-Jul-27
103.0d
0%
CO02QP0130
02Q LB Pipe Erection
29-Jun-27
28-Sep-27
101.0d
0%
CO02YE0110
02Y Lighting JB's, Stands, Tray & Cable
29-Jun-27
12-Oct-27
90.0d
0%
CO03YV2120
03Y Insulate - Piping
30-Jun-27
03-Sep-27
148.0d
0%
CO01BV2110
01B Insulate - Equipment
01-Jul-27
23-Jul-27
100.0d
0%
CO05AM0145
05A Tank Erection 2101-F (Ammonia Storage Tank)
01-Jul-27
25-Feb-28
-51.0d
0%
WO010V2100
010 Insulation
01-Jul-27
02-Nov-27
107.0d
0%
WT050M0100
05A Tank Erection
01-Jul-27
09-Mar-28
-51.0d
0%
CO01CP0150
01C Punchlist / Test Piping
01-Jul-27
12-Jul-27
96.0d
0%
CO02JE0130
02J Power/Control JB's, Tray, Cable, Termination
02-Jul-27
11-Oct-27
98.0d
0%
CO02JI0120
02J Instrument JB's, Field Instr, Tray, Cable
02-Jul-27
11-Oct-27
98.0d
0%
CO03AP0150
03A Punchlist / Test Piping
02-Jul-27
21-Jul-27
62.0d
0%
CO03CP0150
03C Punchlist / Test Piping
02-Jul-27
21-Jul-27
87.0d
0%
CO03DP0150
03D Punchlist / Test Piping
02-Jul-27
12-Jul-27
97.0d
0%
CO01HE0120
01H Lighting Fixture Installation/Termination
03-Jul-27
16-Jul-27
69.0d
0%
CO01HE0130
01H Power/Control JB's, Tray, Cable, Termination
03-Jul-27
10-Sep-27
33.0d
0%
CO01YE0120
01Y Lighting Fixture Installation/Termination
03-Jul-27
23-Jul-27
175.0d
0%
CO01YP0150
01Y Punchlist / Test Piping - Pipe Rack
03-Jul-27
30-Jul-27
133.0d
0%
CO02AE0110
02A Lighting JB's, Stands, Tray & Cable
03-Jul-27
30-Jul-27
157.0d
0%
CO02EV1130
02E Paint Touch-up - Equipment
03-Jul-27
23-Jul-27
151.0d
0%
CO03BE0120
03B Lighting Fixture Installation/Termination
03-Jul-27
09-Jul-27
187.0d
0%
CO02FP0130
02F LB Pipe Erection
05-Jul-27
27-Sep-27
102.0d
0%
CO03BP0140
03B SB Pipe Erection
05-Jul-27
11-Aug-27
138.0d
0%
CO01DV2110
01D Insulate - Equipment
06-Jul-27
23-Jul-27
88.0d
0%
CO02GE0110
02G Lighting JB's, Stands, Tray & Cable
06-Jul-27
18-Aug-27
149.0d
0%
CO02PP0130
02P LB Pipe Erection
06-Jul-27
21-Sep-27
103.0d
0%
CO03FV1120
03F Paint Touch-up - Piping
06-Jul-27
16-Jul-27
112.0d
0%
CO03DV1120
03D Paint Touch-up - Piping
06-Jul-27
12-Jul-27
111.0d
0%
CO01CV2120
01C Insulate - Piping
08-Jul-27
29-Jul-27
96.0d
0%
CO05AS0110
05A Erect Structural Steel - Structure
09-Jul-27
21-Jul-27
23.0d
0%
WO050S0100
050 Erect Steel
09-Jul-27
13-Aug-27
23.0d
0%
CO02EE0120
02E Lighting Fixture Installation/Termination
10-Jul-27
23-Jul-27
175.0d
0%
CO02FE0120
02F Lighting Fixture Installation/Termination
10-Jul-27
23-Jul-27
175.0d
0%
CO02ME0120
02M Lighting Fixture Installation/Termination
10-Jul-27
23-Jul-27
175.0d
0%
CO02MV2110
02M Insulate - Equipment
10-Jul-27
27-Jul-27
172.0d
0%
CO03AE0120
03A Lighting Fixture Installation/Termination
10-Jul-27
16-Jul-27
75.0d
0%
CO03AV1120
03A Paint Touch-up - Piping
10-Jul-27
21-Jul-27
58.0d
0%
CO03AV1130
03A Paint Touch-up - Equipment
10-Jul-27
21-Jul-27
58.0d
0%
CO03CV1120
03C Paint Touch-up - Piping
10-Jul-27
21-Jul-27
102.0d
0%
CO02DP0130
02D LB Pipe Erection
12-Jul-27
22-Oct-27
62.0d
0%
CO02FP0140
02F SB Pipe Erection
12-Jul-27
04-Oct-27
102.0d
0%
CO03BE0130
03B Power/Control JB's, Tray, Cable, Termination
12-Jul-27
23-Aug-27
138.0d
0%
CO03BI0120
03B Instrument JB's, Field Instr, Tray, Cable
12-Jul-27
23-Aug-27
138.0d
0%
CO01CI0130
01C Install In Line Instruments
12-Jul-27
15-Jul-27
96.0d
0%
CO01CV2110
01C Insulate - Equipment
12-Jul-27
02-Aug-27
93.0d
0%
CO02KP0130
02K LB Pipe Erection
12-Jul-27
23-Oct-27
77.0d
0%
CO03DI0130
03D Install In Line Instruments
12-Jul-27
14-Jul-27
97.0d
0%
CO01AE0110
01A Lighting JB's, Stands, Tray & Cable
13-Jul-27
26-Jul-27
91.0d
0%
CO01AK0160
01A Install Liner at Evaporation Pond
13-Jul-27
18-Aug-27
54.0d
0%
CO01JC0150
01K Excavate Pond
13-Jul-27
09-Aug-27
55.0d
0%
CO02QE0110
02Q Lighting JB's, Stands, Tray & Cable
13-Jul-27
19-Jul-27
162.0d
0%
CO01DE0120
01D Lighting Fixture Installation/Termination
14-Jul-27
03-Aug-27
66.0d
0%
CO03EP0150
03E Punchlist / Test Piping
14-Jul-27
13-Aug-27
58.0d
0%
CO05AM0155
05A Tank Erection 2102-F (Ammonia Storage Tank)
14-Jul-27
09-Mar-28
-51.0d
0%
CO03AV2120
03A Insulate - Piping
16-Jul-27
30-Jul-27
63.0d
0%
CO02GP0150
02G Punchlist / Test Piping
16-Jul-27
02-Oct-27
105.0d
0%
CO02DE0120
02D Lighting Fixture Installation/Termination
17-Jul-27
30-Jul-27
169.0d
0%
CO02LE0120
02L Lighting Fixture Installation/Termination
17-Jul-27
06-Aug-27
163.0d
0%
CO02LP0130
02L LB Pipe Erection
17-Jul-27
31-Jan-28
-15.0d
0%
CO02LV1130
02L Paint Touch-up - Equipment
17-Jul-27
28-Sep-27
69.0d
0%
CO03FI0130
03F Install In Line Instruments
17-Jul-27
20-Jul-27
97.0d
0%
CO01ET0110
01E Mechanical Completion
17-Jul-27
17-Jul-27
180.0d
0%
CO01FT0110
01F Mechanical Completion
17-Jul-27
17-Jul-27
152.0d
0%
SC01ET0120
01E RFSU
17-Jul-27
17-Jul-27
239.0d
0%
SC01FT0120
01F RFSU
17-Jul-27
17-Jul-27
239.0d
0%
CO02AP0130
02A LB Pipe Erection
19-Jul-27
23-Oct-27
78.0d
0%
CO02BP0130
02B LB Pipe Erection
19-Jul-27
16-Aug-27
120.0d
0%
CO02KP0140
02K SB Pipe Erection
19-Jul-27
30-Oct-27
77.0d
0%
CO02QE0120
02Q Lighting Fixture Installation/Termination
20-Jul-27
26-Jul-27
173.0d
0%
CO02YE0130
02Y Power/Control JB's, Tray, Cable, Termination
20-Jul-27
16-Nov-27
-35.0d
0%
CO02YI0120
02Y Instrument JB's, Field Instr, Tray, Cable
20-Jul-27
16-Nov-27
-35.0d
0%
CO02FE0130
02F Power/Control JB's, Tray, Cable, Termination
22-Jul-27
11-Oct-27
104.0d
0%
CO02FI0120
02F Instrument JB's, Field Instr, Tray, Cable
22-Jul-27
11-Oct-27
104.0d
0%
CO03AI0130
03A Install In Line Instruments
22-Jul-27
24-Jul-27
62.0d
0%
CO03AV2110
03A Insulate - Equipment
22-Jul-27
05-Aug-27
58.0d
0%
CO03CI0130
03C Install In Line Instruments
22-Jul-27
24-Jul-27
87.0d
0%
CO02NE0110
02N Lighting JB's, Stands, Tray & Cable
23-Jul-27
12-Aug-27
152.0d
0%
CO02NV1130
02N Paint Touch-up - Equipment
23-Jul-27
29-Jul-27
146.0d
0%
CO02JE0120
02J Lighting Fixture Installation/Termination
24-Jul-27
13-Aug-27
157.0d
0%
CO02LP0140
02L SB Pipe Erection
24-Jul-27
07-Feb-28
-15.0d
0%
CO03YI0130
03Y Install In Line Instruments
24-Jul-27
27-Aug-27
139.0d
0%
CO02HM0275
02H Complete Primary Reformer Erection (101-B)
24-Jul-27
24-Jul-27
174.0d
0%
CO02AP0140
02A SB Pipe Erection
26-Jul-27
30-Oct-27
78.0d
0%
CO01AE0120
01A Lighting Fixture Installation/Termination
27-Jul-27
02-Aug-27
91.0d
0%
CO02HP0130
02H LB Pipe Erection
27-Jul-27
05-Jan-28
10.0d
0%
CO02MP0140
02M SB Pipe Erection
27-Jul-27
15-Oct-27
92.0d
0%
CO02PE0110
02P Lighting JB's, Stands, Tray & Cable
27-Jul-27
02-Aug-27
150.0d
0%
CO02YV1120
02Y Paint Touch-up - Piping
27-Jul-27
09-Nov-27
101.0d
0%
CO02YV1130
02Y Paint Touch-up - Pipe Rack
27-Jul-27
09-Nov-27
101.0d
0%
CO03EV1120
03E Paint Touch-up - Piping
27-Jul-27
13-Aug-27
58.0d
0%
CO03EV1130
03E Paint Touch-up - Equipment
27-Jul-27
13-Aug-27
58.0d
0%
CO01DP0150
01D Punchlist / Test Piping
28-Jul-27
10-Sep-27
34.0d
0%
CO02CP0150
02C Punchlist / Test Piping
28-Jul-27
22-Oct-27
83.0d
0%
CO02HM0120
02H Set (Heavey Lift) - 101-C & 102-C
30-Jul-27
04-Aug-27
10.0d
0%
CO03FV2120
03F Insulate - Piping
30-Jul-27
13-Aug-27
88.0d
0%
CO02GV1130
02G Paint Touch-up - Equipment
30-Jul-27
25-Sep-27
116.0d
0%
CO02KE0130
02K Power/Control JB's, Tray, Cable, Termination
30-Jul-27
06-Nov-27
77.0d
0%
CO02KI0120
02K Instrument JB's, Field Instr, Tray, Cable
30-Jul-27
06-Nov-27
77.0d
0%
CO01YI0130
01Y Install In Line Instruments
31-Jul-27
27-Aug-27
139.0d
0%
CO01YV2120
01Y Insulate - Piping
31-Jul-27
02-Oct-27
133.0d
0%
CO02AE0120
02A Lighting Fixture Installation/Termination
31-Jul-27
13-Aug-27
157.0d
0%
CO02EV2110
02E Insulate - Equipment
31-Jul-27
27-Aug-27
151.0d
0%
CO03BP0150
03B Punchlist / Test Piping
31-Jul-27
23-Aug-27
138.0d
0%
CO05BP0130
05B LB Pipe Erection - To Loading Arm
31-Jul-27
21-Sep-27
152.0d
0%
WO050P0100
050 Above Ground Pipe
31-Jul-27
14-Mar-28
19.0d
0%
CO05BM0110
05B Install Loading Arm
02-Aug-27
04-Dec-27
62.0d
0%
WO050M0100
050 Major Equipment
02-Aug-27
04-Dec-27
61.0d
0%
CO02CE0110
02C Lighting JB's, Stands, Tray & Cable
03-Aug-27
05-Oct-27
113.0d
0%
CO02GE0120
02G Lighting Fixture Installation/Termination
03-Aug-27
01-Sep-27
149.0d
0%
CO02HP0140
02H SB Pipe Erection
03-Aug-27
12-Jan-28
10.0d
0%
CO02PE0120
02P Lighting Fixture Installation/Termination
03-Aug-27
09-Aug-27
161.0d
0%
CO01BP0150
01B Punchlist / Test Piping
05-Aug-27
05-Oct-27
32.0d
0%
CO020M0130
Demobilize Heavy Lift Crane
05-Aug-27
16-Aug-27
56.0d
0%
CO02HS0110
02H Erect Structural Steel - Structure
05-Aug-27
07-Oct-27
10.0d
0%
CO01GE0120
01G Lighting Fixture Installation/Termination
06-Aug-27
08-Sep-27
28.0d
0%
CO02GV1120
02G Paint Touch-up - Piping
06-Aug-27
02-Oct-27
134.0d
0%
CO05AS0120
05A Erect Misc Steel
06-Aug-27
13-Aug-27
23.0d
0%
CO02AE0130
02A Power/Control JB's, Tray, Cable, Termination
07-Aug-27
06-Nov-27
78.0d
0%
CO02AI0120
02A Instrument JB's, Field Instr, Tray, Cable
07-Aug-27
06-Nov-27
78.0d
0%
CO02ME0130
02M Power/Control JB's, Tray, Cable, Termination
07-Aug-27
22-Oct-27
95.0d
0%
CO02MI0120
02M Instrument JB's, Field Instr, Tray, Cable
07-Aug-27
22-Oct-27
95.0d
0%
CO03BV1120
03B Paint Touch-up - Piping
07-Aug-27
23-Aug-27
153.0d
0%
CO05BP0140
05B SB Pipe Erection - To Loading Arm
07-Aug-27
28-Sep-27
152.0d
0%
CO02BP0140
02B SB Pipe Erection
09-Aug-27
30-Aug-27
120.0d
0%
CO02JP0150
02J Punchlist / Test Piping
09-Aug-27
11-Oct-27
102.0d
0%
CO02KE0120
02K Lighting Fixture Installation/Termination
09-Aug-27
21-Sep-27
144.0d
0%
CO01DV1120
01D Paint Touch-up - Piping
10-Aug-27
10-Sep-27
45.0d
0%
CO02YP0150
02Y Punchlist / Test Piping
10-Aug-27
09-Nov-27
65.0d
0%
CO02LE0130
02L Power/Control JB's, Tray, Cable, Termination
11-Aug-27
14-Feb-28
-12.0d
0%
CO02LI0120
02L Instrument JB's, Field Instr, Tray, Cable
11-Aug-27
14-Feb-28
-12.0d
0%
CO02NE0120
02N Lighting Fixture Installation/Termination
13-Aug-27
25-Aug-27
152.0d
0%
CO02NV2110
02N Insulate - Equipment
13-Aug-27
08-Sep-27
146.0d
0%
CO02EP0140
02E SB Pipe Erection
16-Aug-27
13-Nov-27
67.0d
0%
CO02LV2110
02L Insulate - Equipment
16-Aug-27
26-Oct-27
69.0d
0%
CO03EI0130
03E Install In Line Instruments
16-Aug-27
25-Aug-27
65.0d
0%
CO01AM0150
01A Install Spray Devices
20-Aug-27
01-Sep-27
54.0d
0%
CO03EV2110
03E Insulate - Equipment
20-Aug-27
02-Oct-27
58.0d
0%
CO03EV2120
03E Insulate - Piping
20-Aug-27
02-Oct-27
58.0d
0%
CO02HE0130
02H Power/Control JB's, Tray, Cable, Termination
23-Aug-27
19-Jan-28
15.0d
0%
CO02HI0120
02H Instrument JB's, Field Instr, Tray, Cable
23-Aug-27
19-Jan-28
15.0d
0%
CO05AM0160
05A Tank Erection 2105-F (Fire Water Tank)
23-Aug-27
16-Oct-27
-29.0d
0%
CO02FP0150
02F Punchlist / Test Piping
25-Aug-27
11-Oct-27
102.0d
0%
CO03BI0130
03B Install In Line Instruments
25-Aug-27
30-Aug-27
138.0d
0%
CO01BV1120
01B Paint Touch-up - Piping
30-Aug-27
05-Oct-27
56.0d
0%
CO02BE0130
02B Power/Control JB's, Tray, Cable, Termination
30-Aug-27
20-Sep-27
136.0d
0%
CO02BI0120
02B Instrument JB's, Field Instr, Tray, Cable
30-Aug-27
20-Sep-27
136.0d
0%
CO02PP0140
02P SB Pipe Erection
30-Aug-27
28-Sep-27
103.0d
0%
CO02BP0150
02B Punchlist / Test Piping
01-Sep-27
20-Sep-27
120.0d
0%
CO02BV1120
02B Paint Touch-up - Piping
01-Sep-27
20-Sep-27
144.0d
0%
CO02CV1120
02C Paint Touch-up - Piping
01-Sep-27
22-Oct-27
116.0d
0%
CO01AE0130
01A Power/Control JB's, Tray, Cable, Termination
03-Sep-27
21-Sep-27
66.0d
0%
CO01AP0130
01A LB Pipe Erection
03-Sep-27
28-Sep-27
54.0d
0%
CO02GV2120
02G Insulate - Piping
03-Sep-27
30-Oct-27
110.0d
0%
CO02JV1120
02J Paint Touch-up - Piping
06-Sep-27
11-Oct-27
102.0d
0%
CO02JV1130
02J Paint Touch-up - Equipment
06-Sep-27
11-Oct-27
102.0d
0%
CO02EE0130
02E Power/Control JB's, Tray, Cable, Termination
08-Sep-27
26-Nov-27
67.0d
0%
CO02EI0120
02E Instrument JB's, Field Instr, Tray, Cable
08-Sep-27
26-Nov-27
67.0d
0%
CO02HV1130
02H Paint Touch-up - Equipment
10-Sep-27
28-Oct-27
52.0d
0%
CO02GV2110
02G Insulate - Equipment
10-Sep-27
23-Oct-27
116.0d
0%
CO01HT0110
01H Mechanical Completion
10-Sep-27
10-Sep-27
33.0d
0%
CO01DI0130
01D Install In Line Instruments
20-Sep-27
24-Sep-27
41.0d
0%
CO02QP0140
02Q SB Pipe Erection
20-Sep-27
05-Oct-27
101.0d
0%
CO02BI0130
02B Install In Line Instruments
21-Sep-27
22-Sep-27
130.0d
0%
CO02PI0120
02P Instrument JB's, Field Instr, Tray, Cable
21-Sep-27
05-Oct-27
121.0d
0%
CO05BA0110
05B Erect Dock Control Operating Building
21-Sep-27
19-Oct-27
135.0d
0%
WO050A0100
050 Buildings
21-Sep-27
19-Oct-27
135.0d
0%
CO01DV2120
01D Insulate - Piping
23-Sep-27
16-Oct-27
34.0d
0%
CO02FV1120
02F Paint Touch-up - Piping
23-Sep-27
11-Oct-27
126.0d
0%
CO02HE0110
02H Lighting JB's, Stands, Tray & Cable
24-Sep-27
04-Nov-27
87.0d
0%
CO02MP0150
02M Punchlist / Test Piping
24-Sep-27
22-Oct-27
92.0d
0%
CO05BV1120
05B Paint Touch-up - Piping
27-Sep-27
05-Oct-27
170.0d
0%
CO02KP0150
02K Punchlist / Test Piping
27-Sep-27
06-Nov-27
80.0d
0%
CO02PP0150
02P Punchlist / Test Piping
28-Sep-27
05-Oct-27
107.0d
0%
CO02QI0120
02Q Instrument JB's, Field Instr, Tray, Cable
28-Sep-27
12-Oct-27
115.0d
0%
CO01AI0120
01A Instrument JB's, Field Instr, Tray, Cable
29-Sep-27
05-Oct-27
54.0d
0%
CO01AP0150
01A Punchlist / Test Piping
29-Sep-27
01-Oct-27
57.0d
0%
CO01AV1120
01A Paint Touch-up - Piping
29-Sep-27
01-Oct-27
58.0d
0%
CO02CV2120
02C Insulate - Piping
29-Sep-27
25-Nov-27
92.0d
0%
CO02PV1130
02P Paint Touch-up - Equipment
29-Sep-27
02-Oct-27
103.0d
0%
CO02YV2120
02Y Insulate - Piping
29-Sep-27
27-Dec-27
65.0d
0%
CO02DP0140
02D SB Pipe Erection
30-Sep-27
25-Nov-27
62.0d
0%
CO02AP0150
02A Punchlist / Test Piping
01-Oct-27
06-Nov-27
79.0d
0%
CO02PV1120
02P Paint Touch-up - Piping
01-Oct-27
05-Oct-27
125.0d
0%
CO01AI0130
01A Install In Line Instruments
02-Oct-27
02-Oct-27
57.0d
0%
CO01BV2120
01B Insulate - Piping
02-Oct-27
02-Nov-27
32.0d
0%
CO02GI0130
02G Install In Line Instruments
02-Oct-27
13-Oct-27
105.0d
0%
CO02QP0150
02Q Punchlist / Test Piping
05-Oct-27
12-Oct-27
101.0d
0%
CO04AT0110
04A Mechanical Completion
05-Oct-27
05-Oct-27
108.0d
0%
CO01BI0130
01B Install In Line Instruments
06-Oct-27
13-Oct-27
37.0d
0%
CO01GI0120
01G DCS Cable Terminations
06-Oct-27
06-Dec-27
-35.0d
0%
CO02CE0120
02C Lighting Fixture Installation/Termination
06-Oct-27
26-Oct-27
113.0d
0%
CO02JV2120
02J Insulate - Piping
06-Oct-27
08-Nov-27
102.0d
0%
CO02MV1120
02M Paint Touch-up - Piping
06-Oct-27
22-Oct-27
116.0d
0%
CO02PI0130
02P Install In Line Instruments
06-Oct-27
06-Oct-27
118.0d
0%
CO02QV1120
02Q Paint Touch-up - Piping
06-Oct-27
09-Oct-27
121.0d
0%
CO02QV1130
02Q Paint Touch-up - Equipment
06-Oct-27
09-Oct-27
121.0d
0%
CO02DE0130
02D Power/Control JB's, Tray, Cable, Termination
11-Oct-27
02-Dec-27
68.0d
0%
CO02DI0120
02D Instrument JB's, Field Instr, Tray, Cable
11-Oct-27
02-Dec-27
68.0d
0%
CO02QV2110
02Q Insulate - Equipment
11-Oct-27
16-Oct-27
121.0d
0%
CO02BV2120
02B Insulate - Piping
12-Oct-27
18-Oct-27
120.0d
0%
CO02FI0130
02F Install In Line Instruments
12-Oct-27
16-Oct-27
109.0d
0%
CO02JI0130
02J Install In Line Instruments
12-Oct-27
19-Oct-27
104.0d
0%
CO02QI0130
02Q Install In Line Instruments
13-Oct-27
13-Oct-27
112.0d
0%
CO02YE0120
02Y Lighting Fixture Installation/Termination
13-Oct-27
27-Nov-27
90.0d
0%
CO02KV1120
02K Paint Touch-up - Piping
13-Oct-27
06-Nov-27
104.0d
0%
CO02FV2120
02F Insulate - Piping
14-Oct-27
08-Nov-27
102.0d
0%
CO02JV2110
02J Insulate - Equipment
14-Oct-27
08-Nov-27
102.0d
0%
CO02AV1120
02A Paint Touch-up - Piping
16-Oct-27
06-Nov-27
103.0d
0%
CO02HV2110
02H Insulate - Equipment
16-Oct-27
01-Dec-27
52.0d
0%
SC01HT0120
01H RFSU
17-Oct-27
17-Oct-27
10.0d
0%
CO02EP0150
02E Punchlist / Test Piping
18-Oct-27
26-Nov-27
67.0d
0%
CO05BE0130
05B Power/Control JB's, Tray, Cable, Termination
19-Oct-27
30-Oct-27
140.0d
0%
CO05BI0120
05B Instrument JB's, Field Instr, Tray, Cable
19-Oct-27
30-Oct-27
140.0d
0%
WO050E0100
050 Above Ground Electrical
19-Oct-27
06-Apr-28
8.0d
0%
WO050I0100
050 Install Instruments & Test
19-Oct-27
25-Mar-28
24.0d
0%
CO02CI0130
02C Install In Line Instruments
23-Oct-27
04-Nov-27
83.0d
0%
CO02MI0130
02M Install In Line Instruments
23-Oct-27
28-Oct-27
99.0d
0%
CO02PV2120
02P Insulate - Piping
27-Oct-27
02-Nov-27
107.0d
0%
CO02MV2120
02M Insulate - Piping
28-Oct-27
25-Nov-27
92.0d
0%
CO05AM0110
05A Set 2202-B Flare & KO Drum
28-Oct-27
04-Dec-27
21.0d
0%
CO05AM0130
05A Set 2101-L Ammonia Refrigeration Package
28-Oct-27
30-Oct-27
46.0d
0%
CO05AM0150
05A Set Rotating Equipment
28-Oct-27
17-Nov-27
31.0d
0%
CO010K0130
010 Compl Roads, Ditches, Paving, & Rock Surfacing
01-Nov-27
28-Jan-28
9.0d
0%
CO010K0140
010 Finish Grading
01-Nov-27
28-Jan-28
37.0d
0%
CO020K0100
020 Site Prep - Guard Posts & Gravel
01-Nov-27
01-Mar-28
9.0d
0%
CO02EV1120
02E Paint Touch-up - Piping
01-Nov-27
26-Nov-27
91.0d
0%
CO02PV2110
02P Insulate - Equipment
01-Nov-27
06-Nov-27
103.0d
0%
CO030K0100
030 Site Prep - Guard Posts & Gravel
01-Nov-27
01-Mar-28
9.0d
0%
WO020K0100
020 Site Prep
01-Nov-27
01-Mar-28
9.0d
0%
WO030K0100
030 Site Prep
01-Nov-27
01-Mar-28
9.0d
0%
CO02DP0150
02D Punchlist / Test Piping
02-Nov-27
02-Dec-27
62.0d
0%
CO02KV2120
02K Insulate - Piping
02-Nov-27
10-Dec-27
80.0d
0%
SC04AT0120
04A RFSU
02-Nov-27
02-Nov-27
132.0d
0%
CO02QV2120
02Q Insulate - Piping
03-Nov-27
09-Nov-27
101.0d
0%
CO05AP0130
05A LB Pipe Erection
04-Nov-27
29-Feb-28
-29.0d
0%
CO02AV2120
02A Insulate - Piping
05-Nov-27
10-Dec-27
79.0d
0%
CO02HE0120
02H Lighting Fixture Installation/Termination
05-Nov-27
01-Dec-27
87.0d
0%
CO02KI0130
02K Install In Line Instruments
06-Nov-27
15-Nov-27
83.0d
0%
CO02AI0130
02A Install In Line Instruments
08-Nov-27
13-Nov-27
84.0d
0%
CO02NP0140
02N SB Pipe Erection
08-Nov-27
17-Nov-27
56.0d
0%
CO02YI0130
02Y Install In Line Instruments
10-Nov-27
13-Dec-27
65.0d
0%
CO02HP0150
02H Punchlist / Test Piping
11-Nov-27
19-Jan-28
10.0d
0%
CO05AP0140
05A SB Pipe Erection
11-Nov-27
07-Mar-28
-29.0d
0%
CO02DV1120
02D Paint Touch-up - Piping
12-Nov-27
02-Dec-27
86.0d
0%
CO02NE0130
02N Power/Control JB's, Tray, Cable, Termination
15-Nov-27
30-Nov-27
80.0d
0%
CO02NI0120
02N Instrument JB's, Field Instr, Tray, Cable
15-Nov-27
30-Nov-27
80.0d
0%
CO02LP0150
02L Punchlist / Test Piping
16-Nov-27
14-Feb-28
-15.0d
0%
CO02NV1120
02N Paint Touch-up - Piping
18-Nov-27
30-Nov-27
88.0d
0%
CO05AE0130
05A Power/Control JB's, Tray, Cable, Termination
18-Nov-27
14-Mar-28
-25.0d
0%
CO05AI0120
05A Instrument JB's, Field Instr, Tray, Cable
18-Nov-27
14-Mar-28
-25.0d
0%
CO02NP0150
02N Punchlist / Test Piping
26-Nov-27
30-Nov-27
56.0d
0%
CO02EI0130
02E Install In Line Instruments
27-Nov-27
03-Dec-27
73.0d
0%
CO02EV2120
02E Insulate - Piping
27-Nov-27
24-Dec-27
67.0d
0%
CO02NI0130
02N Install In Line Instruments
01-Dec-27
01-Dec-27
75.0d
0%
CO02DI0130
02D Install In Line Instruments
03-Dec-27
07-Dec-27
70.0d
0%
CO01GT0110
01G Mechanical Completion
06-Dec-27
06-Dec-27
-35.0d
0%
SC01GT0120
01G RFSU
06-Dec-27
06-Dec-27
-47.0d
0%
CO01DI0140
01D Continuity Testing
07-Dec-27
11-Dec-27
-22.0d
0%
CO02GI0140
02G Continuity Testing
07-Dec-27
16-Dec-27
54.0d
0%
CO02YI0140
02Y Continuity Testing
07-Dec-27
03-Jan-28
53.0d
0%
CO03AI0140
03A Continuity Testing
07-Dec-27
09-Dec-27
-35.0d
0%
CO03YI0140
03Y Continuity Testing
07-Dec-27
17-Jan-28
41.0d
0%
CO05BI0140
05B Continuity Testing
07-Dec-27
07-Dec-27
118.0d
0%
SC02GI0150
02G Function Testing
07-Dec-27
09-Jan-28
63.0d
0%
WC000T1100
000 Commissioning
07-Dec-27
22-Sep-28
-59.0d
0%
CO03AT0110
03A Mechanical Completion
09-Dec-27
09-Dec-27
-26.0d
0%
CO02DV2120
02D Insulate - Piping
10-Dec-27
30-Dec-27
62.0d
0%
CO02HV1120
02H Paint Touch-up - Piping
10-Dec-27
19-Jan-28
45.0d
0%
CO03FI0140
03F Continuity Testing
10-Dec-27
13-Dec-27
-1.0d
0%
SC03AI0150
03A Function Testing
10-Dec-27
20-Dec-27
-47.0d
0%
CO01DT0110
01D Mechanical Completion
11-Dec-27
11-Dec-27
-22.0d
0%
SC01DI0150
01D Function Testing
12-Dec-27
29-Dec-27
-28.0d
0%
CO03FT0110
03F Mechanical Completion
13-Dec-27
13-Dec-27
8.0d
0%
CO01YI0140
01Y Continuity Testing
14-Dec-27
03-Jan-28
53.0d
0%
CO02AI0140
02A Continuity Testing
14-Dec-27
20-Dec-27
52.0d
0%
CO02BI0140
02B Continuity Testing
14-Dec-27
15-Dec-27
73.0d
0%
SC03FI0150
03F Function Testing
14-Dec-27
24-Dec-27
-2.0d
0%
CO02KI0140
02K Continuity Testing
15-Dec-27
22-Dec-27
48.0d
0%
CO02BT0110
02B Mechanical Completion
15-Dec-27
15-Dec-27
75.0d
0%
CO02DI0140
02D Continuity Testing
16-Dec-27
20-Dec-27
59.0d
0%
SC02BI0150
02B Function Testing
16-Dec-27
18-Dec-27
85.0d
0%
CO02GT0110
02G Mechanical Completion
16-Dec-27
16-Dec-27
74.0d
0%
CO02CI0140
02C Continuity Testing
17-Dec-27
29-Dec-27
41.0d
0%
SC02CI0150
02C Function Testing
17-Dec-27
24-Jan-28
48.0d
0%
SC02YI0150
02Y Function Testing
18-Dec-27
10-Jan-28
62.0d
0%
SC02BT0120
02B RFSU
18-Dec-27
18-Dec-27
85.0d
0%
CO02AT0110
02A Mechanical Completion
20-Dec-27
20-Dec-27
71.0d
0%
CO02DT0110
02D Mechanical Completion
20-Dec-27
20-Dec-27
71.0d
0%
SC03AT0120
03A RFSU
20-Dec-27
20-Dec-27
-47.0d
0%
CO01BI0140
01B Continuity Testing
21-Dec-27
28-Dec-27
-29.0d
0%
CO01CI0140
01C Continuity Testing
21-Dec-27
23-Dec-27
-12.0d
0%
CO02EI0140
02E Continuity Testing
21-Dec-27
27-Dec-27
47.0d
0%
CO02JI0140
02J Continuity Testing
21-Dec-27
28-Dec-27
42.0d
0%
CO02MI0140
02M Continuity Testing
21-Dec-27
25-Dec-27
51.0d
0%
CO03BI0140
03B Continuity Testing
21-Dec-27
23-Dec-27
59.0d
0%
SC02AI0150
02A Function Testing
21-Dec-27
12-Jan-28
60.0d
0%
SC02DI0150
02D Function Testing
21-Dec-27
04-Jan-28
68.0d
0%
SC03AT0130
03A Commission
21-Dec-27
27-Dec-27
-47.0d
0%
CO02NI0140
02N Continuity Testing
22-Dec-27
22-Dec-27
67.0d
0%
CO02KT0110
02K Mechanical Completion
22-Dec-27
22-Dec-27
69.0d
0%
CO02NT0110
02N Mechanical Completion
22-Dec-27
22-Dec-27
69.0d
0%
CO02PI0140
02P Continuity Testing
23-Dec-27
23-Dec-27
64.0d
0%
SC02KI0150
02K Function Testing
23-Dec-27
16-Jan-28
56.0d
0%
SC02NI0150
02N Function Testing
23-Dec-27
25-Dec-27
78.0d
0%
CO01CT0110
01C Mechanical Completion
23-Dec-27
23-Dec-27
-7.0d
0%
CO02PT0110
02P Mechanical Completion
23-Dec-27
23-Dec-27
68.0d
0%
CO03BT0110
03B Mechanical Completion
23-Dec-27
23-Dec-27
68.0d
0%
CO02HV2120
02H Insulate - Piping
24-Dec-27
16-Feb-28
21.0d
0%
CO02NV2120
02N Insulate - Piping
24-Dec-27
06-Jan-28
56.0d
0%
CO02QI0140
02Q Continuity Testing
24-Dec-27
24-Dec-27
63.0d
0%
CO03CI0140
03C Continuity Testing
24-Dec-27
27-Dec-27
-19.0d
0%
SC01CI0150
01C Function Testing
24-Dec-27
29-Dec-27
-14.0d
0%
SC01YI0150
01Y Function Testing
24-Dec-27
10-Jan-28
62.0d
0%
SC02PI0150
02P Function Testing
24-Dec-27
28-Dec-27
75.0d
0%
SC03BI0150
03B Function Testing
24-Dec-27
03-Jan-28
69.0d
0%
CO02QT0110
02Q Mechanical Completion
24-Dec-27
24-Dec-27
67.0d
0%
SC03FT0120
03F RFSU
24-Dec-27
24-Dec-27
-2.0d
0%
CO02LV1120
02L Paint Touch-up - Piping
25-Dec-27
14-Feb-28
23.0d
0%
SC02QI0150
02Q Function Testing
25-Dec-27
29-Dec-27
74.0d
0%
CO02MT0110
02M Mechanical Completion
25-Dec-27
25-Dec-27
66.0d
0%
SC02MI0150
02M Function Testing
26-Dec-27
12-Jan-28
60.0d
0%
CO02ET0110
02E Mechanical Completion
27-Dec-27
27-Dec-27
65.0d
0%
CO03CT0110
03C Mechanical Completion
27-Dec-27
27-Dec-27
-10.0d
0%
CO01AI0140
01A Continuity Testing
28-Dec-27
28-Dec-27
-12.0d
0%
CO02FI0140
02F Continuity Testing
28-Dec-27
01-Jan-28
44.0d
0%
CO03DI0140
03D Continuity Testing
28-Dec-27
29-Dec-27
-17.0d
0%
SC01DT0130
01D Commission
28-Dec-27
07-Feb-28
-47.0d
0%
SC02EI0150
02E Function Testing
28-Dec-27
17-Jan-28
55.0d
0%
SC03CI0150
03C Function Testing
28-Dec-27
07-Jan-28
-23.0d
0%
CO01AT0110
01A Mechanical Completion
28-Dec-27
28-Dec-27
-12.0d
0%
CO01BT0110
01B Mechanical Completion
28-Dec-27
28-Dec-27
-11.0d
0%
CO02JT0110
02J Mechanical Completion
28-Dec-27
28-Dec-27
64.0d
0%
SC02PT0120
02P RFSU
28-Dec-27
28-Dec-27
75.0d
0%
SC01AI0150
01A Function Testing
29-Dec-27
29-Dec-27
-14.0d
0%
SC01BI0150
01B Function Testing
29-Dec-27
19-Jan-28
-35.0d
0%
SC02JI0150
02J Function Testing
29-Dec-27
23-Jan-28
49.0d
0%
CO02CT0110
02C Mechanical Completion
29-Dec-27
29-Dec-27
63.0d
0%
CO03DT0110
03D Mechanical Completion
29-Dec-27
29-Dec-27
-12.0d
0%
SC01AT0120
01A RFSU
29-Dec-27
29-Dec-27
-14.0d
0%
SC01CT0120
01C RFSU
29-Dec-27
29-Dec-27
-14.0d
0%
SC01DT0120
01D RFSU
29-Dec-27
29-Dec-27
-28.0d
0%
SC02QT0120
02Q RFSU
29-Dec-27
29-Dec-27
74.0d
0%
CO03EI0140
03E Continuity Testing
30-Dec-27
04-Jan-28
-32.0d
0%
SC03DI0150
03D Function Testing
30-Dec-27
04-Jan-28
-20.0d
0%
SC03YI0150
03Y Function Testing
01-Jan-28
24-Jan-28
48.0d
0%
CO02FT0110
02F Mechanical Completion
01-Jan-28
01-Jan-28
60.0d
0%
SC02FI0150
02F Function Testing
02-Jan-28
20-Jan-28
52.0d
0%
CO01YT0110
01Y Mechanical Completion
03-Jan-28
03-Jan-28
59.0d
0%
CO02YT0110
02Y Mechanical Completion
03-Jan-28
03-Jan-28
59.0d
0%
SC03BT0120
03B RFSU
03-Jan-28
03-Jan-28
69.0d
0%
CO03ET0110
03E Mechanical Completion
04-Jan-28
04-Jan-28
-17.0d
0%
SC02DT0120
02D RFSU
04-Jan-28
04-Jan-28
68.0d
0%
SC03DT0120
03D RFSU
04-Jan-28
04-Jan-28
-20.0d
0%
CO02LV2120
02L Insulate - Piping
05-Jan-28
13-Mar-28
-1.0d
0%
SC03EI0150
03E Function Testing
05-Jan-28
22-Jan-28
-38.0d
0%
SC02NT0120
02N RFSU
06-Jan-28
06-Jan-28
66.0d
0%
SC03CT0120
03C RFSU
07-Jan-28
07-Jan-28
-23.0d
0%
CO05BP0150
05B Punchlist / Test Piping
08-Jan-28
24-Jan-28
63.0d
0%
CO05BV1130
05B Paint Touch-up - Equipment
08-Jan-28
18-Jan-28
62.0d
0%
SC02GT0120
02G RFSU
09-Jan-28
09-Jan-28
63.0d
0%
SC01YT0120
01Y RFSU
10-Jan-28
10-Jan-28
62.0d
0%
SC02YT0120
02Y RFSU
10-Jan-28
10-Jan-28
62.0d
0%
SC02AT0120
02A RFSU
12-Jan-28
12-Jan-28
60.0d
0%
SC02MT0120
02M RFSU
12-Jan-28
12-Jan-28
60.0d
0%
CO02HI0140
02H Continuity Testing
14-Jan-28
26-Jan-28
15.0d
0%
SC02KT0120
02K RFSU
16-Jan-28
16-Jan-28
56.0d
0%
CO03YT0110
03Y Mechanical Completion
17-Jan-28
17-Jan-28
47.0d
0%
SC02ET0120
02E RFSU
17-Jan-28
17-Jan-28
55.0d
0%
CO05AP0150
05A Punchlist / Test Piping
19-Jan-28
14-Mar-28
-29.0d
0%
SC01BT0120
01B RFSU
19-Jan-28
19-Jan-28
-35.0d
0%
CO02HI0130
02H Install In Line Instruments
20-Jan-28
01-Feb-28
10.0d
0%
SC02HI0150
02H Function Testing
20-Jan-28
29-Feb-28
12.0d
0%
SC02FT0120
02F RFSU
20-Jan-28
20-Jan-28
52.0d
0%
SC03ET0120
03E RFSU
22-Jan-28
22-Jan-28
-38.0d
0%
SC02JT0120
02J RFSU
23-Jan-28
23-Jan-28
49.0d
0%
CO05BI0130
05B Install In Line Instruments
24-Jan-28
25-Jan-28
68.0d
0%
CO05BT0110
05B Mechanical Completion
24-Jan-28
24-Jan-28
81.0d
0%
CO05BV2120
05B Insulate - Piping
24-Jan-28
14-Feb-28
63.0d
0%
WO050V2100
050 Insulation
24-Jan-28
10-May-28
-12.0d
0%
SC02CT0120
02C RFSU
24-Jan-28
24-Jan-28
48.0d
0%
SC03YT0120
03Y RFSU
24-Jan-28
24-Jan-28
48.0d
0%
CO05BV2110
05B Insulate - Equipment
25-Jan-28
15-Feb-28
62.0d
0%
CO02HI0145
02H Contingency (101-B)
27-Jan-28
23-Feb-28
15.0d
0%
CO02LI0140
02L Continuity Testing
05-Feb-28
21-Feb-28
-12.0d
0%
SC05BI0150
05B Function Testing
05-Feb-28
08-Feb-28
79.0d
0%
SC02LI0150
02L Function Testing
08-Feb-28
29-Mar-28
-17.0d
0%
SC03FT0130
03F Commission
08-Feb-28
28-Feb-28
-47.0d
0%
CO05AV1120
05A Paint Touch-up - Piping
10-Feb-28
14-Mar-28
-2.0d
0%
CO02LI0130
02L Install In Line Instruments
15-Feb-28
01-Mar-28
-15.0d
0%
SC05BT0120
05B RFSU
15-Feb-28
15-Feb-28
72.0d
0%
CO02LT0110
02L Mechanical Completion
21-Feb-28
21-Feb-28
17.0d
0%
CO02HT0110
02H Mechanical Completion
23-Feb-28
23-Feb-28
15.0d
0%
CO05AK0120
05A Construct Dike (Retaining Wall)
26-Feb-28
05-May-28
-47.0d
0%
CO05AK0130
05A Guard Posts, Fence, Gravel...
26-Feb-28
05-May-28
-47.0d
0%
WO050K0100
050 Site Prep
26-Feb-28
05-May-28
-47.0d
0%
CO05AV2120
05A Insulate - Piping
28-Feb-28
11-Apr-28
-26.0d
0%
CO06AV2120
05A Insulate - Piping
28-Feb-28
11-Apr-28
-26.0d
0%
SC000T0100
020 Commission ISBL
29-Feb-28
28-Apr-28
-47.0d
0%
SC02HT0120
02H RFSU
29-Feb-28
29-Feb-28
12.0d
0%
CO05AE0110
05A Lighting JB's, Stands, Tray & Cable
03-Mar-28
30-Mar-28
-22.0d
0%
CO05AI0140
05A Continuity Testing
10-Mar-28
21-Mar-28
-25.0d
0%
CO05AV1130
05A Paint Touch-up - Equipment
10-Mar-28
12-Apr-28
-51.0d
0%
CO05AI0130
05A Install In Line Instruments
15-Mar-28
25-Mar-28
-29.0d
0%
SC05AI0150
05A Function Testing
15-Mar-28
15-Apr-28
-34.0d
0%
CO05AE0120
05A Lighting Fixture Installation/Termination
24-Mar-28
06-Apr-28
-22.0d
0%
CO05AV2110
05A Insulate - Equipment
28-Mar-28
10-May-28
-51.0d
0%
CO06AV2110
05A Insulate - Equipment
28-Mar-28
10-May-28
-51.0d
0%
SC02LT0120
02L RFSU
29-Mar-28
29-Mar-28
-17.0d
0%
CO05AT0110
05A Mechanical Completion
05-May-28
05-May-28
-47.0d
0%
SC05AT0120
05A RFSU
10-May-28
10-May-28
-59.0d
0%
SC000T0105
020 Startup ISBL
11-May-28
24-Jun-28
-59.0d
0%
SC000T0110
Performance Test Period
25-Jun-28
22-Sep-28
-59.0d
0%
SC000YA100
Construction Bonus Period
23-Sep-28
15-Mar-29
-59.0d
0%
30-Dec 06-Jan 13-Jan 20-Jan 27-Jan 03-Feb 10-Feb 17-Feb 24-Feb 03-Mar 10-Mar 17-Mar 24-Mar 31-Mar 07-Apr 14-Apr 21-Apr 28-Apr 05-May 12-May 19-May 26-May 02-Jun 09-Jun 16-Jun 23-Jun 30-Jun 07-Jul 14-Jul 21-Jul 28-Jul 04-Aug 11-Aug 18-Aug 25-Aug 01-Sep 08-Sep 15-Sep 22-Sep 29-Sep 06-Oct 13-Oct 20-Oct 27-Oct 03-Nov 10-Nov 17-Nov 24-Nov 01-Dec 08-Dec 15-Dec 22-Dec 29-Dec 05-Jan 12-Jan 19-Jan 26-Jan 02-Feb 09-Feb 16-Feb 23-Feb 02-Mar 09-Mar 16-Mar 23-Mar 30-Mar 06-Apr 13-Apr 20-Apr 27-Apr 04-May 11-May 18-May 25-May 01-Jun 08-Jun 15-Jun 22-Jun 29-Jun 06-Jul 13-Jul 20-Jul 27-Jul 03-Aug 10-Aug 17-Aug 24-Aug 31-Aug 07-Sep 14-Sep 21-Sep 28-Sep 05-Oct 12-Oct 19-Oct 26-Oct 02-Nov 09-Nov 16-Nov 23-Nov 30-Nov 07-Dec 14-Dec 21-Dec 28-Dec 04-Jan 11-Jan 18-Jan 25-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun 14-Jun 21-Jun 28-Jun 05-Jul 12-Jul 19-Jul 26-Jul 02-Aug 09-Aug 16-Aug 23-Aug 30-Aug 06-Sep 13-Sep 20-Sep 27-Sep 04-Oct 11-Oct 18-Oct 25-Oct 01-Nov 08-Nov 15-Nov 22-Nov 29-Nov 06-Dec 13-Dec 20-Dec 27-Dec 03-Jan 10-Jan 17-Jan 24-Jan 31-Jan 07-Feb 14-Feb 21-Feb 28-Feb 06-Mar 13-Mar 20-Mar 27-Mar 03-Apr 10-Apr 17-Apr 24-Apr 01-May 08-May 15-May 22-May 29-May 05-Jun 12-Jun 19-Jun 26-Jun 03-Jul 10-Jul 17-Jul 24-Jul 31-Jul 07-Aug 14-Aug 21-Aug 28-Aug 04-Sep 11-Sep 18-Sep 25-Sep 02-Oct 09-Oct 16-Oct 23-Oct 30-Oct 06-Nov 13-Nov 20-Nov 27-Nov 04-Dec 11-Dec 18-Dec 25-Dec 01-Jan 08-Jan 15-Jan 22-Jan 29-Jan 05-Feb 12-Feb 19-Feb 26-Feb 05-Mar 12-Mar 19-Mar 26-Mar Data Date
EK000CK065 — Compl. Layout of Temp. Facil. (including OCI) | 29-Jan-25 → 01-Oct-25 | Complete 100% | float — EK000CK065 EK000CK075 — Review Tech & Commercial Proposal - Field Fab Tank | 16-Feb-25 → 02-Oct-25 | Complete 100% | float — EK000CK075 EK000CK060 — Locate tie in pnts for temp water, phone, & pwr | 26-Feb-25 → 16-Mar-25 | Complete 100% | float — EK000CK060 EK000CK100 — Site Visit - Construction | 26-Feb-25 → 16-Mar-25 | Complete 100% | float — EK000CK100 EK000CK005 — OCI Subcontract - Executed | 19-Mar-25 → 19-Nov-25 | Complete 100% | float — EK000CK005 EK000CK010 — OCI Meeting to Define custom clearance requests | 20-May-25 → 19-Jun-25 | Complete 100% | float — EK000CK010 EK000CK015 — Define OCI's Point of Delivery & Liability | 20-May-25 → 19-Jun-25 | Complete 100% | float — EK000CK015 EK000CV038 — Select Geotech Vendor / Issue Award | 20-May-25 → 17-Aug-25 | Complete 100% | float — EK000CV038 PO000MF000 — Field Erected Tanks Subcontract - Prepare Inquiry, Bid, NTP | 28-Jul-25 → 03-Jan-26 | Complete 100% | float — PO000MF000 EK000CV039 — Geotech Conducts Soil Borings / Draft Prelim Report | 24-Aug-25 → 17-Dec-25 | Complete 100% | float — EK000CV039 CO000GE105 — Commence Admin. Building Design (OCI) | 05-Oct-25 | Complete CO000K0106 — Mobilize Temporary Facilities (& Punchlist & Perm. Power) | 09-Nov-25 → 27-Dec-26 | In Progress 40% | float — CO000K0106 EK000GE150 — Execute OCI Subcontract (KBR) | 16-Nov-25 | Complete PO000C0045 — Purch/Fab/Deliver - Fencing Materials | 01-Dec-25 → 15-Dec-25 | Complete 100% | float — PO000C0045 EK000GE170 — Issue Material Supply PO to OCI (Elect, Struct, Insul) | 11-Dec-25 | Complete CK000YA306 — Establish Tax Free Zone Status | 13-Dec-25 → 31-Jan-26 | Complete 100% | float — CK000YA306 PO000C0050 — Receive at Site - Fencing Materials | 14-Dec-25 | Complete CO000C0150 — Perimeter Wall | 15-Dec-25 → 29-Mar-27 | In Progress 28% | float 27.0d CO000C0150 WO010K0110 — 010 Site Prep - Perimeter Wall | 15-Dec-25 → 29-Mar-27 | In Progress 28% | float 27.0d WO010K0110 PO000MF010 — Field Erected Tanks Subcontract - Purchasing & Fabrication | 04-Jan-26 → 27-Dec-26 | In Progress 31% | float — PO000MF010 CO000M0100 — Commence Engineering - Field Fab Tanks | 04-Jan-26 | Complete CO02HC0140 — 02H Form Pour Strip Fnds - Structure | 21-Mar-26 → 27-Dec-26 | In Progress 12% | float — CO02HC0140 WO020C0100 — 020 Concrete & Excavation | 21-Mar-26 → 23-Mar-27 | In Progress 9% | float 215.0d WO020C0100 CK01UU4150 — 01U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 164.0d CK01UU4150 CK02UU4150 — 02U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 164.0d CK02UU4150 CK03UU4150 — 03U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 164.0d CK03UU4150 CK05UU4150 — 05U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 318.0d CK05UU4150 CO000CK110 — Set-Up KBR Pipe Fab Shop | 24-Mar-26 → 27-Dec-26 | In Progress 11% | float — CO000CK110 WO010C0100 — 010 Concrete & Excavation | 27-Mar-26 → 04-May-27 | In Progress 7% | float 149.0d WO010C0100 CO01GC0150 — 01G Form, Pour, Strip Fnd - Control Building | 27-Mar-26 → 01-Apr-26 | Complete 100% | float — CO01GC0150 CO02JC0150 — 02J Form, Pour, Strip Fnd - 104-D2 (Low Temp Shift Converter) | 30-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0150 CO02JC0160 — 02J Form, Pour, Strip Fnd - 104-D1 (High Temp Shift Converter) | 30-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0160 CO01DC0150 — 01D Form, Pour, Strip Fnd - 2101-U (Cooling Tower) | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO01DC0150 CO000A0110 — Start Buildings - Admin, Canteen, Warehouse, Control | 31-Mar-26 | Complete CO000K0100 — Start Construction | 31-Mar-26 | Complete CO02JC0110 — 02J Form, Pour, Strip Fnds - Major Fnds Gen'l | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0110 CO000A0150 — Install Guard Towers | 01-Apr-26 → 14-Apr-26 | Complete 100% | float — CO000A0150 CO01GA0115 — 01G Erect Control Building (Columns & Parapet Only) | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO01GA0115 CO02LC0150 — 02L Form, Pour, Strip Fnd - 101-E (CO2 Absorber) | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02LC0150 CO02MC0110 — 02M Form, Pour, Strip Fnds - Major Fnds Gen'l | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02MC0110 CO02MC0140 — 02M Form Pour Strip Fnds - Structure | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02MC0140 CO02KC0150 — 02K Form, Pour, Strip Fnd - 114-F (Benfield Solution Tank) | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO02KC0150 CO03DC0110 — 03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank) | 06-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO03DC0110 WO030C0100 — 030 Concrete & Excavation | 06-Apr-26 → 19-Mar-27 | In Progress 5% | float 229.0d WO030C0100 CO02BC0110 — 02B Form, Pour, Strip Fnds - Major Fnds | 09-Apr-26 → 27-Dec-26 | In Progress 6% | float — CO02BC0110 CO000K0108 — Start Foundations - Field Fab Tanks | 09-Apr-26 | Complete CO000K0110 — Start Foundations - Equipment & Piperacks | 09-Apr-26 | Complete CO010K0120 — 010 Construct Perimeter Roads | 15-Apr-26 → 28-Dec-26 | In Progress 5% | float — CO010K0120 CO02AC0110 — 02A Form, Pour, Strip Fnds - Major Fnds | 15-Apr-26 → 09-Mar-27 | In Progress 5% | float 189.0d CO02AC0110 CO01BC0160 — 01B Form, Pour, Strip Fnd - 2001-FB (Water Storage Tank) | 20-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO01BC0160 CO02HC0150 — 02H Form, Pour, Strip Fnd - 103-D (Secondary Reformer) | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO02HC0150 CO03CC0110 — 03C Form, Pour, Strip Fnds - Major Fnds | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO03CC0110 WK000U4100 — 000 U/G Pipe Spool Fabrication | 10-Aug-26 → 07-Dec-26 | Not Started 0% | float — WK000U4100 CO000M0110 — Mobilize Field Fab Tank Contractor | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01BC0110 — 01B Form, Pour, Strip Fnds - Major Fnds Gen'l | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01BC0150 — 01B Form, Pour, Strip Fnd - 2001-FA (Water Storage Tank) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01DC0140 — 01D Form Pour Strip Fnds - Sleepers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01YC0140 — 01Y Form Pour Strip Fnds - Pipe Rack | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02CC0160 — 02C Form, Pour, Strip Fnd - 103-JTC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02CM0140 — 02C Set - 103-JTC Surface Condenser | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02EC0110 — 02E Form, Pour, Strip Fnds - Major Fnds Gen'l | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02EC0140 — 02E Form Pour Strip Fnds - Structure | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02GC0160 — 02G Form, Pour, Strip Fnd - 102-J Fd Gas Compr. & Aux. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HC0110 — 02H Form, Pour, Strip Fnds - 101B (Primary Reformer) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HC0160 — 02H Form, Pour, Strip Fnd - 156-F (Steam Blowdown Drum) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HM0140 — 02H Set - 156-F Steam Blowdown Drum | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02LC0160 — 02L Form, Pour, Strip Fnd - 102-E (CO2 Stripper) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02MC0150 — 02M Form, Pour, Strip Fnd - 105-D (Ammonia Synthesis Converter) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02NC0110 — 02N Form, Pour, Strip Fnds - Major Fnds | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02YC0140 — 02Y Form Pour Strip Fnds - Pipe Rack | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03CM0110 — 03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03DC0150 — 03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03FC0110 — 03F Form, Pour, Strip Fnds - Package Boiler | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO05AC0170 — 05A Install Test Piles | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PO000P0015 — Purch/Fab/Delv - Temporary Testing Materials | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PO000P0020 — Receive at Site - Temporary Testing Materials | 27-Dec-26 | Not Started PO000V1000 — Purch/Fab/Delv - Painting Materials | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PO000V1005 — Receive at Site - Painting Materials | 27-Dec-26 | Not Started PO020EL155 — 020 Issue E&I Cable/Bulks/JB Reqn (OCI) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CK000P0110 — 000 Pipe Fabrication | 28-Dec-26 → 31-May-27 | Not Started 0% | float 49.0d CK000P0110 CK000U4110 — Start Pipe Fab | 28-Dec-26 | Not Started CK01AP0110 — 01A A/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01BU4110 — 01B U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01CU4110 — 01C U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01DP0110 — 01D A/G Pipe Spool Fabrication | 28-Dec-26 → 22-Mar-27 | Not Started 0% | float 104.0d CK01DP0110 CK01DU4110 — 01D U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01EU4120 — 01E/F/G U/G Pipe Spool Fabrication (to Blg Stub Outs) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01YP0110 — 01Y A/G Pipe Spool Fabrication | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 117.0d CK01YP0110 CK02AU4110 — 02A U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02BP0110 — 02B A/G Pipe Spool Fabrication | 28-Dec-26 → 24-May-27 | Not Started 0% | float 55.0d CK02BP0110 CK02BU4110 — 02B U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02CU4110 — 02C U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02DP0110 — 02D A/G Pipe Spool Fabrication | 28-Dec-26 → 30-Apr-27 | Not Started 0% | float 75.0d CK02DP0110 CK02DU4110 — 02D U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02EP0110 — 02E A/G Pipe Spool Fabrication | 28-Dec-26 → 25-Feb-27 | Not Started 0% | float 130.0d CK02EP0110 CK02EU4110 — 02E U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02FP0110 — 02F A/G Pipe Spool Fabrication | 28-Dec-26 → 20-Apr-27 | Not Started 0% | float 84.0d CK02FP0110 CK02FU4110 — 02F U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02GU4110 — 02G U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02HU4110 — 02H U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02JU4110 — 02J U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02KU4110 — 02K U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02LU4110 — 02L U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02MU4110 — 02M U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02NP0110 — 02N A/G Pipe Spool Fabrication | 28-Dec-26 → 27-Mar-27 | Not Started 0% | float 104.0d CK02NP0110 CK02PP0110 — 02P A/G Pipe Spool Fabrication | 28-Dec-26 → 21-Apr-27 | Not Started 0% | float 83.0d CK02PP0110 CK02UU4110 — 02U U/G Pipe Spool Fabrication (CW & Misc Headers) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02YP0110 — 02Y A/G Pipe Spool Fabrication | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 27.0d CK02YP0110 CK03AU4110 — 03A U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03BU4110 — 03B U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03CP0110 — 03C A/G Pipe Spool Fabrication | 28-Dec-26 → 17-Feb-27 | Not Started 0% | float 137.0d CK03CP0110 CK03CU4110 — 03C U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03DU4110 — 03D U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03EU4110 — 03E U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03FU4110 — 03F U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03YP0110 — 03Y A/G Pipe Spool Fabrication | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 80.0d CK03YP0110 CK05AU4110 — 05A U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO01AC0120 — 01A Form, Pour, Strip Fnds - Misc Fnds & Sumps... | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float 247.0d CO01AC0120 CO01BC0120 — 01B Form, Pour, Strip Fnds - Misc Fnds | 28-Dec-26 → 06-Jan-27 | Not Started 0% | float 210.0d CO01BC0120 CO01BC0140 — 01B Form Pour Strip Fnds - Sleepers to Evap Pond | 28-Dec-26 → 27-Jan-27 | Not Started 0% | float 148.0d CO01BC0140 CO01BM0130 — 01B Tank Erection 2001-FA (Water Storage Tank) | 28-Dec-26 → 21-Apr-27 | Not Started 0% | float 9.0d CO01BM0130 CO01BM0140 — 01B Tank Erection 2001-FB (Water Storage Tank) | 28-Dec-26 → 25-Mar-27 | Not Started 0% | float 32.0d CO01BM0140 CO01DM0130 — 01D Erect 2101-U Cooling Tower | 28-Dec-26 → 04-May-27 | Not Started 0% | float 61.0d CO01DM0130 CO01GA0110 — 01G Erect Control Building (Continuation w/ Design Rev) | 28-Dec-26 → 24-Jun-27 | Not Started 0% | float -14.0d CO01GA0110 CO01HC0110 — 01H Form, Pour, Strip Piers - Substation Building | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 112.0d CO01HC0110 CO01YU3110 — 01Y U/G Earthing Installation - Pipe Rack | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 134.0d CO01YU3110 CO02AU4120 — 02A U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 222.0d CO02AU4120 CO02BU4120 — 02B U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 219.0d CO02BU4120 CO02CC0110 — 02C Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 26-Jan-27 | Not Started 0% | float 165.0d CO02CC0110 CO02CC0150 — 02C Form, Pour, Strip Fnd - 103/105-J & Table Tops | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02CM0110 — 02C Set Static Equipment - 128/167-C | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02CU4120 — 02C U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 162.0d CO02CU4120 CO02DC0110 — 02D Form, Pour, Strip Fnds - Major Fnds | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float 252.0d CO02DC0110 CO02DU4120 — 02D U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 248.0d CO02DU4120 CO02EU4120 — 02E U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 227.0d CO02EU4120 CO02FC0110 — 02F Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 234.0d CO02FC0110 CO02FU4120 — 02F U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 234.0d CO02FU4120 CO02GC0150 — 02G Form, Pour, Strip Fnd - 101-J/JT & 2ea. Table Tops | 28-Dec-26 → 01-Feb-27 | Not Started 0% | float 134.0d CO02GC0150 CO02GM0140 — 02G Set/Install - 102-J Fd Gas Compr. & Aux. | 28-Dec-26 → 22-Apr-27 | Not Started 0% | float 188.0d CO02GM0140 CO02HU4120 — 02H U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 162.0d CO02HU4120 CO02JU4120 — 02J U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 211.0d CO02JU4120 CO02KC0110 — 02K Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 192.0d CO02KC0110 CO02KM0130 — 02K Tank Erection 114-F (Benfield Solution Tank) | 28-Dec-26 → 08-Jan-27 | Not Started 0% | float 97.0d CO02KM0130 CO02KU4120 — 02K U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 214.0d CO02KU4120 CO02LC0110 — 02L Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 123.0d CO02LC0110 CO02LC0140 — 02L Form Pour Strip Fnds - 02L Structure | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 45.0d CO02LC0140 CO02MU4120 — 02M U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 239.0d CO02MU4120 CO02UP0130 — 02U LB Pipe Erection (CW & Misc Headers) | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 71.0d CO02UP0130 CO02UV1110 — 02U Paint Fabricated Pipe Spools (CW & Misc Headers) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02YU3110 — 02Y U/G Earthing Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 100.0d CO02YU3110 CO03AC0110 — 03A Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 16-Jan-27 | Not Started 0% | float 155.0d CO03AC0110 CO03BC0110 — 03B Form, Pour, Strip Fnds - Major Fnds (N/A) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO03BC0140 — 03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump | 28-Dec-26 → 30-Dec-26 | Not Started 0% | float 266.0d CO03BC0140 CO03DM0145 — 03D Tank Erection 2002-F (Demin Water Tank) | 28-Dec-26 → 12-Jan-27 | Not Started 0% | float 105.0d CO03DM0145 CO03DU4120 — 03D U/G Piping Installation | 28-Dec-26 → 05-Jan-27 | Not Started 0% | float 199.0d CO03DU4120 CO03EC0110 — 03E Form, Pour, Strip Fnds - 2001-U Water Treatment | 28-Dec-26 → 20-Feb-27 | Not Started 0% | float 126.0d CO03EC0110 CO03FM0110 — 03F Erect 2002-U Package Boiler | 28-Dec-26 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0110 CO03YC0110 — 03Y Form, Pour, Strip Fnds - Sleeper Fnds | 28-Dec-26 → 01-Jan-27 | Not Started 0% | float 98.0d CO03YC0110 CO03YC0120 — 03Y Form, Pour, Strip Fnds - Pipe Rack Fnds | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO04AV1100 — 04A Paint | 28-Dec-26 → 25-May-27 | Not Started 0% | float 148.0d CO04AV1100 CO05AC0175 — 05A Test Piles (Load Test) | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float -51.0d CO05AC0175 P002YS0010 — 02Y Recv at Site - Structural Steel (First Shipment) | 28-Dec-26 | Not Started PO000E0000 — Purch/Fab/Deliver - A/G Electrical Bulks (First) | 28-Dec-26 → 10-Apr-27 | Not Started 0% | float 20.0d PO000E0000 PO000V2000 — Purch/Fab/Delv - Insulation Materials | 28-Dec-26 → 15-May-27 | Not Started 0% | float 98.0d PO000V2000 PO01BS0130 — 01B Fab & Ship Miscellaneous Steel | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 86.0d PO01BS0130 PO01DS0120 — 01D Fab & Ship Structural Steel | 28-Dec-26 → 19-Feb-27 | Not Started 0% | float 94.0d PO01DS0120 PO01DS0130 — 01D Fab & Ship Miscellaneous Steel | 28-Dec-26 → 19-Feb-27 | Not Started 0% | float 94.0d PO01DS0130 PO01EA0135 — 01E Guard House Design Drawings - Submit to KBR | 28-Dec-26 → 02-Jan-27 | Not Started 0% | float 200.0d PO01EA0135 PO01FA0135 — 01F Mosque Design Drawings - Submit to KBR | 28-Dec-26 → 02-Jan-27 | Not Started 0% | float 143.0d PO01FA0135 PO01HS0130 — 01H Fab & Ship Miscellaneous Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 51.0d PO01HS0130 PO01YS0120 — 01Y Fab & Ship Structural Steel | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 39.0d PO01YS0120 PO02AS0120 — 02A Fab & Ship Structural Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 103.0d PO02AS0120 PO02AS0130 — 02A Fab & Ship Miscellaneous Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 115.0d PO02AS0130 PO02CS0130 — 02C Fab & Ship Miscellaneous Steel | 28-Dec-26 → 26-Mar-27 | Not Started 0% | float 83.0d PO02CS0130 PO02DS0120 — 02D Fab & Ship Structural Steel | 28-Dec-26 → 02-Apr-27 | Not Started 0% | float 93.0d PO02DS0120 PO02DS0130 — 02D Fab & Ship Miscellaneous Steel | 28-Dec-26 → 02-Apr-27 | Not Started 0% | float 105.0d PO02DS0130 PO02ES0120 — 02E Fab & Ship Structural Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 127.0d PO02ES0120 PO02ES0130 — 02E Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 67.0d PO02ES0130 PO02FS0130 — 02F Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 133.0d PO02FS0130 PO02HS0120 — 02H Fab & Ship Structural Steel | 28-Dec-26 → 26-Mar-27 | Not Started 0% | float 92.0d PO02HS0120 PO02HS0130 — 02H Fab & Ship Miscellaneous Steel | 28-Dec-26 → 26-Mar-27 | Not Started 0% | float 78.0d PO02HS0130 PO02JS0120 — 02J Fab & Ship Structural Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 98.0d PO02JS0120 PO02JS0130 — 02J Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 110.0d PO02JS0130 PO02LS0120 — 02L Fab & Ship Structural Steel | 28-Dec-26 → 05-Mar-27 | Not Started 0% | float -15.0d PO02LS0120 PO02LS0130 — 02L Fab & Ship Miscellaneous Steel | 28-Dec-26 → 05-Mar-27 | Not Started 0% | float 93.0d PO02LS0130 PO02MS0120 — 02M Fab & Ship Structural Steel | 28-Dec-26 → 19-Mar-27 | Not Started 0% | float 123.0d PO02MS0120 PO02MS0130 — 02M Fab & Ship Miscellaneous Steel | 28-Dec-26 → 19-Mar-27 | Not Started 0% | float 147.0d PO02MS0130 PO02NMS100 — 02N Fab & Ship Miscellaneous Steel | 28-Dec-26 → 30-Apr-27 | Not Started 0% | float 67.0d PO02NMS100 PO02QMS100 — 02Q Fab & Ship Miscellaneous Steel | 28-Dec-26 → 23-Apr-27 | Not Started 0% | float 121.0d PO02QMS100 PO02YS0120 — 02Y Fab & Ship Structural Steel | 28-Dec-26 → 05-Mar-27 | Not Started 0% | float -22.0d PO02YS0120 PO03AS0130 — 03A Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 56.0d PO03AS0130 PO03BS0130 — 03B Fab & Ship Miscellaneous Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 169.0d PO03BS0130 PO03CS0130 — 03C Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 87.0d PO03CS0130 PO03DS0130 — 03D Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 98.0d PO03DS0130 PO03ES0130 — 03E Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 58.0d PO03ES0130 PO03YS0120 — 03Y Fab & Ship Structural Steel | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 39.0d PO03YS0120 WK000P0100 — 000 A/G Pipe Spool Fabrication | 28-Dec-26 → 31-May-27 | Not Started 0% | float 49.0d WK000P0100 WO010A0100 — 010 Buildings | 28-Dec-26 → 24-Jun-27 | Not Started 0% | float 94.0d WO010A0100 WO010M0100 — 010 Major Equipment | 28-Dec-26 → 01-Sep-27 | Not Started 0% | float 54.0d WO010M0100 WO010U3100 — 010 Install U/G Electrical | 28-Dec-26 → 27-Mar-27 | Not Started 0% | float 170.0d WO010U3100 WO020M0100 — 020 Major Equipment | 28-Dec-26 → 16-Aug-27 | Not Started 0% | float 156.0d WO020M0100 WO020U3100 — 020 Install U/G Electrical | 28-Dec-26 → 12-Mar-27 | Not Started 0% | float 265.0d WO020U3100 WO020U4100 — 020 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 224.0d WO020U4100 WO030M0100 — 030 Major Equipment | 28-Dec-26 → 26-Apr-27 | Not Started 0% | float 192.0d WO030M0100 WO030U4100 — 030 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 229.0d WO030U4100 WO04AV1100 — 04A Paint | 28-Dec-26 → 25-May-27 | Not Started 0% | float 148.0d WO04AV1100 WO050C0110 — 050 Concrete Paving | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float 0.0d WT010M0100 — 010 Tank Erection | 28-Dec-26 → 21-Apr-27 | Not Started 0% | float 9.0d WT010M0100 WT020M0100 — 020 Tank Erection | 28-Dec-26 → 08-Jan-27 | Not Started 0% | float 97.0d WT020M0100 WT030M0100 — 030 Tank Erection | 28-Dec-26 → 12-Jan-27 | Not Started 0% | float 105.0d WT030M0100 SC01JT0120 — 01J RFSU | 28-Dec-26 | Not Started CK01BP0110 — 01B A/G Pipe Spool Fabrication | 31-Dec-26 → 23-Mar-27 | Not Started 0% | float 101.0d CK01BP0110 CO01AV1110 — 01A Paint Fabricated Pipe Spools | 31-Dec-26 → 02-Jan-27 | Not Started 0% | float 253.0d CO01AV1110 WO010V1100 — 010 Paint | 31-Dec-26 → 05-Oct-27 | Not Started 0% | float 131.0d WO010V1100 CO02HM0200 — 02H Start Primary Reformer Erection (101-B) | 02-Jan-27 | Not Started CO02HM0210 — 02H Erect Radiant Section Shell (101-B) | 02-Jan-27 → 02-Apr-27 | Not Started 0% | float 108.0d CO02HM0210 CO02LU4120 — 02L U/G Piping Installation | 02-Jan-27 → 29-Jan-27 | Not Started 0% | float 123.0d CO02LU4120 PO03FS0130 — 03F Fab & Ship Miscellaneous Steel | 02-Jan-27 → 09-Apr-27 | Not Started 0% | float 88.0d PO03FS0130 EK01EA0140 — 01E Guard House Design Drawings - Approval | 03-Jan-27 → 16-Jan-27 | Not Started 0% | float 175.0d EK01EA0140 EK01FA0140 — 01F Mosque Design Drawings - Approval | 03-Jan-27 → 16-Jan-27 | Not Started 0% | float 119.0d EK01FA0140 PO01CS0130 — 01C Fab & Ship Miscellaneous Steel | 04-Jan-27 → 09-Apr-27 | Not Started 0% | float 106.0d PO01CS0130 PO02GS0130 — 02G Fab & Ship Miscellaneous Steel | 04-Jan-27 → 26-Mar-27 | Not Started 0% | float 107.0d PO02GS0130 CO01UP0150 — 01U LB Pipe Erection (Firewater Piping) | 05-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO01UP0150 WO010U4100 — 010 U/G Piping Installation | 05-Jan-27 → 26-Mar-27 | Not Started 0% | float 171.0d WO010U4100 CO02GU4120 — 02G U/G Piping Installation | 06-Jan-27 → 26-Feb-27 | Not Started 0% | float 159.0d CO02GU4120 CO03DC0120 — 03D Form, Pour, Strip Fnds - Misc Fnds | 06-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03DC0120 CK02QP0110 — 02Q A/G Pipe Spool Fabrication | 11-Jan-27 → 13-Apr-27 | Not Started 0% | float 90.0d CK02QP0110 EK05ACV210 — 05A COSMO Design Approval (Assuming No Change) | 11-Jan-27 → 16-Jan-27 | Not Started 0% | float -51.0d EK05ACV210 CO02CM0125 — 02C Set - 103/105-J Compressors | 12-Jan-27 → 16-Jan-27 | Not Started 0% | float 167.0d CO02CM0125 CO02YS0110 — 02Y Erect Structural Steel - Pipe Rack | 12-Jan-27 → 14-Jun-27 | Not Started 0% | float -35.0d CO02YS0110 WO020S0100 — 020 Erect Steel | 12-Jan-27 → 07-Oct-27 | Not Started 0% | float 69.0d WO020S0100 CO02HU3110 — 02H U/G Earthing Installation | 13-Jan-27 → 12-Feb-27 | Not Started 0% | float 162.0d CO02HU3110 CO03YV1110 — 03Y Paint Fabricated Pipe Spools | 13-Jan-27 → 13-Feb-27 | Not Started 0% | float 154.0d CO03YV1110 WO030V1100 — 030 Paint | 13-Jan-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030V1100 CO02CU3110 — 02C U/G Earthing Installation | 14-Jan-27 → 12-Feb-27 | Not Started 0% | float 168.0d CO02CU3110 CO03DU3110 — 03D U/G Earthing Installation | 15-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03DU3110 WO030U3100 — 030 Install U/G Electrical | 15-Jan-27 → 12-Mar-27 | Not Started 0% | float 229.0d WO030U3100 PO05AS0120 — 05A Fab & Ship Structural Steel | 15-Jan-27 → 04-Jun-27 | Not Started 0% | float 23.0d PO05AS0120 PO05AS0130 — 05A Fab & Ship Miscellaneous Steel | 15-Jan-27 → 04-Jun-27 | Not Started 0% | float 27.0d PO05AS0130 CO02HC0120 — 02H Form, Pour, Strip Fnds - Misc Fnds | 16-Jan-27 → 05-Feb-27 | Not Started 0% | float 174.0d CO02HC0120 CO02LU3110 — 02L U/G Earthing Installation | 16-Jan-27 → 12-Feb-27 | Not Started 0% | float 129.0d CO02LU3110 CO02UP0150 — 02U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO02UP0150 CO03UP0150 — 03U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO03UP0150 CO02CM0130 — 02C Install - 103/105-J Compressors & Aux. Equip. | 18-Jan-27 → 13-May-27 | Not Started 0% | float 167.0d CO02CM0130 CO05AC0185 — 05A Procure Material & Mob Piling Contractor | 18-Jan-27 → 30-Jan-27 | Not Started 0% | float -51.0d CO05AC0185 CO02AU3110 — 02A U/G Earthing Installation | 20-Jan-27 → 05-Feb-27 | Not Started 0% | float 228.0d CO02AU3110 CO02CV1110 — 02C Paint Fabricated Pipe Spools | 20-Jan-27 → 27-Feb-27 | Not Started 0% | float 245.0d CO02CV1110 WO020V1100 — 020 Paint | 20-Jan-27 → 14-Feb-28 | Not Started 0% | float 23.0d WO020V1100 CO02GC0110 — 02G Form, Pour, Strip Fnds - Major Fnds Gen'l | 23-Jan-27 → 26-Feb-27 | Not Started 0% | float 159.0d CO02GC0110 CK02CP0110 — 02C A/G Pipe Spool Fabrication | 25-Jan-27 → 20-Feb-27 | Not Started 0% | float 134.0d CK02CP0110 CO01HU3110 — 01H U/G Earthing Installation | 25-Jan-27 → 06-Feb-27 | Not Started 0% | float 134.0d CO01HU3110 CO02JU3110 — 02J U/G Earthing Installation | 25-Jan-27 → 12-Feb-27 | Not Started 0% | float 211.0d CO02JU3110 PO05BS0130 — 05B Fab & Ship Miscellaneous Steel | 25-Jan-27 → 12-Jun-27 | Not Started 0% | float 87.0d PO05BS0130 CO02BM0110 — 02B Set Static Equipment | 25-Jan-27 → 25-Jan-27 | Not Started 0% | float — CO02BV1130 — 02B Paint Touch-up - Equipment | 25-Jan-27 → 01-Feb-27 | Not Started 0% | float 300.0d CO02BV1130 CO02KU3110 — 02K U/G Earthing Installation | 26-Jan-27 → 12-Feb-27 | Not Started 0% | float 214.0d CO02KU3110 CO02EU3110 — 02E U/G Earthing Installation | 28-Jan-27 → 12-Feb-27 | Not Started 0% | float 227.0d CO02EU3110 CO01YV1110 — 01Y Paint Fabricated Pipe Spools | 28-Jan-27 → 05-Feb-27 | Not Started 0% | float 149.0d CO01YV1110 CO02FU3110 — 02F U/G Earthing Installation | 29-Jan-27 → 12-Feb-27 | Not Started 0% | float 234.0d CO02FU3110 CO01JP0230 — 01J U/G Pipe Erection - Piping to Corridor | 29-Jan-27 → 26-Feb-27 | Not Started 0% | float 160.0d CO01JP0230 CO04AU4120 — 04A U/G Piping Installation | 29-Jan-27 → 09-Aug-27 | Not Started 0% | float 108.0d CO04AU4120 WO04AE0100 — 04A Above Ground Electrical | 29-Jan-27 → 01-Sep-27 | Not Started 0% | float 108.0d WO04AE0100 WO04AI0100 — 04A Install Instruments & Test | 29-Jan-27 → 01-Sep-27 | Not Started 0% | float 108.0d WO04AI0100 WO04AM0100 — 04A Major Equipment | 29-Jan-27 → 01-Sep-27 | Not Started 0% | float 108.0d WO04AM0100 WO04AS0100 — 04A Erect Steel | 29-Jan-27 → 01-Sep-27 | Not Started 0% | float 108.0d WO04AS0100 WO04AU4100 — 04A U/G Piping Installation | 29-Jan-27 → 01-Sep-27 | Not Started 0% | float 108.0d WO04AU4100 CO02BC0120 — 02B Form, Pour, Strip Fnds - Misc Fnds | 29-Jan-27 → 29-Jan-27 | Not Started 0% | float — PO01YS0000 — 01Y Recv at Site - Structural Steel | 29-Jan-27 | Not Started PO03YS0000 — 03Y Recv at Site - Structural Steel | 29-Jan-27 | Not Started CO01BU4120 — 01B U/G Piping Installation | 30-Jan-27 → 10-Mar-27 | Not Started 0% | float 173.0d CO01BU4120 CO01DU4120 — 01D U/G Piping Installation | 30-Jan-27 → 02-Mar-27 | Not Started 0% | float 49.0d CO01DU4120 CO01EU4130 — 01E/F/G U/G Piping Installation (to Bldg Stub Outs) | 30-Jan-27 → 26-Mar-27 | Not Started 0% | float 147.0d CO01EU4130 CO02CC0120 — 02C Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 19-Feb-27 | Not Started 0% | float 162.0d CO02CC0120 CO02DC0120 — 02D Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 30-Jan-27 | Not Started 0% | float 260.0d CO02EC0120 — 02E Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 227.0d CO02EC0120 CO02FC0120 — 02F Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 234.0d CO02FC0120 CO02FM0110 — 02F Set Static Equipment | 30-Jan-27 → 26-Feb-27 | Not Started 0% | float 241.0d CO02FM0110 CO02JC0120 — 02J Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 211.0d CO02JC0120 CO02KC0120 — 02K Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 214.0d CO02KC0120 CO02LC0120 — 02L Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 19-Feb-27 | Not Started 0% | float 123.0d CO02LC0120 CO02MC0120 — 02M Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 239.0d CO02MC0120 CO02MU3110 — 02M U/G Earthing Installation | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 239.0d CO02MU3110 CO02YC0130 — 02Y Install Paving | 30-Jan-27 → 17-Mar-27 | Not Started 0% | float 71.0d CO02YC0130 CO03AU4120 — 03A U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 135.0d CO03AU4120 CO03BU4120 — 03B U/G Piping Installation | 30-Jan-27 → 17-Feb-27 | Not Started 0% | float 237.0d CO03BU4120 CO03CU4120 — 03C U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 166.0d CO03CU4120 CO03EU4120 — 03E U/G Piping Installation | 30-Jan-27 → 26-Feb-27 | Not Started 0% | float 121.0d CO03EU4120 CO03FU4120 — 03F U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 155.0d CO03FU4120 WO020C0110 — 020 Concrete Paving | 30-Jan-27 → 22-May-27 | Not Started 0% | float 210.0d WO020C0110 CO01HC0140 — 01H Form Pour Strip Fnds - Transformers & Generator | 01-Feb-27 → 27-Feb-27 | Not Started 0% | float 116.0d CO01HC0140 CO03DC0130 — 03D Install Paving | 01-Feb-27 → 06-Feb-27 | Not Started 0% | float 189.0d CO03DC0130 CO03FM0150 — 03F Install Chemical Injection System | 01-Feb-27 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0150 CO05AC0150 — 05A Install Piling - 2101-F Ammonia Tank | 01-Feb-27 → 19-Apr-27 | Not Started 0% | float -51.0d CO05AC0150 CO05AC0155 — 05A Install Piling - 2102-F Ammonia Tank | 01-Feb-27 → 19-Apr-27 | Not Started 0% | float -40.0d CO05AC0155 PO000EL000 — Electrical Heat Tracing - Purchase & Deliver Materials (By OCI) | 01-Feb-27 → 04-May-27 | Not Started 0% | float 108.0d PO000EL000 WO030C0110 — 030 Concrete Paving | 01-Feb-27 → 17-Apr-27 | Not Started 0% | float 210.0d WO030C0110 WO050C0100 — 050 Concrete & Excavation | 01-Feb-27 → 30-Jul-27 | Not Started 0% | float 152.0d WO050C0100 CO02DU3110 — 02D U/G Earthing Installation | 02-Feb-27 → 12-Feb-27 | Not Started 0% | float 248.0d CO02DU3110 CO01EA0130 — 01E Erect Guard House | 04-Feb-27 → 03-Mar-27 | Not Started 0% | float 191.0d CO01EA0130 CO01FA0130 — 01F Erect Mosque | 04-Feb-27 → 28-Apr-27 | Not Started 0% | float 143.0d CO01FA0130 CO02YV1110 — 02Y Paint Fabricated Pipe Spools | 05-Feb-27 → 19-Feb-27 | Not Started 0% | float 131.0d CO02YV1110 CO01CC0110 — 01C Form, Pour, Strip Fnds - Major Fnds Gen'l | 08-Feb-27 → 06-Mar-27 | Not Started 0% | float 117.0d CO01CC0110 CO01YC0130 — 01Y Install Paving | 08-Feb-27 → 27-Feb-27 | Not Started 0% | float 134.0d CO01YC0130 WO010C0110 — 010 Concrete Paving | 08-Feb-27 → 08-Jul-27 | Not Started 0% | float 188.0d WO010C0110 CK02GP0110 — 02G A/G Pipe Spool Fabrication | 09-Feb-27 → 15-Mar-27 | Not Started 0% | float 115.0d CK02GP0110 CO02BU3110 — 02B U/G Earthing Installation | 10-Feb-27 → 12-Feb-27 | Not Started 0% | float 289.0d CO02BU3110 CK03EP0110 — 03E A/G Pipe Spool Fabrication | 12-Feb-27 → 02-Mar-27 | Not Started 0% | float 126.0d CK03EP0110 CK03FP0110 — 03F A/G Pipe Spool Fabrication | 12-Feb-27 → 23-Feb-27 | Not Started 0% | float 132.0d CK03FP0110 CO02EV1110 — 02E Paint Fabricated Pipe Spools | 12-Feb-27 → 04-Mar-27 | Not Started 0% | float 250.0d CO02EV1110 CO03AC0120 — 03A Form, Pour, Strip Fnds - Misc Fnds | 12-Feb-27 → 25-Feb-27 | Not Started 0% | float 141.0d CO03AC0120 CO03CV1110 — 03C Paint Fabricated Pipe Spools | 13-Feb-27 → 24-Feb-27 | Not Started 0% | float 191.0d CO03CV1110 CO02GU3110 — 02G U/G Earthing Installation | 15-Feb-27 → 12-Mar-27 | Not Started 0% | float 159.0d CO02GU3110 CO02GV1110 — 02G Paint Fabricated Pipe Spools | 16-Feb-27 → 22-Mar-27 | Not Started 0% | float 230.0d CO02GV1110 CO03BC0120 — 03B Form, Pour, Strip Fnds - Misc Fnds | 18-Feb-27 → 03-Mar-27 | Not Started 0% | float 243.0d CO03BC0120 CO03CC0120 — 03C Form, Pour, Strip Fnds - Misc Fnds | 19-Feb-27 → 04-Mar-27 | Not Started 0% | float 166.0d CO03CC0120 CO03EV1110 — 03E Paint Fabricated Pipe Spools | 19-Feb-27 → 09-Mar-27 | Not Started 0% | float 171.0d CO03EV1110 CO03FC0120 — 03F Form, Pour, Strip Fnds - Misc Fnds | 19-Feb-27 → 11-Mar-27 | Not Started 0% | float 155.0d CO03FC0120 CO03FV1110 — 03F Paint Fabricated Pipe Spools | 19-Feb-27 → 02-Mar-27 | Not Started 0% | float 183.0d CO03FV1110 PO01DS0000 — 01D Recv at Site - Structural Steel | 19-Feb-27 | Not Started PO01DS0010 — 01D Recv at Site - Misc Steel | 19-Feb-27 | Not Started CK03AP0110 — 03A A/G Pipe Spool Fabrication | 20-Feb-27 → 03-Mar-27 | Not Started 0% | float 125.0d CK03AP0110 CO02CC0130 — 02C Install Paving | 20-Feb-27 → 05-Mar-27 | Not Started 0% | float 162.0d CO02CC0130 CO02LC0130 — 02L Install Paving | 20-Feb-27 → 05-Mar-27 | Not Started 0% | float 123.0d CO02LC0130 CO01CU4120 — 01C U/G Piping Installation | 22-Feb-27 → 06-Mar-27 | Not Started 0% | float 160.0d CO01CU4120 CO02HM0220 — 02H Erect Radiant Ducting / Burners (101-B) | 22-Feb-27 → 20-Mar-27 | Not Started 0% | float 151.0d CO02HM0220 PO02KS0130 — 02K Fab & Ship Miscellaneous Steel | 22-Feb-27 → 09-Apr-27 | Not Started 0% | float 120.0d PO02KS0130 CO03BU3110 — 03B U/G Earthing Installation | 23-Feb-27 → 03-Mar-27 | Not Started 0% | float 237.0d CO03BU3110 CK02JP0110 — 02J A/G Pipe Spool Fabrication | 23-Feb-27 → 20-Mar-27 | Not Started 0% | float 111.0d CK02JP0110 CO03CU3110 — 03C U/G Earthing Installation | 24-Feb-27 → 04-Mar-27 | Not Started 0% | float 166.0d CO03CU3110 CO03FU3110 — 03F U/G Earthing Installation | 24-Feb-27 → 04-Mar-27 | Not Started 0% | float 161.0d CO03FU3110 CO03AU3110 — 03A U/G Earthing Installation | 26-Feb-27 → 04-Mar-27 | Not Started 0% | float 135.0d CO03AU3110 CO02UDT110 — 02U Mechanical Completion | 26-Feb-27 | Not Started CO03UDT110 — 03U Mechanical Completion | 26-Feb-27 | Not Started PO01BS0010 — 01B Recv at Site - Misc Steel | 26-Feb-27 | Not Started SC02UT0120 — 02U RFSU | 26-Feb-27 | Not Started SC03UT0120 — 03U RFSU | 26-Feb-27 | Not Started CK03DP0110 — 03D A/G Pipe Spool Fabrication | 27-Feb-27 → 04-Mar-27 | Not Started 0% | float 124.0d CK03DP0110 CO02GC0120 — 02G Form, Pour, Strip Fnds - Misc Fnds | 27-Feb-27 → 19-Mar-27 | Not Started 0% | float 165.0d CO02GC0120 CO02GM0110 — 02G Set Static Equipment - Gen'l | 27-Feb-27 → 31-Mar-27 | Not Started 0% | float 208.0d CO02GM0110 CO03AV1110 — 03A Paint Fabricated Pipe Spools | 27-Feb-27 → 10-Mar-27 | Not Started 0% | float 148.0d CO03AV1110 CO03EC0120 — 03E Form, Pour, Strip Fnds - Misc Fnds | 27-Feb-27 → 19-Mar-27 | Not Started 0% | float 121.0d CO03EC0120 CO03EU3110 — 03E U/G Earthing Installation | 27-Feb-27 → 12-Mar-27 | Not Started 0% | float 127.0d CO03EU3110 CK01CP0110 — 01C A/G Pipe Spool Fabrication | 27-Feb-27 → 06-Mar-27 | Not Started 0% | float 123.0d CK01CP0110 CO01HC0120 — 01H Form, Pour, Strip Fnds - Misc Fnds | 01-Mar-27 → 13-Mar-27 | Not Started 0% | float 176.0d CO01HC0120 CO02JS0130 — 02J Pre-Install Misc Steel - 104-D2 | 01-Mar-27 → 15-Mar-27 | Not Started 0% | float 103.0d CO02JS0130 CO02JS0140 — 02J Pre-Install Misc Steel - 104-D1 | 01-Mar-27 → 15-Mar-27 | Not Started 0% | float 108.0d CO02JS0140 CO02LS0130 — 02L Pre-Install Misc Steel - 101-E | 01-Mar-27 → 15-Mar-27 | Not Started 0% | float 113.0d CO02LS0130 CO03BM0110 — 03B Set Static Equipment - Gen'l | 01-Mar-27 → 02-Apr-27 | Not Started 0% | float 212.0d CO03BM0110 CO03EM0110 — 03E Set Static Equipment - Gen'l | 01-Mar-27 → 05-Apr-27 | Not Started 0% | float 135.0d CO03EM0110 CO01DC0110 — 01D Form, Pour, Strip Fnds - Major Fnds Gen'l | 03-Mar-27 → 13-Apr-27 | Not Started 0% | float 49.0d CO01DC0110 CO01DU3110 — 01D U/G Earthing Installation | 03-Mar-27 → 17-Mar-27 | Not Started 0% | float 113.0d CO01DU3110 CO01EC0135 — 01E Install Paving - Guard House | 04-Mar-27 → 17-Mar-27 | Not Started 0% | float 285.0d CO01EC0135 CO03BC0130 — 03B Install Paving | 04-Mar-27 → 17-Mar-27 | Not Started 0% | float 237.0d CO03BC0130 CO01BU3110 — 01B U/G Earthing Installation | 05-Mar-27 → 24-Mar-27 | Not Started 0% | float 173.0d CO01BU3110 PO02LS0000 — 02L Recv at Site - Structural Steel | 05-Mar-27 | Not Started PO02LS0010 — 02L Recv at Site - Misc Steel | 05-Mar-27 | Not Started PO02YS0000 — 02Y Recv at Site - Structural Steel (Last Shipment) | 05-Mar-27 | Not Started CO01YS0110 — 01Y Erect Structural Steel - Pipe Rack | 06-Mar-27 → 30-Apr-27 | Not Started 0% | float 39.0d CO01YS0110 CO03DV1110 — 03D Paint Fabricated Pipe Spools | 06-Mar-27 → 11-Mar-27 | Not Started 0% | float 172.0d CO03DV1110 CO03YS0110 — 03Y Erect Structural Steel | 06-Mar-27 → 26-Mar-27 | Not Started 0% | float 39.0d CO03YS0110 WO010S0100 — 010 Erect Steel | 06-Mar-27 → 11-Jun-27 | Not Started 0% | float 94.0d WO010S0100 WO030S0100 — 030 Erect Steel | 06-Mar-27 → 25-Jun-27 | Not Started 0% | float 157.0d WO030S0100 CO01CV1110 — 01C Paint Fabricated Pipe Spools | 06-Mar-27 → 13-Mar-27 | Not Started 0% | float 174.0d CO01CV1110 CO01BV1110 — 01B Paint Fabricated Pipe Spools | 08-Mar-27 → 30-Mar-27 | Not Started 0% | float 153.0d CO01BV1110 CO01CC0120 — 01C Form, Pour, Strip Fnds - Misc Fnds | 08-Mar-27 → 27-Mar-27 | Not Started 0% | float 160.0d CO01CC0120 CO03AC0130 — 03A Install Paving | 08-Mar-27 → 13-Mar-27 | Not Started 0% | float 133.0d CO03AC0130 CO02GM0125 — 02G Set - 101-J/JT Air Compr. | 08-Mar-27 → 05-Apr-27 | Not Started 0% | float 105.0d CO02GM0125 CO02AC0120 — 02A Form, Pour, Strip Fnds - Misc Fnds | 10-Mar-27 → 23-Mar-27 | Not Started 0% | float 189.0d CO02AC0120 CO02AM0150 — 02A Set Rotating Equipment | 10-Mar-27 → 06-Apr-27 | Not Started 0% | float 207.0d CO02AM0150 CO01DV1110 — 01D Paint Fabricated Pipe Spools | 11-Mar-27 → 29-Mar-27 | Not Started 0% | float 142.0d CO01DV1110 CO02GC0130 — 02G Install Paving | 13-Mar-27 → 26-Mar-27 | Not Started 0% | float 159.0d CO02GC0130 CO01CU3110 — 01C U/G Earthing Installation | 15-Mar-27 → 20-Mar-27 | Not Started 0% | float 166.0d CO01CU3110 CO01GU3110 — 01G U/G Earthing Installation | 15-Mar-27 → 27-Mar-27 | Not Started 0% | float 146.0d CO01GU3110 CO03CC0130 — 03C Install Paving | 15-Mar-27 → 20-Mar-27 | Not Started 0% | float 158.0d CO03CC0130 CO02HM0250 — 02H Set Forced Draft Fan (101-B) | 15-Mar-27 → 12-Apr-27 | Not Started 0% | float 234.0d CO02HM0250 CO03CM0150 — 03C Set Rotating Equipment | 15-Mar-27 → 22-Mar-27 | Not Started 0% | float 146.0d CO03CM0150 CO03DM0150 — 03D Set Rotating Equipment | 15-Mar-27 → 29-Mar-27 | Not Started 0% | float 158.0d CO03DM0150 CO02HM0135 — 02H Give 30 Day notice to Manufacture Refractory (103-D) | 16-Mar-27 | Not Started CO03FV1130 — 03F Paint Touch-up - Equipment | 17-Mar-27 → 27-Mar-27 | Not Started 0% | float 183.0d CO03FV1130 CO02YS0120 — 02Y Erect Misc Steel - Pipe Rack | 19-Mar-27 → 14-Jun-27 | Not Started 0% | float 102.0d CO02YS0120 PO02MS0000 — 02M Recv at Site - Structural Steel | 19-Mar-27 | Not Started PO02MS0010 — 02M Recv at Site - Misc Steel | 19-Mar-27 | Not Started CK02MP0110 — 02M A/G Pipe Spool Fabrication | 22-Mar-27 → 07-Apr-27 | Not Started 0% | float 95.0d CK02MP0110 CO02HM0246 — 02H Install Radiant Sect Coils (101-B) | 22-Mar-27 → 17-Apr-27 | Not Started 0% | float 151.0d CO02HM0246 CO03FC0130 — 03F Install Paving | 22-Mar-27 → 03-Apr-27 | Not Started 0% | float 147.0d CO03FC0130 CO02HM0255 — 02H Set Induced Draft Fan (101-B) | 22-Mar-27 → 19-Apr-27 | Not Started 0% | float 234.0d CO02HM0255 CO02KV1130 — 02K Paint Touch-up - Equipment | 23-Mar-27 → 15-Apr-27 | Not Started 0% | float 236.0d CO02KV1130 CO02AC0130 — 02A Install Paving | 24-Mar-27 → 30-Mar-27 | Not Started 0% | float 189.0d CO02AC0130 CO03CV1130 — 03C Paint Touch-up - Equipment | 24-Mar-27 → 05-Apr-27 | Not Started 0% | float 195.0d CO03CV1130 CO02CM0150 — 02C Set Rotating Equipment - 112-J/JA/JM | 26-Mar-27 → 30-Mar-27 | Not Started 0% | float 205.0d CO02CM0150 CO02GM0150 — 02G Set Rotating Equipment | 26-Mar-27 → 10-Apr-27 | Not Started 0% | float 199.0d CO02GM0150 CO02KM0150 — 02K Set Rotating Equipment | 26-Mar-27 → 01-Apr-27 | Not Started 0% | float 163.0d CO02KM0150 CO02LM0150 — 02L Set Rotating Equipment | 26-Mar-27 → 27-Apr-27 | Not Started 0% | float 170.0d CO02LM0150 CO03BM0150 — 03B Set Rotating Equipment | 26-Mar-27 → 15-Apr-27 | Not Started 0% | float 200.0d CO03BM0150 CO01UDT110 — 01U Mechanical Completion | 26-Mar-27 | Not Started PO02CS0010 — 02C Recv at Site - Misc Steel | 26-Mar-27 | Not Started PO02GS0010 — 02G Recv at Site - Misc Steel | 26-Mar-27 | Not Started PO02HS0000 — 02H Recv at Site - Structural Steel | 26-Mar-27 | Not Started PO02HS0010 — 02H Recv at Site - Misc Steel | 26-Mar-27 | Not Started SC01UT0120 — 01U RFSU | 26-Mar-27 | Not Started CO02HS0140 — 02H Install Misc Steel - 156-F | 27-Mar-27 → 09-Apr-27 | Not Started 0% | float 102.0d CO02HS0140 CO03YP0130 — 03Y LB Pipe Erection | 27-Mar-27 → 09-Jul-27 | Not Started 0% | float 39.0d CO03YP0130 WO030P0100 — 030 Above Ground Pipe | 27-Mar-27 → 23-Aug-27 | Not Started 0% | float 138.0d WO030P0100 CO02JV1110 — 02J Paint Fabricated Pipe Spools | 27-Mar-27 → 27-Mar-27 | Not Started 0% | float 164.0d CK03BP0110 — 03B A/G Pipe Spool Fabrication | 29-Mar-27 → 08-Apr-27 | Not Started 0% | float 94.0d CK03BP0110 CO01CC0130 — 01C Install Paving | 29-Mar-27 → 10-Apr-27 | Not Started 0% | float 160.0d CO01CC0130 CO03AM0110 — 03A Set Static Equipment | 29-Mar-27 → 26-Apr-27 | Not Started 0% | float 95.0d CO03AM0110 CO02AV1130 — 02A Paint Touch-up - Equipment | 30-Mar-27 → 20-Apr-27 | Not Started 0% | float 232.0d CO02AV1130 CO01BM0110 — 01B Set Static Equipment | 31-Mar-27 → 27-Apr-27 | Not Started 0% | float 71.0d CO01BM0110 CO02MV1110 — 02M Paint Fabricated Pipe Spools | 01-Apr-27 → 14-Apr-27 | Not Started 0% | float 215.0d CO02MV1110 CO02NV1110 — 02N Paint Fabricated Pipe Spools | 01-Apr-27 → 03-Apr-27 | Not Started 0% | float 216.0d CO02NV1110 CO04AU3110 — 04A U/G Fiber Optic Cable Installation | 01-Apr-27 → 10-Aug-27 | Not Started 0% | float 137.0d CO04AU3110 WO04AU3100 — 04A Install U/G Electrical | 01-Apr-27 → 10-Aug-27 | Not Started 0% | float 137.0d WO04AU3100 CK02LP0110 — 02L A/G Pipe Spool Fabrication | 02-Apr-27 → 22-May-27 | Not Started 0% | float 32.0d CK02LP0110 CO02DM0150 — 02D Set Rotating Equipment | 02-Apr-27 → 15-Apr-27 | Not Started 0% | float 182.0d CO02DM0150 PO02DS0000 — 02D Recv at Site - Structural Steel | 02-Apr-27 | Not Started PO02DS0010 — 02D Recv at Site - Misc Steel | 02-Apr-27 | Not Started CK02KP0110 — 02K A/G Pipe Spool Fabrication | 03-Apr-27 → 27-Apr-27 | Not Started 0% | float 78.0d CK02KP0110 CO01BS0120 — 01B Erect Misc Steel | 03-Apr-27 → 30-Apr-27 | Not Started 0% | float 86.0d CO01BS0120 CO02HC0130 — 02H Install Paving | 03-Apr-27 → 16-Apr-27 | Not Started 0% | float 120.0d CO02HC0130 CO02HM0230 — 02H Set Convection Sections (101-B) | 03-Apr-27 → 30-Apr-27 | Not Started 0% | float 108.0d CO02HM0230 CO02HM0240 — 02H Set Stack for (101-B) | 03-Apr-27 → 30-Apr-27 | Not Started 0% | float 223.0d CO02HM0240 CO03YP0140 — 03Y SB Pipe Erection | 03-Apr-27 → 16-Jul-27 | Not Started 0% | float 45.0d CO03YP0140 CO02JC0130 — 02J Install Paving | 05-Apr-27 → 10-Apr-27 | Not Started 0% | float 168.0d CO02JC0130 CO03BV1110 — 03B Paint Fabricated Pipe Spools | 05-Apr-27 → 15-Apr-27 | Not Started 0% | float 223.0d CO03BV1110 CO03EC0130 — 03E Install Paving | 05-Apr-27 → 17-Apr-27 | Not Started 0% | float 108.0d CO03EC0130 CO01CM0110 — 01C Set Static Equipment - EDR Equipment | 05-Apr-27 → 31-May-27 | Not Started 0% | float 93.0d CO01CM0110 CO01CM0115 — 01C Set Rotating Equipment - EDR Equipment | 05-Apr-27 → 31-May-27 | Not Started 0% | float 99.0d CO01CM0115 CO02GM0130 — 02G Install - 101-J/JT Air Compr. & Gen. Turb. & Aux. | 05-Apr-27 → 30-Jul-27 | Not Started 0% | float 105.0d CO02GM0130 CO02HS0130 — 02H Pre-Install Misc Steel - 103-D | 05-Apr-27 → 19-Apr-27 | Not Started 0% | float 68.0d CO02HS0130 CO03DV1130 — 03D Paint Touch-up - Equipment (& 2002-F Tank) | 06-Apr-27 → 12-Apr-27 | Not Started 0% | float 189.0d CO03DV1130 CO02FV1110 — 02F Paint Fabricated Pipe Spools | 09-Apr-27 → 27-Apr-27 | Not Started 0% | float 204.0d CO02FV1110 CO02LV1110 — 02L Paint Fabricated Pipe Spools | 09-Apr-27 → 29-May-27 | Not Started 0% | float 162.0d CO02LV1110 PO01CS0010 — 01C Recv at Site - Misc Steel | 09-Apr-27 | Not Started PO01HS0010 — 01H Recv at Site - Misc Steel | 09-Apr-27 | Not Started PO02AS0000 — 02A Recv at Site - Structural Steel | 09-Apr-27 | Not Started PO02AS0010 — 02A Recv at Site - Misc Steel | 09-Apr-27 | Not Started PO02KS0010 — 02K Recv at Site - Misc Steel | 09-Apr-27 | Not Started PO03BS0010 — 03B Recv at Site - Misc Steel | 09-Apr-27 | Not Started PO03FS0010 — 03F Recv at Site - Misc Steel | 09-Apr-27 | Not Started CO02KV1110 — 02K Paint Fabricated Pipe Spools | 10-Apr-27 → 04-May-27 | Not Started 0% | float 181.0d CO02KV1110 CO02LS0110 — 02L Erect Structure | 10-Apr-27 → 18-Jun-27 | Not Started 0% | float -15.0d CO02LS0110 PO000E0010 — Receive at Site - A/G Electrical Bulks (First) | 10-Apr-27 | Not Started CO02KC0130 — 02K Install Paving | 12-Apr-27 → 17-Apr-27 | Not Started 0% | float 165.0d CO02KC0130 CO01HA0110 — 01H Set 2610-K Electrical Power House | 12-Apr-27 → 03-May-27 | Not Started 0% | float 76.0d CO01HA0110 CO02YP0130 — 02Y LB Pipe Erection | 13-Apr-27 → 05-Oct-27 | Not Started 0% | float -35.0d CO02YP0130 WO020P0100 — 020 Above Ground Pipe | 13-Apr-27 → 14-Feb-28 | Not Started 0% | float -1.0d WO020P0100 CO01DC0120 — 01D Form, Pour, Strip Fnds - Misc Fnds | 14-Apr-27 → 04-May-27 | Not Started 0% | float 72.0d CO01DC0120 CO01DM0110 — 01D Set Static Equipment | 14-Apr-27 → 25-May-27 | Not Started 0% | float 49.0d CO01DM0110 CO02DV1130 — 02D Paint Touch-up - Equipment | 15-Apr-27 → 29-Apr-27 | Not Started 0% | float 224.0d CO02DV1130 CO02FM0150 — 02F Set Rotating Equipment | 16-Apr-27 → 13-May-27 | Not Started 0% | float 176.0d CO02FM0150 CO02QV1110 — 02Q Paint Fabricated Pipe Spools | 16-Apr-27 → 20-Apr-27 | Not Started 0% | float 210.0d CO02QV1110 PO02ES0000 — 02E Recv at Site - Structural Steel | 16-Apr-27 | Not Started PO02ES0010 — 02E Recv at Site - Misc Steel | 16-Apr-27 | Not Started PO02FS0010 — 02F Recv at Site - Misc Steel | 16-Apr-27 | Not Started PO02JS0000 — 02J Recv at Site - Structural Steel | 16-Apr-27 | Not Started PO02JS0010 — 02J Recv at Site - Misc Steel | 16-Apr-27 | Not Started PO03AS0010 — 03A Recv at Site - Misc Steel | 16-Apr-27 | Not Started PO03CS0010 — 03C Recv at Site - Misc Steel | 16-Apr-27 | Not Started PO03DS0010 — 03D Recv at Site - Misc Steel | 16-Apr-27 | Not Started PO03ES0010 — 03E Recv at Site - Misc Steel | 16-Apr-27 | Not Started CO020M0110 — Mobilize / Assemble / Test Heavy Lift Crane | 19-Apr-27 → 01-May-27 | Not Started 0% | float 56.0d CO020M0110 CO02EC0130 — 02E Install Paving | 19-Apr-27 → 24-Apr-27 | Not Started 0% | float 172.0d CO02EC0130 CO02HM0248 — 02H Install Effluent Transfer Line (107-D) | 19-Apr-27 → 01-May-27 | Not Started 0% | float 151.0d CO02HM0248 CO03BV1130 — 03B Paint Touch-up - Equipment | 19-Apr-27 → 29-Apr-27 | Not Started 0% | float 248.0d CO03BV1130 CK02HP0110 — 02H A/G Pipe Spool Fabrication | 19-Apr-27 → 29-May-27 | Not Started 0% | float 51.0d CK02HP0110 CO01HM0110 — 01H Set Static Equipment - 2303-J Emergency Pwr Gen. | 19-Apr-27 → 31-May-27 | Not Started 0% | float 86.0d CO01HM0110 CO02LS0140 — 02L Pre-Install Misc Steel - 102-E | 19-Apr-27 → 03-May-27 | Not Started 0% | float 76.0d CO02LS0140 CO05AC0160 — 05A Form, Pour, Strip Fnd - 2101-F Ammonia Tank | 20-Apr-27 → 16-Jun-27 | Not Started 0% | float -51.0d CO05AC0160 CO05AC0165 — 05A Form, Pour, Strip Fnd - 2102-F Ammonia Tank | 20-Apr-27 → 16-Jun-27 | Not Started 0% | float -40.0d CO05AC0165 CO02DV1110 — 02D Paint Fabricated Pipe Spools | 23-Apr-27 → 07-May-27 | Not Started 0% | float 177.0d CO02DV1110 CO04AC0110 — 04A Concrete (Valve Boxes & Paving) | 23-Apr-27 → 23-Aug-27 | Not Started 0% | float 130.0d CO04AC0110 WO04AC0100 — 04A Concrete (Valve Boxes & Paving) | 23-Apr-27 → 23-Aug-27 | Not Started 0% | float 130.0d WO04AC0100 PO02QMS110 — 02Q Recv at Site - Misc Steel | 23-Apr-27 | Not Started CO01YS0120 — 01Y Erect Misc Steel - Pipe Rack | 24-Apr-27 → 21-May-27 | Not Started 0% | float 39.0d CO01YS0120 CO02MS0110 — 02M Erect Structural Steel - Structure | 24-Apr-27 → 14-May-27 | Not Started 0% | float 123.0d CO02MS0110 CO02PV1110 — 02P Paint Fabricated Pipe Spools | 24-Apr-27 → 28-Apr-27 | Not Started 0% | float 199.0d CO02PV1110 CO02FC0130 — 02F Install Paving | 26-Apr-27 → 01-May-27 | Not Started 0% | float 173.0d CO02FC0130 CO02HV1110 — 02H Paint Fabricated Pipe Spools | 26-Apr-27 → 05-Jun-27 | Not Started 0% | float 54.0d CO02HV1110 CK05AP0110 — 05A A/G Pipe Spool Fabrication | 28-Apr-27 → 31-May-27 | Not Started 0% | float 49.0d CK05AP0110 CO04AU4130 — 04A Punchlist / Test U/G Piping | 28-Apr-27 → 01-Sep-27 | Not Started 0% | float 108.0d CO04AU4130 CO01FC0135 — 01F Install Paving - Mosque | 29-Apr-27 → 19-May-27 | Not Started 0% | float 203.0d CO01FC0135 PO02NMS110 — 02N Recv at Site - Misc Steel | 30-Apr-27 | Not Started CO01BM0150 — 01B Set Rotating Equipment | 01-May-27 → 11-Jun-27 | Not Started 0% | float 32.0d CO01BM0150 CO01DM0150 — 01D Set Rotating Equipment | 01-May-27 → 11-Jun-27 | Not Started 0% | float 34.0d CO01DM0150 CO01YP0130 — 01Y LB Pipe Erection - Pipe Rack | 01-May-27 → 25-Jun-27 | Not Started 0% | float 39.0d CO01YP0130 CO02CS0120 — 02C Erect Misc. Steel (Platforms) | 01-May-27 → 02-Aug-27 | Not Started 0% | float 83.0d CO02CS0120 CO02GS0130 — 02G Erect Misc. Steel (Platforms) | 01-May-27 → 02-Aug-27 | Not Started 0% | float 107.0d CO02GS0130 CO02HM0235 — 02H Erect Preheater (101-B) | 01-May-27 → 25-Jun-27 | Not Started 0% | float 175.0d CO02HM0235 WO010P0100 — 010 Above Ground Pipe | 01-May-27 → 05-Oct-27 | Not Started 0% | float 95.0d WO010P0100 CO020M0120 — Heavy Lift Crane Useage | 03-May-27 → 04-Aug-27 | Not Started 0% | float 56.0d CO020M0120 CO02HM0130 — 02H Set (Heavy Lift) - 103-D (Secondary Reformer) | 03-May-27 → 07-May-27 | Not Started 0% | float 56.0d CO02HM0130 CO02HM0225 — 02H Erect Penthouse Roof, & Siding (101-B) | 03-May-27 → 29-May-27 | Not Started 0% | float 151.0d CO02HM0225 CO02MC0130 — 02M Install Paving | 03-May-27 → 08-May-27 | Not Started 0% | float 172.0d CO02MC0130 CO02KS0130 — 02K Pre-Install Misc Steel - Static Equipment | 03-May-27 → 17-May-27 | Not Started 0% | float 101.0d CO02KS0130 CO02GP0130 — 02G LB Pipe Erection | 04-May-27 → 10-Sep-27 | Not Started 0% | float 105.0d CO02GP0130 CK02AP0110 — 02A A/G Pipe Spool Fabrication | 05-May-27 → 26-May-27 | Not Started 0% | float 53.0d CK02AP0110 CO000E0500 — Cathodic Protection - Installation | 05-May-27 → 17-Oct-27 | Not Started 0% | float 6.0d CO000E0500 CO01DC0130 — 01D Install Paving | 05-May-27 → 18-May-27 | Not Started 0% | float 72.0d CO01DC0130 CO01DS0120 — 01D Erect Misc Steel | 05-May-27 → 01-Jun-27 | Not Started 0% | float 61.0d CO01DS0120 CO05AV1110 — 05A Paint Fabricated Pipe Spools | 05-May-27 → 07-Jun-27 | Not Started 0% | float 166.0d CO05AV1110 WO050V1100 — 050 Paint | 05-May-27 → 12-Apr-28 | Not Started 0% | float 12.0d WO050V1100 WP000U3100 — Cathodic Protection | 05-May-27 → 17-Oct-27 | Not Started 0% | float 6.0d WP000U3100 CO02CP0130 — 02C LB Pipe Erection | 08-May-27 → 08-Oct-27 | Not Started 0% | float 83.0d CO02CP0130 CO02DS0110 — 02D Erect Structural Steel | 08-May-27 → 28-May-27 | Not Started 0% | float 93.0d CO02DS0110 CO02JM0130 — 02J Set (Heavy Lift) - 104-D2 (Low Temp Shift Converter) | 08-May-27 → 13-May-27 | Not Started 0% | float 56.0d CO02JM0130 CO02LS0120 — 02L Erect Misc Steel | 08-May-27 → 04-Jun-27 | Not Started 0% | float 39.0d CO02LS0120 CO02DC0130 — 02D Install Paving | 10-May-27 → 15-May-27 | Not Started 0% | float 175.0d CO02DC0130 CO02FV1130 — 02F Paint Touch-up - Equipment | 10-May-27 → 27-May-27 | Not Started 0% | float 200.0d CO02FV1130 CO02MS0130 — 02M Pre-Install Misc Steel - 105-D | 10-May-27 → 24-May-27 | Not Started 0% | float 63.0d CO02MS0130 CO02YP0140 — 02Y SB Pipe Erection | 11-May-27 → 02-Nov-27 | Not Started 0% | float -29.0d CO02YP0140 CO05AC0120 — 05A Form, Pour, Strip Fnds - Sleeper & Rack | 11-May-27 → 14-Jun-27 | Not Started 0% | float 44.0d CO05AC0120 CO02GP0140 — 02G SB Pipe Erection | 11-May-27 → 25-Sep-27 | Not Started 0% | float 105.0d CO02GP0140 CO04AV2110 — 04A Insulation | 12-May-27 → 28-Sep-27 | Not Started 0% | float 108.0d CO04AV2110 WO04AV2100 — 04A Insulation | 12-May-27 → 28-Sep-27 | Not Started 0% | float 108.0d WO04AV2100 CO05AU4120 — 05A U/G Piping Installation | 13-May-27 → 07-Jul-27 | Not Started 0% | float 77.0d CO05AU4120 WO050U4100 — 050 U/G Piping Installation | 13-May-27 → 30-Sep-27 | Not Started 0% | float 135.0d WO050U4100 CO02CV1130 — 02C Paint Touch-up - Equipment | 14-May-27 → 22-Jun-27 | Not Started 0% | float 190.0d CO02CV1130 CO02JM0140 — 02J Set (Heavy Lift) - 104-D1 (High Temp Shift Converter) | 14-May-27 → 19-May-27 | Not Started 0% | float 56.0d CO02JM0140 CO01CS0120 — 01C Erect Misc Steel | 15-May-27 → 28-May-27 | Not Started 0% | float 106.0d CO01CS0120 CO01HS0110 — 01H Erect Structural Steel - Stairs & Platform | 15-May-27 → 11-Jun-27 | Not Started 0% | float 51.0d CO01HS0110 CO02AS0110 — 02A Erect Structural Steel | 15-May-27 → 04-Jun-27 | Not Started 0% | float 103.0d CO02AS0110 CO02CP0140 — 02C SB Pipe Erection | 15-May-27 → 15-Oct-27 | Not Started 0% | float 83.0d CO02CP0140 CO02MM0110 — 02M Set Static Equipment - Gen'l | 15-May-27 → 16-Jun-27 | Not Started 0% | float 147.0d CO02MM0110 CO03BS0120 — 03B Erect Misc Steel - Structure | 15-May-27 → 11-Jun-27 | Not Started 0% | float 169.0d CO03BS0120 CO03FS0120 — 03F Erect Misc Steel | 15-May-27 → 25-Jun-27 | Not Started 0% | float 88.0d CO03FS0120 PO000V2005 — Receive at Site - Insulation Materials | 15-May-27 | Not Started CO01BE0110 — 01B Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO01BE0110 CO01EE0110 — 01E Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 180.0d CO01EE0110 CO01FE0110 — 01F Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 152.0d CO01FE0110 CO01GE0130 — 01G Power Tray, Cable, Terminations | 17-May-27 → 12-Jun-27 | Not Started 0% | float 92.0d CO01GE0130 CO02BC0130 — 02B Install Paving | 17-May-27 → 22-May-27 | Not Started 0% | float 210.0d CO02BC0130 CO03CE0110 — 03C Lighting JB's, Stands, Tray & Cable | 17-May-27 → 12-Jun-27 | Not Started 0% | float 123.0d CO03CE0110 CO03DE0110 — 03D Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO03DE0110 CO03DE0130 — 03D Power/Control JB's, Tray, Cable, Termination | 17-May-27 → 04-Jun-27 | Not Started 0% | float 131.0d CO03DE0130 CO03EE0110 — 03E Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO03EE0110 CO03FE0110 — 03F Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 111.0d CO03FE0110 CO03YE0110 — 03Y Lighting JB's, Stands, Tray & Cable | 17-May-27 → 07-Aug-27 | Not Started 0% | float 162.0d CO03YE0110 CO03YE0130 — 03Y Power/Control JB's, Tray, Cable, Termination | 17-May-27 → 07-Aug-27 | Not Started 0% | float 32.0d CO03YE0130 CO03YI0120 — 03Y Instrument JB's, Field Instr, Tray, Cable | 17-May-27 → 07-Aug-27 | Not Started 0% | float 32.0d CO03YI0120 WO010E0100 — 010 Above Ground Electrical | 17-May-27 → 05-Oct-27 | Not Started 0% | float 131.0d WO010E0100 WO030E0100 — 030 Above Ground Electrical | 17-May-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030E0100 WO030I0100 — 030 Install Instruments & Test | 17-May-27 → 17-Jan-28 | Not Started 0% | float 41.0d WO030I0100 CO02KM0110 — 02K Set Static Equipment - Gen'l | 17-May-27 → 07-Jun-27 | Not Started 0% | float 101.0d CO02KM0110 CO04AK0110 — 04A Site Prep (Leveling) | 19-May-27 → 05-Oct-27 | Not Started 0% | float 108.0d CO04AK0110 WO04AK0100 — 04A Site Prep (Leveling) | 19-May-27 → 05-Oct-27 | Not Started 0% | float 108.0d WO04AK0100 CO02AV1110 — 02A Paint Fabricated Pipe Spools | 20-May-27 → 02-Jun-27 | Not Started 0% | float 172.0d CO02AV1110 CO02LM0130 — 02L Set (Heavy Lift) - 101-E (CO2 Absorber) | 20-May-27 → 25-May-27 | Not Started 0% | float 56.0d CO02LM0130 CK05BP0110 — 05B A/G Pipe Spool Fabrication | 22-May-27 → 31-May-27 | Not Started 0% | float 49.0d CK05BP0110 CO01YE0110 — 01Y Lighting JB's, Stands, Tray & Cable | 22-May-27 → 02-Jul-27 | Not Started 0% | float 175.0d CO01YE0110 CO02ES0110 — 02E Erect Structural Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 127.0d CO02ES0110 CO02ES0120 — 02E Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 67.0d CO02ES0120 CO02FS0120 — 02F Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 133.0d CO02FS0120 CO02JS0110 — 02J Erect Structural Steel - Structure | 22-May-27 → 04-Jun-27 | Not Started 0% | float 98.0d CO02JS0110 CO02MS0120 — 02M Erect Misc Steel - Structure | 22-May-27 → 11-Jun-27 | Not Started 0% | float 123.0d CO02MS0120 CO03AS0120 — 03A Erect Misc Steel - Structure | 22-May-27 → 18-Jun-27 | Not Started 0% | float 56.0d CO03AS0120 CO03CS0120 — 03C Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 87.0d CO03CS0120 CO03DS0120 — 03D Erect Misc Steel | 22-May-27 → 18-Jun-27 | Not Started 0% | float 98.0d CO03DS0120 CO03ES0120 — 03E Erect Misc Steel - Structure | 22-May-27 → 18-Jun-27 | Not Started 0% | float 58.0d CO03ES0120 CO02BV1110 — 02B Paint Fabricated Pipe Spools | 25-May-27 → 31-May-27 | Not Started 0% | float 175.0d CO02BV1110 CO03FP0130 — 03F LB Pipe Erection | 25-May-27 → 02-Jul-27 | Not Started 0% | float 88.0d CO03FP0130 CO02LM0140 — 02L Set (Heavy Lift) - 102-E (CO2 Stripper) | 26-May-27 → 31-May-27 | Not Started 0% | float 56.0d CO02LM0140 CO02GE0130 — 02G Power/Control JB's, Tray, Cable, Termination | 26-May-27 → 02-Oct-27 | Not Started 0% | float 108.0d CO02GE0130 CO02GI0120 — 02G Instrument JB's, Field Instr, Tray, Cable | 26-May-27 → 02-Oct-27 | Not Started 0% | float 108.0d CO02GI0120 WO020E0100 — 020 Above Ground Electrical | 26-May-27 → 14-Feb-28 | Not Started 0% | float 23.0d WO020E0100 WO020I0100 — 020 Install Instruments & Test | 26-May-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO020I0100 CO02CV2110 — 02C Insulate - Equipment | 28-May-27 → 06-Jul-27 | Not Started 0% | float 190.0d CO02CV2110 WO020V2100 — 020 Insulation | 28-May-27 → 13-Mar-28 | Not Started 0% | float -1.0d WO020V2100 CO01CE0110 — 01C Lighting JB's, Stands, Tray & Cable | 29-May-27 → 18-Jun-27 | Not Started 0% | float 124.0d CO01CE0110 CO01YP0140 — 01Y SB Pipe Erection - Pipe Rack | 29-May-27 → 23-Jul-27 | Not Started 0% | float 39.0d CO01YP0140 CO02DM0110 — 02D Set Static Equipment | 29-May-27 → 11-Jun-27 | Not Started 0% | float 133.0d CO02DM0110 CO02DS0120 — 02D Erect Misc Steel | 29-May-27 → 18-Jun-27 | Not Started 0% | float 93.0d CO02DS0120 CO02EP0130 — 02E LB Pipe Erection | 29-May-27 → 06-Nov-27 | Not Started 0% | float 67.0d CO02EP0130 CO02HM0260 — 02H Compete Installation of Ducts (101-B) | 29-May-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02HM0260 CO03AP0130 — 03A LB Pipe Erection | 29-May-27 → 07-Jul-27 | Not Started 0% | float 56.0d CO03AP0130 CO03CP0130 — 03C LB Pipe Erection | 29-May-27 → 07-Jul-27 | Not Started 0% | float 87.0d CO03CP0130 CO03EP0130 — 03E LB Pipe Erection | 29-May-27 → 30-Jul-27 | Not Started 0% | float 58.0d CO03EP0130 CO03YV1120 — 03Y Paint Touch-up - Piping | 29-May-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO03YV1120 CO05BV1110 — 05B Paint Fabricated Pipe Spools | 29-May-27 → 07-Jun-27 | Not Started 0% | float 214.0d CO05BV1110 CO02HM0215 — 02H Erect Fuel Gas Lines (101-B) | 31-May-27 → 26-Jun-27 | Not Started 0% | float 151.0d CO02HM0215 CO02HM0227 — 02H Install Spring Hangers & Align (101-B) | 31-May-27 → 10-Jul-27 | Not Started 0% | float 186.0d CO02HM0227 CO02HM0245 — 02H Install Insulation (101-B) | 31-May-27 → 24-Jul-27 | Not Started 0% | float 174.0d CO02HM0245 CO01CA0110 — 01C Erect - EDR Shelter | 31-May-27 → 21-Jun-27 | Not Started 0% | float 98.0d CO01CA0110 CO01AK0150 — 01A Excavate Evaporation Pond | 01-Jun-27 → 12-Jul-27 | Not Started 0% | float 54.0d CO01AK0150 CO02CE0130 — 02C Power/Control JB's, Tray, Cable, Termination | 01-Jun-27 → 22-Oct-27 | Not Started 0% | float 88.0d CO02CE0130 CO02CI0120 — 02C Instrument JB's, Field Instr, Tray, Cable | 01-Jun-27 → 22-Oct-27 | Not Started 0% | float 88.0d CO02CI0120 CO02JM0110 — 02J Set Static Equipment - Gen'l | 01-Jun-27 → 11-Jun-27 | Not Started 0% | float 98.0d CO02JM0110 CO02MM0130 — 02M Set (Heavy Lift) - 105-D (Ammonia Converter) | 01-Jun-27 → 05-Jun-27 | Not Started 0% | float 56.0d CO02MM0130 CO03FP0140 — 03F SB Pipe Erection | 01-Jun-27 → 09-Jul-27 | Not Started 0% | float 88.0d CO03FP0140 WO010K0100 — 010 Site Prep | 01-Jun-27 → 28-Jan-28 | Not Started 0% | float 37.0d WO010K0100 CO01DE0110 — 01D Lighting JB's, Stands, Tray & Cable | 02-Jun-27 → 13-Jul-27 | Not Started 0% | float 66.0d CO01DE0110 CO03YP0150 — 03Y Punchlist / Test Piping | 02-Jun-27 → 23-Jul-27 | Not Started 0% | float 139.0d CO03YP0150 CO01BV1130 — 01B Paint Touch-up - Equipment | 03-Jun-27 → 25-Jun-27 | Not Started 0% | float 100.0d CO01BV1130 PO05AS0000 — 05A Recv at Site - Structural Steel | 04-Jun-27 | Not Started PO05AS0010 — 05A Recv at Site - Misc Steel | 04-Jun-27 | Not Started CO02AM0110 — 02A Set Static Equipment | 05-Jun-27 → 18-Jun-27 | Not Started 0% | float 144.0d CO02AM0110 CO02JS0120 — 02J Erect Misc Steel - Structure | 05-Jun-27 → 11-Jun-27 | Not Started 0% | float 98.0d CO02JS0120 CO02LE0110 — 02L Lighting JB's, Stands, Tray & Cable | 05-Jun-27 → 16-Jul-27 | Not Started 0% | float 163.0d CO02LE0110 CO03AP0140 — 03A SB Pipe Erection | 05-Jun-27 → 14-Jul-27 | Not Started 0% | float 56.0d CO03AP0140 CO03CP0140 — 03C SB Pipe Erection | 05-Jun-27 → 14-Jul-27 | Not Started 0% | float 87.0d CO03CP0140 CO03EP0140 — 03E SB Pipe Erection | 05-Jun-27 → 06-Aug-27 | Not Started 0% | float 58.0d CO03EP0140 CO03FV2110 — 03F Insulate - Equipment | 05-Jun-27 → 19-Jun-27 | Not Started 0% | float 135.0d CO03FV2110 WO030V2100 — 030 Insulation | 05-Jun-27 → 02-Oct-27 | Not Started 0% | float 133.0d WO030V2100 CO02FV2110 — 02F Insulate - Equipment | 07-Jun-27 → 24-Jun-27 | Not Started 0% | float 200.0d CO02FV2110 CO02MM0140 — 02M Set (Heavy Lift) - 121-C (Ammonia Conv./ Effl Exch.) | 07-Jun-27 → 11-Jun-27 | Not Started 0% | float 56.0d CO02MM0140 CO03DP0130 — 03D LB Pipe Erection | 07-Jun-27 → 25-Jun-27 | Not Started 0% | float 98.0d CO03DP0130 CO01CP0130 — 01C LB Pipe Erection | 07-Jun-27 → 28-Jun-27 | Not Started 0% | float 93.0d CO01CP0130 CO02KS0120 — 02K Erect Misc Steel | 07-Jun-27 → 28-Jun-27 | Not Started 0% | float 101.0d CO02KS0120 CO01DV1130 — 01D Paint Touch-up - Equipment | 08-Jun-27 → 25-Jun-27 | Not Started 0% | float 88.0d CO01DV1130 CO03FE0130 — 03F Power/Control JB's, Tray, Cable, Termination | 08-Jun-27 → 16-Jul-27 | Not Started 0% | float 97.0d CO03FE0130 CO03FI0120 — 03F Instrument JB's, Field Instr, Tray, Cable | 08-Jun-27 → 16-Jul-27 | Not Started 0% | float 97.0d CO03FI0120 CO02KV2110 — 02K Insulate - Equipment | 10-Jun-27 → 05-Jul-27 | Not Started 0% | float 192.0d CO02KV2110 CO01BP0130 — 01B LB Pipe Erection | 12-Jun-27 → 21-Sep-27 | Not Started 0% | float 32.0d CO01BP0130 CO01DP0130 — 01D LB Pipe Erection | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 34.0d CO01DP0130 CO01HE0110 — 01H Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 69.0d CO01HE0110 CO02AS0120 — 02A Erect Misc Steel | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 103.0d CO02AS0120 CO02BE0110 — 02B Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 25-Jun-27 | Not Started 0% | float 193.0d CO02BE0110 CO02EE0110 — 02E Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 175.0d CO02EE0110 CO02EM0110 — 02E Set Static Equipment | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 127.0d CO02EM0110 CO02FE0110 — 02F Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 175.0d CO02FE0110 CO02JE0110 — 02J Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 23-Jul-27 | Not Started 0% | float 157.0d CO02JE0110 CO02JP0130 — 02J LB Pipe Erection | 12-Jun-27 → 27-Sep-27 | Not Started 0% | float 98.0d CO02JP0130 CO02ME0110 — 02M Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 175.0d CO02ME0110 CO02MV1130 — 02M Paint Touch-up - Equipment | 12-Jun-27 → 29-Jun-27 | Not Started 0% | float 172.0d CO02MV1130 CO02NM0110 — 02N Set (Heavy Lift) - 120-C (Ammonia Unitized Chiller) | 12-Jun-27 → 17-Jun-27 | Not Started 0% | float 56.0d CO02NM0110 CO03AE0130 — 03A Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 56.0d CO03AE0130 CO03AI0120 — 03A Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 56.0d CO03AI0120 CO03BE0110 — 03B Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 187.0d CO03BE0110 CO03CE0130 — 03C Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CE0130 CO03CI0120 — 03C Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CI0120 CO03EE0130 — 03E Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 61.0d CO03EE0130 CO03EI0120 — 03E Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 61.0d CO03EI0120 PO05BS0010 — 05B Recv at Site - Misc Steel | 12-Jun-27 | Not Started CO02BV2110 — 02B Insulate - Equipment | 14-Jun-27 → 19-Jun-27 | Not Started 0% | float 204.0d CO02BV2110 CO03CE0120 — 03C Lighting Fixture Installation/Termination | 14-Jun-27 → 26-Jun-27 | Not Started 0% | float 123.0d CO03CE0120 CO01CP0140 — 01C SB Pipe Erection | 14-Jun-27 → 05-Jul-27 | Not Started 0% | float 93.0d CO01CP0140 CO02PM0110 — 02P Set 101-U Dearator | 15-Jun-27 → 28-Jun-27 | Not Started 0% | float 103.0d CO02PM0110 CO02QM0110 — 02Q Set 101-F Steam Drum | 15-Jun-27 → 21-Jun-27 | Not Started 0% | float 101.0d CO02QM0110 CO05BC0110 — 05B Form, Pour, Strip Fnds - Sleepers | 15-Jun-27 → 30-Jul-27 | Not Started 0% | float 152.0d CO05BC0110 CO03DP0140 — 03D SB Pipe Erection | 15-Jun-27 → 05-Jul-27 | Not Started 0% | float 97.0d CO03DP0140 CO05AC0110 — 05A Form, Pour, Strip Fnds - Major Fnds Gen'l | 17-Jun-27 → 07-Jul-27 | Not Started 0% | float 77.0d CO05AC0110 CO05AU3110 — 05A U/G Earthing Installation | 17-Jun-27 → 14-Jul-27 | Not Started 0% | float 77.0d CO05AU3110 CO05UP0150 — 05U LB Pipe Erection (Firewater Piping) | 17-Jun-27 → 30-Sep-27 | Not Started 0% | float 135.0d CO05UP0150 WO050U3100 — 050 Install U/G Electrical | 17-Jun-27 → 14-Jul-27 | Not Started 0% | float 77.0d WO050U3100 CO02NS0120 — 02N Erect Misc Steel | 18-Jun-27 → 22-Jul-27 | Not Started 0% | float 56.0d CO02NS0120 CO01BP0140 — 01B SB Pipe Erection | 19-Jun-27 → 28-Sep-27 | Not Started 0% | float 32.0d CO01BP0140 CO01CE0120 — 01C Lighting Fixture Installation/Termination | 19-Jun-27 → 25-Jun-27 | Not Started 0% | float 124.0d CO01CE0120 CO01DP0140 — 01D SB Pipe Erection | 19-Jun-27 → 27-Aug-27 | Not Started 0% | float 34.0d CO01DP0140 CO01HE0140 — 01H Set Transformers TR-100/ 103/ 104/ 105 | 19-Jun-27 → 02-Jul-27 | Not Started 0% | float 33.0d CO01HE0140 CO01YE0130 — 01Y Power/Control JB's, Tray, Cable, Termination | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float 39.0d CO01YE0130 CO01YI0120 — 01Y Instrument JB's, Field Instr, Tray, Cable | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float 39.0d CO01YI0120 CO01YV1120 — 01Y Paint Touch-up - Piping | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float 169.0d CO01YV1120 CO02DE0110 — 02D Lighting JB's, Stands, Tray & Cable | 19-Jun-27 → 16-Jul-27 | Not Started 0% | float 169.0d CO02DE0110 CO02JP0140 — 02J SB Pipe Erection | 19-Jun-27 → 04-Oct-27 | Not Started 0% | float 98.0d CO02JP0140 CO02LM0110 — 02L Set Static Equipment - Gen'l | 19-Jun-27 → 21-Jul-27 | Not Started 0% | float 103.0d CO02LM0110 CO02LM0120 — 02L Set Static Equipment - 02L Structure | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float -15.0d CO02LM0120 CO03AE0110 — 03A Lighting JB's, Stands, Tray & Cable | 19-Jun-27 → 09-Jul-27 | Not Started 0% | float 75.0d CO03AE0110 WO010I0100 — 010 Install Instruments & Test | 19-Jun-27 → 03-Jan-28 | Not Started 0% | float 53.0d WO010I0100 CO01CE0130 — 01C Power/Control JB's, Tray, Cable, Termination | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO01CE0130 CO01CI0120 — 01C Instrument JB's, Field Instr, Tray, Cable | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO01CI0120 CO01CV1120 — 01C Paint Touch-up - Piping | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 93.0d CO01CV1120 CO01CV1130 — 01C Paint Touch-up - Equipment | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 93.0d CO01CV1130 CO02QS0120 — 02Q Erect Misc Steel | 22-Jun-27 → 12-Jul-27 | Not Started 0% | float 101.0d CO02QS0120 CO03DI0120 — 03D Instrument JB's, Field Instr, Tray, Cable | 22-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO03DI0120 CO01GC0130 — 01G Install Paving - Control Building | 25-Jun-27 → 08-Jul-27 | Not Started 0% | float 70.0d CO01GC0130 CO01GE0110 — 01G Lighting JB's, Stands, Tray & Cable | 25-Jun-27 → 05-Aug-27 | Not Started 0% | float 28.0d CO01GE0110 CO01GE0140 — 01G Install UPS in Control Building | 25-Jun-27 → 15-Jul-27 | Not Started 0% | float -8.0d CO01GE0140 CO01GI0150 — 01G Install DCS | 25-Jun-27 → 25-Aug-27 | Not Started 0% | float -14.0d CO01GI0150 CO02AV2110 — 02A Insulate - Equipment | 25-Jun-27 → 16-Jul-27 | Not Started 0% | float 181.0d CO02AV2110 CO02DV2110 — 02D Insulate - Equipment | 25-Jun-27 → 09-Jul-27 | Not Started 0% | float 187.0d CO02DV2110 CO02NP0130 — 02N LB Pipe Erection | 25-Jun-27 → 10-Nov-27 | Not Started 0% | float 56.0d CO02NP0130 CO01BE0130 — 01B Power/Control JB's, Tray, Cable, Termination | 26-Jun-27 → 05-Oct-27 | Not Started 0% | float 32.0d CO01BE0130 CO01BI0120 — 01B Instrument JB's, Field Instr, Tray, Cable | 26-Jun-27 → 05-Oct-27 | Not Started 0% | float 32.0d CO01BI0120 CO01DE0130 — 01D Power/Control JB's, Tray, Cable, Termination | 26-Jun-27 → 10-Sep-27 | Not Started 0% | float 39.0d CO01DE0130 CO01DI0120 — 01D Instrument JB's, Field Instr, Tray, Cable | 26-Jun-27 → 10-Sep-27 | Not Started 0% | float 39.0d CO01DI0120 CO02BE0120 — 02B Lighting Fixture Installation/Termination | 26-Jun-27 → 02-Jul-27 | Not Started 0% | float 193.0d CO02BE0120 CO01BE0120 — 01B Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO01BE0120 CO01EE0120 — 01E Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 180.0d CO01EE0120 CO01FE0120 — 01F Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 152.0d CO01FE0120 CO02MP0130 — 02M LB Pipe Erection | 28-Jun-27 → 08-Oct-27 | Not Started 0% | float 92.0d CO02MP0130 CO03BP0130 — 03B LB Pipe Erection | 28-Jun-27 → 04-Aug-27 | Not Started 0% | float 138.0d CO03BP0130 CO03DE0120 — 03D Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO03DE0120 CO03EE0120 — 03E Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO03EE0120 CO03FE0120 — 03F Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 111.0d CO03FE0120 CO03FP0150 — 03F Punchlist / Test Piping | 28-Jun-27 → 16-Jul-27 | Not Started 0% | float 88.0d CO03FP0150 CO02KE0110 — 02K Lighting JB's, Stands, Tray & Cable | 28-Jun-27 → 09-Aug-27 | Not Started 0% | float 144.0d CO02KE0110 CO02PS0120 — 02P Erect Misc Steel | 29-Jun-27 → 26-Jul-27 | Not Started 0% | float 103.0d CO02PS0120 CO02QP0130 — 02Q LB Pipe Erection | 29-Jun-27 → 28-Sep-27 | Not Started 0% | float 101.0d CO02QP0130 CO02YE0110 — 02Y Lighting JB's, Stands, Tray & Cable | 29-Jun-27 → 12-Oct-27 | Not Started 0% | float 90.0d CO02YE0110 CO03YV2120 — 03Y Insulate - Piping | 30-Jun-27 → 03-Sep-27 | Not Started 0% | float 148.0d CO03YV2120 CO01BV2110 — 01B Insulate - Equipment | 01-Jul-27 → 23-Jul-27 | Not Started 0% | float 100.0d CO01BV2110 CO05AM0145 — 05A Tank Erection 2101-F (Ammonia Storage Tank) | 01-Jul-27 → 25-Feb-28 | Not Started 0% | float -51.0d CO05AM0145 WO010V2100 — 010 Insulation | 01-Jul-27 → 02-Nov-27 | Not Started 0% | float 107.0d WO010V2100 WT050M0100 — 05A Tank Erection | 01-Jul-27 → 09-Mar-28 | Not Started 0% | float -51.0d WT050M0100 CO01CP0150 — 01C Punchlist / Test Piping | 01-Jul-27 → 12-Jul-27 | Not Started 0% | float 96.0d CO01CP0150 CO02JE0130 — 02J Power/Control JB's, Tray, Cable, Termination | 02-Jul-27 → 11-Oct-27 | Not Started 0% | float 98.0d CO02JE0130 CO02JI0120 — 02J Instrument JB's, Field Instr, Tray, Cable | 02-Jul-27 → 11-Oct-27 | Not Started 0% | float 98.0d CO02JI0120 CO03AP0150 — 03A Punchlist / Test Piping | 02-Jul-27 → 21-Jul-27 | Not Started 0% | float 62.0d CO03AP0150 CO03CP0150 — 03C Punchlist / Test Piping | 02-Jul-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CP0150 CO03DP0150 — 03D Punchlist / Test Piping | 02-Jul-27 → 12-Jul-27 | Not Started 0% | float 97.0d CO03DP0150 CO01HE0120 — 01H Lighting Fixture Installation/Termination | 03-Jul-27 → 16-Jul-27 | Not Started 0% | float 69.0d CO01HE0120 CO01HE0130 — 01H Power/Control JB's, Tray, Cable, Termination | 03-Jul-27 → 10-Sep-27 | Not Started 0% | float 33.0d CO01HE0130 CO01YE0120 — 01Y Lighting Fixture Installation/Termination | 03-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO01YE0120 CO01YP0150 — 01Y Punchlist / Test Piping - Pipe Rack | 03-Jul-27 → 30-Jul-27 | Not Started 0% | float 133.0d CO01YP0150 CO02AE0110 — 02A Lighting JB's, Stands, Tray & Cable | 03-Jul-27 → 30-Jul-27 | Not Started 0% | float 157.0d CO02AE0110 CO02EV1130 — 02E Paint Touch-up - Equipment | 03-Jul-27 → 23-Jul-27 | Not Started 0% | float 151.0d CO02EV1130 CO03BE0120 — 03B Lighting Fixture Installation/Termination | 03-Jul-27 → 09-Jul-27 | Not Started 0% | float 187.0d CO03BE0120 CO02FP0130 — 02F LB Pipe Erection | 05-Jul-27 → 27-Sep-27 | Not Started 0% | float 102.0d CO02FP0130 CO03BP0140 — 03B SB Pipe Erection | 05-Jul-27 → 11-Aug-27 | Not Started 0% | float 138.0d CO03BP0140 CO01DV2110 — 01D Insulate - Equipment | 06-Jul-27 → 23-Jul-27 | Not Started 0% | float 88.0d CO01DV2110 CO02GE0110 — 02G Lighting JB's, Stands, Tray & Cable | 06-Jul-27 → 18-Aug-27 | Not Started 0% | float 149.0d CO02GE0110 CO02PP0130 — 02P LB Pipe Erection | 06-Jul-27 → 21-Sep-27 | Not Started 0% | float 103.0d CO02PP0130 CO03FV1120 — 03F Paint Touch-up - Piping | 06-Jul-27 → 16-Jul-27 | Not Started 0% | float 112.0d CO03FV1120 CO03DV1120 — 03D Paint Touch-up - Piping | 06-Jul-27 → 12-Jul-27 | Not Started 0% | float 111.0d CO03DV1120 CO01CV2120 — 01C Insulate - Piping | 08-Jul-27 → 29-Jul-27 | Not Started 0% | float 96.0d CO01CV2120 CO05AS0110 — 05A Erect Structural Steel - Structure | 09-Jul-27 → 21-Jul-27 | Not Started 0% | float 23.0d CO05AS0110 WO050S0100 — 050 Erect Steel | 09-Jul-27 → 13-Aug-27 | Not Started 0% | float 23.0d WO050S0100 CO02EE0120 — 02E Lighting Fixture Installation/Termination | 10-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02EE0120 CO02FE0120 — 02F Lighting Fixture Installation/Termination | 10-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02FE0120 CO02ME0120 — 02M Lighting Fixture Installation/Termination | 10-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02ME0120 CO02MV2110 — 02M Insulate - Equipment | 10-Jul-27 → 27-Jul-27 | Not Started 0% | float 172.0d CO02MV2110 CO03AE0120 — 03A Lighting Fixture Installation/Termination | 10-Jul-27 → 16-Jul-27 | Not Started 0% | float 75.0d CO03AE0120 CO03AV1120 — 03A Paint Touch-up - Piping | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 58.0d CO03AV1120 CO03AV1130 — 03A Paint Touch-up - Equipment | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 58.0d CO03AV1130 CO03CV1120 — 03C Paint Touch-up - Piping | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 102.0d CO03CV1120 CO02DP0130 — 02D LB Pipe Erection | 12-Jul-27 → 22-Oct-27 | Not Started 0% | float 62.0d CO02DP0130 CO02FP0140 — 02F SB Pipe Erection | 12-Jul-27 → 04-Oct-27 | Not Started 0% | float 102.0d CO02FP0140 CO03BE0130 — 03B Power/Control JB's, Tray, Cable, Termination | 12-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BE0130 CO03BI0120 — 03B Instrument JB's, Field Instr, Tray, Cable | 12-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BI0120 CO01CI0130 — 01C Install In Line Instruments | 12-Jul-27 → 15-Jul-27 | Not Started 0% | float 96.0d CO01CI0130 CO01CV2110 — 01C Insulate - Equipment | 12-Jul-27 → 02-Aug-27 | Not Started 0% | float 93.0d CO01CV2110 CO02KP0130 — 02K LB Pipe Erection | 12-Jul-27 → 23-Oct-27 | Not Started 0% | float 77.0d CO02KP0130 CO03DI0130 — 03D Install In Line Instruments | 12-Jul-27 → 14-Jul-27 | Not Started 0% | float 97.0d CO03DI0130 CO01AE0110 — 01A Lighting JB's, Stands, Tray & Cable | 13-Jul-27 → 26-Jul-27 | Not Started 0% | float 91.0d CO01AE0110 CO01AK0160 — 01A Install Liner at Evaporation Pond | 13-Jul-27 → 18-Aug-27 | Not Started 0% | float 54.0d CO01AK0160 CO01JC0150 — 01K Excavate Pond | 13-Jul-27 → 09-Aug-27 | Not Started 0% | float 55.0d CO01JC0150 CO02QE0110 — 02Q Lighting JB's, Stands, Tray & Cable | 13-Jul-27 → 19-Jul-27 | Not Started 0% | float 162.0d CO02QE0110 CO01DE0120 — 01D Lighting Fixture Installation/Termination | 14-Jul-27 → 03-Aug-27 | Not Started 0% | float 66.0d CO01DE0120 CO03EP0150 — 03E Punchlist / Test Piping | 14-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EP0150 CO05AM0155 — 05A Tank Erection 2102-F (Ammonia Storage Tank) | 14-Jul-27 → 09-Mar-28 | Not Started 0% | float -51.0d CO05AM0155 CO03AV2120 — 03A Insulate - Piping | 16-Jul-27 → 30-Jul-27 | Not Started 0% | float 63.0d CO03AV2120 CO02GP0150 — 02G Punchlist / Test Piping | 16-Jul-27 → 02-Oct-27 | Not Started 0% | float 105.0d CO02GP0150 CO02DE0120 — 02D Lighting Fixture Installation/Termination | 17-Jul-27 → 30-Jul-27 | Not Started 0% | float 169.0d CO02DE0120 CO02LE0120 — 02L Lighting Fixture Installation/Termination | 17-Jul-27 → 06-Aug-27 | Not Started 0% | float 163.0d CO02LE0120 CO02LP0130 — 02L LB Pipe Erection | 17-Jul-27 → 31-Jan-28 | Not Started 0% | float -15.0d CO02LP0130 CO02LV1130 — 02L Paint Touch-up - Equipment | 17-Jul-27 → 28-Sep-27 | Not Started 0% | float 69.0d CO02LV1130 CO03FI0130 — 03F Install In Line Instruments | 17-Jul-27 → 20-Jul-27 | Not Started 0% | float 97.0d CO03FI0130 CO01ET0110 — 01E Mechanical Completion | 17-Jul-27 | Not Started CO01FT0110 — 01F Mechanical Completion | 17-Jul-27 | Not Started SC01ET0120 — 01E RFSU | 17-Jul-27 | Not Started SC01FT0120 — 01F RFSU | 17-Jul-27 | Not Started CO02AP0130 — 02A LB Pipe Erection | 19-Jul-27 → 23-Oct-27 | Not Started 0% | float 78.0d CO02AP0130 CO02BP0130 — 02B LB Pipe Erection | 19-Jul-27 → 16-Aug-27 | Not Started 0% | float 120.0d CO02BP0130 CO02KP0140 — 02K SB Pipe Erection | 19-Jul-27 → 30-Oct-27 | Not Started 0% | float 77.0d CO02KP0140 CO02QE0120 — 02Q Lighting Fixture Installation/Termination | 20-Jul-27 → 26-Jul-27 | Not Started 0% | float 173.0d CO02QE0120 CO02YE0130 — 02Y Power/Control JB's, Tray, Cable, Termination | 20-Jul-27 → 16-Nov-27 | Not Started 0% | float -35.0d CO02YE0130 CO02YI0120 — 02Y Instrument JB's, Field Instr, Tray, Cable | 20-Jul-27 → 16-Nov-27 | Not Started 0% | float -35.0d CO02YI0120 CO02FE0130 — 02F Power/Control JB's, Tray, Cable, Termination | 22-Jul-27 → 11-Oct-27 | Not Started 0% | float 104.0d CO02FE0130 CO02FI0120 — 02F Instrument JB's, Field Instr, Tray, Cable | 22-Jul-27 → 11-Oct-27 | Not Started 0% | float 104.0d CO02FI0120 CO03AI0130 — 03A Install In Line Instruments | 22-Jul-27 → 24-Jul-27 | Not Started 0% | float 62.0d CO03AI0130 CO03AV2110 — 03A Insulate - Equipment | 22-Jul-27 → 05-Aug-27 | Not Started 0% | float 58.0d CO03AV2110 CO03CI0130 — 03C Install In Line Instruments | 22-Jul-27 → 24-Jul-27 | Not Started 0% | float 87.0d CO03CI0130 CO02NE0110 — 02N Lighting JB's, Stands, Tray & Cable | 23-Jul-27 → 12-Aug-27 | Not Started 0% | float 152.0d CO02NE0110 CO02NV1130 — 02N Paint Touch-up - Equipment | 23-Jul-27 → 29-Jul-27 | Not Started 0% | float 146.0d CO02NV1130 CO02JE0120 — 02J Lighting Fixture Installation/Termination | 24-Jul-27 → 13-Aug-27 | Not Started 0% | float 157.0d CO02JE0120 CO02LP0140 — 02L SB Pipe Erection | 24-Jul-27 → 07-Feb-28 | Not Started 0% | float -15.0d CO02LP0140 CO03YI0130 — 03Y Install In Line Instruments | 24-Jul-27 → 27-Aug-27 | Not Started 0% | float 139.0d CO03YI0130 CO02HM0275 — 02H Complete Primary Reformer Erection (101-B) | 24-Jul-27 | Not Started CO02AP0140 — 02A SB Pipe Erection | 26-Jul-27 → 30-Oct-27 | Not Started 0% | float 78.0d CO02AP0140 CO01AE0120 — 01A Lighting Fixture Installation/Termination | 27-Jul-27 → 02-Aug-27 | Not Started 0% | float 91.0d CO01AE0120 CO02HP0130 — 02H LB Pipe Erection | 27-Jul-27 → 05-Jan-28 | Not Started 0% | float 10.0d CO02HP0130 CO02MP0140 — 02M SB Pipe Erection | 27-Jul-27 → 15-Oct-27 | Not Started 0% | float 92.0d CO02MP0140 CO02PE0110 — 02P Lighting JB's, Stands, Tray & Cable | 27-Jul-27 → 02-Aug-27 | Not Started 0% | float 150.0d CO02PE0110 CO02YV1120 — 02Y Paint Touch-up - Piping | 27-Jul-27 → 09-Nov-27 | Not Started 0% | float 101.0d CO02YV1120 CO02YV1130 — 02Y Paint Touch-up - Pipe Rack | 27-Jul-27 → 09-Nov-27 | Not Started 0% | float 101.0d CO02YV1130 CO03EV1120 — 03E Paint Touch-up - Piping | 27-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EV1120 CO03EV1130 — 03E Paint Touch-up - Equipment | 27-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EV1130 CO01DP0150 — 01D Punchlist / Test Piping | 28-Jul-27 → 10-Sep-27 | Not Started 0% | float 34.0d CO01DP0150 CO02CP0150 — 02C Punchlist / Test Piping | 28-Jul-27 → 22-Oct-27 | Not Started 0% | float 83.0d CO02CP0150 CO02HM0120 — 02H Set (Heavey Lift) - 101-C & 102-C | 30-Jul-27 → 04-Aug-27 | Not Started 0% | float 10.0d CO02HM0120 CO03FV2120 — 03F Insulate - Piping | 30-Jul-27 → 13-Aug-27 | Not Started 0% | float 88.0d CO03FV2120 CO02GV1130 — 02G Paint Touch-up - Equipment | 30-Jul-27 → 25-Sep-27 | Not Started 0% | float 116.0d CO02GV1130 CO02KE0130 — 02K Power/Control JB's, Tray, Cable, Termination | 30-Jul-27 → 06-Nov-27 | Not Started 0% | float 77.0d CO02KE0130 CO02KI0120 — 02K Instrument JB's, Field Instr, Tray, Cable | 30-Jul-27 → 06-Nov-27 | Not Started 0% | float 77.0d CO02KI0120 CO01YI0130 — 01Y Install In Line Instruments | 31-Jul-27 → 27-Aug-27 | Not Started 0% | float 139.0d CO01YI0130 CO01YV2120 — 01Y Insulate - Piping | 31-Jul-27 → 02-Oct-27 | Not Started 0% | float 133.0d CO01YV2120 CO02AE0120 — 02A Lighting Fixture Installation/Termination | 31-Jul-27 → 13-Aug-27 | Not Started 0% | float 157.0d CO02AE0120 CO02EV2110 — 02E Insulate - Equipment | 31-Jul-27 → 27-Aug-27 | Not Started 0% | float 151.0d CO02EV2110 CO03BP0150 — 03B Punchlist / Test Piping | 31-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BP0150 CO05BP0130 — 05B LB Pipe Erection - To Loading Arm | 31-Jul-27 → 21-Sep-27 | Not Started 0% | float 152.0d CO05BP0130 WO050P0100 — 050 Above Ground Pipe | 31-Jul-27 → 14-Mar-28 | Not Started 0% | float 19.0d WO050P0100 CO05BM0110 — 05B Install Loading Arm | 02-Aug-27 → 04-Dec-27 | Not Started 0% | float 62.0d CO05BM0110 WO050M0100 — 050 Major Equipment | 02-Aug-27 → 04-Dec-27 | Not Started 0% | float 61.0d WO050M0100 CO02CE0110 — 02C Lighting JB's, Stands, Tray & Cable | 03-Aug-27 → 05-Oct-27 | Not Started 0% | float 113.0d CO02CE0110 CO02GE0120 — 02G Lighting Fixture Installation/Termination | 03-Aug-27 → 01-Sep-27 | Not Started 0% | float 149.0d CO02GE0120 CO02HP0140 — 02H SB Pipe Erection | 03-Aug-27 → 12-Jan-28 | Not Started 0% | float 10.0d CO02HP0140 CO02PE0120 — 02P Lighting Fixture Installation/Termination | 03-Aug-27 → 09-Aug-27 | Not Started 0% | float 161.0d CO02PE0120 CO01BP0150 — 01B Punchlist / Test Piping | 05-Aug-27 → 05-Oct-27 | Not Started 0% | float 32.0d CO01BP0150 CO020M0130 — Demobilize Heavy Lift Crane | 05-Aug-27 → 16-Aug-27 | Not Started 0% | float 56.0d CO020M0130 CO02HS0110 — 02H Erect Structural Steel - Structure | 05-Aug-27 → 07-Oct-27 | Not Started 0% | float 10.0d CO02HS0110 CO01GE0120 — 01G Lighting Fixture Installation/Termination | 06-Aug-27 → 08-Sep-27 | Not Started 0% | float 28.0d CO01GE0120 CO02GV1120 — 02G Paint Touch-up - Piping | 06-Aug-27 → 02-Oct-27 | Not Started 0% | float 134.0d CO02GV1120 CO05AS0120 — 05A Erect Misc Steel | 06-Aug-27 → 13-Aug-27 | Not Started 0% | float 23.0d CO05AS0120 CO02AE0130 — 02A Power/Control JB's, Tray, Cable, Termination | 07-Aug-27 → 06-Nov-27 | Not Started 0% | float 78.0d CO02AE0130 CO02AI0120 — 02A Instrument JB's, Field Instr, Tray, Cable | 07-Aug-27 → 06-Nov-27 | Not Started 0% | float 78.0d CO02AI0120 CO02ME0130 — 02M Power/Control JB's, Tray, Cable, Termination | 07-Aug-27 → 22-Oct-27 | Not Started 0% | float 95.0d CO02ME0130 CO02MI0120 — 02M Instrument JB's, Field Instr, Tray, Cable | 07-Aug-27 → 22-Oct-27 | Not Started 0% | float 95.0d CO02MI0120 CO03BV1120 — 03B Paint Touch-up - Piping | 07-Aug-27 → 23-Aug-27 | Not Started 0% | float 153.0d CO03BV1120 CO05BP0140 — 05B SB Pipe Erection - To Loading Arm | 07-Aug-27 → 28-Sep-27 | Not Started 0% | float 152.0d CO05BP0140 CO02BP0140 — 02B SB Pipe Erection | 09-Aug-27 → 30-Aug-27 | Not Started 0% | float 120.0d CO02BP0140 CO02JP0150 — 02J Punchlist / Test Piping | 09-Aug-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02JP0150 CO02KE0120 — 02K Lighting Fixture Installation/Termination | 09-Aug-27 → 21-Sep-27 | Not Started 0% | float 144.0d CO02KE0120 CO01DV1120 — 01D Paint Touch-up - Piping | 10-Aug-27 → 10-Sep-27 | Not Started 0% | float 45.0d CO01DV1120 CO02YP0150 — 02Y Punchlist / Test Piping | 10-Aug-27 → 09-Nov-27 | Not Started 0% | float 65.0d CO02YP0150 CO02LE0130 — 02L Power/Control JB's, Tray, Cable, Termination | 11-Aug-27 → 14-Feb-28 | Not Started 0% | float -12.0d CO02LE0130 CO02LI0120 — 02L Instrument JB's, Field Instr, Tray, Cable | 11-Aug-27 → 14-Feb-28 | Not Started 0% | float -12.0d CO02LI0120 CO02NE0120 — 02N Lighting Fixture Installation/Termination | 13-Aug-27 → 25-Aug-27 | Not Started 0% | float 152.0d CO02NE0120 CO02NV2110 — 02N Insulate - Equipment | 13-Aug-27 → 08-Sep-27 | Not Started 0% | float 146.0d CO02NV2110 CO02EP0140 — 02E SB Pipe Erection | 16-Aug-27 → 13-Nov-27 | Not Started 0% | float 67.0d CO02EP0140 CO02LV2110 — 02L Insulate - Equipment | 16-Aug-27 → 26-Oct-27 | Not Started 0% | float 69.0d CO02LV2110 CO03EI0130 — 03E Install In Line Instruments | 16-Aug-27 → 25-Aug-27 | Not Started 0% | float 65.0d CO03EI0130 CO01AM0150 — 01A Install Spray Devices | 20-Aug-27 → 01-Sep-27 | Not Started 0% | float 54.0d CO01AM0150 CO03EV2110 — 03E Insulate - Equipment | 20-Aug-27 → 02-Oct-27 | Not Started 0% | float 58.0d CO03EV2110 CO03EV2120 — 03E Insulate - Piping | 20-Aug-27 → 02-Oct-27 | Not Started 0% | float 58.0d CO03EV2120 CO02HE0130 — 02H Power/Control JB's, Tray, Cable, Termination | 23-Aug-27 → 19-Jan-28 | Not Started 0% | float 15.0d CO02HE0130 CO02HI0120 — 02H Instrument JB's, Field Instr, Tray, Cable | 23-Aug-27 → 19-Jan-28 | Not Started 0% | float 15.0d CO02HI0120 CO05AM0160 — 05A Tank Erection 2105-F (Fire Water Tank) | 23-Aug-27 → 16-Oct-27 | Not Started 0% | float -29.0d CO05AM0160 CO02FP0150 — 02F Punchlist / Test Piping | 25-Aug-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02FP0150 CO03BI0130 — 03B Install In Line Instruments | 25-Aug-27 → 30-Aug-27 | Not Started 0% | float 138.0d CO03BI0130 CO01BV1120 — 01B Paint Touch-up - Piping | 30-Aug-27 → 05-Oct-27 | Not Started 0% | float 56.0d CO01BV1120 CO02BE0130 — 02B Power/Control JB's, Tray, Cable, Termination | 30-Aug-27 → 20-Sep-27 | Not Started 0% | float 136.0d CO02BE0130 CO02BI0120 — 02B Instrument JB's, Field Instr, Tray, Cable | 30-Aug-27 → 20-Sep-27 | Not Started 0% | float 136.0d CO02BI0120 CO02PP0140 — 02P SB Pipe Erection | 30-Aug-27 → 28-Sep-27 | Not Started 0% | float 103.0d CO02PP0140 CO02BP0150 — 02B Punchlist / Test Piping | 01-Sep-27 → 20-Sep-27 | Not Started 0% | float 120.0d CO02BP0150 CO02BV1120 — 02B Paint Touch-up - Piping | 01-Sep-27 → 20-Sep-27 | Not Started 0% | float 144.0d CO02BV1120 CO02CV1120 — 02C Paint Touch-up - Piping | 01-Sep-27 → 22-Oct-27 | Not Started 0% | float 116.0d CO02CV1120 CO01AE0130 — 01A Power/Control JB's, Tray, Cable, Termination | 03-Sep-27 → 21-Sep-27 | Not Started 0% | float 66.0d CO01AE0130 CO01AP0130 — 01A LB Pipe Erection | 03-Sep-27 → 28-Sep-27 | Not Started 0% | float 54.0d CO01AP0130 CO02GV2120 — 02G Insulate - Piping | 03-Sep-27 → 30-Oct-27 | Not Started 0% | float 110.0d CO02GV2120 CO02JV1120 — 02J Paint Touch-up - Piping | 06-Sep-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02JV1120 CO02JV1130 — 02J Paint Touch-up - Equipment | 06-Sep-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02JV1130 CO02EE0130 — 02E Power/Control JB's, Tray, Cable, Termination | 08-Sep-27 → 26-Nov-27 | Not Started 0% | float 67.0d CO02EE0130 CO02EI0120 — 02E Instrument JB's, Field Instr, Tray, Cable | 08-Sep-27 → 26-Nov-27 | Not Started 0% | float 67.0d CO02EI0120 CO02HV1130 — 02H Paint Touch-up - Equipment | 10-Sep-27 → 28-Oct-27 | Not Started 0% | float 52.0d CO02HV1130 CO02GV2110 — 02G Insulate - Equipment | 10-Sep-27 → 23-Oct-27 | Not Started 0% | float 116.0d CO02GV2110 CO01HT0110 — 01H Mechanical Completion | 10-Sep-27 | Not Started CO01DI0130 — 01D Install In Line Instruments | 20-Sep-27 → 24-Sep-27 | Not Started 0% | float 41.0d CO01DI0130 CO02QP0140 — 02Q SB Pipe Erection | 20-Sep-27 → 05-Oct-27 | Not Started 0% | float 101.0d CO02QP0140 CO02BI0130 — 02B Install In Line Instruments | 21-Sep-27 → 22-Sep-27 | Not Started 0% | float 130.0d CO02PI0120 — 02P Instrument JB's, Field Instr, Tray, Cable | 21-Sep-27 → 05-Oct-27 | Not Started 0% | float 121.0d CO02PI0120 CO05BA0110 — 05B Erect Dock Control Operating Building | 21-Sep-27 → 19-Oct-27 | Not Started 0% | float 135.0d CO05BA0110 WO050A0100 — 050 Buildings | 21-Sep-27 → 19-Oct-27 | Not Started 0% | float 135.0d WO050A0100 CO01DV2120 — 01D Insulate - Piping | 23-Sep-27 → 16-Oct-27 | Not Started 0% | float 34.0d CO01DV2120 CO02FV1120 — 02F Paint Touch-up - Piping | 23-Sep-27 → 11-Oct-27 | Not Started 0% | float 126.0d CO02FV1120 CO02HE0110 — 02H Lighting JB's, Stands, Tray & Cable | 24-Sep-27 → 04-Nov-27 | Not Started 0% | float 87.0d CO02HE0110 CO02MP0150 — 02M Punchlist / Test Piping | 24-Sep-27 → 22-Oct-27 | Not Started 0% | float 92.0d CO02MP0150 CO05BV1120 — 05B Paint Touch-up - Piping | 27-Sep-27 → 05-Oct-27 | Not Started 0% | float 170.0d CO05BV1120 CO02KP0150 — 02K Punchlist / Test Piping | 27-Sep-27 → 06-Nov-27 | Not Started 0% | float 80.0d CO02KP0150 CO02PP0150 — 02P Punchlist / Test Piping | 28-Sep-27 → 05-Oct-27 | Not Started 0% | float 107.0d CO02PP0150 CO02QI0120 — 02Q Instrument JB's, Field Instr, Tray, Cable | 28-Sep-27 → 12-Oct-27 | Not Started 0% | float 115.0d CO02QI0120 CO01AI0120 — 01A Instrument JB's, Field Instr, Tray, Cable | 29-Sep-27 → 05-Oct-27 | Not Started 0% | float 54.0d CO01AI0120 CO01AP0150 — 01A Punchlist / Test Piping | 29-Sep-27 → 01-Oct-27 | Not Started 0% | float 57.0d CO01AP0150 CO01AV1120 — 01A Paint Touch-up - Piping | 29-Sep-27 → 01-Oct-27 | Not Started 0% | float 58.0d CO01AV1120 CO02CV2120 — 02C Insulate - Piping | 29-Sep-27 → 25-Nov-27 | Not Started 0% | float 92.0d CO02CV2120 CO02PV1130 — 02P Paint Touch-up - Equipment | 29-Sep-27 → 02-Oct-27 | Not Started 0% | float 103.0d CO02PV1130 CO02YV2120 — 02Y Insulate - Piping | 29-Sep-27 → 27-Dec-27 | Not Started 0% | float 65.0d CO02YV2120 CO02DP0140 — 02D SB Pipe Erection | 30-Sep-27 → 25-Nov-27 | Not Started 0% | float 62.0d CO02DP0140 CO02AP0150 — 02A Punchlist / Test Piping | 01-Oct-27 → 06-Nov-27 | Not Started 0% | float 79.0d CO02AP0150 CO02PV1120 — 02P Paint Touch-up - Piping | 01-Oct-27 → 05-Oct-27 | Not Started 0% | float 125.0d CO02PV1120 CO01AI0130 — 01A Install In Line Instruments | 02-Oct-27 → 02-Oct-27 | Not Started 0% | float 57.0d CO01BV2120 — 01B Insulate - Piping | 02-Oct-27 → 02-Nov-27 | Not Started 0% | float 32.0d CO01BV2120 CO02GI0130 — 02G Install In Line Instruments | 02-Oct-27 → 13-Oct-27 | Not Started 0% | float 105.0d CO02GI0130 CO02QP0150 — 02Q Punchlist / Test Piping | 05-Oct-27 → 12-Oct-27 | Not Started 0% | float 101.0d CO02QP0150 CO04AT0110 — 04A Mechanical Completion | 05-Oct-27 | Not Started CO01BI0130 — 01B Install In Line Instruments | 06-Oct-27 → 13-Oct-27 | Not Started 0% | float 37.0d CO01BI0130 CO01GI0120 — 01G DCS Cable Terminations | 06-Oct-27 → 06-Dec-27 | Not Started 0% | float -35.0d CO01GI0120 CO02CE0120 — 02C Lighting Fixture Installation/Termination | 06-Oct-27 → 26-Oct-27 | Not Started 0% | float 113.0d CO02CE0120 CO02JV2120 — 02J Insulate - Piping | 06-Oct-27 → 08-Nov-27 | Not Started 0% | float 102.0d CO02JV2120 CO02MV1120 — 02M Paint Touch-up - Piping | 06-Oct-27 → 22-Oct-27 | Not Started 0% | float 116.0d CO02MV1120 CO02PI0130 — 02P Install In Line Instruments | 06-Oct-27 → 06-Oct-27 | Not Started 0% | float 118.0d CO02QV1120 — 02Q Paint Touch-up - Piping | 06-Oct-27 → 09-Oct-27 | Not Started 0% | float 121.0d CO02QV1120 CO02QV1130 — 02Q Paint Touch-up - Equipment | 06-Oct-27 → 09-Oct-27 | Not Started 0% | float 121.0d CO02QV1130 CO02DE0130 — 02D Power/Control JB's, Tray, Cable, Termination | 11-Oct-27 → 02-Dec-27 | Not Started 0% | float 68.0d CO02DE0130 CO02DI0120 — 02D Instrument JB's, Field Instr, Tray, Cable | 11-Oct-27 → 02-Dec-27 | Not Started 0% | float 68.0d CO02DI0120 CO02QV2110 — 02Q Insulate - Equipment | 11-Oct-27 → 16-Oct-27 | Not Started 0% | float 121.0d CO02QV2110 CO02BV2120 — 02B Insulate - Piping | 12-Oct-27 → 18-Oct-27 | Not Started 0% | float 120.0d CO02BV2120 CO02FI0130 — 02F Install In Line Instruments | 12-Oct-27 → 16-Oct-27 | Not Started 0% | float 109.0d CO02FI0130 CO02JI0130 — 02J Install In Line Instruments | 12-Oct-27 → 19-Oct-27 | Not Started 0% | float 104.0d CO02JI0130 CO02QI0130 — 02Q Install In Line Instruments | 13-Oct-27 → 13-Oct-27 | Not Started 0% | float 112.0d CO02YE0120 — 02Y Lighting Fixture Installation/Termination | 13-Oct-27 → 27-Nov-27 | Not Started 0% | float 90.0d CO02YE0120 CO02KV1120 — 02K Paint Touch-up - Piping | 13-Oct-27 → 06-Nov-27 | Not Started 0% | float 104.0d CO02KV1120 CO02FV2120 — 02F Insulate - Piping | 14-Oct-27 → 08-Nov-27 | Not Started 0% | float 102.0d CO02FV2120 CO02JV2110 — 02J Insulate - Equipment | 14-Oct-27 → 08-Nov-27 | Not Started 0% | float 102.0d CO02JV2110 CO02AV1120 — 02A Paint Touch-up - Piping | 16-Oct-27 → 06-Nov-27 | Not Started 0% | float 103.0d CO02AV1120 CO02HV2110 — 02H Insulate - Equipment | 16-Oct-27 → 01-Dec-27 | Not Started 0% | float 52.0d CO02HV2110 SC01HT0120 — 01H RFSU | 17-Oct-27 | Not Started CO02EP0150 — 02E Punchlist / Test Piping | 18-Oct-27 → 26-Nov-27 | Not Started 0% | float 67.0d CO02EP0150 CO05BE0130 — 05B Power/Control JB's, Tray, Cable, Termination | 19-Oct-27 → 30-Oct-27 | Not Started 0% | float 140.0d CO05BE0130 CO05BI0120 — 05B Instrument JB's, Field Instr, Tray, Cable | 19-Oct-27 → 30-Oct-27 | Not Started 0% | float 140.0d CO05BI0120 WO050E0100 — 050 Above Ground Electrical | 19-Oct-27 → 06-Apr-28 | Not Started 0% | float 8.0d WO050E0100 WO050I0100 — 050 Install Instruments & Test | 19-Oct-27 → 25-Mar-28 | Not Started 0% | float 24.0d WO050I0100 CO02CI0130 — 02C Install In Line Instruments | 23-Oct-27 → 04-Nov-27 | Not Started 0% | float 83.0d CO02CI0130 CO02MI0130 — 02M Install In Line Instruments | 23-Oct-27 → 28-Oct-27 | Not Started 0% | float 99.0d CO02MI0130 CO02PV2120 — 02P Insulate - Piping | 27-Oct-27 → 02-Nov-27 | Not Started 0% | float 107.0d CO02PV2120 CO02MV2120 — 02M Insulate - Piping | 28-Oct-27 → 25-Nov-27 | Not Started 0% | float 92.0d CO02MV2120 CO05AM0110 — 05A Set 2202-B Flare & KO Drum | 28-Oct-27 → 04-Dec-27 | Not Started 0% | float 21.0d CO05AM0110 CO05AM0130 — 05A Set 2101-L Ammonia Refrigeration Package | 28-Oct-27 → 30-Oct-27 | Not Started 0% | float 46.0d CO05AM0130 CO05AM0150 — 05A Set Rotating Equipment | 28-Oct-27 → 17-Nov-27 | Not Started 0% | float 31.0d CO05AM0150 CO010K0130 — 010 Compl Roads, Ditches, Paving, & Rock Surfacing | 01-Nov-27 → 28-Jan-28 | Not Started 0% | float 9.0d CO010K0130 CO010K0140 — 010 Finish Grading | 01-Nov-27 → 28-Jan-28 | Not Started 0% | float 37.0d CO010K0140 CO020K0100 — 020 Site Prep - Guard Posts & Gravel | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d CO020K0100 CO02EV1120 — 02E Paint Touch-up - Piping | 01-Nov-27 → 26-Nov-27 | Not Started 0% | float 91.0d CO02EV1120 CO02PV2110 — 02P Insulate - Equipment | 01-Nov-27 → 06-Nov-27 | Not Started 0% | float 103.0d CO02PV2110 CO030K0100 — 030 Site Prep - Guard Posts & Gravel | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d CO030K0100 WO020K0100 — 020 Site Prep | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO020K0100 WO030K0100 — 030 Site Prep | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO030K0100 CO02DP0150 — 02D Punchlist / Test Piping | 02-Nov-27 → 02-Dec-27 | Not Started 0% | float 62.0d CO02DP0150 CO02KV2120 — 02K Insulate - Piping | 02-Nov-27 → 10-Dec-27 | Not Started 0% | float 80.0d CO02KV2120 SC04AT0120 — 04A RFSU | 02-Nov-27 | Not Started CO02QV2120 — 02Q Insulate - Piping | 03-Nov-27 → 09-Nov-27 | Not Started 0% | float 101.0d CO02QV2120 CO05AP0130 — 05A LB Pipe Erection | 04-Nov-27 → 29-Feb-28 | Not Started 0% | float -29.0d CO05AP0130 CO02AV2120 — 02A Insulate - Piping | 05-Nov-27 → 10-Dec-27 | Not Started 0% | float 79.0d CO02AV2120 CO02HE0120 — 02H Lighting Fixture Installation/Termination | 05-Nov-27 → 01-Dec-27 | Not Started 0% | float 87.0d CO02HE0120 CO02KI0130 — 02K Install In Line Instruments | 06-Nov-27 → 15-Nov-27 | Not Started 0% | float 83.0d CO02KI0130 CO02AI0130 — 02A Install In Line Instruments | 08-Nov-27 → 13-Nov-27 | Not Started 0% | float 84.0d CO02AI0130 CO02NP0140 — 02N SB Pipe Erection | 08-Nov-27 → 17-Nov-27 | Not Started 0% | float 56.0d CO02NP0140 CO02YI0130 — 02Y Install In Line Instruments | 10-Nov-27 → 13-Dec-27 | Not Started 0% | float 65.0d CO02YI0130 CO02HP0150 — 02H Punchlist / Test Piping | 11-Nov-27 → 19-Jan-28 | Not Started 0% | float 10.0d CO02HP0150 CO05AP0140 — 05A SB Pipe Erection | 11-Nov-27 → 07-Mar-28 | Not Started 0% | float -29.0d CO05AP0140 CO02DV1120 — 02D Paint Touch-up - Piping | 12-Nov-27 → 02-Dec-27 | Not Started 0% | float 86.0d CO02DV1120 CO02NE0130 — 02N Power/Control JB's, Tray, Cable, Termination | 15-Nov-27 → 30-Nov-27 | Not Started 0% | float 80.0d CO02NE0130 CO02NI0120 — 02N Instrument JB's, Field Instr, Tray, Cable | 15-Nov-27 → 30-Nov-27 | Not Started 0% | float 80.0d CO02NI0120 CO02LP0150 — 02L Punchlist / Test Piping | 16-Nov-27 → 14-Feb-28 | Not Started 0% | float -15.0d CO02LP0150 CO02NV1120 — 02N Paint Touch-up - Piping | 18-Nov-27 → 30-Nov-27 | Not Started 0% | float 88.0d CO02NV1120 CO05AE0130 — 05A Power/Control JB's, Tray, Cable, Termination | 18-Nov-27 → 14-Mar-28 | Not Started 0% | float -25.0d CO05AE0130 CO05AI0120 — 05A Instrument JB's, Field Instr, Tray, Cable | 18-Nov-27 → 14-Mar-28 | Not Started 0% | float -25.0d CO05AI0120 CO02NP0150 — 02N Punchlist / Test Piping | 26-Nov-27 → 30-Nov-27 | Not Started 0% | float 56.0d CO02NP0150 CO02EI0130 — 02E Install In Line Instruments | 27-Nov-27 → 03-Dec-27 | Not Started 0% | float 73.0d CO02EI0130 CO02EV2120 — 02E Insulate - Piping | 27-Nov-27 → 24-Dec-27 | Not Started 0% | float 67.0d CO02EV2120 CO02NI0130 — 02N Install In Line Instruments | 01-Dec-27 → 01-Dec-27 | Not Started 0% | float 75.0d CO02DI0130 — 02D Install In Line Instruments | 03-Dec-27 → 07-Dec-27 | Not Started 0% | float 70.0d CO02DI0130 CO01GT0110 — 01G Mechanical Completion | 06-Dec-27 | Not Started SC01GT0120 — 01G RFSU | 06-Dec-27 | Not Started CO01DI0140 — 01D Continuity Testing | 07-Dec-27 → 11-Dec-27 | Not Started 0% | float -22.0d CO01DI0140 CO02GI0140 — 02G Continuity Testing | 07-Dec-27 → 16-Dec-27 | Not Started 0% | float 54.0d CO02GI0140 CO02YI0140 — 02Y Continuity Testing | 07-Dec-27 → 03-Jan-28 | Not Started 0% | float 53.0d CO02YI0140 CO03AI0140 — 03A Continuity Testing | 07-Dec-27 → 09-Dec-27 | Not Started 0% | float -35.0d CO03AI0140 CO03YI0140 — 03Y Continuity Testing | 07-Dec-27 → 17-Jan-28 | Not Started 0% | float 41.0d CO03YI0140 CO05BI0140 — 05B Continuity Testing | 07-Dec-27 → 07-Dec-27 | Not Started 0% | float 118.0d SC02GI0150 — 02G Function Testing | 07-Dec-27 → 09-Jan-28 | Not Started 0% | float 63.0d SC02GI0150 WC000T1100 — 000 Commissioning | 07-Dec-27 → 22-Sep-28 | Not Started 0% | float -59.0d WC000T1100 CO03AT0110 — 03A Mechanical Completion | 09-Dec-27 | Not Started CO02DV2120 — 02D Insulate - Piping | 10-Dec-27 → 30-Dec-27 | Not Started 0% | float 62.0d CO02DV2120 CO02HV1120 — 02H Paint Touch-up - Piping | 10-Dec-27 → 19-Jan-28 | Not Started 0% | float 45.0d CO02HV1120 CO03FI0140 — 03F Continuity Testing | 10-Dec-27 → 13-Dec-27 | Not Started 0% | float -1.0d CO03FI0140 SC03AI0150 — 03A Function Testing | 10-Dec-27 → 20-Dec-27 | Not Started 0% | float -47.0d SC03AI0150 CO01DT0110 — 01D Mechanical Completion | 11-Dec-27 | Not Started SC01DI0150 — 01D Function Testing | 12-Dec-27 → 29-Dec-27 | Not Started 0% | float -28.0d SC01DI0150 CO03FT0110 — 03F Mechanical Completion | 13-Dec-27 | Not Started CO01YI0140 — 01Y Continuity Testing | 14-Dec-27 → 03-Jan-28 | Not Started 0% | float 53.0d CO01YI0140 CO02AI0140 — 02A Continuity Testing | 14-Dec-27 → 20-Dec-27 | Not Started 0% | float 52.0d CO02AI0140 CO02BI0140 — 02B Continuity Testing | 14-Dec-27 → 15-Dec-27 | Not Started 0% | float 73.0d SC03FI0150 — 03F Function Testing | 14-Dec-27 → 24-Dec-27 | Not Started 0% | float -2.0d SC03FI0150 CO02KI0140 — 02K Continuity Testing | 15-Dec-27 → 22-Dec-27 | Not Started 0% | float 48.0d CO02KI0140 CO02BT0110 — 02B Mechanical Completion | 15-Dec-27 | Not Started CO02DI0140 — 02D Continuity Testing | 16-Dec-27 → 20-Dec-27 | Not Started 0% | float 59.0d CO02DI0140 SC02BI0150 — 02B Function Testing | 16-Dec-27 → 18-Dec-27 | Not Started 0% | float 85.0d SC02BI0150 CO02GT0110 — 02G Mechanical Completion | 16-Dec-27 | Not Started CO02CI0140 — 02C Continuity Testing | 17-Dec-27 → 29-Dec-27 | Not Started 0% | float 41.0d CO02CI0140 SC02CI0150 — 02C Function Testing | 17-Dec-27 → 24-Jan-28 | Not Started 0% | float 48.0d SC02CI0150 SC02YI0150 — 02Y Function Testing | 18-Dec-27 → 10-Jan-28 | Not Started 0% | float 62.0d SC02YI0150 SC02BT0120 — 02B RFSU | 18-Dec-27 | Not Started CO02AT0110 — 02A Mechanical Completion | 20-Dec-27 | Not Started CO02DT0110 — 02D Mechanical Completion | 20-Dec-27 | Not Started SC03AT0120 — 03A RFSU | 20-Dec-27 | Not Started CO01BI0140 — 01B Continuity Testing | 21-Dec-27 → 28-Dec-27 | Not Started 0% | float -29.0d CO01BI0140 CO01CI0140 — 01C Continuity Testing | 21-Dec-27 → 23-Dec-27 | Not Started 0% | float -12.0d CO01CI0140 CO02EI0140 — 02E Continuity Testing | 21-Dec-27 → 27-Dec-27 | Not Started 0% | float 47.0d CO02EI0140 CO02JI0140 — 02J Continuity Testing | 21-Dec-27 → 28-Dec-27 | Not Started 0% | float 42.0d CO02JI0140 CO02MI0140 — 02M Continuity Testing | 21-Dec-27 → 25-Dec-27 | Not Started 0% | float 51.0d CO02MI0140 CO03BI0140 — 03B Continuity Testing | 21-Dec-27 → 23-Dec-27 | Not Started 0% | float 59.0d CO03BI0140 SC02AI0150 — 02A Function Testing | 21-Dec-27 → 12-Jan-28 | Not Started 0% | float 60.0d SC02AI0150 SC02DI0150 — 02D Function Testing | 21-Dec-27 → 04-Jan-28 | Not Started 0% | float 68.0d SC02DI0150 SC03AT0130 — 03A Commission | 21-Dec-27 → 27-Dec-27 | Not Started 0% | float -47.0d SC03AT0130 CO02NI0140 — 02N Continuity Testing | 22-Dec-27 → 22-Dec-27 | Not Started 0% | float 67.0d CO02KT0110 — 02K Mechanical Completion | 22-Dec-27 | Not Started CO02NT0110 — 02N Mechanical Completion | 22-Dec-27 | Not Started CO02PI0140 — 02P Continuity Testing | 23-Dec-27 → 23-Dec-27 | Not Started 0% | float 64.0d SC02KI0150 — 02K Function Testing | 23-Dec-27 → 16-Jan-28 | Not Started 0% | float 56.0d SC02KI0150 SC02NI0150 — 02N Function Testing | 23-Dec-27 → 25-Dec-27 | Not Started 0% | float 78.0d SC02NI0150 CO01CT0110 — 01C Mechanical Completion | 23-Dec-27 | Not Started CO02PT0110 — 02P Mechanical Completion | 23-Dec-27 | Not Started CO03BT0110 — 03B Mechanical Completion | 23-Dec-27 | Not Started CO02HV2120 — 02H Insulate - Piping | 24-Dec-27 → 16-Feb-28 | Not Started 0% | float 21.0d CO02HV2120 CO02NV2120 — 02N Insulate - Piping | 24-Dec-27 → 06-Jan-28 | Not Started 0% | float 56.0d CO02NV2120 CO02QI0140 — 02Q Continuity Testing | 24-Dec-27 → 24-Dec-27 | Not Started 0% | float 63.0d CO03CI0140 — 03C Continuity Testing | 24-Dec-27 → 27-Dec-27 | Not Started 0% | float -19.0d CO03CI0140 SC01CI0150 — 01C Function Testing | 24-Dec-27 → 29-Dec-27 | Not Started 0% | float -14.0d SC01CI0150 SC01YI0150 — 01Y Function Testing | 24-Dec-27 → 10-Jan-28 | Not Started 0% | float 62.0d SC01YI0150 SC02PI0150 — 02P Function Testing | 24-Dec-27 → 28-Dec-27 | Not Started 0% | float 75.0d SC02PI0150 SC03BI0150 — 03B Function Testing | 24-Dec-27 → 03-Jan-28 | Not Started 0% | float 69.0d SC03BI0150 CO02QT0110 — 02Q Mechanical Completion | 24-Dec-27 | Not Started SC03FT0120 — 03F RFSU | 24-Dec-27 | Not Started CO02LV1120 — 02L Paint Touch-up - Piping | 25-Dec-27 → 14-Feb-28 | Not Started 0% | float 23.0d CO02LV1120 SC02QI0150 — 02Q Function Testing | 25-Dec-27 → 29-Dec-27 | Not Started 0% | float 74.0d SC02QI0150 CO02MT0110 — 02M Mechanical Completion | 25-Dec-27 | Not Started SC02MI0150 — 02M Function Testing | 26-Dec-27 → 12-Jan-28 | Not Started 0% | float 60.0d SC02MI0150 CO02ET0110 — 02E Mechanical Completion | 27-Dec-27 | Not Started CO03CT0110 — 03C Mechanical Completion | 27-Dec-27 | Not Started CO01AI0140 — 01A Continuity Testing | 28-Dec-27 → 28-Dec-27 | Not Started 0% | float -12.0d CO02FI0140 — 02F Continuity Testing | 28-Dec-27 → 01-Jan-28 | Not Started 0% | float 44.0d CO02FI0140 CO03DI0140 — 03D Continuity Testing | 28-Dec-27 → 29-Dec-27 | Not Started 0% | float -17.0d SC01DT0130 — 01D Commission | 28-Dec-27 → 07-Feb-28 | Not Started 0% | float -47.0d SC01DT0130 SC02EI0150 — 02E Function Testing | 28-Dec-27 → 17-Jan-28 | Not Started 0% | float 55.0d SC02EI0150 SC03CI0150 — 03C Function Testing | 28-Dec-27 → 07-Jan-28 | Not Started 0% | float -23.0d SC03CI0150 CO01AT0110 — 01A Mechanical Completion | 28-Dec-27 | Not Started CO01BT0110 — 01B Mechanical Completion | 28-Dec-27 | Not Started CO02JT0110 — 02J Mechanical Completion | 28-Dec-27 | Not Started SC02PT0120 — 02P RFSU | 28-Dec-27 | Not Started SC01AI0150 — 01A Function Testing | 29-Dec-27 → 29-Dec-27 | Not Started 0% | float -14.0d SC01BI0150 — 01B Function Testing | 29-Dec-27 → 19-Jan-28 | Not Started 0% | float -35.0d SC01BI0150 SC02JI0150 — 02J Function Testing | 29-Dec-27 → 23-Jan-28 | Not Started 0% | float 49.0d SC02JI0150 CO02CT0110 — 02C Mechanical Completion | 29-Dec-27 | Not Started CO03DT0110 — 03D Mechanical Completion | 29-Dec-27 | Not Started SC01AT0120 — 01A RFSU | 29-Dec-27 | Not Started SC01CT0120 — 01C RFSU | 29-Dec-27 | Not Started SC01DT0120 — 01D RFSU | 29-Dec-27 | Not Started SC02QT0120 — 02Q RFSU | 29-Dec-27 | Not Started CO03EI0140 — 03E Continuity Testing | 30-Dec-27 → 04-Jan-28 | Not Started 0% | float -32.0d CO03EI0140 SC03DI0150 — 03D Function Testing | 30-Dec-27 → 04-Jan-28 | Not Started 0% | float -20.0d SC03DI0150 SC03YI0150 — 03Y Function Testing | 01-Jan-28 → 24-Jan-28 | Not Started 0% | float 48.0d SC03YI0150 CO02FT0110 — 02F Mechanical Completion | 01-Jan-28 | Not Started SC02FI0150 — 02F Function Testing | 02-Jan-28 → 20-Jan-28 | Not Started 0% | float 52.0d SC02FI0150 CO01YT0110 — 01Y Mechanical Completion | 03-Jan-28 | Not Started CO02YT0110 — 02Y Mechanical Completion | 03-Jan-28 | Not Started SC03BT0120 — 03B RFSU | 03-Jan-28 | Not Started CO03ET0110 — 03E Mechanical Completion | 04-Jan-28 | Not Started SC02DT0120 — 02D RFSU | 04-Jan-28 | Not Started SC03DT0120 — 03D RFSU | 04-Jan-28 | Not Started CO02LV2120 — 02L Insulate - Piping | 05-Jan-28 → 13-Mar-28 | Not Started 0% | float -1.0d CO02LV2120 SC03EI0150 — 03E Function Testing | 05-Jan-28 → 22-Jan-28 | Not Started 0% | float -38.0d SC03EI0150 SC02NT0120 — 02N RFSU | 06-Jan-28 | Not Started SC03CT0120 — 03C RFSU | 07-Jan-28 | Not Started CO05BP0150 — 05B Punchlist / Test Piping | 08-Jan-28 → 24-Jan-28 | Not Started 0% | float 63.0d CO05BP0150 CO05BV1130 — 05B Paint Touch-up - Equipment | 08-Jan-28 → 18-Jan-28 | Not Started 0% | float 62.0d CO05BV1130 SC02GT0120 — 02G RFSU | 09-Jan-28 | Not Started SC01YT0120 — 01Y RFSU | 10-Jan-28 | Not Started SC02YT0120 — 02Y RFSU | 10-Jan-28 | Not Started SC02AT0120 — 02A RFSU | 12-Jan-28 | Not Started SC02MT0120 — 02M RFSU | 12-Jan-28 | Not Started CO02HI0140 — 02H Continuity Testing | 14-Jan-28 → 26-Jan-28 | Not Started 0% | float 15.0d CO02HI0140 SC02KT0120 — 02K RFSU | 16-Jan-28 | Not Started CO03YT0110 — 03Y Mechanical Completion | 17-Jan-28 | Not Started SC02ET0120 — 02E RFSU | 17-Jan-28 | Not Started CO05AP0150 — 05A Punchlist / Test Piping | 19-Jan-28 → 14-Mar-28 | Not Started 0% | float -29.0d CO05AP0150 SC01BT0120 — 01B RFSU | 19-Jan-28 | Not Started CO02HI0130 — 02H Install In Line Instruments | 20-Jan-28 → 01-Feb-28 | Not Started 0% | float 10.0d CO02HI0130 SC02HI0150 — 02H Function Testing | 20-Jan-28 → 29-Feb-28 | Not Started 0% | float 12.0d SC02HI0150 SC02FT0120 — 02F RFSU | 20-Jan-28 | Not Started SC03ET0120 — 03E RFSU | 22-Jan-28 | Not Started SC02JT0120 — 02J RFSU | 23-Jan-28 | Not Started CO05BI0130 — 05B Install In Line Instruments | 24-Jan-28 → 25-Jan-28 | Not Started 0% | float 68.0d CO05BT0110 — 05B Mechanical Completion | 24-Jan-28 | Not Started CO05BV2120 — 05B Insulate - Piping | 24-Jan-28 → 14-Feb-28 | Not Started 0% | float 63.0d CO05BV2120 WO050V2100 — 050 Insulation | 24-Jan-28 → 10-May-28 | Not Started 0% | float -12.0d WO050V2100 SC02CT0120 — 02C RFSU | 24-Jan-28 | Not Started SC03YT0120 — 03Y RFSU | 24-Jan-28 | Not Started CO05BV2110 — 05B Insulate - Equipment | 25-Jan-28 → 15-Feb-28 | Not Started 0% | float 62.0d CO05BV2110 CO02HI0145 — 02H Contingency (101-B) | 27-Jan-28 → 23-Feb-28 | Not Started 0% | float 15.0d CO02HI0145 CO02LI0140 — 02L Continuity Testing | 05-Feb-28 → 21-Feb-28 | Not Started 0% | float -12.0d CO02LI0140 SC05BI0150 — 05B Function Testing | 05-Feb-28 → 08-Feb-28 | Not Started 0% | float 79.0d SC05BI0150 SC02LI0150 — 02L Function Testing | 08-Feb-28 → 29-Mar-28 | Not Started 0% | float -17.0d SC02LI0150 SC03FT0130 — 03F Commission | 08-Feb-28 → 28-Feb-28 | Not Started 0% | float -47.0d SC03FT0130 CO05AV1120 — 05A Paint Touch-up - Piping | 10-Feb-28 → 14-Mar-28 | Not Started 0% | float -2.0d CO05AV1120 CO02LI0130 — 02L Install In Line Instruments | 15-Feb-28 → 01-Mar-28 | Not Started 0% | float -15.0d CO02LI0130 SC05BT0120 — 05B RFSU | 15-Feb-28 | Not Started CO02LT0110 — 02L Mechanical Completion | 21-Feb-28 | Not Started CO02HT0110 — 02H Mechanical Completion | 23-Feb-28 | Not Started CO05AK0120 — 05A Construct Dike (Retaining Wall) | 26-Feb-28 → 05-May-28 | Not Started 0% | float -47.0d CO05AK0120 CO05AK0130 — 05A Guard Posts, Fence, Gravel... | 26-Feb-28 → 05-May-28 | Not Started 0% | float -47.0d CO05AK0130 WO050K0100 — 050 Site Prep | 26-Feb-28 → 05-May-28 | Not Started 0% | float -47.0d WO050K0100 CO05AV2120 — 05A Insulate - Piping | 28-Feb-28 → 11-Apr-28 | Not Started 0% | float -26.0d CO05AV2120 CO06AV2120 — 05A Insulate - Piping | 28-Feb-28 → 11-Apr-28 | Not Started 0% | float -26.0d CO06AV2120 SC000T0100 — 020 Commission ISBL | 29-Feb-28 → 28-Apr-28 | Not Started 0% | float -47.0d SC000T0100 SC02HT0120 — 02H RFSU | 29-Feb-28 | Not Started CO05AE0110 — 05A Lighting JB's, Stands, Tray & Cable | 03-Mar-28 → 30-Mar-28 | Not Started 0% | float -22.0d CO05AE0110 CO05AI0140 — 05A Continuity Testing | 10-Mar-28 → 21-Mar-28 | Not Started 0% | float -25.0d CO05AI0140 CO05AV1130 — 05A Paint Touch-up - Equipment | 10-Mar-28 → 12-Apr-28 | Not Started 0% | float -51.0d CO05AV1130 CO05AI0130 — 05A Install In Line Instruments | 15-Mar-28 → 25-Mar-28 | Not Started 0% | float -29.0d CO05AI0130 SC05AI0150 — 05A Function Testing | 15-Mar-28 → 15-Apr-28 | Not Started 0% | float -34.0d SC05AI0150 CO05AE0120 — 05A Lighting Fixture Installation/Termination | 24-Mar-28 → 06-Apr-28 | Not Started 0% | float -22.0d CO05AE0120 CO05AV2110 — 05A Insulate - Equipment | 28-Mar-28 → 10-May-28 | Not Started 0% | float -51.0d CO05AV2110 CO06AV2110 — 05A Insulate - Equipment | 28-Mar-28 → 10-May-28 | Not Started 0% | float -51.0d CO06AV2110 SC02LT0120 — 02L RFSU | 29-Mar-28 | Not Started CO05AT0110 — 05A Mechanical Completion | 05-May-28 | Not Started SC05AT0120 — 05A RFSU | 10-May-28 | Not Started SC000T0105 — 020 Startup ISBL | 11-May-28 → 24-Jun-28 | Not Started 0% | float -59.0d SC000T0105 SC000T0110 — Performance Test Period | 25-Jun-28 → 22-Sep-28 | Not Started 0% | float -59.0d SC000T0110 SC000YA100 — Construction Bonus Period | 23-Sep-28 → 15-Mar-29 | Not Started 0% | float -59.0d SC000YA100