Projects
EBCF-4

EBIC Construction Forecast (27-Jan-07)

Data Date: 23-Apr-26
Plan: 22-Jan-25 – 27-Mar-29
Legend: Not Started In Progress Complete Critical Milestone Showing 1500 of 4648 (capped — pick a WBS subtree, or show all) activities in EBCF-4 EBIC Construction Forecast (27-Jan-07) × clear
Code
Activity
Start
Finish
Flt
%
PK000I354H
ITCC - Fabricate Hardware
11-Feb-25
27-Dec-26
64%
EK05BPI030
05B Conceptual Layout - Supersketches
07-May-25
27-Dec-26
59%
EK000MBG10
General & Administrative
28-May-25
27-Dec-26
57%
EM03EPI120
03E Plant Layout Model
14-Jun-25
27-Dec-26
56%
EM03API120
03A Plant Layout Model
22-Jul-25
27-Dec-26
53%
EM03YPI120
03Y Plant Layout Model
22-Jul-25
27-Dec-26
53%
PK000MB33K
MB333 - Fab/PO Promise 101-B Riser Transition 101-B
29-Jul-25
27-Dec-26
52%
PK000MBP1K
MB221 - Fab/PO Promise 101-B Radiant Steel Panels
09-Aug-25
27-Dec-26
51%
PK000MBP1Q
MB221 - Fab/PO Promise 101-B Radiant Coil/Harps
09-Aug-25
27-Dec-26
51%
PK000MBP1R
MB221 - Fab/PO Promise 101-B Convection Modules
09-Aug-25
27-Dec-26
51%
PK000MBP1S
MB221 - Fabr/PO Promise 101-B Radiant Ducting
09-Aug-25
27-Dec-26
51%
PK000MD31K
MD301 - Fabricate/PO Promise 103-D
09-Aug-25
17-Feb-27
55.0d
46%
PK000MD33K
MD303 - Fabricate/PO Promise 105-D
09-Aug-25
20-Mar-27
50.0d
44%
PK000MJ21K
MJ202 - Fabricate/PO Promise 102/3/5-J
09-Aug-25
27-Dec-26
51%
PK000MB62K
MB621 - Fabricate/PO Promise 101-B ID & FD Fans
12-Aug-25
27-Dec-26
51%
PK000MB81K
MB810 - Fabricate/PO Promise 102-B
12-Aug-25
27-Dec-26
51%
PK000MD32K
MD302 - Fabricate/PO Promise 104-D1/2
13-Aug-25
10-Jan-27
85.0d
49%
PK000MJ75K
MJ750 - Fabricate/PO Promise SURFACE CONDENSORS
13-Aug-25
27-Dec-26
51%
PK000MB34K
MB340 - Fabricate/PO Promise 101-B Finning
14-Aug-25
27-Dec-26
51%
PK000PTA0G
Engineered Pipe Supports - Fab / Exworks
14-Aug-25
27-Dec-26
51%
EK020IC210
020 Control Valves - D/S,Sizing,Tech Eval
15-Aug-25
27-Dec-26
51%
PK000MD22A
MD202 - Fabricate/PO Promise TOWERS 104-E
16-Aug-25
27-Dec-26
50%
PK000MD22K
MD202 - Fabricate/PO Promise TOWERS 103/105-E
16-Aug-25
27-Dec-26
50%
PK000MD22T
MD202 - Fabricate/PO Promise TOWERS 150-E
16-Aug-25
28-Feb-27
100.0d
45%
PK000MD34K
MD304 - Fabricate/PO Promise 106-D, 109-DA/B
16-Aug-25
29-Jan-27
200.0d
47%
PK000MD34Z
MD304 - Fabricate/PO Promise 108-DA/B
16-Aug-25
27-Dec-26
50%
PK000MD42K
MD402 - Fabricate/PO Promise 102-F1, 102-F2
16-Aug-25
21-Mar-27
130.0d
43%
PK000MD42N
MD402 - Fabricate/PO Promise 104-F, 144-F
16-Aug-25
27-Dec-26
50%
PK000MD44K
MD404 - Fabricate/PO Promise 109-F
16-Aug-25
27-Dec-26
50%
PK000MD44L
MD404 - Fabricate/PO Promise 107-F
16-Aug-25
27-Dec-26
50%
PK000MD44T
MD404 - Fabricate/PO Promise 132-F
16-Aug-25
27-Dec-26
50%
PK000MD45A
MD405 - Fabricate/PO Promise ISBL DRUMS - 115-F
16-Aug-25
27-Dec-26
50%
PK000MD45K
MD405 - Fabricate/PO Promise ISBL DRUMS - 156-F & 157-F
16-Aug-25
27-Dec-26
50%
PK000MD46K
MD411 - Fabricate/PO Promise OSBL DRUMS - 2203-F & 2204-F
16-Aug-25
27-Dec-26
50%
PK000MD46T
MD411 - Fabricate/PO Promise OSBL DRUMS - 2006-F
16-Aug-25
27-Dec-26
50%
PK000MD4Q
MD405 - Fabricate/PO Promise ISBL DRUMS - 118-F
16-Aug-25
27-Dec-26
50%
PK020MC31C
MC312 - Fabricate/PO Promise 121-C
21-Aug-25
28-Feb-27
90.0d
44%
PK020MC31K
MC312 - Fabricate/PO Promise 120-C
21-Aug-25
28-Feb-27
90.0d
44%
PK000MD41K
MD401 - Fabricate/PO Promise 101-F
23-Aug-25
27-Dec-26
50%
PK000MD43K
MD403 - Fabricate/PO Promise 106-F
23-Aug-25
11-Mar-27
135.0d
43%
PK000MJ35K
MJ305 - Fabricate/PO Promise ISBL ANSI/API PUMPS
23-Aug-25
27-Dec-26
50%
ZZ2070
MJ305 - Fabricate/PO Promise OSBL ANSI/API PUMPS
23-Aug-25
27-Dec-26
50%
EM01CPI120
01C Plant Layout Model
24-Aug-25
27-Dec-26
50%
PK000MD51K
MD501 - Fabricate/PO Promise 107-D
27-Aug-25
27-Dec-26
49%
PK000MJ22K
MJ201 - Fabricate/PO Promise 101-J
30-Aug-25
10-Jan-27
86.0d
48%
PK000ML31K
ML313 - Fabricate/PO Promise 160-L
30-Aug-25
27-Dec-26
49%
PK000MBP3R
MB311 - Fab/Exworks 101-B Crossover Tube & Pipe
02-Sep-25
27-Dec-26
49%
PK000MBP3S
MB311 - Fab/Exworks 101-B Crossover Fittings
02-Sep-25
27-Dec-26
49%
PK000MB51K
MB511 - Fabricate/PO Promise 101-B Insulation
03-Sep-25
30-Dec-26
204.0d
48%
PK000MU41K
MU410 - Fabricate/PO Promise 2002-U PKG BOILER
06-Sep-25
27-Dec-26
48%
PK02HMD21
02H MD301 103-D Secondary Reformer - Prod. V. Data
09-Sep-25
27-Dec-26
48%
PK000MC61K
MC610 - Fabricate/PO Promise DBL PIPE EXCH 188-CA
10-Sep-25
27-Dec-26
48%
PK000MBP4K
MB312 - Fab/PO Promise 101-B Radiant Cast Fittings
11-Sep-25
27-Dec-26
48%
PK000MBP4Q
MB312 - Fab/PO Promise 101-B Radiant Cast Stringer Grids
11-Sep-25
27-Dec-26
48%
PK000MBP4R
MB312 - Fab/PO Promise 101-B Radiant Cast Tube/Riser/Manifold
11-Sep-25
27-Dec-26
48%
PK000ML51K
ML512 - Fabricate/PO Promise 2102-L LOADING ARM
11-Sep-25
27-Dec-26
48%
EM020ELEL2
02 U/G Electrical Routing Plans - IFC
16-Sep-25
27-Dec-26
47%
EK000FP036
FP ISBL Firewater P&IDs - Development & Issue IFC
17-Sep-25
27-Dec-26
47%
PK000MD21K
MD201 - Fabricate/PO Promise 101-E
17-Sep-25
01-Jan-27
93.0d
46%
PK000MD21M
MD201 - Fabricate/PO Promise 102-E
17-Sep-25
05-Mar-27
62.0d
41%
PK02EMD02
02E MD304 106-D Methanator - Prod. V. Data
18-Sep-25
27-Dec-26
47%
PK000ML33K
ML330 - Fabricate/Po Promise 2101-L
20-Sep-25
27-Dec-26
47%
EM020ELEH2
02 Develop & Issue Earthing / Grounding Dwgs - IFC
24-Sep-25
27-Dec-26
46%
EK04API030
04A Conceptual Layout - Supersketches
27-Sep-25
27-Dec-26
46%
PK000PSA8G
000 Relief Valves - Fabricate/Exworks
27-Sep-25
30-Dec-26
257.0d
46%
PK000MD47K
MD406 - Fabricate/PO Promise ISBL DRUMS
01-Oct-25
27-Dec-26
45%
PK000MU33K
MU330 - Fabricate/PO Promise 2001-U
01-Oct-25
27-Dec-26
45%
PK000PIA1K
Bulk Piping A/G - Fab/Exworks (CROME)
01-Oct-25
27-Dec-26
45%
PK000PIA4G
Product Line Piping - Fab/Exworks +/- 5700 Mts.
01-Oct-25
27-Dec-26
45%
PK000MC21K
MC210 - Fabricate/PO Promise 110/115/124/128/130/133/134/160/167/173/174-C
09-Oct-25
27-Dec-26
44%
PK000MC21N
MC210 - Fabricate/PO Promise 127-C
09-Oct-25
27-Dec-26
44%
PK000MC23A
MC230 - Fabricate/PO Promise 106-C & 109-C
09-Oct-25
27-Dec-26
44%
PK000MC23K
MC230 - Fabricate/PO Promise 105/107/172/183-C
09-Oct-25
27-Dec-26
44%
PK000MC23N
MC230 - Fabricate/PO Promise 111/114-C
09-Oct-25
27-Dec-26
44%
PK02AMC14
02A MC210 160-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
PK02AMC15
02A MC210 160-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
PK02AMC16
02A MC210 160-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
PK02LMC21
02E MC230 114-C, 172-C & 183-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
PK02LMC22
02E MC230 114-C, 172-C & 183-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
PK02LMC23
02E MC230 114-C, 172-C & 183-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1430
02C MC210 128-C, 134-C, 167-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1440
02C MC210 128-C, 134-C, 167-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1490
02D MC210 127-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1500
02D MC210 127-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1510
02E MC210 115-C, 130-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1520
02E MC210 115-C, 130-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1530
02E MC210 115-C, 130-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1540
02G MC210 133-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1550
02G MC210 133-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1560
02G MC210 133-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1590
02J MC210 173-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1600
02J MC210 173-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1610
02K MC210 174-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1620
02K MC210 174-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1630
02K MC210 174-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1670
02L MC210 110-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1680
02L MC210 110-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1690
02L MC210 110-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1700
02M MC210 124-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1710
02M MC210 124-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1720
02M MC210 124-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1760
02L MC230 105-C, 106-C, 107-C, 109-C & 111-C - Piping Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1770
02L MC230 105-C, 106-C, 107-C, 109-C & 111-C - Civil Prod. V. Data
10-Oct-25
27-Dec-26
44%
ZZ1780
02L MC230 105-C, 106-C, 107-C, 109-C & 111-C - E&I Prod. V. Data
10-Oct-25
27-Dec-26
44%
PK000MJ34K
MJ304 - Fabricate/PO Promise MP BFW PUMPS
15-Oct-25
16-Jan-27
186.0d
42%
PK000MC32K
MC311 - Fabricate/PO Promise KBR S&T EXCH
16-Oct-25
16-Jan-27
76.0d
42%
PK000IC35J
DCS - Planning V. Data
17-Oct-25
27-Dec-26
43%
PK000IC35H
DCS - Fabricate Hardware
21-Oct-25
27-Dec-26
43%
PK010I1240
Rotameters - Fabricate/Exworks
30-Oct-25
27-Dec-26
42%
PK010I1150
Annubars - Fabricate/Exworks
31-Oct-25
30-Dec-26
509.0d
41%
EK010FP031
FP Firewater Pump P&IDs - Development & Issue IFD
01-Nov-25
27-Dec-26
41%
ZZ1850
02J MC311 103-C1/C2 - Piping Prod. V. Data
02-Nov-25
27-Dec-26
41%
ZZ1870
02J MC311 103-C1/C2 - E&I Prod. V. Data
02-Nov-25
27-Dec-26
41%
ZZ1930
02M MC311 123-C1/C2A/C2B - E&I Prod. V. Data
02-Nov-25
27-Dec-26
41%
PK000MB69K
MB691 - Fabricate/PO Promise 101-B
04-Nov-25
27-Dec-26
41%
PK000MU21K
MU221 - Fabricate/PO Promise LIFT STATION
04-Nov-25
27-Dec-26
41%
PK000MU22K
MU222 - Fabricate/PO Promise 2401-U
04-Nov-25
27-Dec-26
41%
CO000K0106
Mobilize Temporary Facilities (& Punchlist & Perm. Power)
09-Nov-25
27-Dec-26
40%
PK02KMD11
02K MD202 150-E Process Condensate Stripper - Prod. V. Data
13-Nov-25
27-Dec-26
40%
EM02FCV160
02F Design & Model Major Eq. Fdns
13-Nov-25
27-Dec-26
40%
PK000MU30K
MU300 - Fabricate/PO Promise 2102-U
19-Nov-25
27-Dec-26
39%
PK000MJ31K
MJ301 - Fabricate/ PO Promise 104-J
20-Nov-25
31-Jan-27
168.0d
35%
PK000MJ32K
MJ302 - Fabricate/PO Promise 107-JA/JB/JC
20-Nov-25
17-Jan-27
175.0d
37%
PK02FMJV01
02F MJ301 104-J/JA - Piping Prod. V. Data
20-Nov-25
27-Dec-26
39%
PK02FMJV02
02F MJ301 104-J/JA - Civil Prod. V. Data
20-Nov-25
27-Dec-26
39%
PK02FMJV03
02F MJ301 104-J/JA - E&I Prod. V. Data
21-Nov-25
22-Jan-27
517.0d
36%
PK000PR20H
PR201 KAAP Catalyst - Fabricate/Exworks
10-Dec-25
03-Nov-27
26.0d
19%
EK020EL126
Electrical Load List - Revised IFD w/Outstanding Equip. Data
13-Dec-25
27-Dec-26
35%
PK000MJ37K
MJ340 - Fabricate/PO Promise METERING PUMPS
13-Dec-25
27-Dec-26
35%
CO000C0150
Perimeter Wall
15-Dec-25
29-Mar-27
27.0d
28%
WO010K0110
010 Site Prep - Perimeter Wall
15-Dec-25
29-Mar-27
27.0d
28%
EK020EL000
ISBL Motor & Drivers - Prod. V. Data (information only)
16-Dec-25
22-Jan-27
32%
EK000I2305
On/Off Valves - Purchase ERW
18-Dec-25
27-Dec-26
34%
PK000MJ73K
MJ730 - Fabricate/PO Promise EMERG PWR GENERATOR
25-Dec-25
28-Feb-27
70.0d
28%
EK010IC213
010 Control Valves - Purchase ERW
25-Dec-25
27-Dec-26
33%
PK03DMJV02
03D MJ305 2002-J/JA - Civil Prod. V. Data
27-Dec-25
27-Dec-26
32%
EK020ELEE0
Tie-in List - IFC
28-Dec-25
27-Dec-26
32%
EM03BCV110
03B Design & Model Sumps
30-Dec-25
27-Dec-26
32%
PK000EL000
OSBL Motors & Drivers - Prod. V. Data (Information Only)
30-Dec-25
30-Dec-26
32%
PK03DMJV01
03D MJ305 2002-J/JA - Piping Prod. V. Data
30-Dec-25
27-Dec-26
32%
PK03DMJV03
03D MJ305 2002-J/JA - E&I Prod. V. Data
30-Dec-25
27-Dec-26
32%
EM02ACV122
02A Update Model Struct Steel & Issue Dwgs - IFC
31-Dec-25
27-Dec-26
32%
PK01BMJV03
01B MJ305 2001-JA/JB/JC, 2004-J/JA,2007-J/JA,2007-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK01HMJV01
01H MJ730 2303-J - Civil Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK01HMJV02
01H MJ730 2303-J - E&I Prod. V. Data
31-Dec-25
30-Dec-26
511.0d
31%
PK02BMLV03
02B ML313 160-L - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02CMJV04
02C MJ202 103-J/105-J - Piping Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02CMJV05
02C MJ202 103-J/105-J - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02CMJV08
02C MJ305 112-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02DMD01
02D MD403 106-F Ammonia Separator - Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02DMJV03
02D MJ305 120-J/JA, 124-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02GMJV03
02G MJ202 102/3/5-J - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02GMJV06
02G MJ201 101-J - Civil Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02GMJV07
02G MJ201 101-J - Piping Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02GMJV08
02G MJ201 101-J - E&I Prod. V. Data
31-Dec-25
30-Dec-26
535.0d
31%
PK02GMJV11
02G MJ305 113-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02KMJV03
02K MJ305 111-J,115-J - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02LMJV01
02L MJ302 107-J - Civil Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02LMJV02
02L MJ302 107-J - Piping Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02LMJV03
02L MJ302 107-J - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK02LMJV06
02L MJ305 116-J/JA,121-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03BMUV03
03B MU222,MJ305 2401-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03CMJV03
03C MJ305 2205-J/JA,2206-J/JA - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03EMUV01
03E MU330 2001-U - Piping Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03EMUV02
03E MU330 2001-U - Civil Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03EMUV03
03E MU330 2001-U - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03FMUV03
03F MU222 2401-U - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03FMUV04
03F MU410 2002-U - Piping Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03FMUV05
03F MU410 2002-U - Civil Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK03FMUV06
03F MU410 2002-U - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK05AMLV01
05A ML330 2101-L - Piping Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK05AMLV02
05A ML330 2101-L - Civil Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK05AMLV03
05A ML330 2101-L - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
PK05BMLV03
05B ML512 2102-L - E&I Prod. V. Data
31-Dec-25
27-Dec-26
32%
EK030IC213
030 Control Valves - Purchase ERW
01-Jan-26
27-Dec-26
31%
EM02NCV164
02N Update Model Major Eq. Fdns & Issue Dwgs-IFC
01-Jan-26
27-Dec-26
31%
EK01AIC300
01A In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK01BIC300
01B In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK01CIC300
01C In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK01DIC300
01D In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK01YIC300
01Y In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02CIC300
02C In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02EIC300
02E In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02FIC300
02F In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02GIC300
02G In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02HIC300
02H In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02JIC300
02J In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02KIC300
02K In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02LIC300
02L In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02MIC300
02M In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02NIC300
02N In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK02QIC300
02Q In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK03AIC300
03A In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK03BIC300
03B In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK03DIC300
03D In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK03EIC300
03E In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK03FIC300
03F In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK03YIC300
03Y In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK05AIC300
05A In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EK05BIC300
05B In Line Instrument Approved Vendor Data
01-Jan-26
27-Dec-26
31%
EM02ECV122
02E Update Model Struct Steel & Issue Dwgs - IFC
02-Jan-26
27-Dec-26
31%
EM02ECV164
02E Update Model Major Eq. Fdns & Issue Dwgs-IFC
02-Jan-26
27-Dec-26
31%
EM05ACV160
05A Design & Model Major Eq. Fdns
03-Jan-26
27-Dec-26
31%
PK000MC31K
MC310 - Fabricate/PO Promise 101-C & 102-C (Heavy Lift)
03-Jan-26
30-Jun-27
8.0d
20%
PK000MJ33K
MJ303 - Fabricate/PO Promise CW PUMPS
03-Jan-26
28-Feb-27
27.0d
26%
PK01DMJV03
01D MJ303 2202-JA/JB/JC - E&I Prod. V. Data
04-Jan-26
27-Dec-26
31%
ZZ1790
02H MC310 101,102-C - Piping Prod. V. Data
04-Jan-26
27-Dec-26
31%
ZZ1800
02H MC310 101,102-C - Civil Prod. V. Data
04-Jan-26
27-Dec-26
31%
ZZ1810
02H MC310 101,102-C - E&I Prod. V. Data
04-Jan-26
27-Dec-26
31%
PO000MF010
Field Erected Tanks Subcontract - Purchasing & Fabrication
04-Jan-26
27-Dec-26
31%
PK000MB64K
MB640 - Fabricate/PO Promise 101-B Springs & Hangers
06-Jan-26
27-Dec-26
30%
PK000MB71K
MB710 - Fabricate/PO Promise 2202-B/BL Storage Flare & Flame FRT Gen.
06-Jan-26
27-Dec-26
30%
PK02HMB38
02H MB622 101-B - Piping Prod. V. Data
06-Jan-26
27-Dec-26
30%
PK02HMB39
02H MB622 101-B - Civil Prod. V. Data
06-Jan-26
27-Dec-26
30%
PK02HMB40
02H MB622 101-B - E&I Prod. V. Data
06-Jan-26
27-Dec-26
30%
PK000MB65K
MB622 - Fab/PO Promise 101-B Penthouse Circ Fans
07-Jan-26
27-Dec-26
30%
EM03FCV160
03F Design & Model Major Eq. Fdns
07-Jan-26
27-Dec-26
30%
EK020ELEC2
Short Circuit, Load Flow Motor starting
10-Jan-26
27-Dec-26
30%
EM000MCG10
GEN and ADMINISTRATIVE
13-Jan-26
27-Dec-26
29%
PK000MU31K
MU310 - Fabricate/PO Promise Injection System & Chlorination Unit
14-Jan-26
27-Dec-26
29%
PK01DMUV01
01D MU310 2202-L,2203-L,2203-L,2205-L,2208-L,2212-L-Piping Prod. V. Data
14-Jan-26
27-Dec-26
29%
PK01DMUV03
01D MU310 2202-L,2203-L,2203-L,2205-L,2208-L,2212-L- E&I Prod. V. Data
14-Jan-26
27-Dec-26
29%
PK02LMLV07
02L MU310 109-L - Piping Prod. V. Data
14-Jan-26
27-Dec-26
29%
PK02FMUV01
02F MU310 106-L,108-L - Piping Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK02FMUV02
02F MU310 106-L,107-L,108-L - Civil Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK02FMUV03
02F MU310 106-L,107-L,108-L - E&I Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK02LMLV08
02L MU310 109-L - Civil Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK02LMLV09
02L MU310 109-L - E&I Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK03FMUV07
03F MU310 2001-L - Piping Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK03FMUV08
03F MU310 2001-L - Civil Prod. V. Data
15-Jan-26
27-Dec-26
29%
PK03FMUV09
03F MU310 2001-L - E&I Prod. V. Data
15-Jan-26
27-Dec-26
29%
EK000IC353
DCS - Software Programming by KBR
15-Jan-26
27-Dec-26
29%
EM02JPI134
02J Detail Model Development
15-Jan-26
27-Dec-26
29%
EM02QPI134
02Q Detail Model Development
16-Jan-26
27-Dec-26
28%
PK01CMUV01
01C MU300 2102-U - Piping Prod. V. Data
16-Jan-26
27-Dec-26
28%
PK01CMUV02
01C MU300 2102-U - Civil Prod. V. Data
16-Jan-26
27-Dec-26
28%
PK01CMUV03
01C MU300 2102-U - E&I Prod. V. Data
16-Jan-26
27-Dec-26
28%
EK020IC213
020 Control Valves - Purchase ERW
17-Jan-26
27-Dec-26
28%
PK000MJ37U
MJ307 - Fabricate/PO Promise ISBL ANSI/API PUMPS
20-Jan-26
20-Jan-27
192.0d
26%
PK05AMJV04
05A MJ307 2100-JA/JB - Piping Prod. V. Data
20-Jan-26
27-Dec-26
28%
PK05AMJV05
05A MJ307 2100-JA/JB - Civil Prod. V. Data
20-Jan-26
27-Dec-26
28%
PK05AMJV06
05A MJ307 2100-JA/JB - E&I Prod. V. Data
20-Jan-26
27-Dec-26
28%
PK000MB66K
MB660 - Fabricate/PO Promise 101-B Dampers & Air Doors
24-Jan-26
27-Dec-26
27%
EK010I1241
Rotameters - Purchase ERW
28-Jan-26
27-Dec-26
26%
EK050PI014
Plot Plan - Dock/Storage Issue IFC
28-Jan-26
27-Dec-26
26%
EM01API200
01A Equipment Location Plans
28-Jan-26
27-Dec-26
26%
EM01CPI200
01C Equipment Location Plans
28-Jan-26
27-Dec-26
26%
EM02GPI200
02G Equipment Location Plans
28-Jan-26
27-Dec-26
26%
EM02YPI134
02Y Detail Model Development
28-Jan-26
27-Dec-26
26%
EM03API200
03A Equipment Location Plans
28-Jan-26
27-Dec-26
26%
EM03BPI200
03B Equipment Location Plans
28-Jan-26
27-Dec-26
26%
EM03EPI200
03E Equipment Location Plans
28-Jan-26
27-Dec-26
26%
EM05API200
05A Equipment Location Plans
28-Jan-26
27-Dec-26
26%
PK01BMF02
01B MF302 2001-FA/FB Water Tank - Prod. V. Data (Subcontract)
28-Jan-26
27-Dec-26
26%
PK01BMF03
01B MF302 2001-FA/FB Water Tank - Piping Prod. V. Data (Subcontract)
28-Jan-26
27-Dec-26
26%
PK01BMF04
01B MF302 2001-FA/FB Water Tank - Civil Prod. V. Data (Subcontract)
28-Jan-26
27-Dec-26
26%
PK01BMF05
01B MF302 2001-FA/FB Water Tank - E&I Prod. V. Data (Subcontract)
28-Jan-26
27-Dec-26
26%
PK02AMJV01
02A MJ340 130-J/JA,131-J/JA - Piping Prod. V. Data
28-Jan-26
27-Dec-26
26%
PK02AMJV02
02A MJ340 130-J/JA,131-J/JA - Civil Prod. V. Data
28-Jan-26
27-Dec-26
26%
PK02AMJV03
02A MJ340 130-J/JA,131-J/JA - E&I Prod. V. Data
28-Jan-26
27-Dec-26
26%
PK03DMF01
03D MF302 2002-F Demineralized Water Tank - Prod. V. Data (Subcontract)
28-Jan-26
27-Dec-26
26%
EM02EPI134
02E Detail Model Development
29-Jan-26
27-Dec-26
26%
EM02MPI134
02M Detail Model Development
29-Jan-26
27-Dec-26
26%
EM02ACV164
02A Update Model Major Eq. Fdns & Issue Dwgs-IFC
29-Jan-26
27-Dec-26
26%
PK000I1220
Coriolis Meters - Fabricate/Exworks
29-Jan-26
27-Dec-26
26%
XE000OW301
05B SPDC TO Provide Required Eng. Data
29-Jan-26
27-Dec-26
26%
PK000MB42S
MB420 - Marshaling 101-B Cast Peep Sites
30-Jan-26
27-Dec-26
25%
PK03AMLV01
03A ML500 2003-L - Piping Prod. V. Data
31-Jan-26
27-Dec-26
25%
PK03AMLV02
03A ML500 2003-L - Civil Prod. V. Data
31-Jan-26
27-Dec-26
25%
PK03AMLV03
03A ML500 2003-L - E&I Prod. V. Data
31-Jan-26
27-Dec-26
25%
PK000I221H
000 Everest Control Valves - Fabricate/Exworks
03-Feb-26
30-Dec-26
504.0d
24%
PK000MD110
MD305 Merc. Removal Bed - Fabricate/PO Promise
03-Feb-26
28-Feb-27
157.0d
21%
PK02MMD12
02M MD305 102-D Mercury Guard - Prod. V. Data
03-Feb-26
27-Dec-26
24%
PK000ML50K
ML500 - Fabricate/PO Promise 2003-L PAI/IA
04-Feb-26
10-Feb-27
78.0d
21%
PK000MJ36K
MJ305 - Fabricate/PO Promise OSBL PUMPS
04-Feb-26
10-Jan-27
60.0d
23%
EM02LPI134
02L Detail Model Development
06-Feb-26
27-Dec-26
24%
PK000I352H
SIS - Fabricate Hardware
10-Feb-26
27-Dec-26
23%
EK02EIC120
02E Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EK02HIC120
02H Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EK02JIC120
02J Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EK02KIC120
02K Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EK02LIC120
02L Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EK02MIC120
02M Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EK02QIC120
02Q Instrument Detail Model / Review
11-Feb-26
27-Dec-26
23%
EM01CCV160
01C Design & Model Major Eq. Fdns (Excluding EDR)
11-Feb-26
27-Dec-26
23%
PK02KMF04
02K MF301 114-F Benfield Solution Storage Tank - Fdn. V. Data (Subcontract)
11-Feb-26
27-Dec-26
23%
PK02KMF05
02K MF301 114-F Benfield Solution Storage Tank - Prod. V. Data (Subcontract)
11-Feb-26
27-Dec-26
23%
PK05AMF05
05A MF311 2101/2102-F Ammonia Storage Tanks - Foundation V. Data (Subcontract)
11-Feb-26
27-Dec-26
23%
PK000I1100
020 Orific Plates - Fabricate/Exworks
13-Feb-26
27-Dec-26
22%
PK000MU11K
05B MU311 - Fabricate/PO Promise HYDROCHLORIC ACID STORAGE
13-Feb-26
27-Dec-26
22%
EM02UPICWG
02U U/G Plan Dwgs Issue IFC
14-Feb-26
27-Dec-26
22%
EK000E001D
Sub Stations - Tech Evaluation
19-Feb-26
27-Dec-26
21%
PK000PS00E
000 SP Items - Final Negotiation / Interim Award
19-Feb-26
27-Dec-26
21%
EM02CPI134
02C Detail Model Development
20-Feb-26
27-Dec-26
20%
EM01BCV226
01B Issue Fdn IFC- 2001-FA/FB (Water Storage Tanks)
24-Feb-26
27-Dec-26
19%
EK000CS027
Turnover System Definition for OSBL
25-Feb-26
27-Dec-26
19%
EK000I444F
Planning V. Data - Shelters/ Analyzers
25-Feb-26
27-Dec-26
19%
EM03ECV110
03E Design & Model Containment Area
25-Feb-26
27-Dec-26
19%
PK000I352J
SIS - Planning V. Data
25-Feb-26
27-Dec-26
19%
PK000I354J
ITCC - Planning V. Data
25-Feb-26
27-Dec-26
19%
PK02GMLV02
02G ML425 101-L - Civil Prod. V. Data
25-Feb-26
27-Dec-26
19%
PK02GMLV03
02G ML425 101-L - E&I Prod. V. Data
25-Feb-26
27-Dec-26
19%
PK05AMLV04
05A ML501 2103-L - Piping Prod. V. Data
25-Feb-26
27-Dec-26
19%
PK05AMLV05
05A ML501 2103-L - Civil Prod. V. Data
25-Feb-26
27-Dec-26
19%
PK05AMLV06
05A ML501 2103-L - E&I Prod. V. Data
25-Feb-26
27-Dec-26
19%
EM20ELEK2
02 Develop & Issue Cable Ladder Plans - IFC
03-Mar-26
27-Dec-26
17%
PK000MB68K
MB692 - Fabricate/PO Promise 101-B Cat Vacuum Equip.
03-Mar-26
27-Dec-26
17%
EK020I131A
Develop / Issue Purchase ERW -Transmitter ISBL
04-Mar-26
27-Dec-26
17%
EK030I131A
Develop / Issue Purchase ERW -Transmitter OSBL
04-Mar-26
27-Dec-26
17%
EM02FPI134
02F Detail Model Development
04-Mar-26
27-Dec-26
17%
EK000E002D
Transformer - Tech Evaluation
04-Mar-26
27-Dec-26
17%
PK000E002E
Transformer - Eval Bids/Issue Recmd
04-Mar-26
27-Dec-26
17%
PK000MB21F
Marshaling of Equip. 101-B Siding for MB212
04-Mar-26
27-Dec-26
17%
EM02HPI134
02H Detail Model Development
07-Mar-26
27-Dec-26
16%
EK000I221F
000 Everest Control Valves - Purchase ERW
11-Mar-26
27-Dec-26
15%
EK010I1211
Vortex Meters - Purchase ERW
11-Mar-26
27-Dec-26
15%
EK02CIC120
02C Instrument Detail Model / Review
11-Mar-26
27-Dec-26
15%
EM02YCV122
02Y Update Model Struct Steel & Issue Dwgs - IFC
11-Mar-26
27-Dec-26
15%
PK000ML43S
ML430 - Marshaling 110-L BENFIELD MIXER
11-Mar-26
27-Dec-26
15%
EM02DMD229
02D Vessel Steel Release IFC (MD403, MD404, 106/7/9-F)
12-Mar-26
27-Dec-26
15%
EM02EMD229
02E Vessel Steel Release IFC
12-Mar-26
27-Dec-26
15%
EM02HMD229
02H Vessel Steel Release IFC (MD301, MD405, MD501)
12-Mar-26
27-Dec-26
15%
EM02JMD229
02J Vessel Steel Release IFC (MD302,MD304)
12-Mar-26
27-Dec-26
15%
EM02LMD229
02L Vessel Steel Release IFC (MD201, MD402, MD404, MD406)
12-Mar-26
27-Dec-26
15%
EM02MMD229
02M Vessel Steel Release IFC (MD303, MD402)
12-Mar-26
27-Dec-26
15%
EM02QMD229
02Q Vessel Steel Release IFC (MD401)
12-Mar-26
27-Dec-26
15%
EK000I617A
Develop / Issue Purchase ERW - Magnetic Lvl Gauges
13-Mar-26
27-Dec-26
15%
EM02AMD229
02A Vessel Steel Release IFC
13-Mar-26
27-Dec-26
15%
EM02KMD229
02K Vessel Steel Release IFC (MD202, MD405)
13-Mar-26
27-Dec-26
15%
PK05BMU06
05B MU311 2109-LA/LB, 2110-L - Piping Prod. V. Data
14-Mar-26
27-Dec-26
14%
PK05BMU07
05B MU311 2109-LA/LB, 2110-L - Civil Prod. V. Data
14-Mar-26
27-Dec-26
14%
PK000MJ39P
Issue Formal P.O. for MJ391/MJ392
17-Mar-26
27-Dec-26
13%
EK050PI006
Site Data Needed - Loading Area (SPDC)
18-Mar-26
27-Dec-26
13%
PK000MJ39K
Fabricate/Exworks FIREWATER PUMPS
18-Mar-26
10-Jan-27
60.0d
12%
PK01BMJV04
01B MJ391 2204-J/JA - Piping Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK01BMJV05
01B MJ391 2204-J/JA - Civil Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK01BMJV06
01B MJ391 2204-J/JA - E&I Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK02EMD03
02E MD304 109-DA Molecular Sieve Dryer - Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK02EMD04
02E MD304 109-DB Molecular Sieve Dryer - Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK05AMJV07
05A MJ392 2105-JA/JB - Piping Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK05AMJV08
05A MJ392 2105-JA/JB - Civil Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK05AMJV09
05A MJ392 2105-JA/JB - E&I Prod. V. Data
18-Mar-26
27-Dec-26
13%
PK000MU25J
02G MU225 Final Negotiate/Interim Award
19-Mar-26
27-Dec-26
13%
PK000MU29K
MU292 - Fabricate/PO Promise 2404-L
19-Mar-26
27-Dec-26
13%
PK03BMUV04
03B MU292 2404-L - Piping Prod. V. Data
19-Mar-26
27-Dec-26
13%
PK03BMUV05
03B MU292 2404-L - Civil Prod. V. Data
19-Mar-26
27-Dec-26
13%
PK03BMUV06
03B MU292 2404-L - E&I Prod. V. Data
19-Mar-26
27-Dec-26
13%
EM01YPI138
01Y Design / Issue Pipe Supports IFC
20-Mar-26
27-Dec-26
12%
EM02LCV164
02L Update Model Major Eq. Fdns & Issue Dwgs-IFC
20-Mar-26
27-Dec-26
12%
EM02MCV164
02M Update Model Major Eq. Fdns & Issue Dwgs-IFC
20-Mar-26
27-Dec-26
12%
CO02HC0140
02H Form Pour Strip Fnds - Structure
21-Mar-26
27-Dec-26
12%
EM03CPI138
03C Design / Issue Pipe Supports IFC
21-Mar-26
27-Dec-26
12%
WO020C0100
020 Concrete & Excavation
21-Mar-26
23-Mar-27
215.0d
9%
EK000I616A
Develop / Issue Purchase ERW - Steam Drum Lvl Gauges - ISBL
22-Mar-26
27-Dec-26
12%
EK030I616A
Develop / Issue Purchase ERW - Steam Drum Lvl Gauges - OSBL
22-Mar-26
27-Dec-26
12%
EM02API134
02A Detail Model Development
22-Mar-26
27-Dec-26
12%
CK01UU4150
01U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
164.0d
10%
CK02UU4150
02U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
164.0d
10%
CK03UU4150
03U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
164.0d
10%
CK05UU4150
05U U/G Pipe Spool Fabrication & Delivery (FW) HDPE
24-Mar-26
16-Jan-27
318.0d
10%
CO000CK110
Set-Up KBR Pipe Fab Shop
24-Mar-26
27-Dec-26
11%
XE000OW300
04A SPDC TO Provide Required Eng. Data
24-Mar-26
27-Dec-26
11%
EM02YCV133
02Y Update Model Structural Fdns & Issue Dwgs - IFC
25-Mar-26
27-Dec-26
11%
EM03CMD229
03C Vessel Steel Release IFC (MD411 2203-F, 2204-F)
26-Mar-26
27-Dec-26
11%
EM03FMD229
03F Vessel Steel Release IFC (MD411, 2006-F)
26-Mar-26
27-Dec-26
11%
PK020IC210
020 Control Valves - Fabricate/Exworks
27-Mar-26
27-Dec-26
10%
WO010C0100
010 Concrete & Excavation
27-Mar-26
04-May-27
149.0d
7%
PK010IC210
010 Control Valves - Fabricate/Exworks
28-Mar-26
27-Dec-26
10%
PK030IC210
030 Control Valves - Fabricate/Exworks
28-Mar-26
27-Dec-26
10%
CO02JC0150
02J Form, Pour, Strip Fnd - 104-D2 (Low Temp Shift Converter)
30-Mar-26
27-Dec-26
9%
CO02JC0160
02J Form, Pour, Strip Fnd - 104-D1 (High Temp Shift Converter)
30-Mar-26
27-Dec-26
9%
CO01DC0150
01D Form, Pour, Strip Fnd - 2101-U (Cooling Tower)
31-Mar-26
27-Dec-26
9%
EK020FP460
FP Electrical Area Classification OSBL - IFC
31-Mar-26
27-Dec-26
9%
EM000ELEH2
01,03,05 Develop & Issue Earthing / Grounding Dwgs - IFC
31-Mar-26
27-Dec-26
9%
EM02HCV164
02H Update Model Major Eq. Fdns & Issue Dwgs-IFC
31-Mar-26
27-Dec-26
9%
PK01DMUV07
01D MU322 2210-L,2211-L - Piping Prod. V. Data
31-Mar-26
27-Dec-26
9%
PK01DMUV09
01D MU322 2210-L,2211-L - E&I Prod. V. Data
31-Mar-26
27-Dec-26
9%
CO02JC0110
02J Form, Pour, Strip Fnds - Major Fnds Gen'l
01-Apr-26
27-Dec-26
9%
EK000I1122
020 Venturis - Purchase ERW
01-Apr-26
27-Dec-26
9%
EK000I623A
Develop / Issue Purchase ERW -Multi-Point Thermocouples - ISBL
01-Apr-26
27-Dec-26
9%
EK000MU25E
02G MU225 Prepare & Issue Purchase ERW
01-Apr-26
27-Dec-26
9%
EK010I1151
Annubars - Purchase ERW
01-Apr-26
27-Dec-26
9%
EK02AIC120
02A Instrument Detail Model / Review
01-Apr-26
27-Dec-26
9%
EK030I623A
Develop / Issue Purchase ERW -Multi-Point Thermocouples - OSBL
01-Apr-26
27-Dec-26
9%
EM010IC123
UNIT 01 Instr. Location Plans - IFC
01-Apr-26
27-Dec-26
9%
EM01BMD229
01B Vessel Steel Release IFC
01-Apr-26
27-Dec-26
9%
EM020IC124
UNIT 02 Instr. Location Plans - IFC
01-Apr-26
27-Dec-26
9%
EM020IC128
Instrument Wiring Diagrams - IFC
01-Apr-26
27-Dec-26
9%
EM030IC125
UNIT 03 Instr. Location Plans - IFC
01-Apr-26
27-Dec-26
9%
EM050IC130
05B Instr. Location Plans - IFC
01-Apr-26
16-Jan-27
166.0d
8%
PK000ML42S
ML420 - Marshaling CARTRIDGE FILTERS
01-Apr-26
27-Dec-26
9%
PK02HMB50
02H MB692 101-BL2 - Piping Prod. V. Data
01-Apr-26
27-Dec-26
9%
PK02HMB51
02H MB692 101-BL2 - Civil Prod. V. Data
01-Apr-26
27-Dec-26
9%
PK02HMB52
02H MB692 101-BL2 - E&I Prod. V. Data
01-Apr-26
27-Dec-26
9%
PK05AMB46
05A MB710 2202-B/BL - Piping Prod. V. Data
01-Apr-26
27-Dec-26
9%
PK05AMB47
05A MB710 2202-B/BL - Civil Prod. V. Data
01-Apr-26
27-Dec-26
9%
PK05AMB48
05A MB710 2202-B/BL - E&I Prod. V. Data
01-Apr-26
27-Dec-26
9%
PK000PIA1H
Bulk Piping A/G & U/G - Transport / Delivery (First CS,SS,U/G)
01-Apr-26
27-Dec-26
9%
PK000MB61L
Marshaling of 101-B Burners MB610
02-Apr-26
27-Dec-26
8%
PK000MU32K
01D MU322 - Fabricate/PO Promise COOLING WTR FILTER & CLARIFIER
02-Apr-26
27-Dec-26
8%
PK000ML90K
ML900 - Fabricate/PO Promise Evap. Pond Spray Nzl.
02-Apr-26
27-Dec-26
8%
PK01AMLV01
01A ML900 2408-LA,LB,LC,LD - Piping Prod. V. Data
02-Apr-26
27-Dec-26
8%
PK01AMLV02
01A ML900 2408-LA,LB,LC,LD - Civil Prod. V. Data
02-Apr-26
27-Dec-26
8%
PK01AMLV03
01A ML900 2408-LA,LB,LC,LD - E&I Prod. V. Data
02-Apr-26
27-Dec-26
8%
CO01GA0115
01G Erect Control Building (Columns & Parapet Only)
03-Apr-26
27-Dec-26
8%
CO02LC0150
02L Form, Pour, Strip Fnd - 101-E (CO2 Absorber)
03-Apr-26
27-Dec-26
8%
CO02MC0110
02M Form, Pour, Strip Fnds - Major Fnds Gen'l
03-Apr-26
27-Dec-26
8%
CO02MC0140
02M Form Pour Strip Fnds - Structure
03-Apr-26
27-Dec-26
8%
EK010E008D
540-SB Admin. Area Pwr Supply - Tech Evaluation
03-Apr-26
27-Dec-26
8%
EM01YCV122
01Y Update Model S/S Piperack & Issue Dwgs - IFC
03-Apr-26
27-Dec-26
8%
CO02KC0150
02K Form, Pour, Strip Fnd - 114-F (Benfield Solution Tank)
04-Apr-26
27-Dec-26
7%
EK020EL160
Switchgear One line Diagrams - IFD
04-Apr-26
27-Dec-26
7%
EK020EL180
MCC One line Diagrams - IFD
04-Apr-26
27-Dec-26
7%
EK05BEL160
Switchgear One line Diagrams - IFD
04-Apr-26
27-Dec-26
7%
EK05BEL180
MCC One line Diagrams - IFD
04-Apr-26
27-Dec-26
7%
EM01UPICWG
01U U/G Plan Dwgs Issue IFC
04-Apr-26
27-Dec-26
7%
CO03DC0110
03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank)
06-Apr-26
27-Dec-26
7%
WO030C0100
030 Concrete & Excavation
06-Apr-26
19-Mar-27
229.0d
5%
PK000E00C
UPS System - Receive Bids
07-Apr-26
27-Dec-26
6%
EK000I621A
Develop / Issue Purchase ERW - Temperature Elements - ISBL
08-Apr-26
27-Dec-26
6%
EK030I621A
Develop / Issue Purchase ERW - Temperature Elements - OSBL
08-Apr-26
27-Dec-26
6%
CO02BC0110
02B Form, Pour, Strip Fnds - Major Fnds
09-Apr-26
27-Dec-26
6%
PK000MC61F
MC610 - Marshaling DBL PIPE EXCH 161-C
10-Apr-26
27-Dec-26
5%
EM03CCV126
03C Conceptual Misc. Steel Design/ Model
11-Apr-26
27-Dec-26
5%
EM02CCV128
02C Update Model Structural Fdns & Issue Dwgs - IFC
11-Apr-26
27-Dec-26
5%
EM02ECV128
02E Update Model Structural Fdns & Issue Dwgs - IFC
14-Apr-26
27-Dec-26
5%
CO010K0120
010 Construct Perimeter Roads
15-Apr-26
28-Dec-26
5%
CO02AC0110
02A Form, Pour, Strip Fnds - Major Fnds
15-Apr-26
09-Mar-27
189.0d
5%
EM02DCV126
02D Conceptual Misc. Steel Design/ Model
15-Apr-26
27-Dec-26
5%
EM02DCV164
02D Update Model Major Eq. Fdns & Issue Dwgs-IFC
15-Apr-26
27-Dec-26
5%
EM02UPI200
02U Issue U/G Material Final Release
15-Apr-26
27-Dec-26
5%
EM05UPI191
05U U/G Plan Dwgs IFC
15-Apr-26
27-Dec-26
5%
PK000I444D
Vendor Update Pricing - Shelters/ Analyzers
15-Apr-26
27-Dec-26
5%
PK000MB83S
MB630 - Marshaling 101-B Air Preheater
15-Apr-26
27-Dec-26
5%
EM02DCV166
02D Conceptual Misc. Foundations Design/ Model
15-Apr-26
27-Dec-26
5%
PK000MU61S
MU611 - Marshaling 2101-U, 2101-UJA Thru UJG CW TWR & Fans
15-Apr-26
27-Dec-26
5%
PK000MU61U
MU611 - Marshaling 2101-UJA Thru UJGM CW Motors
15-Apr-26
27-Dec-26
5%
PK000I3521
SIS - Vendor Provides Software & Workstations
16-Apr-26
27-Dec-26
5%
PK010I1210
Vortex Meters - Fabricate/Exworks
16-Apr-26
27-Dec-26
5%
EM02DCV128
02D Update Model Structural Fdns & Issue Dwgs - IFC
16-Apr-26
27-Dec-26
5%
EM02NPI143
02N OP's & Service Model Review Comment Resolution
16-Apr-26
27-Dec-26
5%
EM03CCV166
03C Conceptual Misc. Foundations Design/ Model
16-Apr-26
27-Dec-26
5%
EM03YCV120
03Y Design & Model Major Structural Steel
17-Apr-26
27-Dec-26
5%
EM01UPI200
01U Issue U/G Material Final Release 90%
17-Apr-26
27-Dec-26
5%
EK000I3523
SIS - Software Programming by KBR
18-Apr-26
27-Dec-26
5%
EM020ELEK2
02 Develop & Issue Power Plans - IFC
18-Apr-26
27-Dec-26
5%
EK000I611A
Develop / Issue Purchase ERW - Pressure Gauges - ISBL
19-Apr-26
27-Dec-26
5%
CO01BC0160
01B Form, Pour, Strip Fnd - 2001-FB (Water Storage Tank)
20-Apr-26
27-Dec-26
5%
CO02HC0150
02H Form, Pour, Strip Fnd - 103-D (Secondary Reformer)
21-Apr-26
27-Dec-26
5%
CO03CC0110
03C Form, Pour, Strip Fnds - Major Fnds
21-Apr-26
27-Dec-26
5%
EM02GPI021
02G Model Review Comment Resolution
21-Apr-26
27-Dec-26
5%
EM03UPI200
03U Issue U/G Material Final Release (90%)
21-Apr-26
27-Dec-26
5%
EM05BEL120
05B Electrical Conceptual Layouts
21-Apr-26
27-Dec-26
5%
EK02FIC120
02F Instrument Detail Model / Review
22-Apr-26
27-Dec-26
5%
EK030I611A
Develop / Issue Purchase ERW - Pressure Gauges - OSBL
22-Apr-26
27-Dec-26
5%
EK05ACV100
05A Soils Investigation - Golder Review & Report
22-Apr-26
27-Dec-26
5%
EK05AIC120
05A Instrument Detail Model / Review
22-Apr-26
27-Dec-26
5%
EM02JCV126
02J Misc. Steel Design/ Model
22-Apr-26
27-Dec-26
5%
EM03UPI190
03U U/G Plan Dwgs Issue IFC
22-Apr-26
27-Dec-26
5%
EM03UPIASG
03U Iso Issue IFC - Other HDPE (AS & NA)
22-Apr-26
27-Dec-26
5%
EM03UPIOSG
03U Iso Issue IFC - Metalic Piping (OS)
22-Apr-26
27-Dec-26
5%
PK000I3520
SIS - Vendor Update Pricing / Quote
22-Apr-26
27-Dec-26
5%
PK010I1100
010 Orific Plates - Fabricate/Exworks
22-Apr-26
27-Dec-26
5%
EK02GIC120
02G Instrument Detail Model / Review
23-Apr-26
27-Dec-26
5%
EK000MJ38C
Prepare & Issue Purchase ERW - MJ308
23-Apr-26
27-Dec-26
5%
PK000MJ38M
Final Negotiate/Interim Award - MJ308
23-Apr-26
27-Dec-26
5%
PK000MJ38R
Issue Formal P.O. for MJ308
23-Apr-26
27-Dec-26
5%
PK000MJ38T
Recv. Planning V. Data MJ308
23-Apr-26
27-Dec-26
5%
PK000MJ38U
MJ308 - Fabricate/PO Promisse ISBL ANSI/API PUMPS
23-Apr-26
10-Jan-27
198.0d
5%
PK01AMJV01
01A MJ308 2408-JA/JB - Piping Prod. V. Data
23-Apr-26
27-Dec-26
5%
PK01AMJV02
01A MJ308 2408-JA/JB - Civil Prod. V. Data
23-Apr-26
27-Dec-26
5%
PK01AMJV03
01A MJ308 2408-JA/JB - E&I Prod. V. Data
23-Apr-26
27-Dec-26
5%
EM03CPI141
03C Detail OP's & Services Model Review Mtg
24-Apr-26
27-Dec-26
5%
EM02DPI141
02D Detail OP's & Services Model Review Mtg
24-Apr-26
27-Dec-26
5%
PK000MU35S
MU350 - Marshaling 101-U DEAERATOR
24-Apr-26
27-Dec-26
5%
WK000U4100
000 U/G Pipe Spool Fabrication
10-Aug-26
07-Dec-26
0%
CO000M0110
Mobilize Field Fab Tank Contractor
27-Dec-26
27-Dec-26
0%
CO01BC0110
01B Form, Pour, Strip Fnds - Major Fnds Gen'l
27-Dec-26
27-Dec-26
0%
CO01BC0150
01B Form, Pour, Strip Fnd - 2001-FA (Water Storage Tank)
27-Dec-26
27-Dec-26
0%
CO01DC0140
01D Form Pour Strip Fnds - Sleepers
27-Dec-26
27-Dec-26
0%
CO01YC0140
01Y Form Pour Strip Fnds - Pipe Rack
27-Dec-26
27-Dec-26
0%
CO02CC0160
02C Form, Pour, Strip Fnd - 103-JTC
27-Dec-26
27-Dec-26
0%
CO02CM0140
02C Set - 103-JTC Surface Condenser
27-Dec-26
27-Dec-26
0%
CO02EC0110
02E Form, Pour, Strip Fnds - Major Fnds Gen'l
27-Dec-26
27-Dec-26
0%
CO02EC0140
02E Form Pour Strip Fnds - Structure
27-Dec-26
27-Dec-26
0%
CO02GC0160
02G Form, Pour, Strip Fnd - 102-J Fd Gas Compr. & Aux.
27-Dec-26
27-Dec-26
0%
CO02HC0110
02H Form, Pour, Strip Fnds - 101B (Primary Reformer)
27-Dec-26
27-Dec-26
0%
CO02HC0160
02H Form, Pour, Strip Fnd - 156-F (Steam Blowdown Drum)
27-Dec-26
27-Dec-26
0%
CO02HM0140
02H Set - 156-F Steam Blowdown Drum
27-Dec-26
27-Dec-26
0%
CO02LC0160
02L Form, Pour, Strip Fnd - 102-E (CO2 Stripper)
27-Dec-26
27-Dec-26
0%
CO02MC0150
02M Form, Pour, Strip Fnd - 105-D (Ammonia Synthesis Converter)
27-Dec-26
27-Dec-26
0%
CO02NC0110
02N Form, Pour, Strip Fnds - Major Fnds
27-Dec-26
27-Dec-26
0%
CO02YC0140
02Y Form Pour Strip Fnds - Pipe Rack
27-Dec-26
27-Dec-26
0%
CO03CM0110
03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks
27-Dec-26
27-Dec-26
0%
CO03DC0150
03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps)
27-Dec-26
27-Dec-26
0%
CO03FC0110
03F Form, Pour, Strip Fnds - Package Boiler
27-Dec-26
27-Dec-26
0%
CO05AC0170
05A Install Test Piles
27-Dec-26
27-Dec-26
0%
CO05AMF200
05A Final Tank Design Loads Submitted by DSD
27-Dec-26
27-Dec-26
0%
EK000CV146
Receive Site Survey Data Areas 04 & 05
27-Dec-26
27-Dec-26
0%
EK000E004D
UPS System - Tech Evaluation
27-Dec-26
27-Dec-26
0%
EK000ELEG0
Electrical Heat Tracing - ERW Package
27-Dec-26
27-Dec-26
0%
EK000FP034
FP ISBL Firewater P&IDs - Development & Issue IFD
27-Dec-26
27-Dec-26
0%
EK000FP060
FP Overall Firewater P&IDs - Development & Issue IFD
27-Dec-26
27-Dec-26
0%
EK000FP065
FP Overall Firewater P&IDs - Development & Issue IFC
27-Dec-26
27-Dec-26
0%
EK000GE030
Production Check Estimate
27-Dec-26
27-Dec-26
0%
EK000I3522
SIS - Final Tech Evaluation for Purchase
27-Dec-26
27-Dec-26
0%
EK000I352M
SIS - Review / Approve V. Data
27-Dec-26
27-Dec-26
0%
EK000I354M
ITCC - Review / Approve V. Data
27-Dec-26
27-Dec-26
0%
EK000I444E
Final Tech Evaluation - Shelters/ Analyzers
27-Dec-26
27-Dec-26
0%
EK000I444G
Review / Approve V. Data - Shelters/ Analyzers
27-Dec-26
27-Dec-26
0%
EK000I612A
Develop / Issue Purchase ERW - Differential Pressure Gauges
27-Dec-26
27-Dec-26
0%
EK000MF32D
05A MF312 2105-F Water Tank - Fdn Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EK000YA828
(EP-30) Vendor Acceptance of Commitment for Electrical 20 MVA Transformers
27-Dec-26
27-Dec-26
0%
EK000YA829
(EP-31) Vendor Acceptance of Commitment for Substation
27-Dec-26
27-Dec-26
0%
EK000YA832
(EP-32) Issue OSBL (Units01/03) found./UG pipe work package
27-Dec-26
27-Dec-26
0%
EK000YA833
(EP-33) Issue > 90% ISBL Civil Foundations
27-Dec-26
27-Dec-26
0%
EK000YA836
(PC-07) Issue 101-B -Primary Reformer Erection Drawings
27-Dec-26
27-Dec-26
0%
EK000YA839
(EP-35) Issue >90% OSBL P&ID's For Construction (IFC)
27-Dec-26
27-Dec-26
0%
EK000YA841
(EP-29) Issue OSBL Plot Plan for Construction (IFC)
27-Dec-26
27-Dec-26
0%
EK000YA848
(EP-37) Issue >90% ISBL Instrument Location Plans/Wire Lists for Construction (IFC)
27-Dec-26
27-Dec-26
0%
EK000YA858
(EP-38) Deliver Syn Gas Compressor, 103-J, and Ammonia Refrig Compressor, 105-J, to site
27-Dec-26
27-Dec-26
0%
EK000YA888
(TLA-02) Second TLA Payment
27-Dec-26
27-Dec-26
0%
EK010FP040
FP Firewater Pump P&IDs - Development & Issue IFC
27-Dec-26
27-Dec-26
0%
EK01AIC120
01A Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK01API144
01A OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK01BIC120
01B Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK01BPI144
01B OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK01CIC120
01C Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK01CPI143
01C OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK01DIC120
01D Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK01DPI144
01D OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK01HIC120
01H Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK01JIC120
01J Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK01JPI050
01J Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK01JPI143
01J Op's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK01YPI143
01Y OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK020EL121
Overall One line Diagrams - IFD
27-Dec-26
27-Dec-26
0%
EK020EL210
Production Check Estimate - Electrical
27-Dec-26
27-Dec-26
0%
EK020ELEC3
Protective Device Coordination
27-Dec-26
27-Dec-26
0%
EK020ELEG5
Cathodic Protection - Design & Specs Package (By Consultant)
27-Dec-26
27-Dec-26
0%
EK020ELEM1
Cable & Raceway Schedule - IFC
27-Dec-26
27-Dec-26
0%
EK020ELG70
Construction & Operation Interfac.
27-Dec-26
27-Dec-26
0%
EK020IC133
Field Bus J-boxes Wiring Reports - IFC
27-Dec-26
27-Dec-26
0%
EK02API144
02A OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02CPI144
02C OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02DPI143
02D OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02EPI143
02E OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02FPI143
02F OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02GPI050
02G Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02HPI144
02H OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02JPI144
02J OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02KPI143
02K OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02LPI143
02L OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02MPI143
02M OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02NPI144
02N OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK02YPI144
02Y OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03AIC120
03A Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK03API050
03A Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03API143
03A OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03BIC120
03B Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK03BPI050
03B Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03BPI143
03B OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03CPI143
03C OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03DIC120
03D Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK03DPI145
03D OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03EIC120
03E Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK03EPI050
03E Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03EPI144
03E OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03FIC120
03F Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK03FPI050
03F Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03FPI144
03F OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03YIC120
03Y Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK03YPI050
03Y Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK03YPI144
03Y OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK04AIC120
04A Instrument Detail Model / Review
27-Dec-26
27-Dec-26
0%
EK05ACV110
05A Update Model & Issue Fnd Dwgs-IFC (Ammonia Tanks)
27-Dec-26
27-Dec-26
0%
EK05AMD100
05A Review & Select Ammonia Tank Design
27-Dec-26
27-Dec-26
0%
EK05API050
05A Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EK05API144
05A OP's & Serv. Model Comments Resolution Approval
27-Dec-26
27-Dec-26
0%
EK05BPI035
05B Plot Plan
27-Dec-26
27-Dec-26
0%
EK100ELEK2
01,03,04,05 Develop & Issue Cable Ladder Plans - IFC Except 01H & 05A
27-Dec-26
27-Dec-26
0%
EK200ELEK2
01H Develop & Issue Cable Ladder Plans - IFC
27-Dec-26
27-Dec-26
0%
EK2QPI144
02Q OP's & Serv. Model Comment Resolution Approval
27-Dec-26
27-Dec-26
0%
EM000ELEJ2
01,03,05 Develop & Issue Lighting Plans - IFC
27-Dec-26
27-Dec-26
0%
EM000ELEK2
01,03,04,05 Develop & Issue Power Plans - IFC
27-Dec-26
27-Dec-26
0%
EM000ELEL2
01,03,04,05 Electrical Routing Plans
27-Dec-26
27-Dec-26
0%
EM000ELEM2
Dev/Issue Elect Cable/Raceway Sched IFC
27-Dec-26
27-Dec-26
0%
EM01API132
01A Planning Release
27-Dec-26
27-Dec-26
0%
EM01API134
01A Detail Model Development
27-Dec-26
27-Dec-26
0%
EM01API135
01A A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM01API136
01A IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM01API138
01A Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM01API141
01A Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01API143
01A OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM01ASY172
01A P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM01ASY272
01A P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM01BCV123
01B Update Model S/S Sleepers & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01BCV126
01B Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM01BCV127
01B Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01BCV133
01B Update Model S/S Sleeper Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01BCV164
01B Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM01BCV166
01B Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM01BCV167
01B Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01BPI134
01B Detail Model Development
27-Dec-26
27-Dec-26
0%
EM01BPI135
01B A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM01BPI136
01B IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM01BPI138
01B Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM01BPI141
01B Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01BPI143
01B OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM01BSY172
01B P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM01BSY272
01B P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM01CCV164
01C Update Model Major Eq. Fdns & Issue Dwgs-IFC (Excluding EDR)
27-Dec-26
27-Dec-26
0%
EM01CCV180
01C Design & Model Major Eq. Fdns (Including EDR)
27-Dec-26
27-Dec-26
0%
EM01CCV190
01C Update Model Major Eq. Fdns & Issue Dwgs-IFC (Including EDR)
27-Dec-26
27-Dec-26
0%
EM01CPI132
01C Planning Release
27-Dec-26
27-Dec-26
0%
EM01CPI134
01C Detail Model Development
27-Dec-26
27-Dec-26
0%
EM01CPI135
01C A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM01CPI136
01C IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM01CPI138
01C Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM01CPI141
01C Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01CPI142
01C OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM01CSY172
01C P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM01CSY272
01C P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM01DCV122
01D Update Model S/S Sleepers & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01DCV126
01D Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM01DCV127
01D Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01DCV133
01D Update Model S/S Sleeper Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01DCV166
01D Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM01DCV167
01D Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01DPI134
01D Detail Model Development
27-Dec-26
27-Dec-26
0%
EM01DPI135
01D A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM01DPI136
01D IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM01DPI138
01D Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM01DPI141
01D Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01DPI143
01D OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM01DSY172
01D P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM01DSY272
01D P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM01HCV125
01H Design & Model Substation Fdns
27-Dec-26
27-Dec-26
0%
EM01HCV126
01H Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM01HCV127
01H Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01HCV128
01H Update Model Substation Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01HCV160
01H Design & Model Major Eq. Fdns
27-Dec-26
27-Dec-26
0%
EM01HCV164
01H Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM01HCV166
01H Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM01HCV167
01H Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01JCV122
01J Update Model Metering Enclosure & Issue Dwgs (Concrete Wall) - IFC
27-Dec-26
27-Dec-26
0%
EM01JCV133
01J Update Model Metering Enclosure Fdns & Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM01JPI130
01J Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01JPI132
01J Planning Release
27-Dec-26
27-Dec-26
0%
EM01JPI133
01J IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM01JPI134
01J Detail Model Development
27-Dec-26
27-Dec-26
0%
EM01JPI135
01J A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM01JPI136
01J IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM01JPI138
01J Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM01JPI140
01J Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM01JPI141
01J Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01JPI142
01J OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM01JSY272
01J P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM01YCV133
01Y Update Model Piperack Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM01YPI135
01Y A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM01YPI136
01Y IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM01YPI141
01Y Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM01YPI142
01Y OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM01YSY272
01Y P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM020ELEJ2
02 Develop & Issue Lighting Plans - IFC
27-Dec-26
27-Dec-26
0%
EM020IC127
Instrument Installation Details (10%) - IFC
27-Dec-26
27-Dec-26
0%
EM020IC129
Instrument Loop Diagrams - IFC
27-Dec-26
27-Dec-26
0%
EM020IC132
Traditional J-boxes Wiring Reports - IFC
27-Dec-26
27-Dec-26
0%
EM020IC134
DCS Marshalling Report - IFC
27-Dec-26
27-Dec-26
0%
EM020IC135
SIS Termination Report - IFC
27-Dec-26
27-Dec-26
0%
EM020IC136
ITCC Termination Report - IFC
27-Dec-26
27-Dec-26
0%
EM020IC137
Miscellaneous Wiring Report - IFC
27-Dec-26
27-Dec-26
0%
EM02ACV126
02A Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02ACV127
02A Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02ACV166
02A Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02ACV167
02A Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02API135
02A A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02API136
02A IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02API138
02A Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02API142
02A Detail OP's & Service Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02API143
02A OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02ASY172
02A P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02ASY272
02A P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02CCV122
02C Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02CCV126
02C Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02CCV127
02C Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02CCV164
02C Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM02CCV166
02C Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02CCV167
02C Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02CPI135
02C A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02CPI136
02C IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02CPI138
02C Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02CPI141
02C Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02CPI143
02C OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM02CSY172
02C P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02CSY272
02C P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02DCV122
02D Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02DCV127
02D Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02DCV167
02D Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02DPI135
02D A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02DPI136
02D IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02DPI138
02D Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02DPI142
02D OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02DSY272
02D P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02ECV126
02E Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02ECV127
02E Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02ECV166
02E Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM02ECV167
02E Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02EPI135
02E A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02EPI136
02E IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02EPI138
02E Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02EPI141
02E Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02EPI142
02E OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02ESY172
02E P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02ESY272
02E P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02FCV126
02F Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02FCV127
02F Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02FCV164
02F Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM02FCV166
02F Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM02FCV167
02F Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02FPI135
02F A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02FPI136
02F IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02FPI138
02F Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02FPI141
02F Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02FPI142
02F OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02FSY172
02F P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02FSY272
02F P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02GCV164
02G Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM02GPI132
02G Planning Release
27-Dec-26
27-Dec-26
0%
EM02GPI133
02G IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM02GPI134
02G Detail Model Development
27-Dec-26
27-Dec-26
0%
EM02GPI141
02G Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02GSY172
02G P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02HCV122
02H Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02HCV126
02H Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02HCV127
02H Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02HCV128
02H Update Model Structural Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02HCV166
02H Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02HCV167
02H Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02HPI135
02H A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02HPI136
02H IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02HPI138
02H Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02HPI141
02H Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02HPI143
02H OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM02HSY172
02H P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02HSY272
02H P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02JCV122
02J Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02JCV127
02J Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02JCV166
02J Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02JCV167
02J Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02JPI135
02J A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02JPI136
02J IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02JPI138
02J Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02JPI141
02J Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02JPI143
02J OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM02JSY172
02J P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02JSY272
02J P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02KCV126
02K Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02KCV164
02K Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM02KCV166
02K Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02KPI134
02K Plant Detail Model Development
27-Dec-26
27-Dec-26
0%
EM02KPI135
02K A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02KPI136
02K IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02KPI138
02K Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02KPI141
02K Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02KPI142
02K OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02KSY172
02K P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02KSY272
02K P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02LCV122
02L Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02LCV126
02L Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02LCV127
02L Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02LCV128
02L Update Model Structural Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02LCV166
02L Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02LCV167
02L Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02LPI135
02L A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02LPI136
02L IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02LPI138
02L Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02LPI141
02L Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02LPI142
02L OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02LSY172
02L P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02LSY272
02L P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02MCV122
02M Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02MCV126
02M Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM02MCV127
02M Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02MCV128
02M Update Model Structural Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02MCV166
02M Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM02MCV167
02M Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM02MPI135
02M A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02MPI136
02M IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02MPI138
02M Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02MPI141
02M Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02MPI142
02M OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02MSY172
02M P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02MSY272
02M P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02NPI135
02N A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02NPI136
02N IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02NPI138
02N Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02NSY272
02N P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02PSY272
02P P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02QPI135
02Q A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02QPI136
02Q IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02QPI138
02Q Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02QPI142
02Q Detail OP's & Service Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02QPI143
02Q OP's & Service Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM02QSY172
02Q P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02QSY272
02Q P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM02YCV123
02Y Struct Steel Issue Dwgs - IFC Silencer Area
27-Dec-26
27-Dec-26
0%
EM02YPI135
02Y A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM02YPI136
02Y IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM02YPI138
02Y Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM02YPI142
02Y Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM02YPI143
02Y OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM02YSY172
02Y P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM02YSY272
02Y P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03ACV126
03A Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM03ACV127
03A Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03ACV160
03A Design & Model Major Eq. Fdns
27-Dec-26
27-Dec-26
0%
EM03ACV164
03A Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM03ACV166
03A Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM03ACV167
03A Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03API130
03A Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03API132
03A Planning Release
27-Dec-26
27-Dec-26
0%
EM03API133
03A IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM03API134
03A Detail Model Development
27-Dec-26
27-Dec-26
0%
EM03API135
03A A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03API136
03A IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03API138
03A Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM03API140
03A Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03API141
03A Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03API142
03A OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03ASY172
03A P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM03ASY272
03A P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03BCV112
03B Update Model Sumps & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM03BCV126
03B Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM03BCV127
03B Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03BCV166
03B Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM03BCV167
03B Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03BMD228
03B Clips Release IFC
27-Dec-26
27-Dec-26
0%
EM03BMD229
03B Vessel Steel Release IFC
27-Dec-26
27-Dec-26
0%
EM03BPI130
03B Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03BPI132
03B Planning Release
27-Dec-26
27-Dec-26
0%
EM03BPI133
03B IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM03BPI134
03B Detail Model Development
27-Dec-26
27-Dec-26
0%
EM03BPI135
03B A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03BPI136
03B IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03BPI138
03B Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM03BPI140
03B Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03BPI141
03B Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03BPI142
03B OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03BSY172
03B P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM03BSY272
03B P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03CCV127
03C Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03CCV167
03C Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03CPI135
03C A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03CPI136
03C IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03CPI142
03C OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03CSY272
03C P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03DCV126
03D Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM03DCV127
03D Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03DCV164
03D Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM03DCV166
03D Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM03DCV167
03D Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03DPI134
03D Detail Model Development
27-Dec-26
27-Dec-26
0%
EM03DPI135
03D A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03DPI136
03D IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03DPI138
03D Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM03DPI141
03D Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03DPI143
03D OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM03DSY172
03D P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM03DSY272
03D P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03ECV112
03E Update Model Containment Area & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM03ECV126
03E Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM03ECV127
03E Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03ECV160
03E Design & Model Major Eq. Fdns
27-Dec-26
27-Dec-26
0%
EM03ECV164
03E Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM03ECV166
03E Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM03ECV167
03E Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03EPI123
03E Plant Layout Nozzle Release
27-Dec-26
27-Dec-26
0%
EM03EPI130
03E Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03EPI132
03E Planning Release
27-Dec-26
27-Dec-26
0%
EM03EPI133
03E IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM03EPI134
03E Detail Model Development
27-Dec-26
27-Dec-26
0%
EM03EPI135
03E A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03EPI136
03E IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03EPI138
03E Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM03EPI141
03E Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03EPI142
03E Detail OP's & Service Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03EPI143
03E OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03ESY172
03E P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM03ESY272
03E P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03FCV126
03F Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM03FCV127
03F Model Misc. Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03FCV164
03F Update Model Major Eq. Fdns & Issue Dwgs-IFC
27-Dec-26
27-Dec-26
0%
EM03FCV166
03F Conceptual Misc. Foundations Design/ Model
27-Dec-26
27-Dec-26
0%
EM03FCV167
03F Update Model Misc Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03FPI130
03F Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03FPI132
03F Planning Release
27-Dec-26
27-Dec-26
0%
EM03FPI133
03F IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM03FPI134
03F Detail Model Development
27-Dec-26
27-Dec-26
0%
EM03FPI135
03F A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03FPI136
03F IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03FPI138
03F Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM03FPI141
03F Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03FPI142
03F Detail OP's & Service Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03FPI143
03F OP's & Serv. Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03FPI200
03F Equipment Location Plans
27-Dec-26
27-Dec-26
0%
EM03FSY172
03F P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM03FSY272
03F P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM03YCV122
03Y Update Model Struct Steel & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03YCV133
03Y Update Model Piperack Fdns & Issue Dwgs - IFC
27-Dec-26
27-Dec-26
0%
EM03YPI021
03Y Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM03YPI130
03Y Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03YPI132
03Y Planning Release
27-Dec-26
27-Dec-26
0%
EM03YPI133
03Y IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM03YPI134
03Y Detail Model Development
27-Dec-26
27-Dec-26
0%
EM03YPI135
03Y A/G Piping Iso's - Issue IFC
27-Dec-26
27-Dec-26
0%
EM03YPI136
03Y IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM03YPI138
03Y Design / Issue Pipe Supports IFC
27-Dec-26
27-Dec-26
0%
EM03YPI141
03Y Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM03YPI143
03Y OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM03YSY172
03Y P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM03YSY272
03Y P&IDs & Line List Issue - IFC
27-Dec-26
27-Dec-26
0%
EM04API120
04A Plant Layout Model
27-Dec-26
27-Dec-26
0%
EM04API134
04A Plant Detail Model Development
27-Dec-26
27-Dec-26
0%
EM04API138
04A Design / Issue Pipe & Supports IFC
27-Dec-26
27-Dec-26
0%
EM04API200
04A Issue U/G Material Final Release
27-Dec-26
27-Dec-26
0%
EM05ACV126
05A Conceptual Misc. Steel Design/ Model
27-Dec-26
27-Dec-26
0%
EM05ACV166
05A Conceptual Misc. Foundation Design/ Model
27-Dec-26
27-Dec-26
0%
EM05AMD228
05A Clips Release IFC
27-Dec-26
27-Dec-26
0%
EM05AMD229
05A Vessel Steel Release IFC
27-Dec-26
27-Dec-26
0%
EM05API130
05A Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM05API132
05A Planning Release
27-Dec-26
27-Dec-26
0%
EM05API133
05A IDP - Plant Layout
27-Dec-26
27-Dec-26
0%
EM05API134
05A Detail Model Development
27-Dec-26
27-Dec-26
0%
EM05API136
05A IDP - Detail Design
27-Dec-26
27-Dec-26
0%
EM05API140
05A Model Review Comment Resolution
27-Dec-26
27-Dec-26
0%
EM05API142
05A Detail OP's & Services Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM05API143
05A OP's & Serv. Model Review Comments Resolution
27-Dec-26
27-Dec-26
0%
EM05BPI120
05B Plant Layout Model
27-Dec-26
27-Dec-26
0%
EM05BPI130
05B Model Review Mtg
27-Dec-26
27-Dec-26
0%
EM05BSY172
05B P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EM05UPI200
05U Issue U/G Material Final Release
27-Dec-26
27-Dec-26
0%
EM5ASY172
05A P&IDs & Line List Issue - IFD
27-Dec-26
27-Dec-26
0%
EMO2YCV124
02Y Structl Fdns Issue Dwgs - IFC Silencer Area
27-Dec-26
27-Dec-26
0%
PK0003525
SIS - Ship to DCS Shop/ Setup
27-Dec-26
27-Dec-26
0%
PK0003526
SIS - Integrated FAT
27-Dec-26
27-Dec-26
0%
PK000E001E
Sub Stations - Eval Bids/Issue Recmd
27-Dec-26
27-Dec-26
0%
PK000E001G
Sub Stations - Interim Award
27-Dec-26
27-Dec-26
0%
PK000E001J
Sub Stations - Planning V. Data
27-Dec-26
27-Dec-26
0%
PK000E001K
Sub Stations - Formal Award
27-Dec-26
27-Dec-26
0%
PK000E001M
Sub Stations - Production V. Data
27-Dec-26
27-Dec-26
0%
PK000E002G
Transformer - Interim Award
27-Dec-26
27-Dec-26
0%
PK000E002J
Transformer - Planning V. Data
27-Dec-26
27-Dec-26
0%
PK000E002K
Transformer - Formal Award
27-Dec-26
27-Dec-26
0%
PK000E002M
Transformer - Production V. Data
27-Dec-26
27-Dec-26
0%
PK000E004E
UPS System - Eval Bids/Issue Recmd
27-Dec-26
27-Dec-26
0%
PK000E004G
UPS System - Interim Award
27-Dec-26
27-Dec-26
0%
PK000E004J
UPS System - Planning V. Data
27-Dec-26
27-Dec-26
0%
PK000E004K
UPS System - Formal Award
27-Dec-26
27-Dec-26
0%
PK000E004M
UPS System - Production V. Data
27-Dec-26
27-Dec-26
0%
PK000I1103
020 Orific Plates - Transport & Deliver
27-Dec-26
27-Dec-26
0%
PK000I1105
020 Orific Plates - Recv on Site
27-Dec-26
27-Dec-26
0%
PK000I1161
020 Wedge Flow Meters - Fabricate/Exworks
27-Dec-26
27-Dec-26
0%
PK000I1162
020 Wedge Flow Meters - Transport & Deliver
27-Dec-26
27-Dec-26
0%
PK000I1163
020 Wedge Flow Meters - Recv on Site
27-Dec-26
27-Dec-26
0%
PK000I1221
Coriolis Meters - Transport & Deliver
27-Dec-26
27-Dec-26
0%
PK000I1222
Coriolis Meters - Recv on Site
27-Dec-26
27-Dec-26
0%
PK000I1270
Fabricate/Exworks Magnetic Flow Meters
27-Dec-26
27-Dec-26
0%
PK000I1271
Transport & Deliver Magnetic Flow Meters
27-Dec-26
27-Dec-26
0%
PK000I1272
Recv on Site Magnetic Flow Meters
27-Dec-26
27-Dec-26
0%
PK000I3522
SIS - FAT Test
27-Dec-26
27-Dec-26
0%
PK000I3523
SIS - Cleanup / Changes
27-Dec-26
27-Dec-26
0%
PK000I3542
ITCC - Software Programming by Vendor
27-Dec-26
27-Dec-26
0%
PK000I3543
ITCC - FAT Test
27-Dec-26
27-Dec-26
0%
PK000I3544
ITCC - Cleanup / Changes
27-Dec-26
27-Dec-26
0%
PK000I354P
ITCC - Ship to DCS Shop/ Setup
27-Dec-26
27-Dec-26
0%
PK000I354Q
ITCC - Integrated FAT
27-Dec-26
27-Dec-26
0%
PK000I444H
Fabricate - Shelters/ Analyzers
27-Dec-26
27-Dec-26
0%
PK000I611H
Fabricate / Exworks - Pressure Gauges - ISBL
27-Dec-26
27-Dec-26
0%
PK000I616H
Fabricate / Exworks - Steam Drum Lvl Gauges
27-Dec-26
27-Dec-26
0%
PK000I616L
Recv at Site - Steam Drum Lvl Gauges
27-Dec-26
27-Dec-26
0%
PK000I616N
Transport & Deliver - Steam Drum Lvl Gauges
27-Dec-26
27-Dec-26
0%
PK000I617H
Fabricate / Exworks - Magnetic Lvl Gauges
27-Dec-26
27-Dec-26
0%
PK000IC352
DCS - FAT Test
27-Dec-26
27-Dec-26
0%
PK000IC353
DCS - Cleanup / Changes
27-Dec-26
27-Dec-26
0%
PK000IC355
DCS - ITCC / SIS / DCS - Integrated FAT
27-Dec-26
27-Dec-26
0%
PK000IC35M
DCS - Review / Approve V. Data
27-Dec-26
27-Dec-26
0%
PK000MB21O
Transport & Deliver of Equip. 101-B Siding
27-Dec-26
27-Dec-26
0%
PK000MB33O
MB333 - Transport/Customes Equip. 101-B
27-Dec-26
27-Dec-26
0%
PK000MB33S
MB333 - Marshaling Riser Transition 101-B
27-Dec-26
27-Dec-26
0%
PK000MB33Z
02H Recv. at Site - 101-B Riser Transition
27-Dec-26
27-Dec-26
0%
PK000MB34Z
Shop Recv.- 101-B Finned Convection Tubes & Pipe
27-Dec-26
27-Dec-26
0%
PK000MB41Z
Shop Recv. - 101-B Cast Tube Supports
27-Dec-26
27-Dec-26
0%
PK000MB42O
MB420 - Transport to Vendor 101-B Cast Peep Sites
27-Dec-26
27-Dec-26
0%
PK000MB61O
Transport & Deliver 101-B Burners
27-Dec-26
27-Dec-26
0%
PK000MB63O
MB630 - Transport/Customes 101-B Air Preheater
27-Dec-26
27-Dec-26
0%
PK000MB64O
MB640 - Transport/Customes 101-B Springs & Hangers
27-Dec-26
27-Dec-26
0%
PK000MB64S
MB640 - Marshaling 101-B Springs & Hangers
27-Dec-26
27-Dec-26
0%
PK000MB65O
MB622 - Transport/Customes 101-B Penthouse Circ Fans
27-Dec-26
27-Dec-26
0%
PK000MB65S
MB622 - Marshaling 101-B Penthouse Circ Fans
27-Dec-26
27-Dec-26
0%
PK000MB66O
MB660 - Transport/Customes 101-B Dampers & Air Doors
27-Dec-26
27-Dec-26
0%
PK000MB66S
MB660 - Marshaling 101-B Dampers & Air Doors
27-Dec-26
27-Dec-26
0%
PK000MB68O
MB692 - Transport/Customes 101-B Cat Vacuum Equip.
27-Dec-26
27-Dec-26
0%
PK000MB68S
MB692 - Marshaling 101-B Cat Vacuum Equip.
27-Dec-26
27-Dec-26
0%
PK000MB69O
MB691 - Transport/Customes of Equip. 101-B
27-Dec-26
27-Dec-26
0%
PK000MB69S
MB691 - Marshaling 101-B for MB691
27-Dec-26
27-Dec-26
0%
PK000MB81O
MB810 - Transport & Deliver of Equip. 101-B
27-Dec-26
27-Dec-26
0%
PK000MB81S
MB810 - Marshaling 102-B
27-Dec-26
27-Dec-26
0%
PK000MBP1C
MB221 - Marshaling 101-B Convection Modules
27-Dec-26
27-Dec-26
0%
PK000MBP1M
MB221 - Transport/Customes 101-B Radiant Steel Panels
27-Dec-26
27-Dec-26
0%
PK000MBP1T
MB221 - Fab/PO Promise 101-B Crossover Pipe
27-Dec-26
27-Dec-26
0%
PK000MBP1U
MB221 - Transport/Customes 101-B Radiant Harps
27-Dec-26
27-Dec-26
0%
PK000MBP1V
MB221 - Transport/Customes 101-B Convection Modules
27-Dec-26
27-Dec-26
0%
PK000MBP1X
MB221 - Transport/Customes 101-B Radiant Ducting
27-Dec-26
27-Dec-26
0%
PK000MBP1Y
MB221 - Transport/Customes 101-B Crossover
27-Dec-26
27-Dec-26
0%
PK000MBP2C
MB221 - Marshaling 101-B Crossover
27-Dec-26
27-Dec-26
0%
PK000MBP3C
MB221 - Marshaling 101-B Radiant Ducting
27-Dec-26
27-Dec-26
0%
PK000MBP3V
MB311 - Shop Recv - 101-B Crossover Tube & Pipe
27-Dec-26
27-Dec-26
0%
PK000MBP3W
MB311 - Shop Recv - 101-B Crossover Fittings
27-Dec-26
27-Dec-26
0%
PK000MBP4C
MB221 - Marshaling 101-B Radiant Coil/Harps
27-Dec-26
27-Dec-26
0%
PK000MBP4O
MB312 - Transport/Customes 101-B Radiant Cast Stringer Grids
27-Dec-26
27-Dec-26
0%
PK000MBP4S
MB312 - Transport/Customes 101-B Radiant Cast Tube/Riser/Manifold
27-Dec-26
27-Dec-26
0%
PK000MBP4T
MB312 - Shop Recv. 101-B Radiant Cast Stringer Grids
27-Dec-26
27-Dec-26
0%
PK000MBP4U
MB312 - Shop Recv. 101-B Radiant Cast Tube/Riser/Manifold
27-Dec-26
27-Dec-26
0%
PK000MBP5C
MB221 - Marshaling 101-B Radiant Steel Panels
27-Dec-26
27-Dec-26
0%
PK000MC21O
MC210 - Transport/Customes 110/115/124/128/130/133/134/160/167/173/174-C
27-Dec-26
27-Dec-26
0%
PK000MC21R
MC210 - Marshaling 127-C
27-Dec-26
27-Dec-26
0%
PK000MC21S
MC210 - Marshaling 110/115/124/128/130/133/134/160/167/173/174-C
27-Dec-26
27-Dec-26
0%
PK000MC21T
MC210 - Transport/Customes 127-C
27-Dec-26
27-Dec-26
0%
PK000MC23B
MC230 - Marshaling 106-C & 109-C
27-Dec-26
27-Dec-26
0%
PK000MC23C
MC230 - Transport/Customes 106-C & 109-C
27-Dec-26
27-Dec-26
0%
PK000MC23O
MC230 - Transport/Customes 105/172/183-C
27-Dec-26
27-Dec-26
0%
PK000MC23R
MC230 - Marshaling 111/114-C
27-Dec-26
27-Dec-26
0%
PK000MC23S
MC230 - Marshaling 105/172/183-C
27-Dec-26
27-Dec-26
0%
PK000MC23T
MC230 - Transport/Customes 114-C
27-Dec-26
27-Dec-26
0%
PK000MC61O
MC610 - Transport/Customes DBL PIPE EXCH 188-CA
27-Dec-26
27-Dec-26
0%
PK000MC61Q
MC610 - Transport/Customes DBL PIPE EXCH 161-C
27-Dec-26
27-Dec-26
0%
PK000MC61S
MC610 - Marshaling DBL PIPE EXCH 188-CA
27-Dec-26
27-Dec-26
0%
PK000MD22B
MD202 - Marshaling TOWERS 104-E
27-Dec-26
27-Dec-26
0%
PK000MD22C
MD202 - Transport/Customes TOWERS 104-E
27-Dec-26
27-Dec-26
0%
PK000MD22O
MD202 - Transport/Customes TOWERS 103/105-E
27-Dec-26
27-Dec-26
0%
PK000MD22S
MD202 - Marshaling TOWERS 103/105-E
27-Dec-26
27-Dec-26
0%
PK000MD42A
MD402 -Marshaling 144-F
27-Dec-26
27-Dec-26
0%
PK000MD42B
MD402 - Transport/Customes 144-F
27-Dec-26
27-Dec-26
0%
PK000MD42R
MD402 - Transport/Customes 104-F
27-Dec-26
27-Dec-26
0%
PK000MD42T
MD402 -Marshaling 104-F
27-Dec-26
27-Dec-26
0%
PK000MD44M
MD404 - Marshaling 107-F
27-Dec-26
27-Dec-26
0%
PK000MD44N
MD404 - Transport/Customes 107-F
27-Dec-26
27-Dec-26
0%
PK000MD44O
MD404 - Transport/Customes 109-F
27-Dec-26
27-Dec-26
0%
PK000MD44Q
02D Recv. at Site - 107-F Ammonia Letdown Drum
27-Dec-26
27-Dec-26
0%
PK000MD44S
MD404 - Marshaling 109-F
27-Dec-26
27-Dec-26
0%
PK000MD45B
MD405 - Marshaling ISBL DRUMS - 115-F
27-Dec-26
27-Dec-26
0%
PK000MD45C
MD405 - Transport/Customes ISBL DRUMS - 115-F
27-Dec-26
27-Dec-26
0%
PK000MD45O
MD405 - Transport/Customes ISBL DRUMS - 156-F & 157-F
27-Dec-26
27-Dec-26
0%
PK000MD45S
MD405 - Marshaling ISBL DRUMS - 156-F & 157-F
27-Dec-26
27-Dec-26
0%
PK000MD45T
MD405 - Transport/Customes ISBL DRUMS - 118-F
27-Dec-26
27-Dec-26
0%
PK000MD46O
MD411 - Transport/Customes OSBL DRUMS - 2203-F & 2204-F
27-Dec-26
27-Dec-26
0%
PK000MD46S
MD411 - Marshaling OSBL DRUMS - 2203-F & 2204-F
27-Dec-26
27-Dec-26
0%
PK000MD46U
MD411 - Marshaling OSBL DRUMS - 2006-F
27-Dec-26
27-Dec-26
0%
PK000MD46V
MD411 - Transport/Customes OSBL DRUMS - 2006-F
27-Dec-26
27-Dec-26
0%
PK000MD47O
MD406 - Transport/DCustomes ISBL DRUMS
27-Dec-26
27-Dec-26
0%
PK000MD47S
MD406 - Marshaling ISBL DRUMS 103-F
27-Dec-26
27-Dec-26
0%
PK000MD51O
MD501 - Transport/Customes 107-D
27-Dec-26
27-Dec-26
0%
PK000MD51S
MD501 - Marshaling 107-D
27-Dec-26
27-Dec-26
0%
PK000MDR
MD405 - Marshaling ISBL DRUMS - 118-F
27-Dec-26
27-Dec-26
0%
PK000MJ21O
MJ202 - Transport/Customes 102/3/5-J
27-Dec-26
27-Dec-26
0%
PK000MJ21S
MJ202 - Marshaling 102/3/5-J
27-Dec-26
27-Dec-26
0%
PK000MJ37O
MJ340 - Transport/Customes METERING PUMPS
27-Dec-26
27-Dec-26
0%
PK000MJ37S
MJ340 - Marshaling METERING PUMPS
27-Dec-26
27-Dec-26
0%
PK000MJ71I
Eval Bids & Issue Recmd MJ731
27-Dec-26
27-Dec-26
0%
PK000MJ71J
Final Negotiate/Interim Award - MJ731
27-Dec-26
27-Dec-26
0%
PK000MJ71P
Issue Formal P.O. for MJ731
27-Dec-26
27-Dec-26
0%
PK000MJ75O
MJ750 - Transport/Customes SURFACE CONDENSORS
27-Dec-26
27-Dec-26
0%
PK000MJ75S
MJ750 - Marshaling SURFACE CONDENSORS
27-Dec-26
27-Dec-26
0%
PK000ML33O
ML330 - Transport/Customes 2101-L
27-Dec-26
27-Dec-26
0%
PK000ML33S
ML330 - Marshaling 2101-L
27-Dec-26
27-Dec-26
0%
PK000ML42O
ML420 - Transpor/Customes CARTRIDGE FILTERS
27-Dec-26
27-Dec-26
0%
PK000ML43O
ML430 - Transport/Customes 110-L BENFIELD MIXER
27-Dec-26
27-Dec-26
0%
PK000ML51O
ML512 - Transport/Customs 2102-L LOADING ARM
27-Dec-26
27-Dec-26
0%
PK000ML51S
ML512 - Marshaling 2102-L LOADING ARM
27-Dec-26
27-Dec-26
0%
PK000MU11S
05B MU311 - Marshaling HYDROCHLORIC ACID STORAGE
27-Dec-26
27-Dec-26
0%
PK000MU21O
MU221 - Transport/Customs LIFT STATION
27-Dec-26
27-Dec-26
0%
PK000MU21S
MU221 - Marshaling LIFT STATION
27-Dec-26
27-Dec-26
0%
PK000MU22O
MU222 - Transport/Customes .2401-U
27-Dec-26
27-Dec-26
0%
PK000MU22S
MU222 - Marshaling 2401-U
27-Dec-26
27-Dec-26
0%
PK000MU25K
MU225 - 02G Fabricate/PO Promise LIFT STATION
27-Dec-26
27-Dec-26
0%
PK000MU25P
02G MU225 Issue Formal P.O.
27-Dec-26
27-Dec-26
0%
PK000MU311
05B MU311 Transport/Customes BULK CHEM. STORAGE TANKS
27-Dec-26
27-Dec-26
0%
PK000MU35O
MU350 - Transport/Customes 101-U DEAERATOR
27-Dec-26
27-Dec-26
0%
PK000MU41O
MU410 - Transport/Customes 2002-U PKG BOILER
27-Dec-26
27-Dec-26
0%
PK000MU41S
MU410 - Marshaling 2002-U PKG BOILER
27-Dec-26
27-Dec-26
0%
PK000MU61O
MU611 - Transport/Customes 2101-U, 2101-UJA Thru UJG CW TWR & Fans
27-Dec-26
27-Dec-26
0%
PK000PIA1J
Bulk Piping A/G & U/G - Receive at Site FIRST (CS,SS,U/G)
27-Dec-26
27-Dec-26
0%
PK000PIA1L
Bulk Piping A/G - Transport / Delivery (CROME)
27-Dec-26
27-Dec-26
0%
PK000PIA1M
Bulk Piping A/G - Receive at Site (CHROME)
27-Dec-26
27-Dec-26
0%
PK000PIA4H
Product Line Piping - Transport / Delivery to Insulation Shop
27-Dec-26
27-Dec-26
0%
PK000PIA4I
Product Line Piping - Insulation Fab/Exworks
27-Dec-26
27-Dec-26
0%
PK000PIA4J
Product Line Piping - Receive at Site
27-Dec-26
27-Dec-26
0%
PK000PIA4K
Product Line Piping - Transport / Delivery
27-Dec-26
27-Dec-26
0%
PK000PIA4L
Product Line Piping - Fab/Exworks Remaining +/- 1500 Mts.
27-Dec-26
27-Dec-26
0%
PK000PS00F
000 SP Items - Issue Formal Blanket P.O.
27-Dec-26
27-Dec-26
0%
PK010E008F
540-SG Admin. Area Pwr Supply - Eval Bids/Issue Recmd
27-Dec-26
27-Dec-26
0%
PK010E008G
540-SG Admin. Area Pwr Supply - Interim Award
27-Dec-26
27-Dec-26
0%
PK010E008H
540-SG Admin. Area Pwr Supply - Formal Award
27-Dec-26
27-Dec-26
0%
PK010E008J
540-SG Admin. Area Pwr Supply - Planning V. Data
27-Dec-26
27-Dec-26
0%
PK010E008L
540-SG Admin. Area Pwr Supply - Production V. Data
27-Dec-26
27-Dec-26
0%
PK010I1103
010 Orific Plates - Transport & Deliver
27-Dec-26
27-Dec-26
0%
PK010I1105
010 Orific Plates - Recv on Site
27-Dec-26
27-Dec-26
0%
PK01DMU61Z
01D Recv. at Site - 2101-U, 2101-UJA Thru UJG CW TWR & Fans
27-Dec-26
27-Dec-26
0%
PK01FMU21Z
01E Recv. at Site - 2402-L Lift Station
27-Dec-26
27-Dec-26
0%
PK01GMU21Z
01E Recv. at Site - Lift Station
27-Dec-26
27-Dec-26
0%
PK020I131H
Fabricate / Exworks - Transmitters -Press.
27-Dec-26
27-Dec-26
0%
PK020IC214
020 Control Valves - Transport & Deliver
27-Dec-26
27-Dec-26
0%
PK020IC220
020 Control Valves - Recv on Site
27-Dec-26
27-Dec-26
0%
PK02AMC21Z
02A Recv. at Site - 160-C Ammonia Distl Column Reboiler
27-Dec-26
27-Dec-26
0%
PK02AMC61Z
02A Recv. at Site - 161-C Aqua Ammonia Interchanger
27-Dec-26
27-Dec-26
0%
PK02AMD22D
02A Recv. at Site - 104-E Tower
27-Dec-26
27-Dec-26
0%
PK02AMD22Z
02A Recv. at Site - 103-E, 105-E Towers
27-Dec-26
27-Dec-26
0%
PK02AMJ37Z
02A Recv. at Site - 130-J/JA, 131-J/JA Metering Pumps
27-Dec-26
27-Dec-26
0%
PK02CMC21Z
02C Recv. at Site - 128-C, 134-C, 167-C Exchangers
27-Dec-26
27-Dec-26
0%
PK02CMJ21Z
02C Recv. at Site - 103-J & 105-J
27-Dec-26
27-Dec-26
0%
PK02CMJ75Z
02C Recv. at Site - 103-JTC Surface Condenser
27-Dec-26
27-Dec-26
0%
PK02DMC21Z
02D Recv. at Site - 127-C Refrigerant Condenser
27-Dec-26
27-Dec-26
0%
PK02DMD44Z
02D Recv. at Site - 109-F Refrigerant Receiver
27-Dec-26
27-Dec-26
0%
PK02EMC21Z
02E Recv. at Site - 115-C & 130-C Exchangers
27-Dec-26
27-Dec-26
0%
PK02EMC23S
02E Recv. at Site - 114-C Exchangers
27-Dec-26
27-Dec-26
0%
PK02EMC23Z
02E Recv. at Site - 172-C, 183-C Exchangers
27-Dec-26
27-Dec-26
0%
PK02EMD42Z
02E Recv. at Site - 104-F Syn Gas Compr Suction Drum
27-Dec-26
27-Dec-26
0%
PK02EMD45Z
02E Recv. at Site - 157-F Mole Sieve Regen HP Cond Drum
27-Dec-26
27-Dec-26
0%
PK02FMU11Z
05B MU311 Recv. at Site - 2109-LA HYDROCHLORIC ACID STORAGE TANK A
27-Dec-26
27-Dec-26
0%
PK02GMC21Z
02G Recv. at Site - 133-C Fd Gas Compr. Kickback Cooler
27-Dec-26
27-Dec-26
0%
PK02GMJ21Z
02G Recv. at Site - 102-J/JL Fd Gas Compr. & Aux.
27-Dec-26
27-Dec-26
0%
PK02GMJ75Z
02G Recv. at Site - 101-JTC Surface Condenser
27-Dec-26
27-Dec-26
0%
PK02GMLV04
02G MU225 2104-L - Piping Prod. V. Data
27-Dec-26
27-Dec-26
0%
PK02GMLV05
02G MU225 2104-L - Civil Prod. V. Data
27-Dec-26
27-Dec-26
0%
PK02GMLV06
02G MU225 2104-L - E&I Prod. V. Data
27-Dec-26
27-Dec-26
0%
PK02GMU11Z
05B MU311 Recv. at Site - 2109-LB HYDROCHLORIC ACID STORAGE TANK B
27-Dec-26
27-Dec-26
0%
PK02HMB21Z
02H Recv. at Site - 101-B Siding
27-Dec-26
27-Dec-26
0%
PK02HMB42Z
02H Recv. at Vendor - 101-B Cast Peep Sites
27-Dec-26
27-Dec-26
0%
PK02HMB61Z
02H Recv. at Site - 101-B Burners
27-Dec-26
27-Dec-26
0%
PK02HMB63Z
02H Recv. at Site - 101-B Air Preheater
27-Dec-26
27-Dec-26
0%
PK02HMB64Z
02H Recv. at Site - 101-B Springs & Hangers
27-Dec-26
27-Dec-26
0%
PK02HMB65Z
02H Recv. at Site - 101-B Penthouse Circ Fans
27-Dec-26
27-Dec-26
0%
PK02HMB66Z
02H Recv. at Site - 101-B Dampers & Air Doors
27-Dec-26
27-Dec-26
0%
PK02HMB68Z
02H Recv. at Site - 101-B Cat Vacuum Equip
27-Dec-26
27-Dec-26
0%
PK02HMB69Z
02H Recv. at Site - 101-B Expansion Joints
27-Dec-26
27-Dec-26
0%
PK02HMBP1K
02H Recv. at Site - 101-B Radiant Steel Panels
27-Dec-26
27-Dec-26
0%
PK02HMBP1Q
02H Recv. at Site - 101-B Radiant Harps
27-Dec-26
27-Dec-26
0%
PK02HMBP1R
02H Recv. at Site - 101-B Convection Modules
27-Dec-26
27-Dec-26
0%
PK02HMBP1S
02H Recv. at Site - 101-B Radiant Ducting
27-Dec-26
27-Dec-26
0%
PK02HMBP1T
02H Recv. at Site - 101-B Crossover
27-Dec-26
27-Dec-26
0%
PK02HMD45Z
02H Recv. at Site - 156-F Steam Blowdown Drum
27-Dec-26
27-Dec-26
0%
PK02HMD51Z
02H Recv. at Site - 107-D Primary Reformer Tranfer Line
27-Dec-26
27-Dec-26
0%
PK02JMC21Z
02J Recv. at Site - 173-C Startup Cooler
27-Dec-26
27-Dec-26
0%
PK02KMC21Z
02K Recv. at Site - 174-C Stripped Condensate Cooler
27-Dec-26
27-Dec-26
0%
PK02KMC61Z
02K Recv. at Site - 188-CA/ CB/ CC Exchangers
27-Dec-26
27-Dec-26
0%
PK02KMD45A
02K Recv. at Site - Equip. 115-F
27-Dec-26
27-Dec-26
0%
PK02KMD45Z
02K Recv. at Site - Equip. 118-F
27-Dec-26
27-Dec-26
0%
PK02KML42Z
02K Recv. at Site - 115-L Benfeild Sump Filter
27-Dec-26
27-Dec-26
0%
PK02KML43Z
02K Recv. at Site - 110-L Benfeild Mixer
27-Dec-26
27-Dec-26
0%
PK02LMC21Z
02L Recv. at Site - 110-C Lean Solution Cooler
27-Dec-26
27-Dec-26
0%
PK02LMC23A
02L Recv. at Site - 106-C & 109-C Exchangers
27-Dec-26
27-Dec-26
0%
PK02LMC23Z
02L Recv. at Site - 105-C Exchanger
27-Dec-26
27-Dec-26
0%
PK02LMD47Z
02L Recv. at Site - 103-F CO2 Stripper Cond KO Drum
27-Dec-26
27-Dec-26
0%
PK02LML42Z
02L Recv. at Site - 104-L Benfeild Solution Filter
27-Dec-26
27-Dec-26
0%
PK02LMU11Z
05B MU311 Recv. at Site - 2110-L SODIUM HYDROCHLORITE STORAGE
27-Dec-26
27-Dec-26
0%
PK02MMB81Z
02M Recv. at Site - 102-B Startup Heater
27-Dec-26
27-Dec-26
0%
PK02MMC21Z
02M Recv. at Site - 124-C Ammonia Convr. Effluent Cooler
27-Dec-26
27-Dec-26
0%
PK02MMD42Z
02M Recv. at Site - 144-F Feed Gas KO Drum
27-Dec-26
27-Dec-26
0%
PK02PMU35Z
02P Recv. at Site - 101-U Deaerator
27-Dec-26
27-Dec-26
0%
PK030I1100
Orific Plates - Fabricate/Exworks
27-Dec-26
27-Dec-26
0%
PK030IC214
030 Control Valves - Transport & Delivery
27-Dec-26
27-Dec-26
0%
PK030IC220
030 Control Valves - Recv on Site
27-Dec-26
27-Dec-26
0%
PK03BMU22Z
03B Recv. at Site - 2401-U Sanitary Treatment Pkg
27-Dec-26
27-Dec-26
0%
PK03CMD46Z
03C Recv. at Site - 2203-F & 2204-F Caustic Tank/ Acid Drum
27-Dec-26
27-Dec-26
0%
PK03FMD46Z
03F Recv. at Site - 2006-F Boiler Blowdown Drum
27-Dec-26
27-Dec-26
0%
PK03FMU11Z
05B MU311 Recv. at Site - 2109-L HYDROCHLORIC ACID STORAGE
27-Dec-26
27-Dec-26
0%
PK03FMU41Z
03F Recv. at Site - 2002-U Package Boiler
27-Dec-26
27-Dec-26
0%
PK050I1105
050 Orfice Plates - Recv on Site Dock/Storage Area
27-Dec-26
27-Dec-26
0%
PK05AMF25
05A MF311 2101/2102-F Ammonia Storage Tanks - Prod. V. Data (Subcontract)
27-Dec-26
27-Dec-26
0%
PK05AMJV10
05A MJ731 2108-J - Civil Prod. V. Data
27-Dec-26
27-Dec-26
0%
PK05AMJV11
05A MJ731 2108-J - E&I Prod. V. Data
27-Dec-26
27-Dec-26
0%
PK05AML33Z
05A Recv. at Site - 2101-L Ammonia Refrigeration Pkg
27-Dec-26
27-Dec-26
0%
PK05BML51Z
05B Recv. at Site - 2102-L Loading Arm
27-Dec-26
27-Dec-26
0%
PO000P0015
Purch/Fab/Delv - Temporary Testing Materials
27-Dec-26
27-Dec-26
0%
PO000P0020
Receive at Site - Temporary Testing Materials
27-Dec-26
27-Dec-26
0%
PO000V1000
Purch/Fab/Delv - Painting Materials
27-Dec-26
27-Dec-26
0%
PO000V1005
Receive at Site - Painting Materials
27-Dec-26
27-Dec-26
0%
PO020EL155
020 Issue E&I Cable/Bulks/JB Reqn (OCI)
27-Dec-26
27-Dec-26
0%
XE000OW305
(EBIC) Permit - Free Zone Status (SIDC)
27-Dec-26
27-Dec-26
0%
XE000OW310
(EBIC) Arrange For Solid Waste Collection/Disposal
27-Dec-26
27-Dec-26
0%
XE000OW325
(EBIC) Tie-In Construction Elec Power Supply
27-Dec-26
27-Dec-26
0%
XE000OW373
(EBIC) Permit - Free Zone Status (SPDC)
27-Dec-26
27-Dec-26
0%
XE05AOW340
(EBIC) Clear & Level Site For Ammonia Storage
27-Dec-26
27-Dec-26
0%
ZZ1020
01D Recv. at Site - 2101-UJA Thru UJGM CW Motors
27-Dec-26
27-Dec-26
0%
ZZ1040
MU611 - Transport/Customes 2101-UJA Thru UJGM CW Motors
27-Dec-26
27-Dec-26
0%
CK000P0110
000 Pipe Fabrication
28-Dec-26
31-May-27
49.0d
0%
CK000U4110
Start Pipe Fab
28-Dec-26
28-Dec-26
0%
CK01AP0110
01A A/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01BU4110
01B U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01CU4110
01C U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01DP0110
01D A/G Pipe Spool Fabrication
28-Dec-26
22-Mar-27
104.0d
0%
CK01DU4110
01D U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK01EU4120
01E/F/G U/G Pipe Spool Fabrication (to Blg Stub Outs)
28-Dec-26
28-Dec-26
0%
CK01YP0110
01Y A/G Pipe Spool Fabrication
28-Dec-26
29-Jan-27
117.0d
0%
CK02AU4110
02A U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02BP0110
02B A/G Pipe Spool Fabrication
28-Dec-26
24-May-27
55.0d
0%
CK02BU4110
02B U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02CU4110
02C U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02DP0110
02D A/G Pipe Spool Fabrication
28-Dec-26
30-Apr-27
75.0d
0%
CK02DU4110
02D U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02EP0110
02E A/G Pipe Spool Fabrication
28-Dec-26
25-Feb-27
130.0d
0%
CK02EU4110
02E U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02FP0110
02F A/G Pipe Spool Fabrication
28-Dec-26
20-Apr-27
84.0d
0%
CK02FU4110
02F U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02GU4110
02G U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02HU4110
02H U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02JU4110
02J U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02KU4110
02K U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02LU4110
02L U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02MU4110
02M U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK02NP0110
02N A/G Pipe Spool Fabrication
28-Dec-26
27-Mar-27
104.0d
0%
CK02PP0110
02P A/G Pipe Spool Fabrication
28-Dec-26
21-Apr-27
83.0d
0%
CK02UU4110
02U U/G Pipe Spool Fabrication (CW & Misc Headers)
28-Dec-26
28-Dec-26
0%
CK02YP0110
02Y A/G Pipe Spool Fabrication
28-Dec-26
29-Jan-27
27.0d
0%
CK03AU4110
03A U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03BU4110
03B U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03CP0110
03C A/G Pipe Spool Fabrication
28-Dec-26
17-Feb-27
137.0d
0%
CK03CU4110
03C U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03DU4110
03D U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03EU4110
03E U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03FU4110
03F U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CK03YP0110
03Y A/G Pipe Spool Fabrication
28-Dec-26
06-Feb-27
80.0d
0%
CK05AU4110
05A U/G Pipe Spool Fabrication
28-Dec-26
28-Dec-26
0%
CO01AC0120
01A Form, Pour, Strip Fnds - Misc Fnds & Sumps...
28-Dec-26
09-Jan-27
247.0d
0%
CO01BC0120
01B Form, Pour, Strip Fnds - Misc Fnds
28-Dec-26
06-Jan-27
210.0d
0%
CO01BC0140
01B Form Pour Strip Fnds - Sleepers to Evap Pond
28-Dec-26
27-Jan-27
148.0d
0%
CO01BM0130
01B Tank Erection 2001-FA (Water Storage Tank)
28-Dec-26
21-Apr-27
9.0d
0%
CO01BM0140
01B Tank Erection 2001-FB (Water Storage Tank)
28-Dec-26
25-Mar-27
32.0d
0%
CO01DM0130
01D Erect 2101-U Cooling Tower
28-Dec-26
04-May-27
61.0d
0%
CO01GA0110
01G Erect Control Building (Continuation w/ Design Rev)
28-Dec-26
24-Jun-27
-14.0d
0%
CO01HC0110
01H Form, Pour, Strip Piers - Substation Building
28-Dec-26
06-Feb-27
112.0d
0%
CO01YU3110
01Y U/G Earthing Installation - Pipe Rack
28-Dec-26
06-Feb-27
134.0d
0%
CO02AU4120
02A U/G Piping Installation
28-Dec-26
29-Jan-27
222.0d
0%
CO02BU4120
02B U/G Piping Installation
28-Dec-26
29-Jan-27
219.0d
0%
CO02CC0110
02C Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
26-Jan-27
165.0d
0%
CO02CC0150
02C Form, Pour, Strip Fnd - 103/105-J & Table Tops
28-Dec-26
28-Dec-26
0%
CO02CM0110
02C Set Static Equipment - 128/167-C
28-Dec-26
28-Dec-26
0%
CO02CU4120
02C U/G Piping Installation
28-Dec-26
29-Jan-27
162.0d
0%
CO02DC0110
02D Form, Pour, Strip Fnds - Major Fnds
28-Dec-26
09-Jan-27
252.0d
0%
CO02DU4120
02D U/G Piping Installation
28-Dec-26
29-Jan-27
248.0d
0%
CO02EU4120
02E U/G Piping Installation
28-Dec-26
29-Jan-27
227.0d
0%
CO02FC0110
02F Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
234.0d
0%
CO02FU4120
02F U/G Piping Installation
28-Dec-26
29-Jan-27
234.0d
0%
CO02GC0150
02G Form, Pour, Strip Fnd - 101-J/JT & 2ea. Table Tops
28-Dec-26
01-Feb-27
134.0d
0%
CO02GM0140
02G Set/Install - 102-J Fd Gas Compr. & Aux.
28-Dec-26
22-Apr-27
188.0d
0%
CO02HU4120
02H U/G Piping Installation
28-Dec-26
29-Jan-27
162.0d
0%
CO02JU4120
02J U/G Piping Installation
28-Dec-26
29-Jan-27
211.0d
0%
CO02KC0110
02K Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
192.0d
0%
CO02KM0130
02K Tank Erection 114-F (Benfield Solution Tank)
28-Dec-26
08-Jan-27
97.0d
0%
CO02KU4120
02K U/G Piping Installation
28-Dec-26
29-Jan-27
214.0d
0%
CO02LC0110
02L Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
123.0d
0%
CO02LC0140
02L Form Pour Strip Fnds - 02L Structure
28-Dec-26
29-Jan-27
45.0d
0%
CO02MU4120
02M U/G Piping Installation
28-Dec-26
29-Jan-27
239.0d
0%
CO02UP0130
02U LB Pipe Erection (CW & Misc Headers)
28-Dec-26
29-Jan-27
71.0d
0%
CO02UV1110
02U Paint Fabricated Pipe Spools (CW & Misc Headers)
28-Dec-26
28-Dec-26
0%
CO02YU3110
02Y U/G Earthing Installation
28-Dec-26
29-Jan-27
100.0d
0%
CO03AC0110
03A Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
16-Jan-27
155.0d
0%
CO03BC0110
03B Form, Pour, Strip Fnds - Major Fnds (N/A)
28-Dec-26
28-Dec-26
0%
CO03BC0140
03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump
28-Dec-26
30-Dec-26
266.0d
0%
CO03DM0145
03D Tank Erection 2002-F (Demin Water Tank)
28-Dec-26
12-Jan-27
105.0d
0%
CO03DU4120
03D U/G Piping Installation
28-Dec-26
05-Jan-27
199.0d
0%
CO03EC0110
03E Form, Pour, Strip Fnds - 2001-U Water Treatment
28-Dec-26
20-Feb-27
126.0d
0%
CO03FM0110
03F Erect 2002-U Package Boiler
28-Dec-26
13-Mar-27
159.0d
0%
CO03YC0110
03Y Form, Pour, Strip Fnds - Sleeper Fnds
28-Dec-26
01-Jan-27
98.0d
0%
CO03YC0120
03Y Form, Pour, Strip Fnds - Pipe Rack Fnds
28-Dec-26
28-Dec-26
0%
CO04AV1100
04A Paint
28-Dec-26
25-May-27
148.0d
0%
CO05AC0175
05A Test Piles (Load Test)
28-Dec-26
09-Jan-27
-51.0d
0%
EK000YA500
Issue ISBL Paint & Insulation Work Package
28-Dec-26
08-Mar-27
750.0d
0%
EK000YA845
(PC-08) Complete >10% - ISBL -Unit 02 - Pipe Spool Fabrication,>2 Inch Diameter
28-Dec-26
28-Dec-26
0%
P002YS0010
02Y Recv at Site - Structural Steel (First Shipment)
28-Dec-26
28-Dec-26
0%
PO000E0000
Purch/Fab/Deliver - A/G Electrical Bulks (First)
28-Dec-26
10-Apr-27
20.0d
0%
PO000V2000
Purch/Fab/Delv - Insulation Materials
28-Dec-26
15-May-27
98.0d
0%
PO01BS0130
01B Fab & Ship Miscellaneous Steel
28-Dec-26
26-Feb-27
86.0d
0%
PO01DS0120
01D Fab & Ship Structural Steel
28-Dec-26
19-Feb-27
94.0d
0%
PO01DS0130
01D Fab & Ship Miscellaneous Steel
28-Dec-26
19-Feb-27
94.0d
0%
PO01EA0135
01E Guard House Design Drawings - Submit to KBR
28-Dec-26
02-Jan-27
200.0d
0%
PO01FA0135
01F Mosque Design Drawings - Submit to KBR
28-Dec-26
02-Jan-27
143.0d
0%
PO01HS0130
01H Fab & Ship Miscellaneous Steel
28-Dec-26
09-Apr-27
51.0d
0%
PO01YS0120
01Y Fab & Ship Structural Steel
28-Dec-26
29-Jan-27
39.0d
0%
PO02AS0120
02A Fab & Ship Structural Steel
28-Dec-26
09-Apr-27
103.0d
0%
PO02AS0130
02A Fab & Ship Miscellaneous Steel
28-Dec-26
09-Apr-27
115.0d
0%
PO02CS0130
02C Fab & Ship Miscellaneous Steel
28-Dec-26
26-Mar-27
83.0d
0%
PO02DS0120
02D Fab & Ship Structural Steel
28-Dec-26
02-Apr-27
93.0d
0%
PO02DS0130
02D Fab & Ship Miscellaneous Steel
28-Dec-26
02-Apr-27
105.0d
0%
PO02ES0120
02E Fab & Ship Structural Steel
28-Dec-26
16-Apr-27
127.0d
0%
PO02ES0130
02E Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
67.0d
0%
PO02FS0130
02F Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
133.0d
0%
PO02HS0120
02H Fab & Ship Structural Steel
28-Dec-26
26-Mar-27
92.0d
0%
PO02HS0130
02H Fab & Ship Miscellaneous Steel
28-Dec-26
26-Mar-27
78.0d
0%
PO02JS0120
02J Fab & Ship Structural Steel
28-Dec-26
16-Apr-27
98.0d
0%
PO02JS0130
02J Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
110.0d
0%
PO02LS0120
02L Fab & Ship Structural Steel
28-Dec-26
05-Mar-27
-15.0d
0%
PO02LS0130
02L Fab & Ship Miscellaneous Steel
28-Dec-26
05-Mar-27
93.0d
0%
PO02MS0120
02M Fab & Ship Structural Steel
28-Dec-26
19-Mar-27
123.0d
0%
PO02MS0130
02M Fab & Ship Miscellaneous Steel
28-Dec-26
19-Mar-27
147.0d
0%
PO02NMS100
02N Fab & Ship Miscellaneous Steel
28-Dec-26
30-Apr-27
67.0d
0%
PO02QMS100
02Q Fab & Ship Miscellaneous Steel
28-Dec-26
23-Apr-27
121.0d
0%
PO02YS0120
02Y Fab & Ship Structural Steel
28-Dec-26
05-Mar-27
-22.0d
0%
PO03AS0130
03A Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
56.0d
0%
PO03BS0130
03B Fab & Ship Miscellaneous Steel
28-Dec-26
09-Apr-27
169.0d
0%
PO03CS0130
03C Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
87.0d
0%
PO03DS0130
03D Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
98.0d
0%
PO03ES0130
03E Fab & Ship Miscellaneous Steel
28-Dec-26
16-Apr-27
58.0d
0%
PO03YS0120
03Y Fab & Ship Structural Steel
28-Dec-26
29-Jan-27
39.0d
0%
WK000P0100
000 A/G Pipe Spool Fabrication
28-Dec-26
31-May-27
49.0d
0%
WO010A0100
010 Buildings
28-Dec-26
24-Jun-27
94.0d
0%
WO010M0100
010 Major Equipment
28-Dec-26
01-Sep-27
54.0d
0%
WO010U3100
010 Install U/G Electrical
28-Dec-26
27-Mar-27
170.0d
0%
WO020M0100
020 Major Equipment
28-Dec-26
16-Aug-27
156.0d
0%
WO020U3100
020 Install U/G Electrical
28-Dec-26
12-Mar-27
265.0d
0%
WO020U4100
020 U/G Piping Installation
28-Dec-26
26-Feb-27
224.0d
0%
WO030M0100
030 Major Equipment
28-Dec-26
26-Apr-27
192.0d
0%
WO030U4100
030 U/G Piping Installation
28-Dec-26
26-Feb-27
229.0d
0%
WO04AV1100
04A Paint
28-Dec-26
25-May-27
148.0d
0%
WO050C0110
050 Concrete Paving
28-Dec-26
28-Dec-26
0.0d
0%
WT010M0100
010 Tank Erection
28-Dec-26
21-Apr-27
9.0d
0%
WT020M0100
020 Tank Erection
28-Dec-26
08-Jan-27
97.0d
0%
WT030M0100
030 Tank Erection
28-Dec-26
12-Jan-27
105.0d
0%
EK000YA843
(PC-18) Complete >90% Bldg No. 2604-K Workshop / Warehouse Erection
28-Dec-26
28-Dec-26
750.0d
0%
SC01JT0120
01J RFSU
28-Dec-26
28-Dec-26
441.0d
0%
XE000OW335
(EBIC) Permit - Land Easement (SIDC Assistance)
28-Dec-26
28-Dec-26
750.0d
0%
XE000OW340
(EBIC) Permit - Tanks (SIDC)
28-Dec-26
28-Dec-26
750.0d
0%
XE000OW345
(EBIC) Purchase Chemicals For Operation
28-Dec-26
28-Dec-26
750.0d
0%
XE000OW355
(EBIC) Tie-In Municipal Water To Site
28-Dec-26
28-Dec-26
353.0d
0%
XE000OW370
(EBIC) Permit - Tanks (SPDC)
28-Dec-26
28-Dec-26
750.0d
0%
XE000OW375
(EBIC) Tie-In Site Electrical Power Supply
28-Dec-26
28-Dec-26
297.0d
0%
XE000OW405
(EBIC) Tie-In Port Elec Power Supply To Substation
28-Dec-26
28-Dec-26
750.0d
0%
EK000CS040
Issue Operation & Maintenance Manuals for Review
30-Dec-26
21-Mar-27
215.0d
0%
EK000ELEGP
Electrical Heat Tracing - Design & BOM by Consultant
30-Dec-26
30-Jan-27
91.0d
0%
EK000ELEN1
01,03,04 LV Wiring Diagrams - IFC
30-Dec-26
03-Feb-27
509.0d
0%
EK000ELEN2
01,03,04 LV//MV WIRING DIAGRAMS & CTL SCHEMATICS - IFC
30-Dec-26
03-Feb-27
509.0d
0%
EK000ELEN3
01,03, Equipment Interconnection Diagrams - IFC
30-Dec-26
30-Jan-27
511.0d
0%
EK020EL130
Overall One line Diagrams - IFC
30-Dec-26
01-Jan-27
82.0d
0%
EK020EL165
Switchgear One line Diagrams - IFC
30-Dec-26
29-Jan-27
231.0d
0%
EK020EL185
MCC One line Diagrams - IFC
30-Dec-26
30-Jan-27
231.0d
0%
EK020ELEG6
Cathodic Protection - Material Supply (By Consultant)
30-Dec-26
02-May-27
6.0d
0%
EK020ELEN1
02 LV Wiring Diagrams - IFC
30-Dec-26
16-Jan-27
296.0d
0%
EK020ELEN2
02 MV WIRING DIAGRAMS & CTL SCHEMATICS - IFC
30-Dec-26
26-Feb-27
306.0d
0%
EK020ELEN3
02 Equipment Interconnection Diagrams - IFC
30-Dec-26
30-Jan-27
511.0d
0%
EK020IC131
Instrument Loop Diagrams FF - IFC
30-Dec-26
03-Jan-27
530.0d
0%
EK05ACV200
05A Redesign Piling & Ammonia Tank Foundations
30-Dec-26
10-Jan-27
-44.0d
0%
EK05BIC120
05B Instrument Model
30-Dec-26
30-Dec-26
110.0d
0%
EM000ELEN3
01,03 Equipment Interconnection Diagrams
30-Dec-26
30-Jan-27
511.0d
0%
EM020ELEN1
02 LV WIRING DIAGRAMS & CTL SCHEMATICS
30-Dec-26
29-Jan-27
512.0d
0%
EM020ELEN2
02 MV WIRING DIAGRAMS & CTL SCHEMATICS
30-Dec-26
29-Jan-27
512.0d
0%
EM020ELEN3
02 Equipment Interconnection Diagrams
30-Dec-26
30-Jan-27
511.0d
0%
EM02GPI143
02G OP's & Serv. Model Review Comments Resolution
30-Dec-26
03-Jan-27
88.0d
0%
EM02KCV127
02K Model Misc. Steel & Issue Dwgs - IFC
30-Dec-26
10-Jan-27
100.0d
0%
EM02KCV167
02K Update Model Misc Fdns & Issue Dwgs - IFC
30-Dec-26
10-Jan-27
207.0d
0%
EM05ACV122
05A Update Model PR Struct Steel & Issue Dwgs - IFC
30-Dec-26
10-Jan-27
21.0d
0%
EM05ACV127
05A Model Misc. Steel & Issue Dwgs - IFC
30-Dec-26
10-Jan-27
25.0d
0%
EM05ACV164
05A Update Model Major Eq. Fdns & Issue Dwgs-IFC
30-Dec-26
27-Jan-27
-14.0d
0%
EM05API135
05A A/G Piping Iso's - Issue IFC
30-Dec-26
03-Jan-27
90.0d
0%
EM05API138
05A Design / Issue Pipe Supports IFC
30-Dec-26
03-Jan-27
162.0d
0%
EM05BCV122
05B Design / Model / IFC - Sleeper Steel & FDN's
30-Dec-26
24-Jan-27
71.0d
0%
EM05BCV133
05B Design / Model / IFC - S/S at Jetty
30-Dec-26
24-Jan-27
71.0d
0%
EM05BPI141
05B Model Review Comment Resolution
30-Dec-26
10-Jan-27
75.0d
0%
PK000E001H
Sub Stations - Fab / Exworks
30-Dec-26
28-Feb-27
62.0d
0%
PK000E002H
Transformer - Fab / Exworks
30-Dec-26
04-Feb-27
28.0d
0%
PK000E004H
UPS System - Fab / Exworks
30-Dec-26
05-Feb-27
27.0d
0%
PK000I1121
020 Venturis - Fabricate/Exworks
30-Dec-26
30-Dec-26
509.0d
0%
PK000I2300
On/Off Valves - Fabricate/Exworks
30-Dec-26
07-Feb-27
460.0d
0%
PK000I3524
SIS - Packing / Exworks
30-Dec-26
10-Jan-27
55.0d
0%
PK000I3545
ITCC - Packing / Exworks
30-Dec-26
10-Jan-27
55.0d
0%
PK000I4440
FAT Test - Shelters/ Analyzers
30-Dec-26
10-Jan-27
161.0d
0%
PK000I611N
Transport & Deliver - Pressure Gauges - ISBL
30-Dec-26
03-Jan-27
110.0d
0%
PK000I612H
Fabricate / Exworks - Differential Pressure Gauges
30-Dec-26
18-Feb-27
28.0d
0%
PK000I617N
Transport & Deliver - Magnetic Lvl Gauges
30-Dec-26
13-Jan-27
104.0d
0%
PK000I621H
Fabricate / Exworks - Temperature Elements
30-Dec-26
13-Mar-27
31.0d
0%
PK000I623H
Fabricate / Exworks - Multi-Point Thermocouples
30-Dec-26
30-Dec-26
84.0d
0%
PK000IC354
DCS - Packing / Exworks
30-Dec-26
30-Dec-26
85.0d
0%
PK000IC35N
DCS - Transport (Hold for Field Request)
30-Dec-26
07-Feb-27
85.0d
0%
PK000MB62S
MB621 - Marshaling 101-B ID & FD Fans
30-Dec-26
14-Feb-27
215.0d
0%
PK000MB71S
MB710 - Marshaling 2202-B/BL Storage Flare & Flame FRT Gen.
30-Dec-26
07-Feb-27
240.0d
0%
PK000MD34T
MD304 - Marshaling 108-DA/B
30-Dec-26
07-Feb-27
162.0d
0%
PK000MD41S
MD401 - Marshaling 101-F
30-Dec-26
07-Feb-27
175.0d
0%
PK000MD44U
MD404 - Marshaling 132-F
30-Dec-26
07-Feb-27
65.0d
0%
PK000MJ35S
MJ305 - Marshaling ISBL ANSI/API PUMPS
30-Dec-26
11-Feb-27
153.0d
0%
PK000MJ71K
MJ731 - Fabricate/PO Promise EMERG PWR GENERATOR
30-Dec-26
21-Feb-27
70.0d
0%
PK000ML31S
ML313 - Marshaling 160-L
30-Dec-26
30-Dec-26
261.0d
0%
PK000ML90S
01A ML900 - Marshaling Evap. Pond Spray Nzl.
30-Dec-26
10-Jan-27
103.0d
0%
PK000MU25S
02G MU225 - Marshaling LIFT STATION
30-Dec-26
07-Feb-27
215.0d
0%
PK000MU29S
MU292 - Marshaling 2404-L
30-Dec-26
07-Feb-27
195.0d
0%
PK000MU30S
MU300 - Marshaling 2102-U
30-Dec-26
07-Feb-27
76.0d
0%
PK000MU31S
MU310 - Marshaling Injection System & Chlorination Unit
30-Dec-26
07-Feb-27
59.0d
0%
PK000MU32S
MU322 - Marshaling COOLING WTR FILTER & CLARIFIER
30-Dec-26
07-Feb-27
71.0d
0%
PK000MU33S
MU330 - Marshaling 2001-U
30-Dec-26
07-Feb-27
111.0d
0%
PK000PIA1N
Bulk Piping A/G - Fab/Exworks (FINAL)
30-Dec-26
07-Mar-27
45.0d
0%
PK000PS00G
000 SP Items - Fabricate/Exworks
30-Dec-26
30-Dec-26
247.0d
0%
PK000PSA8H
000 Relief Valves - Transport & Deliver
30-Dec-26
24-Feb-27
257.0d
0%
PK000PTA0J
Engineered Pipe Supports - Transport
30-Dec-26
10-Feb-27
58.0d
0%
PK010E008K
540-SG Admin. Area Pwr Supply - Fab / Exworks
30-Dec-26
11-Feb-27
70.0d
0%
PK010I1211
Vortex Meters - Transport & Deliver
30-Dec-26
31-Dec-26
533.0d
0%
PK010I1241
Rotameters - Transport & Deliver
30-Dec-26
14-Jan-27
523.0d
0%
PK010IC214
010 Control Valves - Transport & Deliver
30-Dec-26
30-Dec-26
535.0d
0%
PK010IC220
010 Control Valves - Recv on Site
30-Dec-26
30-Dec-26
0%
PK010IC252
MOV Valves - Fabricate/Exworks
30-Dec-26
27-Jan-27
475.0d
0%
PK020I131N
Transport & Deliver - Transmitters -Press.
30-Dec-26
20-Feb-27
76.0d
0%
PK030I1103
Orific Plates -Transport & Deliver
30-Dec-26
27-Jan-27
514.0d
0%
PK030I131H
Fabricate / Exworks - Transmitters - Temp.
30-Dec-26
16-Jan-27
71.0d
0%
PK030I611H
Fabricate / Exworks - Pressure Gauges - OSBL
30-Dec-26
04-Feb-27
58.0d
0%
ZZ2080
MJ305 - Transport/Customes OSBL ANSI/API PUMPS
30-Dec-26
07-Feb-27
190.0d
0%
ZZ2090
MJ305 - Marshaling OSBL ANSI/API PUMPS
30-Dec-26
30-Dec-26
190.0d
0%
CK01BP0110
01B A/G Pipe Spool Fabrication
31-Dec-26
23-Mar-27
101.0d
0%
CO01AV1110
01A Paint Fabricated Pipe Spools
31-Dec-26
02-Jan-27
253.0d
0%
PK000I1131
Venturis - Transport & Deliver
31-Dec-26
03-Feb-27
509.0d
0%
PK000I221N
000 Everest Control Valves - Transport & Deliver
31-Dec-26
10-Feb-27
504.0d
0%
PK000MB51S
MB511 - Marshaling 101-B Insulation
31-Dec-26
20-Jan-27
204.0d
0%
PK000ML31O
ML313 - Transport/Customs 160-L
31-Dec-26
24-Jan-27
365.0d
0%
PK000PS00H
000 SP Items - Transport & Deliver
31-Dec-26
10-Mar-27
247.0d
0%
PK010I1151
Annubars - Transport & Deliver
31-Dec-26
03-Feb-27
509.0d
0%
WO010V1100
010 Paint
31-Dec-26
05-Oct-27
131.0d
0%
PK010I1212
Vortex Meters - Recv on Site
31-Dec-26
31-Dec-26
615.0d
0%
EM05ACV133
05A Update Model Structural Piperack Fdns & Issue Dwgs - IFC
01-Jan-27
10-Jan-27
121.0d
0%
XE000OW230
(EBIC) Permit - Operating Permit (SPDC)
01-Jan-27
01-Jan-27
746.0d
0%
XE000OW374
(EBIC) Permit - Operating Permit (SIDC)
01-Jan-27
01-Jan-27
746.0d
0%
EM5ASY272
05A P&IDs & Line List Issue - IFC
01-Jan-27
01-Jan-27
164.0d
0%
EM5BSY272
05B P&IDs & Line List Issue - IFC
01-Jan-27
01-Jan-27
267.0d
0%
CO02HM0200
02H Start Primary Reformer Erection (101-B)
02-Jan-27
02-Jan-27
108.0d
0%
CO02HM0210
02H Erect Radiant Section Shell (101-B)
02-Jan-27
02-Apr-27
108.0d
0%
CO02LU4120
02L U/G Piping Installation
02-Jan-27
29-Jan-27
123.0d
0%
PK000MD21S
MD201- Marshaling 101-E
02-Jan-27
07-Feb-27
93.0d
0%
PO03FS0130
03F Fab & Ship Miscellaneous Steel
02-Jan-27
09-Apr-27
88.0d
0%
EK01EA0140
01E Guard House Design Drawings - Approval
03-Jan-27
16-Jan-27
175.0d
0%
EK01FA0140
01F Mosque Design Drawings - Approval
03-Jan-27
16-Jan-27
119.0d
0%
EK000PI200
Final Delta Piping Bulk Quanities for Purchase
03-Jan-27
03-Jan-27
0%
EK000YA838
(EP-34) Issue >90% ISBL P&ID's For Construction (IFC)
03-Jan-27
03-Jan-27
0%
EK02GPI144
02G OP's & Serv. Model Comments Resolution Approval
03-Jan-27
03-Jan-27
0%
EM02GCV122
02G Update Model Struct Steel & Issue Dwgs - IFC
03-Jan-27
03-Jan-27
0%
EM02GCV126
02G Conceptual Misc. Steel Design/ Model
03-Jan-27
03-Jan-27
0%
EM02GCV127
02G Model Misc. Steel & Issue Dwgs - IFC
03-Jan-27
03-Jan-27
0%
EM02GCV128
02G Update Model Structural Fdns & Issue Dwgs - IFC
03-Jan-27
03-Jan-27
0%
EM02GCV166
02G Conceptual Misc. Foundations Design/ Model
03-Jan-27
03-Jan-27
0%
EM02GCV167
02G Update Model Misc Fdns & Issue Dwgs - IFC
03-Jan-27
03-Jan-27
0%
EM02GPI135
02G A/G Piping Iso's - Issue IFC
03-Jan-27
03-Jan-27
0%
EM02GPI136
02G IDP - Detail Design
03-Jan-27
03-Jan-27
0%
EM02GPI138
02G Design / Issue Pipe Supports IFC
03-Jan-27
03-Jan-27
0%
EM02GSY272
02G P&IDs & Line List Issue - IFC
03-Jan-27
03-Jan-27
0%
PK000I611L
Recv at Site - Pressure Gauges - ISBL
04-Jan-27
04-Jan-27
134.0d
0%
PO01CS0130
01C Fab & Ship Miscellaneous Steel
04-Jan-27
09-Apr-27
106.0d
0%
PO02GS0130
02G Fab & Ship Miscellaneous Steel
04-Jan-27
26-Mar-27
107.0d
0%
CO01UP0150
01U LB Pipe Erection (Firewater Piping)
05-Jan-27
06-Feb-27
212.0d
0%
WO010U4100
010 U/G Piping Installation
05-Jan-27
26-Mar-27
171.0d
0%
CO02GU4120
02G U/G Piping Installation
06-Jan-27
26-Feb-27
159.0d
0%
CO03DC0120
03D Form, Pour, Strip Fnds - Misc Fnds
06-Jan-27
19-Jan-27
199.0d
0%
EM000IC100
Instrument Index - IFC
06-Jan-27
06-Jan-27
530.0d
0%
CK02QP0110
02Q A/G Pipe Spool Fabrication
11-Jan-27
13-Apr-27
90.0d
0%
EK05ACV210
05A COSMO Design Approval (Assuming No Change)
11-Jan-27
16-Jan-27
-51.0d
0%
CO02CM0125
02C Set - 103/105-J Compressors
12-Jan-27
16-Jan-27
167.0d
0%
CO02YS0110
02Y Erect Structural Steel - Pipe Rack
12-Jan-27
14-Jun-27
-35.0d
0%
WO020S0100
020 Erect Steel
12-Jan-27
07-Oct-27
69.0d
0%
CO02HU3110
02H U/G Earthing Installation
13-Jan-27
12-Feb-27
162.0d
0%
CO03YV1110
03Y Paint Fabricated Pipe Spools
13-Jan-27
13-Feb-27
154.0d
0%
EM05BPI133
05B IDP - Plant Layout
13-Jan-27
14-Jan-27
75.0d
0%
PK000I352N
SIS - Transport & Delivery
13-Jan-27
21-Mar-27
55.0d
0%
PK000I354N
ITCC - Transport & Delivery
13-Jan-27
21-Mar-27
55.0d
0%
PK000I4441
Cleanup / Changes - Shelters/ Analyzers
13-Jan-27
24-Jan-27
161.0d
0%
PK000MD32S
MD302 - Marshaling 104-D1/2
13-Jan-27
07-Feb-27
85.0d
0%
PK000MJ22S
MJ201 - Marshaling 101-J
13-Jan-27
31-Jan-27
86.0d
0%
PK000MJ36S
MJ305 - Marshaling OSBL PUMPS
13-Jan-27
31-Jan-27
60.0d
0%
PK000MJ38V
MJ308 - Marshaling ISBL ANSI/API PUMPS
13-Jan-27
31-Jan-27
198.0d
0%
PK000MJ39S
Marshaling FIREWATER PUMPS
13-Jan-27
31-Jan-27
60.0d
0%
PK000ML90O
01A ML900 - Transport/Customes Evap. Pond Spray Nzl.
13-Jan-27
21-Feb-27
103.0d
0%
WO030V1100
030 Paint
13-Jan-27
23-Aug-27
153.0d
0%
CO02CU3110
02C U/G Earthing Installation
14-Jan-27
12-Feb-27
168.0d
0%
PK000I617L
Recv at Site - Magnetic Lvl Gauges
14-Jan-27
14-Jan-27
125.0d
0%
PK010I1242
Rotameters - Recv on Site
14-Jan-27
14-Jan-27
0%
CO03DU3110
03D U/G Earthing Installation
15-Jan-27
19-Jan-27
199.0d
0%
EK05BPI050
05B Model Comment Resolution Approval
15-Jan-27
17-Jan-27
75.0d
0%
EM05ACV167
05A Update Model Misc Fdns & Issue Dwgs - IFC
15-Jan-27
24-Jan-27
111.0d
0%
WO030U3100
030 Install U/G Electrical
15-Jan-27
12-Mar-27
229.0d
0%
PO05AS0120
05A Fab & Ship Structural Steel
15-Jan-27
04-Jun-27
23.0d
0%
PO05AS0130
05A Fab & Ship Miscellaneous Steel
15-Jan-27
04-Jun-27
27.0d
0%
CO02HC0120
02H Form, Pour, Strip Fnds - Misc Fnds
16-Jan-27
05-Feb-27
174.0d
0%
CO02LU3110
02L U/G Earthing Installation
16-Jan-27
12-Feb-27
129.0d
0%
CO02UP0150
02U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
CO03UP0150
03U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
PK000MC32S
MC311 - Marshaling KBR S&T EXCH
17-Jan-27
06-Mar-27
76.0d
0%
PK000MJ34S
MJ304 - Marshaling MP BFW PUMPS
17-Jan-27
06-Feb-27
186.0d
0%
PK030I131N
Transport & Deliver - Transmitters - Temp.
17-Jan-27
30-Jan-27
91.0d
0%
CO02CM0130
02C Install - 103/105-J Compressors & Aux. Equip.
18-Jan-27
13-May-27
167.0d
0%
CO05AC0185
05A Procure Material & Mob Piling Contractor
18-Jan-27
30-Jan-27
-51.0d
0%
CO02AU3110
02A U/G Earthing Installation
20-Jan-27
05-Feb-27
228.0d
0%
CO02CV1110
02C Paint Fabricated Pipe Spools
20-Jan-27
27-Feb-27
245.0d
0%
EM05BCV167
05B Design / Model / IFC - Equip. Fdn's.
20-Jan-27
20-Jan-27
221.0d
0%
EM05BPI132
05B Planning Release
20-Jan-27
24-Jan-27
75.0d
0%
EM05BPI200
05B Equipment Location Plans
20-Jan-27
24-Jan-27
221.0d
0%
PK000MJ32S
MJ302 - Marshaling 107-JA/JB/JC
20-Jan-27
07-Feb-27
175.0d
0%
WO020V1100
020 Paint
20-Jan-27
14-Feb-28
23.0d
0%
Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 Mar 2026 Apr 2026 May 2026 Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Data Date
PK000I354H — ITCC - Fabricate Hardware | 11-Feb-25 → 27-Dec-26 | In Progress 64% | float — PK000I354H EK05BPI030 — 05B Conceptual Layout - Supersketches | 07-May-25 → 27-Dec-26 | In Progress 59% | float — EK05BPI030 EK000MBG10 — General & Administrative | 28-May-25 → 27-Dec-26 | In Progress 57% | float — EK000MBG10 EM03EPI120 — 03E Plant Layout Model | 14-Jun-25 → 27-Dec-26 | In Progress 56% | float — EM03EPI120 EM03API120 — 03A Plant Layout Model | 22-Jul-25 → 27-Dec-26 | In Progress 53% | float — EM03API120 EM03YPI120 — 03Y Plant Layout Model | 22-Jul-25 → 27-Dec-26 | In Progress 53% | float — EM03YPI120 PK000MB33K — MB333 - Fab/PO Promise 101-B Riser Transition 101-B | 29-Jul-25 → 27-Dec-26 | In Progress 52% | float — PK000MB33K PK000MBP1K — MB221 - Fab/PO Promise 101-B Radiant Steel Panels | 09-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MBP1K PK000MBP1Q — MB221 - Fab/PO Promise 101-B Radiant Coil/Harps | 09-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MBP1Q PK000MBP1R — MB221 - Fab/PO Promise 101-B Convection Modules | 09-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MBP1R PK000MBP1S — MB221 - Fabr/PO Promise 101-B Radiant Ducting | 09-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MBP1S PK000MD31K — MD301 - Fabricate/PO Promise 103-D | 09-Aug-25 → 17-Feb-27 | In Progress 46% | float 55.0d PK000MD31K PK000MD33K — MD303 - Fabricate/PO Promise 105-D | 09-Aug-25 → 20-Mar-27 | In Progress 44% | float 50.0d PK000MD33K PK000MJ21K — MJ202 - Fabricate/PO Promise 102/3/5-J | 09-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MJ21K PK000MB62K — MB621 - Fabricate/PO Promise 101-B ID & FD Fans | 12-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MB62K PK000MB81K — MB810 - Fabricate/PO Promise 102-B | 12-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MB81K PK000MD32K — MD302 - Fabricate/PO Promise 104-D1/2 | 13-Aug-25 → 10-Jan-27 | In Progress 49% | float 85.0d PK000MD32K PK000MJ75K — MJ750 - Fabricate/PO Promise SURFACE CONDENSORS | 13-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MJ75K PK000MB34K — MB340 - Fabricate/PO Promise 101-B Finning | 14-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000MB34K PK000PTA0G — Engineered Pipe Supports - Fab / Exworks | 14-Aug-25 → 27-Dec-26 | In Progress 51% | float — PK000PTA0G EK020IC210 — 020 Control Valves - D/S,Sizing,Tech Eval | 15-Aug-25 → 27-Dec-26 | In Progress 51% | float — EK020IC210 PK000MD22A — MD202 - Fabricate/PO Promise TOWERS 104-E | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD22A PK000MD22K — MD202 - Fabricate/PO Promise TOWERS 103/105-E | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD22K PK000MD22T — MD202 - Fabricate/PO Promise TOWERS 150-E | 16-Aug-25 → 28-Feb-27 | In Progress 45% | float 100.0d PK000MD22T PK000MD34K — MD304 - Fabricate/PO Promise 106-D, 109-DA/B | 16-Aug-25 → 29-Jan-27 | In Progress 47% | float 200.0d PK000MD34K PK000MD34Z — MD304 - Fabricate/PO Promise 108-DA/B | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD34Z PK000MD42K — MD402 - Fabricate/PO Promise 102-F1, 102-F2 | 16-Aug-25 → 21-Mar-27 | In Progress 43% | float 130.0d PK000MD42K PK000MD42N — MD402 - Fabricate/PO Promise 104-F, 144-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD42N PK000MD44K — MD404 - Fabricate/PO Promise 109-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD44K PK000MD44L — MD404 - Fabricate/PO Promise 107-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD44L PK000MD44T — MD404 - Fabricate/PO Promise 132-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD44T PK000MD45A — MD405 - Fabricate/PO Promise ISBL DRUMS - 115-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD45A PK000MD45K — MD405 - Fabricate/PO Promise ISBL DRUMS - 156-F & 157-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD45K PK000MD46K — MD411 - Fabricate/PO Promise OSBL DRUMS - 2203-F & 2204-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD46K PK000MD46T — MD411 - Fabricate/PO Promise OSBL DRUMS - 2006-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD46T PK000MD4Q — MD405 - Fabricate/PO Promise ISBL DRUMS - 118-F | 16-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD4Q PK020MC31C — MC312 - Fabricate/PO Promise 121-C | 21-Aug-25 → 28-Feb-27 | In Progress 44% | float 90.0d PK020MC31C PK020MC31K — MC312 - Fabricate/PO Promise 120-C | 21-Aug-25 → 28-Feb-27 | In Progress 44% | float 90.0d PK020MC31K PK000MD41K — MD401 - Fabricate/PO Promise 101-F | 23-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MD41K PK000MD43K — MD403 - Fabricate/PO Promise 106-F | 23-Aug-25 → 11-Mar-27 | In Progress 43% | float 135.0d PK000MD43K PK000MJ35K — MJ305 - Fabricate/PO Promise ISBL ANSI/API PUMPS | 23-Aug-25 → 27-Dec-26 | In Progress 50% | float — PK000MJ35K ZZ2070 — MJ305 - Fabricate/PO Promise OSBL ANSI/API PUMPS | 23-Aug-25 → 27-Dec-26 | In Progress 50% | float — ZZ2070 EM01CPI120 — 01C Plant Layout Model | 24-Aug-25 → 27-Dec-26 | In Progress 50% | float — EM01CPI120 PK000MD51K — MD501 - Fabricate/PO Promise 107-D | 27-Aug-25 → 27-Dec-26 | In Progress 49% | float — PK000MD51K PK000MJ22K — MJ201 - Fabricate/PO Promise 101-J | 30-Aug-25 → 10-Jan-27 | In Progress 48% | float 86.0d PK000MJ22K PK000ML31K — ML313 - Fabricate/PO Promise 160-L | 30-Aug-25 → 27-Dec-26 | In Progress 49% | float — PK000ML31K PK000MBP3R — MB311 - Fab/Exworks 101-B Crossover Tube & Pipe | 02-Sep-25 → 27-Dec-26 | In Progress 49% | float — PK000MBP3R PK000MBP3S — MB311 - Fab/Exworks 101-B Crossover Fittings | 02-Sep-25 → 27-Dec-26 | In Progress 49% | float — PK000MBP3S PK000MB51K — MB511 - Fabricate/PO Promise 101-B Insulation | 03-Sep-25 → 30-Dec-26 | In Progress 48% | float 204.0d PK000MB51K PK000MU41K — MU410 - Fabricate/PO Promise 2002-U PKG BOILER | 06-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK000MU41K PK02HMD21 — 02H MD301 103-D Secondary Reformer - Prod. V. Data | 09-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK02HMD21 PK000MC61K — MC610 - Fabricate/PO Promise DBL PIPE EXCH 188-CA | 10-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK000MC61K PK000MBP4K — MB312 - Fab/PO Promise 101-B Radiant Cast Fittings | 11-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK000MBP4K PK000MBP4Q — MB312 - Fab/PO Promise 101-B Radiant Cast Stringer Grids | 11-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK000MBP4Q PK000MBP4R — MB312 - Fab/PO Promise 101-B Radiant Cast Tube/Riser/Manifold | 11-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK000MBP4R PK000ML51K — ML512 - Fabricate/PO Promise 2102-L LOADING ARM | 11-Sep-25 → 27-Dec-26 | In Progress 48% | float — PK000ML51K EM020ELEL2 — 02 U/G Electrical Routing Plans - IFC | 16-Sep-25 → 27-Dec-26 | In Progress 47% | float — EM020ELEL2 EK000FP036 — FP ISBL Firewater P&IDs - Development & Issue IFC | 17-Sep-25 → 27-Dec-26 | In Progress 47% | float — EK000FP036 PK000MD21K — MD201 - Fabricate/PO Promise 101-E | 17-Sep-25 → 01-Jan-27 | In Progress 46% | float 93.0d PK000MD21K PK000MD21M — MD201 - Fabricate/PO Promise 102-E | 17-Sep-25 → 05-Mar-27 | In Progress 41% | float 62.0d PK000MD21M PK02EMD02 — 02E MD304 106-D Methanator - Prod. V. Data | 18-Sep-25 → 27-Dec-26 | In Progress 47% | float — PK02EMD02 PK000ML33K — ML330 - Fabricate/Po Promise 2101-L | 20-Sep-25 → 27-Dec-26 | In Progress 47% | float — PK000ML33K EM020ELEH2 — 02 Develop & Issue Earthing / Grounding Dwgs - IFC | 24-Sep-25 → 27-Dec-26 | In Progress 46% | float — EM020ELEH2 EK04API030 — 04A Conceptual Layout - Supersketches | 27-Sep-25 → 27-Dec-26 | In Progress 46% | float — EK04API030 PK000PSA8G — 000 Relief Valves - Fabricate/Exworks | 27-Sep-25 → 30-Dec-26 | In Progress 46% | float 257.0d PK000PSA8G PK000MD47K — MD406 - Fabricate/PO Promise ISBL DRUMS | 01-Oct-25 → 27-Dec-26 | In Progress 45% | float — PK000MD47K PK000MU33K — MU330 - Fabricate/PO Promise 2001-U | 01-Oct-25 → 27-Dec-26 | In Progress 45% | float — PK000MU33K PK000PIA1K — Bulk Piping A/G - Fab/Exworks (CROME) | 01-Oct-25 → 27-Dec-26 | In Progress 45% | float — PK000PIA1K PK000PIA4G — Product Line Piping - Fab/Exworks +/- 5700 Mts. | 01-Oct-25 → 27-Dec-26 | In Progress 45% | float — PK000PIA4G PK000MC21K — MC210 - Fabricate/PO Promise 110/115/124/128/130/133/134/160/167/173/174-C | 09-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK000MC21K PK000MC21N — MC210 - Fabricate/PO Promise 127-C | 09-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK000MC21N PK000MC23A — MC230 - Fabricate/PO Promise 106-C & 109-C | 09-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK000MC23A PK000MC23K — MC230 - Fabricate/PO Promise 105/107/172/183-C | 09-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK000MC23K PK000MC23N — MC230 - Fabricate/PO Promise 111/114-C | 09-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK000MC23N PK02AMC14 — 02A MC210 160-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK02AMC14 PK02AMC15 — 02A MC210 160-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK02AMC15 PK02AMC16 — 02A MC210 160-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK02AMC16 PK02LMC21 — 02E MC230 114-C, 172-C & 183-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK02LMC21 PK02LMC22 — 02E MC230 114-C, 172-C & 183-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK02LMC22 PK02LMC23 — 02E MC230 114-C, 172-C & 183-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — PK02LMC23 ZZ1430 — 02C MC210 128-C, 134-C, 167-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1430 ZZ1440 — 02C MC210 128-C, 134-C, 167-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1440 ZZ1490 — 02D MC210 127-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1490 ZZ1500 — 02D MC210 127-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1500 ZZ1510 — 02E MC210 115-C, 130-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1510 ZZ1520 — 02E MC210 115-C, 130-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1520 ZZ1530 — 02E MC210 115-C, 130-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1530 ZZ1540 — 02G MC210 133-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1540 ZZ1550 — 02G MC210 133-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1550 ZZ1560 — 02G MC210 133-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1560 ZZ1590 — 02J MC210 173-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1590 ZZ1600 — 02J MC210 173-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1600 ZZ1610 — 02K MC210 174-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1610 ZZ1620 — 02K MC210 174-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1620 ZZ1630 — 02K MC210 174-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1630 ZZ1670 — 02L MC210 110-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1670 ZZ1680 — 02L MC210 110-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1680 ZZ1690 — 02L MC210 110-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1690 ZZ1700 — 02M MC210 124-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1700 ZZ1710 — 02M MC210 124-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1710 ZZ1720 — 02M MC210 124-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1720 ZZ1760 — 02L MC230 105-C, 106-C, 107-C, 109-C & 111-C - Piping Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1760 ZZ1770 — 02L MC230 105-C, 106-C, 107-C, 109-C & 111-C - Civil Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1770 ZZ1780 — 02L MC230 105-C, 106-C, 107-C, 109-C & 111-C - E&I Prod. V. Data | 10-Oct-25 → 27-Dec-26 | In Progress 44% | float — ZZ1780 PK000MJ34K — MJ304 - Fabricate/PO Promise MP BFW PUMPS | 15-Oct-25 → 16-Jan-27 | In Progress 42% | float 186.0d PK000MJ34K PK000MC32K — MC311 - Fabricate/PO Promise KBR S&T EXCH | 16-Oct-25 → 16-Jan-27 | In Progress 42% | float 76.0d PK000MC32K PK000IC35J — DCS - Planning V. Data | 17-Oct-25 → 27-Dec-26 | In Progress 43% | float — PK000IC35J PK000IC35H — DCS - Fabricate Hardware | 21-Oct-25 → 27-Dec-26 | In Progress 43% | float — PK000IC35H PK010I1240 — Rotameters - Fabricate/Exworks | 30-Oct-25 → 27-Dec-26 | In Progress 42% | float — PK010I1240 PK010I1150 — Annubars - Fabricate/Exworks | 31-Oct-25 → 30-Dec-26 | In Progress 41% | float 509.0d PK010I1150 EK010FP031 — FP Firewater Pump P&IDs - Development & Issue IFD | 01-Nov-25 → 27-Dec-26 | In Progress 41% | float — EK010FP031 ZZ1850 — 02J MC311 103-C1/C2 - Piping Prod. V. Data | 02-Nov-25 → 27-Dec-26 | In Progress 41% | float — ZZ1850 ZZ1870 — 02J MC311 103-C1/C2 - E&I Prod. V. Data | 02-Nov-25 → 27-Dec-26 | In Progress 41% | float — ZZ1870 ZZ1930 — 02M MC311 123-C1/C2A/C2B - E&I Prod. V. Data | 02-Nov-25 → 27-Dec-26 | In Progress 41% | float — ZZ1930 PK000MB69K — MB691 - Fabricate/PO Promise 101-B | 04-Nov-25 → 27-Dec-26 | In Progress 41% | float — PK000MB69K PK000MU21K — MU221 - Fabricate/PO Promise LIFT STATION | 04-Nov-25 → 27-Dec-26 | In Progress 41% | float — PK000MU21K PK000MU22K — MU222 - Fabricate/PO Promise 2401-U | 04-Nov-25 → 27-Dec-26 | In Progress 41% | float — PK000MU22K CO000K0106 — Mobilize Temporary Facilities (& Punchlist & Perm. Power) | 09-Nov-25 → 27-Dec-26 | In Progress 40% | float — CO000K0106 PK02KMD11 — 02K MD202 150-E Process Condensate Stripper - Prod. V. Data | 13-Nov-25 → 27-Dec-26 | In Progress 40% | float — PK02KMD11 EM02FCV160 — 02F Design & Model Major Eq. Fdns | 13-Nov-25 → 27-Dec-26 | In Progress 40% | float — EM02FCV160 PK000MU30K — MU300 - Fabricate/PO Promise 2102-U | 19-Nov-25 → 27-Dec-26 | In Progress 39% | float — PK000MU30K PK000MJ31K — MJ301 - Fabricate/ PO Promise 104-J | 20-Nov-25 → 31-Jan-27 | In Progress 35% | float 168.0d PK000MJ31K PK000MJ32K — MJ302 - Fabricate/PO Promise 107-JA/JB/JC | 20-Nov-25 → 17-Jan-27 | In Progress 37% | float 175.0d PK000MJ32K PK02FMJV01 — 02F MJ301 104-J/JA - Piping Prod. V. Data | 20-Nov-25 → 27-Dec-26 | In Progress 39% | float — PK02FMJV01 PK02FMJV02 — 02F MJ301 104-J/JA - Civil Prod. V. Data | 20-Nov-25 → 27-Dec-26 | In Progress 39% | float — PK02FMJV02 PK02FMJV03 — 02F MJ301 104-J/JA - E&I Prod. V. Data | 21-Nov-25 → 22-Jan-27 | In Progress 36% | float 517.0d PK02FMJV03 PK000PR20H — PR201 KAAP Catalyst - Fabricate/Exworks | 10-Dec-25 → 03-Nov-27 | In Progress 19% | float 26.0d PK000PR20H EK020EL126 — Electrical Load List - Revised IFD w/Outstanding Equip. Data | 13-Dec-25 → 27-Dec-26 | In Progress 35% | float — EK020EL126 PK000MJ37K — MJ340 - Fabricate/PO Promise METERING PUMPS | 13-Dec-25 → 27-Dec-26 | In Progress 35% | float — PK000MJ37K CO000C0150 — Perimeter Wall | 15-Dec-25 → 29-Mar-27 | In Progress 28% | float 27.0d CO000C0150 WO010K0110 — 010 Site Prep - Perimeter Wall | 15-Dec-25 → 29-Mar-27 | In Progress 28% | float 27.0d WO010K0110 EK020EL000 — ISBL Motor & Drivers - Prod. V. Data (information only) | 16-Dec-25 → 22-Jan-27 | In Progress 32% | float — EK020EL000 EK000I2305 — On/Off Valves - Purchase ERW | 18-Dec-25 → 27-Dec-26 | In Progress 34% | float — EK000I2305 PK000MJ73K — MJ730 - Fabricate/PO Promise EMERG PWR GENERATOR | 25-Dec-25 → 28-Feb-27 | In Progress 28% | float 70.0d PK000MJ73K EK010IC213 — 010 Control Valves - Purchase ERW | 25-Dec-25 → 27-Dec-26 | In Progress 33% | float — EK010IC213 PK03DMJV02 — 03D MJ305 2002-J/JA - Civil Prod. V. Data | 27-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03DMJV02 EK020ELEE0 — Tie-in List - IFC | 28-Dec-25 → 27-Dec-26 | In Progress 32% | float — EK020ELEE0 EM03BCV110 — 03B Design & Model Sumps | 30-Dec-25 → 27-Dec-26 | In Progress 32% | float — EM03BCV110 PK000EL000 — OSBL Motors & Drivers - Prod. V. Data (Information Only) | 30-Dec-25 → 30-Dec-26 | In Progress 32% | float — PK000EL000 PK03DMJV01 — 03D MJ305 2002-J/JA - Piping Prod. V. Data | 30-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03DMJV01 PK03DMJV03 — 03D MJ305 2002-J/JA - E&I Prod. V. Data | 30-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03DMJV03 EM02ACV122 — 02A Update Model Struct Steel & Issue Dwgs - IFC | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — EM02ACV122 PK01BMJV03 — 01B MJ305 2001-JA/JB/JC, 2004-J/JA,2007-J/JA,2007-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK01BMJV03 PK01HMJV01 — 01H MJ730 2303-J - Civil Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK01HMJV01 PK01HMJV02 — 01H MJ730 2303-J - E&I Prod. V. Data | 31-Dec-25 → 30-Dec-26 | In Progress 31% | float 511.0d PK01HMJV02 PK02BMLV03 — 02B ML313 160-L - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02BMLV03 PK02CMJV04 — 02C MJ202 103-J/105-J - Piping Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02CMJV04 PK02CMJV05 — 02C MJ202 103-J/105-J - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02CMJV05 PK02CMJV08 — 02C MJ305 112-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02CMJV08 PK02DMD01 — 02D MD403 106-F Ammonia Separator - Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02DMD01 PK02DMJV03 — 02D MJ305 120-J/JA, 124-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02DMJV03 PK02GMJV03 — 02G MJ202 102/3/5-J - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02GMJV03 PK02GMJV06 — 02G MJ201 101-J - Civil Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02GMJV06 PK02GMJV07 — 02G MJ201 101-J - Piping Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02GMJV07 PK02GMJV08 — 02G MJ201 101-J - E&I Prod. V. Data | 31-Dec-25 → 30-Dec-26 | In Progress 31% | float 535.0d PK02GMJV08 PK02GMJV11 — 02G MJ305 113-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02GMJV11 PK02KMJV03 — 02K MJ305 111-J,115-J - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02KMJV03 PK02LMJV01 — 02L MJ302 107-J - Civil Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02LMJV01 PK02LMJV02 — 02L MJ302 107-J - Piping Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02LMJV02 PK02LMJV03 — 02L MJ302 107-J - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02LMJV03 PK02LMJV06 — 02L MJ305 116-J/JA,121-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK02LMJV06 PK03BMUV03 — 03B MU222,MJ305 2401-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03BMUV03 PK03CMJV03 — 03C MJ305 2205-J/JA,2206-J/JA - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03CMJV03 PK03EMUV01 — 03E MU330 2001-U - Piping Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03EMUV01 PK03EMUV02 — 03E MU330 2001-U - Civil Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03EMUV02 PK03EMUV03 — 03E MU330 2001-U - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03EMUV03 PK03FMUV03 — 03F MU222 2401-U - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03FMUV03 PK03FMUV04 — 03F MU410 2002-U - Piping Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03FMUV04 PK03FMUV05 — 03F MU410 2002-U - Civil Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03FMUV05 PK03FMUV06 — 03F MU410 2002-U - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK03FMUV06 PK05AMLV01 — 05A ML330 2101-L - Piping Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK05AMLV01 PK05AMLV02 — 05A ML330 2101-L - Civil Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK05AMLV02 PK05AMLV03 — 05A ML330 2101-L - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK05AMLV03 PK05BMLV03 — 05B ML512 2102-L - E&I Prod. V. Data | 31-Dec-25 → 27-Dec-26 | In Progress 32% | float — PK05BMLV03 EK030IC213 — 030 Control Valves - Purchase ERW | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK030IC213 EM02NCV164 — 02N Update Model Major Eq. Fdns & Issue Dwgs-IFC | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EM02NCV164 EK01AIC300 — 01A In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK01AIC300 EK01BIC300 — 01B In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK01BIC300 EK01CIC300 — 01C In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK01CIC300 EK01DIC300 — 01D In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK01DIC300 EK01YIC300 — 01Y In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK01YIC300 EK02CIC300 — 02C In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02CIC300 EK02EIC300 — 02E In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02EIC300 EK02FIC300 — 02F In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02FIC300 EK02GIC300 — 02G In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02GIC300 EK02HIC300 — 02H In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02HIC300 EK02JIC300 — 02J In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02JIC300 EK02KIC300 — 02K In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02KIC300 EK02LIC300 — 02L In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02LIC300 EK02MIC300 — 02M In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02MIC300 EK02NIC300 — 02N In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02NIC300 EK02QIC300 — 02Q In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK02QIC300 EK03AIC300 — 03A In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK03AIC300 EK03BIC300 — 03B In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK03BIC300 EK03DIC300 — 03D In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK03DIC300 EK03EIC300 — 03E In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK03EIC300 EK03FIC300 — 03F In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK03FIC300 EK03YIC300 — 03Y In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK03YIC300 EK05AIC300 — 05A In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK05AIC300 EK05BIC300 — 05B In Line Instrument Approved Vendor Data | 01-Jan-26 → 27-Dec-26 | In Progress 31% | float — EK05BIC300 EM02ECV122 — 02E Update Model Struct Steel & Issue Dwgs - IFC | 02-Jan-26 → 27-Dec-26 | In Progress 31% | float — EM02ECV122 EM02ECV164 — 02E Update Model Major Eq. Fdns & Issue Dwgs-IFC | 02-Jan-26 → 27-Dec-26 | In Progress 31% | float — EM02ECV164 EM05ACV160 — 05A Design & Model Major Eq. Fdns | 03-Jan-26 → 27-Dec-26 | In Progress 31% | float — EM05ACV160 PK000MC31K — MC310 - Fabricate/PO Promise 101-C & 102-C (Heavy Lift) | 03-Jan-26 → 30-Jun-27 | In Progress 20% | float 8.0d PK000MC31K PK000MJ33K — MJ303 - Fabricate/PO Promise CW PUMPS | 03-Jan-26 → 28-Feb-27 | In Progress 26% | float 27.0d PK000MJ33K PK01DMJV03 — 01D MJ303 2202-JA/JB/JC - E&I Prod. V. Data | 04-Jan-26 → 27-Dec-26 | In Progress 31% | float — PK01DMJV03 ZZ1790 — 02H MC310 101,102-C - Piping Prod. V. Data | 04-Jan-26 → 27-Dec-26 | In Progress 31% | float — ZZ1790 ZZ1800 — 02H MC310 101,102-C - Civil Prod. V. Data | 04-Jan-26 → 27-Dec-26 | In Progress 31% | float — ZZ1800 ZZ1810 — 02H MC310 101,102-C - E&I Prod. V. Data | 04-Jan-26 → 27-Dec-26 | In Progress 31% | float — ZZ1810 PO000MF010 — Field Erected Tanks Subcontract - Purchasing & Fabrication | 04-Jan-26 → 27-Dec-26 | In Progress 31% | float — PO000MF010 PK000MB64K — MB640 - Fabricate/PO Promise 101-B Springs & Hangers | 06-Jan-26 → 27-Dec-26 | In Progress 30% | float — PK000MB64K PK000MB71K — MB710 - Fabricate/PO Promise 2202-B/BL Storage Flare & Flame FRT Gen. | 06-Jan-26 → 27-Dec-26 | In Progress 30% | float — PK000MB71K PK02HMB38 — 02H MB622 101-B - Piping Prod. V. Data | 06-Jan-26 → 27-Dec-26 | In Progress 30% | float — PK02HMB38 PK02HMB39 — 02H MB622 101-B - Civil Prod. V. Data | 06-Jan-26 → 27-Dec-26 | In Progress 30% | float — PK02HMB39 PK02HMB40 — 02H MB622 101-B - E&I Prod. V. Data | 06-Jan-26 → 27-Dec-26 | In Progress 30% | float — PK02HMB40 PK000MB65K — MB622 - Fab/PO Promise 101-B Penthouse Circ Fans | 07-Jan-26 → 27-Dec-26 | In Progress 30% | float — PK000MB65K EM03FCV160 — 03F Design & Model Major Eq. Fdns | 07-Jan-26 → 27-Dec-26 | In Progress 30% | float — EM03FCV160 EK020ELEC2 — Short Circuit, Load Flow Motor starting | 10-Jan-26 → 27-Dec-26 | In Progress 30% | float — EK020ELEC2 EM000MCG10 — GEN and ADMINISTRATIVE | 13-Jan-26 → 27-Dec-26 | In Progress 29% | float — EM000MCG10 PK000MU31K — MU310 - Fabricate/PO Promise Injection System & Chlorination Unit | 14-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK000MU31K PK01DMUV01 — 01D MU310 2202-L,2203-L,2203-L,2205-L,2208-L,2212-L-Piping Prod. V. Data | 14-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK01DMUV01 PK01DMUV03 — 01D MU310 2202-L,2203-L,2203-L,2205-L,2208-L,2212-L- E&I Prod. V. Data | 14-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK01DMUV03 PK02LMLV07 — 02L MU310 109-L - Piping Prod. V. Data | 14-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK02LMLV07 PK02FMUV01 — 02F MU310 106-L,108-L - Piping Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK02FMUV01 PK02FMUV02 — 02F MU310 106-L,107-L,108-L - Civil Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK02FMUV02 PK02FMUV03 — 02F MU310 106-L,107-L,108-L - E&I Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK02FMUV03 PK02LMLV08 — 02L MU310 109-L - Civil Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK02LMLV08 PK02LMLV09 — 02L MU310 109-L - E&I Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK02LMLV09 PK03FMUV07 — 03F MU310 2001-L - Piping Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK03FMUV07 PK03FMUV08 — 03F MU310 2001-L - Civil Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK03FMUV08 PK03FMUV09 — 03F MU310 2001-L - E&I Prod. V. Data | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — PK03FMUV09 EK000IC353 — DCS - Software Programming by KBR | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — EK000IC353 EM02JPI134 — 02J Detail Model Development | 15-Jan-26 → 27-Dec-26 | In Progress 29% | float — EM02JPI134 EM02QPI134 — 02Q Detail Model Development | 16-Jan-26 → 27-Dec-26 | In Progress 28% | float — EM02QPI134 PK01CMUV01 — 01C MU300 2102-U - Piping Prod. V. Data | 16-Jan-26 → 27-Dec-26 | In Progress 28% | float — PK01CMUV01 PK01CMUV02 — 01C MU300 2102-U - Civil Prod. V. Data | 16-Jan-26 → 27-Dec-26 | In Progress 28% | float — PK01CMUV02 PK01CMUV03 — 01C MU300 2102-U - E&I Prod. V. Data | 16-Jan-26 → 27-Dec-26 | In Progress 28% | float — PK01CMUV03 EK020IC213 — 020 Control Valves - Purchase ERW | 17-Jan-26 → 27-Dec-26 | In Progress 28% | float — EK020IC213 PK000MJ37U — MJ307 - Fabricate/PO Promise ISBL ANSI/API PUMPS | 20-Jan-26 → 20-Jan-27 | In Progress 26% | float 192.0d PK000MJ37U PK05AMJV04 — 05A MJ307 2100-JA/JB - Piping Prod. V. Data | 20-Jan-26 → 27-Dec-26 | In Progress 28% | float — PK05AMJV04 PK05AMJV05 — 05A MJ307 2100-JA/JB - Civil Prod. V. Data | 20-Jan-26 → 27-Dec-26 | In Progress 28% | float — PK05AMJV05 PK05AMJV06 — 05A MJ307 2100-JA/JB - E&I Prod. V. Data | 20-Jan-26 → 27-Dec-26 | In Progress 28% | float — PK05AMJV06 PK000MB66K — MB660 - Fabricate/PO Promise 101-B Dampers & Air Doors | 24-Jan-26 → 27-Dec-26 | In Progress 27% | float — PK000MB66K EK010I1241 — Rotameters - Purchase ERW | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EK010I1241 EK050PI014 — Plot Plan - Dock/Storage Issue IFC | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EK050PI014 EM01API200 — 01A Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM01API200 EM01CPI200 — 01C Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM01CPI200 EM02GPI200 — 02G Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM02GPI200 EM02YPI134 — 02Y Detail Model Development | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM02YPI134 EM03API200 — 03A Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM03API200 EM03BPI200 — 03B Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM03BPI200 EM03EPI200 — 03E Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM03EPI200 EM05API200 — 05A Equipment Location Plans | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM05API200 PK01BMF02 — 01B MF302 2001-FA/FB Water Tank - Prod. V. Data (Subcontract) | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK01BMF02 PK01BMF03 — 01B MF302 2001-FA/FB Water Tank - Piping Prod. V. Data (Subcontract) | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK01BMF03 PK01BMF04 — 01B MF302 2001-FA/FB Water Tank - Civil Prod. V. Data (Subcontract) | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK01BMF04 PK01BMF05 — 01B MF302 2001-FA/FB Water Tank - E&I Prod. V. Data (Subcontract) | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK01BMF05 PK02AMJV01 — 02A MJ340 130-J/JA,131-J/JA - Piping Prod. V. Data | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK02AMJV01 PK02AMJV02 — 02A MJ340 130-J/JA,131-J/JA - Civil Prod. V. Data | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK02AMJV02 PK02AMJV03 — 02A MJ340 130-J/JA,131-J/JA - E&I Prod. V. Data | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK02AMJV03 PK03DMF01 — 03D MF302 2002-F Demineralized Water Tank - Prod. V. Data (Subcontract) | 28-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK03DMF01 EM02EPI134 — 02E Detail Model Development | 29-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM02EPI134 EM02MPI134 — 02M Detail Model Development | 29-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM02MPI134 EM02ACV164 — 02A Update Model Major Eq. Fdns & Issue Dwgs-IFC | 29-Jan-26 → 27-Dec-26 | In Progress 26% | float — EM02ACV164 PK000I1220 — Coriolis Meters - Fabricate/Exworks | 29-Jan-26 → 27-Dec-26 | In Progress 26% | float — PK000I1220 XE000OW301 — 05B SPDC TO Provide Required Eng. Data | 29-Jan-26 → 27-Dec-26 | In Progress 26% | float — XE000OW301 PK000MB42S — MB420 - Marshaling 101-B Cast Peep Sites | 30-Jan-26 → 27-Dec-26 | In Progress 25% | float — PK000MB42S PK03AMLV01 — 03A ML500 2003-L - Piping Prod. V. Data | 31-Jan-26 → 27-Dec-26 | In Progress 25% | float — PK03AMLV01 PK03AMLV02 — 03A ML500 2003-L - Civil Prod. V. Data | 31-Jan-26 → 27-Dec-26 | In Progress 25% | float — PK03AMLV02 PK03AMLV03 — 03A ML500 2003-L - E&I Prod. V. Data | 31-Jan-26 → 27-Dec-26 | In Progress 25% | float — PK03AMLV03 PK000I221H — 000 Everest Control Valves - Fabricate/Exworks | 03-Feb-26 → 30-Dec-26 | In Progress 24% | float 504.0d PK000I221H PK000MD110 — MD305 Merc. Removal Bed - Fabricate/PO Promise | 03-Feb-26 → 28-Feb-27 | In Progress 21% | float 157.0d PK000MD110 PK02MMD12 — 02M MD305 102-D Mercury Guard - Prod. V. Data | 03-Feb-26 → 27-Dec-26 | In Progress 24% | float — PK02MMD12 PK000ML50K — ML500 - Fabricate/PO Promise 2003-L PAI/IA | 04-Feb-26 → 10-Feb-27 | In Progress 21% | float 78.0d PK000ML50K PK000MJ36K — MJ305 - Fabricate/PO Promise OSBL PUMPS | 04-Feb-26 → 10-Jan-27 | In Progress 23% | float 60.0d PK000MJ36K EM02LPI134 — 02L Detail Model Development | 06-Feb-26 → 27-Dec-26 | In Progress 24% | float — EM02LPI134 PK000I352H — SIS - Fabricate Hardware | 10-Feb-26 → 27-Dec-26 | In Progress 23% | float — PK000I352H EK02EIC120 — 02E Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02EIC120 EK02HIC120 — 02H Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02HIC120 EK02JIC120 — 02J Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02JIC120 EK02KIC120 — 02K Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02KIC120 EK02LIC120 — 02L Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02LIC120 EK02MIC120 — 02M Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02MIC120 EK02QIC120 — 02Q Instrument Detail Model / Review | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EK02QIC120 EM01CCV160 — 01C Design & Model Major Eq. Fdns (Excluding EDR) | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — EM01CCV160 PK02KMF04 — 02K MF301 114-F Benfield Solution Storage Tank - Fdn. V. Data (Subcontract) | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — PK02KMF04 PK02KMF05 — 02K MF301 114-F Benfield Solution Storage Tank - Prod. V. Data (Subcontract) | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — PK02KMF05 PK05AMF05 — 05A MF311 2101/2102-F Ammonia Storage Tanks - Foundation V. Data (Subcontract) | 11-Feb-26 → 27-Dec-26 | In Progress 23% | float — PK05AMF05 PK000I1100 — 020 Orific Plates - Fabricate/Exworks | 13-Feb-26 → 27-Dec-26 | In Progress 22% | float — PK000I1100 PK000MU11K — 05B MU311 - Fabricate/PO Promise HYDROCHLORIC ACID STORAGE | 13-Feb-26 → 27-Dec-26 | In Progress 22% | float — PK000MU11K EM02UPICWG — 02U U/G Plan Dwgs Issue IFC | 14-Feb-26 → 27-Dec-26 | In Progress 22% | float — EM02UPICWG EK000E001D — Sub Stations - Tech Evaluation | 19-Feb-26 → 27-Dec-26 | In Progress 21% | float — EK000E001D PK000PS00E — 000 SP Items - Final Negotiation / Interim Award | 19-Feb-26 → 27-Dec-26 | In Progress 21% | float — PK000PS00E EM02CPI134 — 02C Detail Model Development | 20-Feb-26 → 27-Dec-26 | In Progress 20% | float — EM02CPI134 EM01BCV226 — 01B Issue Fdn IFC- 2001-FA/FB (Water Storage Tanks) | 24-Feb-26 → 27-Dec-26 | In Progress 19% | float — EM01BCV226 EK000CS027 — Turnover System Definition for OSBL | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — EK000CS027 EK000I444F — Planning V. Data - Shelters/ Analyzers | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — EK000I444F EM03ECV110 — 03E Design & Model Containment Area | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — EM03ECV110 PK000I352J — SIS - Planning V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK000I352J PK000I354J — ITCC - Planning V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK000I354J PK02GMLV02 — 02G ML425 101-L - Civil Prod. V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK02GMLV02 PK02GMLV03 — 02G ML425 101-L - E&I Prod. V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK02GMLV03 PK05AMLV04 — 05A ML501 2103-L - Piping Prod. V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK05AMLV04 PK05AMLV05 — 05A ML501 2103-L - Civil Prod. V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK05AMLV05 PK05AMLV06 — 05A ML501 2103-L - E&I Prod. V. Data | 25-Feb-26 → 27-Dec-26 | In Progress 19% | float — PK05AMLV06 EM20ELEK2 — 02 Develop & Issue Cable Ladder Plans - IFC | 03-Mar-26 → 27-Dec-26 | In Progress 17% | float — EM20ELEK2 PK000MB68K — MB692 - Fabricate/PO Promise 101-B Cat Vacuum Equip. | 03-Mar-26 → 27-Dec-26 | In Progress 17% | float — PK000MB68K EK020I131A — Develop / Issue Purchase ERW -Transmitter ISBL | 04-Mar-26 → 27-Dec-26 | In Progress 17% | float — EK020I131A EK030I131A — Develop / Issue Purchase ERW -Transmitter OSBL | 04-Mar-26 → 27-Dec-26 | In Progress 17% | float — EK030I131A EM02FPI134 — 02F Detail Model Development | 04-Mar-26 → 27-Dec-26 | In Progress 17% | float — EM02FPI134 EK000E002D — Transformer - Tech Evaluation | 04-Mar-26 → 27-Dec-26 | In Progress 17% | float — EK000E002D PK000E002E — Transformer - Eval Bids/Issue Recmd | 04-Mar-26 → 27-Dec-26 | In Progress 17% | float — PK000E002E PK000MB21F — Marshaling of Equip. 101-B Siding for MB212 | 04-Mar-26 → 27-Dec-26 | In Progress 17% | float — PK000MB21F EM02HPI134 — 02H Detail Model Development | 07-Mar-26 → 27-Dec-26 | In Progress 16% | float — EM02HPI134 EK000I221F — 000 Everest Control Valves - Purchase ERW | 11-Mar-26 → 27-Dec-26 | In Progress 15% | float — EK000I221F EK010I1211 — Vortex Meters - Purchase ERW | 11-Mar-26 → 27-Dec-26 | In Progress 15% | float — EK010I1211 EK02CIC120 — 02C Instrument Detail Model / Review | 11-Mar-26 → 27-Dec-26 | In Progress 15% | float — EK02CIC120 EM02YCV122 — 02Y Update Model Struct Steel & Issue Dwgs - IFC | 11-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02YCV122 PK000ML43S — ML430 - Marshaling 110-L BENFIELD MIXER | 11-Mar-26 → 27-Dec-26 | In Progress 15% | float — PK000ML43S EM02DMD229 — 02D Vessel Steel Release IFC (MD403, MD404, 106/7/9-F) | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02DMD229 EM02EMD229 — 02E Vessel Steel Release IFC | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02EMD229 EM02HMD229 — 02H Vessel Steel Release IFC (MD301, MD405, MD501) | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02HMD229 EM02JMD229 — 02J Vessel Steel Release IFC (MD302,MD304) | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02JMD229 EM02LMD229 — 02L Vessel Steel Release IFC (MD201, MD402, MD404, MD406) | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02LMD229 EM02MMD229 — 02M Vessel Steel Release IFC (MD303, MD402) | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02MMD229 EM02QMD229 — 02Q Vessel Steel Release IFC (MD401) | 12-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02QMD229 EK000I617A — Develop / Issue Purchase ERW - Magnetic Lvl Gauges | 13-Mar-26 → 27-Dec-26 | In Progress 15% | float — EK000I617A EM02AMD229 — 02A Vessel Steel Release IFC | 13-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02AMD229 EM02KMD229 — 02K Vessel Steel Release IFC (MD202, MD405) | 13-Mar-26 → 27-Dec-26 | In Progress 15% | float — EM02KMD229 PK05BMU06 — 05B MU311 2109-LA/LB, 2110-L - Piping Prod. V. Data | 14-Mar-26 → 27-Dec-26 | In Progress 14% | float — PK05BMU06 PK05BMU07 — 05B MU311 2109-LA/LB, 2110-L - Civil Prod. V. Data | 14-Mar-26 → 27-Dec-26 | In Progress 14% | float — PK05BMU07 PK000MJ39P — Issue Formal P.O. for MJ391/MJ392 | 17-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK000MJ39P EK050PI006 — Site Data Needed - Loading Area (SPDC) | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — EK050PI006 PK000MJ39K — Fabricate/Exworks FIREWATER PUMPS | 18-Mar-26 → 10-Jan-27 | In Progress 12% | float 60.0d PK000MJ39K PK01BMJV04 — 01B MJ391 2204-J/JA - Piping Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK01BMJV04 PK01BMJV05 — 01B MJ391 2204-J/JA - Civil Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK01BMJV05 PK01BMJV06 — 01B MJ391 2204-J/JA - E&I Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK01BMJV06 PK02EMD03 — 02E MD304 109-DA Molecular Sieve Dryer - Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK02EMD03 PK02EMD04 — 02E MD304 109-DB Molecular Sieve Dryer - Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK02EMD04 PK05AMJV07 — 05A MJ392 2105-JA/JB - Piping Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK05AMJV07 PK05AMJV08 — 05A MJ392 2105-JA/JB - Civil Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK05AMJV08 PK05AMJV09 — 05A MJ392 2105-JA/JB - E&I Prod. V. Data | 18-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK05AMJV09 PK000MU25J — 02G MU225 Final Negotiate/Interim Award | 19-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK000MU25J PK000MU29K — MU292 - Fabricate/PO Promise 2404-L | 19-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK000MU29K PK03BMUV04 — 03B MU292 2404-L - Piping Prod. V. Data | 19-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK03BMUV04 PK03BMUV05 — 03B MU292 2404-L - Civil Prod. V. Data | 19-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK03BMUV05 PK03BMUV06 — 03B MU292 2404-L - E&I Prod. V. Data | 19-Mar-26 → 27-Dec-26 | In Progress 13% | float — PK03BMUV06 EM01YPI138 — 01Y Design / Issue Pipe Supports IFC | 20-Mar-26 → 27-Dec-26 | In Progress 12% | float — EM01YPI138 EM02LCV164 — 02L Update Model Major Eq. Fdns & Issue Dwgs-IFC | 20-Mar-26 → 27-Dec-26 | In Progress 12% | float — EM02LCV164 EM02MCV164 — 02M Update Model Major Eq. Fdns & Issue Dwgs-IFC | 20-Mar-26 → 27-Dec-26 | In Progress 12% | float — EM02MCV164 CO02HC0140 — 02H Form Pour Strip Fnds - Structure | 21-Mar-26 → 27-Dec-26 | In Progress 12% | float — CO02HC0140 EM03CPI138 — 03C Design / Issue Pipe Supports IFC | 21-Mar-26 → 27-Dec-26 | In Progress 12% | float — EM03CPI138 WO020C0100 — 020 Concrete & Excavation | 21-Mar-26 → 23-Mar-27 | In Progress 9% | float 215.0d WO020C0100 EK000I616A — Develop / Issue Purchase ERW - Steam Drum Lvl Gauges - ISBL | 22-Mar-26 → 27-Dec-26 | In Progress 12% | float — EK000I616A EK030I616A — Develop / Issue Purchase ERW - Steam Drum Lvl Gauges - OSBL | 22-Mar-26 → 27-Dec-26 | In Progress 12% | float — EK030I616A EM02API134 — 02A Detail Model Development | 22-Mar-26 → 27-Dec-26 | In Progress 12% | float — EM02API134 CK01UU4150 — 01U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 164.0d CK01UU4150 CK02UU4150 — 02U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 164.0d CK02UU4150 CK03UU4150 — 03U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 164.0d CK03UU4150 CK05UU4150 — 05U U/G Pipe Spool Fabrication & Delivery (FW) HDPE | 24-Mar-26 → 16-Jan-27 | In Progress 10% | float 318.0d CK05UU4150 CO000CK110 — Set-Up KBR Pipe Fab Shop | 24-Mar-26 → 27-Dec-26 | In Progress 11% | float — CO000CK110 XE000OW300 — 04A SPDC TO Provide Required Eng. Data | 24-Mar-26 → 27-Dec-26 | In Progress 11% | float — XE000OW300 EM02YCV133 — 02Y Update Model Structural Fdns & Issue Dwgs - IFC | 25-Mar-26 → 27-Dec-26 | In Progress 11% | float — EM02YCV133 EM03CMD229 — 03C Vessel Steel Release IFC (MD411 2203-F, 2204-F) | 26-Mar-26 → 27-Dec-26 | In Progress 11% | float — EM03CMD229 EM03FMD229 — 03F Vessel Steel Release IFC (MD411, 2006-F) | 26-Mar-26 → 27-Dec-26 | In Progress 11% | float — EM03FMD229 PK020IC210 — 020 Control Valves - Fabricate/Exworks | 27-Mar-26 → 27-Dec-26 | In Progress 10% | float — PK020IC210 WO010C0100 — 010 Concrete & Excavation | 27-Mar-26 → 04-May-27 | In Progress 7% | float 149.0d WO010C0100 PK010IC210 — 010 Control Valves - Fabricate/Exworks | 28-Mar-26 → 27-Dec-26 | In Progress 10% | float — PK010IC210 PK030IC210 — 030 Control Valves - Fabricate/Exworks | 28-Mar-26 → 27-Dec-26 | In Progress 10% | float — PK030IC210 CO02JC0150 — 02J Form, Pour, Strip Fnd - 104-D2 (Low Temp Shift Converter) | 30-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0150 CO02JC0160 — 02J Form, Pour, Strip Fnd - 104-D1 (High Temp Shift Converter) | 30-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0160 CO01DC0150 — 01D Form, Pour, Strip Fnd - 2101-U (Cooling Tower) | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO01DC0150 EK020FP460 — FP Electrical Area Classification OSBL - IFC | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — EK020FP460 EM000ELEH2 — 01,03,05 Develop & Issue Earthing / Grounding Dwgs - IFC | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — EM000ELEH2 EM02HCV164 — 02H Update Model Major Eq. Fdns & Issue Dwgs-IFC | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — EM02HCV164 PK01DMUV07 — 01D MU322 2210-L,2211-L - Piping Prod. V. Data | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — PK01DMUV07 PK01DMUV09 — 01D MU322 2210-L,2211-L - E&I Prod. V. Data | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — PK01DMUV09 CO02JC0110 — 02J Form, Pour, Strip Fnds - Major Fnds Gen'l | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0110 EK000I1122 — 020 Venturis - Purchase ERW | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EK000I1122 EK000I623A — Develop / Issue Purchase ERW -Multi-Point Thermocouples - ISBL | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EK000I623A EK000MU25E — 02G MU225 Prepare & Issue Purchase ERW | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EK000MU25E EK010I1151 — Annubars - Purchase ERW | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EK010I1151 EK02AIC120 — 02A Instrument Detail Model / Review | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EK02AIC120 EK030I623A — Develop / Issue Purchase ERW -Multi-Point Thermocouples - OSBL | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EK030I623A EM010IC123 — UNIT 01 Instr. Location Plans - IFC | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EM010IC123 EM01BMD229 — 01B Vessel Steel Release IFC | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EM01BMD229 EM020IC124 — UNIT 02 Instr. Location Plans - IFC | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EM020IC124 EM020IC128 — Instrument Wiring Diagrams - IFC | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EM020IC128 EM030IC125 — UNIT 03 Instr. Location Plans - IFC | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — EM030IC125 EM050IC130 — 05B Instr. Location Plans - IFC | 01-Apr-26 → 16-Jan-27 | In Progress 8% | float 166.0d EM050IC130 PK000ML42S — ML420 - Marshaling CARTRIDGE FILTERS | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK000ML42S PK02HMB50 — 02H MB692 101-BL2 - Piping Prod. V. Data | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK02HMB50 PK02HMB51 — 02H MB692 101-BL2 - Civil Prod. V. Data | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK02HMB51 PK02HMB52 — 02H MB692 101-BL2 - E&I Prod. V. Data | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK02HMB52 PK05AMB46 — 05A MB710 2202-B/BL - Piping Prod. V. Data | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK05AMB46 PK05AMB47 — 05A MB710 2202-B/BL - Civil Prod. V. Data | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK05AMB47 PK05AMB48 — 05A MB710 2202-B/BL - E&I Prod. V. Data | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK05AMB48 PK000PIA1H — Bulk Piping A/G & U/G - Transport / Delivery (First CS,SS,U/G) | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — PK000PIA1H PK000MB61L — Marshaling of 101-B Burners MB610 | 02-Apr-26 → 27-Dec-26 | In Progress 8% | float — PK000MB61L PK000MU32K — 01D MU322 - Fabricate/PO Promise COOLING WTR FILTER & CLARIFIER | 02-Apr-26 → 27-Dec-26 | In Progress 8% | float — PK000MU32K PK000ML90K — ML900 - Fabricate/PO Promise Evap. Pond Spray Nzl. | 02-Apr-26 → 27-Dec-26 | In Progress 8% | float — PK000ML90K PK01AMLV01 — 01A ML900 2408-LA,LB,LC,LD - Piping Prod. V. Data | 02-Apr-26 → 27-Dec-26 | In Progress 8% | float — PK01AMLV01 PK01AMLV02 — 01A ML900 2408-LA,LB,LC,LD - Civil Prod. V. Data | 02-Apr-26 → 27-Dec-26 | In Progress 8% | float — PK01AMLV02 PK01AMLV03 — 01A ML900 2408-LA,LB,LC,LD - E&I Prod. V. Data | 02-Apr-26 → 27-Dec-26 | In Progress 8% | float — PK01AMLV03 CO01GA0115 — 01G Erect Control Building (Columns & Parapet Only) | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO01GA0115 CO02LC0150 — 02L Form, Pour, Strip Fnd - 101-E (CO2 Absorber) | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02LC0150 CO02MC0110 — 02M Form, Pour, Strip Fnds - Major Fnds Gen'l | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02MC0110 CO02MC0140 — 02M Form Pour Strip Fnds - Structure | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02MC0140 EK010E008D — 540-SB Admin. Area Pwr Supply - Tech Evaluation | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — EK010E008D EM01YCV122 — 01Y Update Model S/S Piperack & Issue Dwgs - IFC | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — EM01YCV122 CO02KC0150 — 02K Form, Pour, Strip Fnd - 114-F (Benfield Solution Tank) | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO02KC0150 EK020EL160 — Switchgear One line Diagrams - IFD | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — EK020EL160 EK020EL180 — MCC One line Diagrams - IFD | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — EK020EL180 EK05BEL160 — Switchgear One line Diagrams - IFD | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — EK05BEL160 EK05BEL180 — MCC One line Diagrams - IFD | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — EK05BEL180 EM01UPICWG — 01U U/G Plan Dwgs Issue IFC | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — EM01UPICWG CO03DC0110 — 03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank) | 06-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO03DC0110 WO030C0100 — 030 Concrete & Excavation | 06-Apr-26 → 19-Mar-27 | In Progress 5% | float 229.0d WO030C0100 PK000E00C — UPS System - Receive Bids | 07-Apr-26 → 27-Dec-26 | In Progress 6% | float — PK000E00C EK000I621A — Develop / Issue Purchase ERW - Temperature Elements - ISBL | 08-Apr-26 → 27-Dec-26 | In Progress 6% | float — EK000I621A EK030I621A — Develop / Issue Purchase ERW - Temperature Elements - OSBL | 08-Apr-26 → 27-Dec-26 | In Progress 6% | float — EK030I621A CO02BC0110 — 02B Form, Pour, Strip Fnds - Major Fnds | 09-Apr-26 → 27-Dec-26 | In Progress 6% | float — CO02BC0110 PK000MC61F — MC610 - Marshaling DBL PIPE EXCH 161-C | 10-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MC61F EM03CCV126 — 03C Conceptual Misc. Steel Design/ Model | 11-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03CCV126 EM02CCV128 — 02C Update Model Structural Fdns & Issue Dwgs - IFC | 11-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02CCV128 EM02ECV128 — 02E Update Model Structural Fdns & Issue Dwgs - IFC | 14-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02ECV128 CO010K0120 — 010 Construct Perimeter Roads | 15-Apr-26 → 28-Dec-26 | In Progress 5% | float — CO010K0120 CO02AC0110 — 02A Form, Pour, Strip Fnds - Major Fnds | 15-Apr-26 → 09-Mar-27 | In Progress 5% | float 189.0d CO02AC0110 EM02DCV126 — 02D Conceptual Misc. Steel Design/ Model | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02DCV126 EM02DCV164 — 02D Update Model Major Eq. Fdns & Issue Dwgs-IFC | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02DCV164 EM02UPI200 — 02U Issue U/G Material Final Release | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02UPI200 EM05UPI191 — 05U U/G Plan Dwgs IFC | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM05UPI191 PK000I444D — Vendor Update Pricing - Shelters/ Analyzers | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000I444D PK000MB83S — MB630 - Marshaling 101-B Air Preheater | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MB83S EM02DCV166 — 02D Conceptual Misc. Foundations Design/ Model | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02DCV166 PK000MU61S — MU611 - Marshaling 2101-U, 2101-UJA Thru UJG CW TWR & Fans | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MU61S PK000MU61U — MU611 - Marshaling 2101-UJA Thru UJGM CW Motors | 15-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MU61U PK000I3521 — SIS - Vendor Provides Software & Workstations | 16-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000I3521 PK010I1210 — Vortex Meters - Fabricate/Exworks | 16-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK010I1210 EM02DCV128 — 02D Update Model Structural Fdns & Issue Dwgs - IFC | 16-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02DCV128 EM02NPI143 — 02N OP's & Service Model Review Comment Resolution | 16-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02NPI143 EM03CCV166 — 03C Conceptual Misc. Foundations Design/ Model | 16-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03CCV166 EM03YCV120 — 03Y Design & Model Major Structural Steel | 17-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03YCV120 EM01UPI200 — 01U Issue U/G Material Final Release 90% | 17-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM01UPI200 EK000I3523 — SIS - Software Programming by KBR | 18-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK000I3523 EM020ELEK2 — 02 Develop & Issue Power Plans - IFC | 18-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM020ELEK2 EK000I611A — Develop / Issue Purchase ERW - Pressure Gauges - ISBL | 19-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK000I611A CO01BC0160 — 01B Form, Pour, Strip Fnd - 2001-FB (Water Storage Tank) | 20-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO01BC0160 CO02HC0150 — 02H Form, Pour, Strip Fnd - 103-D (Secondary Reformer) | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO02HC0150 CO03CC0110 — 03C Form, Pour, Strip Fnds - Major Fnds | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO03CC0110 EM02GPI021 — 02G Model Review Comment Resolution | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02GPI021 EM03UPI200 — 03U Issue U/G Material Final Release (90%) | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03UPI200 EM05BEL120 — 05B Electrical Conceptual Layouts | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM05BEL120 EK02FIC120 — 02F Instrument Detail Model / Review | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK02FIC120 EK030I611A — Develop / Issue Purchase ERW - Pressure Gauges - OSBL | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK030I611A EK05ACV100 — 05A Soils Investigation - Golder Review & Report | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK05ACV100 EK05AIC120 — 05A Instrument Detail Model / Review | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK05AIC120 EM02JCV126 — 02J Misc. Steel Design/ Model | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02JCV126 EM03UPI190 — 03U U/G Plan Dwgs Issue IFC | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03UPI190 EM03UPIASG — 03U Iso Issue IFC - Other HDPE (AS & NA) | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03UPIASG EM03UPIOSG — 03U Iso Issue IFC - Metalic Piping (OS) | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03UPIOSG PK000I3520 — SIS - Vendor Update Pricing / Quote | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000I3520 PK010I1100 — 010 Orific Plates - Fabricate/Exworks | 22-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK010I1100 EK02GIC120 — 02G Instrument Detail Model / Review | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK02GIC120 EK000MJ38C — Prepare & Issue Purchase ERW - MJ308 | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — EK000MJ38C PK000MJ38M — Final Negotiate/Interim Award - MJ308 | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MJ38M PK000MJ38R — Issue Formal P.O. for MJ308 | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MJ38R PK000MJ38T — Recv. Planning V. Data MJ308 | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MJ38T PK000MJ38U — MJ308 - Fabricate/PO Promisse ISBL ANSI/API PUMPS | 23-Apr-26 → 10-Jan-27 | In Progress 5% | float 198.0d PK000MJ38U PK01AMJV01 — 01A MJ308 2408-JA/JB - Piping Prod. V. Data | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK01AMJV01 PK01AMJV02 — 01A MJ308 2408-JA/JB - Civil Prod. V. Data | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK01AMJV02 PK01AMJV03 — 01A MJ308 2408-JA/JB - E&I Prod. V. Data | 23-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK01AMJV03 EM03CPI141 — 03C Detail OP's & Services Model Review Mtg | 24-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM03CPI141 EM02DPI141 — 02D Detail OP's & Services Model Review Mtg | 24-Apr-26 → 27-Dec-26 | In Progress 5% | float — EM02DPI141 PK000MU35S — MU350 - Marshaling 101-U DEAERATOR | 24-Apr-26 → 27-Dec-26 | In Progress 5% | float — PK000MU35S WK000U4100 — 000 U/G Pipe Spool Fabrication | 10-Aug-26 → 07-Dec-26 | Not Started 0% | float — WK000U4100 CO000M0110 — Mobilize Field Fab Tank Contractor | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01BC0110 — 01B Form, Pour, Strip Fnds - Major Fnds Gen'l | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01BC0150 — 01B Form, Pour, Strip Fnd - 2001-FA (Water Storage Tank) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01DC0140 — 01D Form Pour Strip Fnds - Sleepers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01YC0140 — 01Y Form Pour Strip Fnds - Pipe Rack | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02CC0160 — 02C Form, Pour, Strip Fnd - 103-JTC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02CM0140 — 02C Set - 103-JTC Surface Condenser | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02EC0110 — 02E Form, Pour, Strip Fnds - Major Fnds Gen'l | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02EC0140 — 02E Form Pour Strip Fnds - Structure | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02GC0160 — 02G Form, Pour, Strip Fnd - 102-J Fd Gas Compr. & Aux. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HC0110 — 02H Form, Pour, Strip Fnds - 101B (Primary Reformer) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HC0160 — 02H Form, Pour, Strip Fnd - 156-F (Steam Blowdown Drum) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HM0140 — 02H Set - 156-F Steam Blowdown Drum | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02LC0160 — 02L Form, Pour, Strip Fnd - 102-E (CO2 Stripper) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02MC0150 — 02M Form, Pour, Strip Fnd - 105-D (Ammonia Synthesis Converter) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02NC0110 — 02N Form, Pour, Strip Fnds - Major Fnds | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02YC0140 — 02Y Form Pour Strip Fnds - Pipe Rack | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03CM0110 — 03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03DC0150 — 03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03FC0110 — 03F Form, Pour, Strip Fnds - Package Boiler | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO05AC0170 — 05A Install Test Piles | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO05AMF200 — 05A Final Tank Design Loads Submitted by DSD | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000CV146 — Receive Site Survey Data Areas 04 & 05 | 27-Dec-26 | Not Started EK000E004D — UPS System - Tech Evaluation | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000ELEG0 — Electrical Heat Tracing - ERW Package | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000FP034 — FP ISBL Firewater P&IDs - Development & Issue IFD | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000FP060 — FP Overall Firewater P&IDs - Development & Issue IFD | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000FP065 — FP Overall Firewater P&IDs - Development & Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000GE030 — Production Check Estimate | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000I3522 — SIS - Final Tech Evaluation for Purchase | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000I352M — SIS - Review / Approve V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000I354M — ITCC - Review / Approve V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000I444E — Final Tech Evaluation - Shelters/ Analyzers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000I444G — Review / Approve V. Data - Shelters/ Analyzers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000I612A — Develop / Issue Purchase ERW - Differential Pressure Gauges | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000MF32D — 05A MF312 2105-F Water Tank - Fdn Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK000YA828 — (EP-30) Vendor Acceptance of Commitment for Electrical 20 MVA Transformers | 27-Dec-26 | Not Started EK000YA829 — (EP-31) Vendor Acceptance of Commitment for Substation | 27-Dec-26 | Not Started EK000YA832 — (EP-32) Issue OSBL (Units01/03) found./UG pipe work package | 27-Dec-26 | Not Started EK000YA833 — (EP-33) Issue > 90% ISBL Civil Foundations | 27-Dec-26 | Not Started EK000YA836 — (PC-07) Issue 101-B -Primary Reformer Erection Drawings | 27-Dec-26 | Not Started EK000YA839 — (EP-35) Issue >90% OSBL P&ID's For Construction (IFC) | 27-Dec-26 | Not Started EK000YA841 — (EP-29) Issue OSBL Plot Plan for Construction (IFC) | 27-Dec-26 | Not Started EK000YA848 — (EP-37) Issue >90% ISBL Instrument Location Plans/Wire Lists for Construction (IFC) | 27-Dec-26 | Not Started EK000YA858 — (EP-38) Deliver Syn Gas Compressor, 103-J, and Ammonia Refrig Compressor, 105-J, to site | 27-Dec-26 | Not Started EK000YA888 — (TLA-02) Second TLA Payment | 27-Dec-26 | Not Started EK010FP040 — FP Firewater Pump P&IDs - Development & Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01AIC120 — 01A Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01API144 — 01A OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01BIC120 — 01B Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01BPI144 — 01B OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01CIC120 — 01C Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01CPI143 — 01C OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01DIC120 — 01D Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01DPI144 — 01D OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01HIC120 — 01H Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01JIC120 — 01J Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01JPI050 — 01J Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01JPI143 — 01J Op's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK01YPI143 — 01Y OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020EL121 — Overall One line Diagrams - IFD | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020EL210 — Production Check Estimate - Electrical | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020ELEC3 — Protective Device Coordination | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020ELEG5 — Cathodic Protection - Design & Specs Package (By Consultant) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020ELEM1 — Cable & Raceway Schedule - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020ELG70 — Construction & Operation Interfac. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK020IC133 — Field Bus J-boxes Wiring Reports - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02API144 — 02A OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02CPI144 — 02C OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02DPI143 — 02D OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02EPI143 — 02E OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02FPI143 — 02F OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02GPI050 — 02G Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02HPI144 — 02H OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02JPI144 — 02J OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02KPI143 — 02K OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02LPI143 — 02L OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02MPI143 — 02M OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02NPI144 — 02N OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK02YPI144 — 02Y OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03AIC120 — 03A Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03API050 — 03A Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03API143 — 03A OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03BIC120 — 03B Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03BPI050 — 03B Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03BPI143 — 03B OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03CPI143 — 03C OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03DIC120 — 03D Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03DPI145 — 03D OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03EIC120 — 03E Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03EPI050 — 03E Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03EPI144 — 03E OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03FIC120 — 03F Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03FPI050 — 03F Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03FPI144 — 03F OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03YIC120 — 03Y Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03YPI050 — 03Y Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK03YPI144 — 03Y OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK04AIC120 — 04A Instrument Detail Model / Review | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK05ACV110 — 05A Update Model & Issue Fnd Dwgs-IFC (Ammonia Tanks) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK05AMD100 — 05A Review & Select Ammonia Tank Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK05API050 — 05A Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK05API144 — 05A OP's & Serv. Model Comments Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK05BPI035 — 05B Plot Plan | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK100ELEK2 — 01,03,04,05 Develop & Issue Cable Ladder Plans - IFC Except 01H & 05A | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK200ELEK2 — 01H Develop & Issue Cable Ladder Plans - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EK2QPI144 — 02Q OP's & Serv. Model Comment Resolution Approval | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM000ELEJ2 — 01,03,05 Develop & Issue Lighting Plans - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM000ELEK2 — 01,03,04,05 Develop & Issue Power Plans - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM000ELEL2 — 01,03,04,05 Electrical Routing Plans | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM000ELEM2 — Dev/Issue Elect Cable/Raceway Sched IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API132 — 01A Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API134 — 01A Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API135 — 01A A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API136 — 01A IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API138 — 01A Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API141 — 01A Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01API143 — 01A OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01ASY172 — 01A P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM01ASY272 — 01A P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM01BCV123 — 01B Update Model S/S Sleepers & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BCV126 — 01B Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BCV127 — 01B Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BCV133 — 01B Update Model S/S Sleeper Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BCV164 — 01B Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BCV166 — 01B Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BCV167 — 01B Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BPI134 — 01B Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BPI135 — 01B A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BPI136 — 01B IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BPI138 — 01B Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BPI141 — 01B Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BPI143 — 01B OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01BSY172 — 01B P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM01BSY272 — 01B P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM01CCV164 — 01C Update Model Major Eq. Fdns & Issue Dwgs-IFC (Excluding EDR) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CCV180 — 01C Design & Model Major Eq. Fdns (Including EDR) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CCV190 — 01C Update Model Major Eq. Fdns & Issue Dwgs-IFC (Including EDR) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI132 — 01C Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI134 — 01C Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI135 — 01C A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI136 — 01C IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI138 — 01C Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI141 — 01C Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CPI142 — 01C OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01CSY172 — 01C P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM01CSY272 — 01C P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM01DCV122 — 01D Update Model S/S Sleepers & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DCV126 — 01D Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DCV127 — 01D Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DCV133 — 01D Update Model S/S Sleeper Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DCV166 — 01D Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DCV167 — 01D Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DPI134 — 01D Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DPI135 — 01D A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DPI136 — 01D IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DPI138 — 01D Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DPI141 — 01D Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DPI143 — 01D OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01DSY172 — 01D P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM01DSY272 — 01D P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM01HCV125 — 01H Design & Model Substation Fdns | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV126 — 01H Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV127 — 01H Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV128 — 01H Update Model Substation Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV160 — 01H Design & Model Major Eq. Fdns | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV164 — 01H Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV166 — 01H Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01HCV167 — 01H Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JCV122 — 01J Update Model Metering Enclosure & Issue Dwgs (Concrete Wall) - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JCV133 — 01J Update Model Metering Enclosure Fdns & Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI130 — 01J Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI132 — 01J Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI133 — 01J IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI134 — 01J Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI135 — 01J A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI136 — 01J IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI138 — 01J Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI140 — 01J Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI141 — 01J Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JPI142 — 01J OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01JSY272 — 01J P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM01YCV133 — 01Y Update Model Piperack Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01YPI135 — 01Y A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01YPI136 — 01Y IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01YPI141 — 01Y Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01YPI142 — 01Y OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM01YSY272 — 01Y P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM020ELEJ2 — 02 Develop & Issue Lighting Plans - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC127 — Instrument Installation Details (10%) - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC129 — Instrument Loop Diagrams - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC132 — Traditional J-boxes Wiring Reports - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC134 — DCS Marshalling Report - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC135 — SIS Termination Report - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC136 — ITCC Termination Report - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM020IC137 — Miscellaneous Wiring Report - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ACV126 — 02A Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ACV127 — 02A Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ACV166 — 02A Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ACV167 — 02A Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02API135 — 02A A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02API136 — 02A IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02API138 — 02A Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02API142 — 02A Detail OP's & Service Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02API143 — 02A OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ASY172 — 02A P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02ASY272 — 02A P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02CCV122 — 02C Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CCV126 — 02C Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CCV127 — 02C Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CCV164 — 02C Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CCV166 — 02C Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CCV167 — 02C Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CPI135 — 02C A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CPI136 — 02C IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CPI138 — 02C Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CPI141 — 02C Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CPI143 — 02C OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02CSY172 — 02C P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02CSY272 — 02C P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02DCV122 — 02D Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DCV127 — 02D Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DCV167 — 02D Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DPI135 — 02D A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DPI136 — 02D IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DPI138 — 02D Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DPI142 — 02D OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02DSY272 — 02D P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02ECV126 — 02E Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ECV127 — 02E Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ECV166 — 02E Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ECV167 — 02E Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02EPI135 — 02E A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02EPI136 — 02E IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02EPI138 — 02E Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02EPI141 — 02E Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02EPI142 — 02E OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02ESY172 — 02E P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02ESY272 — 02E P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02FCV126 — 02F Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FCV127 — 02F Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FCV164 — 02F Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FCV166 — 02F Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FCV167 — 02F Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FPI135 — 02F A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FPI136 — 02F IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FPI138 — 02F Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FPI141 — 02F Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FPI142 — 02F OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02FSY172 — 02F P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02FSY272 — 02F P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02GCV164 — 02G Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02GPI132 — 02G Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02GPI133 — 02G IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02GPI134 — 02G Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02GPI141 — 02G Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02GSY172 — 02G P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02HCV122 — 02H Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HCV126 — 02H Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HCV127 — 02H Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HCV128 — 02H Update Model Structural Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HCV166 — 02H Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HCV167 — 02H Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HPI135 — 02H A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HPI136 — 02H IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HPI138 — 02H Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HPI141 — 02H Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HPI143 — 02H OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02HSY172 — 02H P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02HSY272 — 02H P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02JCV122 — 02J Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JCV127 — 02J Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JCV166 — 02J Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JCV167 — 02J Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JPI135 — 02J A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JPI136 — 02J IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JPI138 — 02J Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JPI141 — 02J Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JPI143 — 02J OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02JSY172 — 02J P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02JSY272 — 02J P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02KCV126 — 02K Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KCV164 — 02K Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KCV166 — 02K Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KPI134 — 02K Plant Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KPI135 — 02K A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KPI136 — 02K IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KPI138 — 02K Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KPI141 — 02K Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KPI142 — 02K OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02KSY172 — 02K P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02KSY272 — 02K P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02LCV122 — 02L Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LCV126 — 02L Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LCV127 — 02L Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LCV128 — 02L Update Model Structural Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LCV166 — 02L Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LCV167 — 02L Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LPI135 — 02L A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LPI136 — 02L IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LPI138 — 02L Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LPI141 — 02L Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LPI142 — 02L OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02LSY172 — 02L P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02LSY272 — 02L P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02MCV122 — 02M Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MCV126 — 02M Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MCV127 — 02M Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MCV128 — 02M Update Model Structural Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MCV166 — 02M Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MCV167 — 02M Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MPI135 — 02M A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MPI136 — 02M IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MPI138 — 02M Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MPI141 — 02M Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MPI142 — 02M OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02MSY172 — 02M P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02MSY272 — 02M P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02NPI135 — 02N A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02NPI136 — 02N IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02NPI138 — 02N Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02NSY272 — 02N P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02PSY272 — 02P P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02QPI135 — 02Q A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02QPI136 — 02Q IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02QPI138 — 02Q Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02QPI142 — 02Q Detail OP's & Service Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02QPI143 — 02Q OP's & Service Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02QSY172 — 02Q P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02QSY272 — 02Q P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM02YCV123 — 02Y Struct Steel Issue Dwgs - IFC Silencer Area | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02YPI135 — 02Y A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02YPI136 — 02Y IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02YPI138 — 02Y Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02YPI142 — 02Y Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02YPI143 — 02Y OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM02YSY172 — 02Y P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM02YSY272 — 02Y P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03ACV126 — 03A Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ACV127 — 03A Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ACV160 — 03A Design & Model Major Eq. Fdns | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ACV164 — 03A Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ACV166 — 03A Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ACV167 — 03A Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API130 — 03A Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API132 — 03A Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API133 — 03A IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API134 — 03A Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API135 — 03A A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API136 — 03A IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API138 — 03A Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API140 — 03A Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API141 — 03A Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03API142 — 03A OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ASY172 — 03A P&IDs & Line List Issue - IFD | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ASY272 — 03A P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03BCV112 — 03B Update Model Sumps & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BCV126 — 03B Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BCV127 — 03B Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BCV166 — 03B Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BCV167 — 03B Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BMD228 — 03B Clips Release IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BMD229 — 03B Vessel Steel Release IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI130 — 03B Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI132 — 03B Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI133 — 03B IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI134 — 03B Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI135 — 03B A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI136 — 03B IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI138 — 03B Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI140 — 03B Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI141 — 03B Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BPI142 — 03B OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03BSY172 — 03B P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM03BSY272 — 03B P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03CCV127 — 03C Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03CCV167 — 03C Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03CPI135 — 03C A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03CPI136 — 03C IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03CPI142 — 03C OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03CSY272 — 03C P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03DCV126 — 03D Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DCV127 — 03D Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DCV164 — 03D Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DCV166 — 03D Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DCV167 — 03D Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DPI134 — 03D Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DPI135 — 03D A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DPI136 — 03D IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DPI138 — 03D Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DPI141 — 03D Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DPI143 — 03D OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03DSY172 — 03D P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM03DSY272 — 03D P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03ECV112 — 03E Update Model Containment Area & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ECV126 — 03E Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ECV127 — 03E Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ECV160 — 03E Design & Model Major Eq. Fdns | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ECV164 — 03E Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ECV166 — 03E Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ECV167 — 03E Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI123 — 03E Plant Layout Nozzle Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI130 — 03E Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI132 — 03E Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI133 — 03E IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI134 — 03E Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI135 — 03E A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI136 — 03E IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI138 — 03E Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI141 — 03E Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI142 — 03E Detail OP's & Service Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03EPI143 — 03E OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03ESY172 — 03E P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM03ESY272 — 03E P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03FCV126 — 03F Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FCV127 — 03F Model Misc. Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FCV164 — 03F Update Model Major Eq. Fdns & Issue Dwgs-IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FCV166 — 03F Conceptual Misc. Foundations Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FCV167 — 03F Update Model Misc Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI130 — 03F Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI132 — 03F Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI133 — 03F IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI134 — 03F Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI135 — 03F A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI136 — 03F IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI138 — 03F Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI141 — 03F Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI142 — 03F Detail OP's & Service Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI143 — 03F OP's & Serv. Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FPI200 — 03F Equipment Location Plans | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03FSY172 — 03F P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM03FSY272 — 03F P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM03YCV122 — 03Y Update Model Struct Steel & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YCV133 — 03Y Update Model Piperack Fdns & Issue Dwgs - IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI021 — 03Y Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI130 — 03Y Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI132 — 03Y Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI133 — 03Y IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI134 — 03Y Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI135 — 03Y A/G Piping Iso's - Issue IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI136 — 03Y IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI138 — 03Y Design / Issue Pipe Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI141 — 03Y Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YPI143 — 03Y OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM03YSY172 — 03Y P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EM03YSY272 — 03Y P&IDs & Line List Issue - IFC | 27-Dec-26 | Not Started EM04API120 — 04A Plant Layout Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM04API134 — 04A Plant Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM04API138 — 04A Design / Issue Pipe & Supports IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM04API200 — 04A Issue U/G Material Final Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05ACV126 — 05A Conceptual Misc. Steel Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05ACV166 — 05A Conceptual Misc. Foundation Design/ Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05AMD228 — 05A Clips Release IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05AMD229 — 05A Vessel Steel Release IFC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API130 — 05A Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API132 — 05A Planning Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API133 — 05A IDP - Plant Layout | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API134 — 05A Detail Model Development | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API136 — 05A IDP - Detail Design | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API140 — 05A Model Review Comment Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API142 — 05A Detail OP's & Services Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05API143 — 05A OP's & Serv. Model Review Comments Resolution | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05BPI120 — 05B Plant Layout Model | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05BPI130 — 05B Model Review Mtg | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05BSY172 — 05B P&IDs & Line List Issue - IFD | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM05UPI200 — 05U Issue U/G Material Final Release | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — EM5ASY172 — 05A P&IDs & Line List Issue - IFD | 27-Dec-26 | Not Started EMO2YCV124 — 02Y Structl Fdns Issue Dwgs - IFC Silencer Area | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK0003525 — SIS - Ship to DCS Shop/ Setup | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK0003526 — SIS - Integrated FAT | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E001E — Sub Stations - Eval Bids/Issue Recmd | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E001G — Sub Stations - Interim Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E001J — Sub Stations - Planning V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E001K — Sub Stations - Formal Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E001M — Sub Stations - Production V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E002G — Transformer - Interim Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E002J — Transformer - Planning V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E002K — Transformer - Formal Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E002M — Transformer - Production V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E004E — UPS System - Eval Bids/Issue Recmd | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E004G — UPS System - Interim Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E004J — UPS System - Planning V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E004K — UPS System - Formal Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000E004M — UPS System - Production V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1103 — 020 Orific Plates - Transport & Deliver | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1105 — 020 Orific Plates - Recv on Site | 27-Dec-26 | Not Started PK000I1161 — 020 Wedge Flow Meters - Fabricate/Exworks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1162 — 020 Wedge Flow Meters - Transport & Deliver | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1163 — 020 Wedge Flow Meters - Recv on Site | 27-Dec-26 | Not Started PK000I1221 — Coriolis Meters - Transport & Deliver | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1222 — Coriolis Meters - Recv on Site | 27-Dec-26 | Not Started PK000I1270 — Fabricate/Exworks Magnetic Flow Meters | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1271 — Transport & Deliver Magnetic Flow Meters | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I1272 — Recv on Site Magnetic Flow Meters | 27-Dec-26 | Not Started PK000I3522 — SIS - FAT Test | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I3523 — SIS - Cleanup / Changes | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I3542 — ITCC - Software Programming by Vendor | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I3543 — ITCC - FAT Test | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I3544 — ITCC - Cleanup / Changes | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I354P — ITCC - Ship to DCS Shop/ Setup | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I354Q — ITCC - Integrated FAT | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I444H — Fabricate - Shelters/ Analyzers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I611H — Fabricate / Exworks - Pressure Gauges - ISBL | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I616H — Fabricate / Exworks - Steam Drum Lvl Gauges | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I616L — Recv at Site - Steam Drum Lvl Gauges | 27-Dec-26 | Not Started PK000I616N — Transport & Deliver - Steam Drum Lvl Gauges | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000I617H — Fabricate / Exworks - Magnetic Lvl Gauges | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000IC352 — DCS - FAT Test | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000IC353 — DCS - Cleanup / Changes | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000IC355 — DCS - ITCC / SIS / DCS - Integrated FAT | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000IC35M — DCS - Review / Approve V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB21O — Transport & Deliver of Equip. 101-B Siding | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB33O — MB333 - Transport/Customes Equip. 101-B | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB33S — MB333 - Marshaling Riser Transition 101-B | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB33Z — 02H Recv. at Site - 101-B Riser Transition | 27-Dec-26 | Not Started PK000MB34Z — Shop Recv.- 101-B Finned Convection Tubes & Pipe | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB41Z — Shop Recv. - 101-B Cast Tube Supports | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB42O — MB420 - Transport to Vendor 101-B Cast Peep Sites | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB61O — Transport & Deliver 101-B Burners | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB63O — MB630 - Transport/Customes 101-B Air Preheater | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB64O — MB640 - Transport/Customes 101-B Springs & Hangers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB64S — MB640 - Marshaling 101-B Springs & Hangers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB65O — MB622 - Transport/Customes 101-B Penthouse Circ Fans | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB65S — MB622 - Marshaling 101-B Penthouse Circ Fans | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB66O — MB660 - Transport/Customes 101-B Dampers & Air Doors | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB66S — MB660 - Marshaling 101-B Dampers & Air Doors | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB68O — MB692 - Transport/Customes 101-B Cat Vacuum Equip. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB68S — MB692 - Marshaling 101-B Cat Vacuum Equip. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB69O — MB691 - Transport/Customes of Equip. 101-B | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB69S — MB691 - Marshaling 101-B for MB691 | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB81O — MB810 - Transport & Deliver of Equip. 101-B | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MB81S — MB810 - Marshaling 102-B | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1C — MB221 - Marshaling 101-B Convection Modules | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1M — MB221 - Transport/Customes 101-B Radiant Steel Panels | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1T — MB221 - Fab/PO Promise 101-B Crossover Pipe | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1U — MB221 - Transport/Customes 101-B Radiant Harps | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1V — MB221 - Transport/Customes 101-B Convection Modules | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1X — MB221 - Transport/Customes 101-B Radiant Ducting | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP1Y — MB221 - Transport/Customes 101-B Crossover | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP2C — MB221 - Marshaling 101-B Crossover | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP3C — MB221 - Marshaling 101-B Radiant Ducting | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP3V — MB311 - Shop Recv - 101-B Crossover Tube & Pipe | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP3W — MB311 - Shop Recv - 101-B Crossover Fittings | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP4C — MB221 - Marshaling 101-B Radiant Coil/Harps | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP4O — MB312 - Transport/Customes 101-B Radiant Cast Stringer Grids | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP4S — MB312 - Transport/Customes 101-B Radiant Cast Tube/Riser/Manifold | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP4T — MB312 - Shop Recv. 101-B Radiant Cast Stringer Grids | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP4U — MB312 - Shop Recv. 101-B Radiant Cast Tube/Riser/Manifold | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MBP5C — MB221 - Marshaling 101-B Radiant Steel Panels | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC21O — MC210 - Transport/Customes 110/115/124/128/130/133/134/160/167/173/174-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC21R — MC210 - Marshaling 127-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC21S — MC210 - Marshaling 110/115/124/128/130/133/134/160/167/173/174-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC21T — MC210 - Transport/Customes 127-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC23B — MC230 - Marshaling 106-C & 109-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC23C — MC230 - Transport/Customes 106-C & 109-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC23O — MC230 - Transport/Customes 105/172/183-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC23R — MC230 - Marshaling 111/114-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC23S — MC230 - Marshaling 105/172/183-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC23T — MC230 - Transport/Customes 114-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC61O — MC610 - Transport/Customes DBL PIPE EXCH 188-CA | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC61Q — MC610 - Transport/Customes DBL PIPE EXCH 161-C | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MC61S — MC610 - Marshaling DBL PIPE EXCH 188-CA | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD22B — MD202 - Marshaling TOWERS 104-E | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD22C — MD202 - Transport/Customes TOWERS 104-E | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD22O — MD202 - Transport/Customes TOWERS 103/105-E | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD22S — MD202 - Marshaling TOWERS 103/105-E | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD42A — MD402 -Marshaling 144-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD42B — MD402 - Transport/Customes 144-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD42R — MD402 - Transport/Customes 104-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD42T — MD402 -Marshaling 104-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD44M — MD404 - Marshaling 107-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD44N — MD404 - Transport/Customes 107-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD44O — MD404 - Transport/Customes 109-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD44Q — 02D Recv. at Site - 107-F Ammonia Letdown Drum | 27-Dec-26 | Not Started PK000MD44S — MD404 - Marshaling 109-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD45B — MD405 - Marshaling ISBL DRUMS - 115-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD45C — MD405 - Transport/Customes ISBL DRUMS - 115-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD45O — MD405 - Transport/Customes ISBL DRUMS - 156-F & 157-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD45S — MD405 - Marshaling ISBL DRUMS - 156-F & 157-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD45T — MD405 - Transport/Customes ISBL DRUMS - 118-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD46O — MD411 - Transport/Customes OSBL DRUMS - 2203-F & 2204-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD46S — MD411 - Marshaling OSBL DRUMS - 2203-F & 2204-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD46U — MD411 - Marshaling OSBL DRUMS - 2006-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD46V — MD411 - Transport/Customes OSBL DRUMS - 2006-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD47O — MD406 - Transport/DCustomes ISBL DRUMS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD47S — MD406 - Marshaling ISBL DRUMS 103-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD51O — MD501 - Transport/Customes 107-D | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MD51S — MD501 - Marshaling 107-D | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MDR — MD405 - Marshaling ISBL DRUMS - 118-F | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ21O — MJ202 - Transport/Customes 102/3/5-J | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ21S — MJ202 - Marshaling 102/3/5-J | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ37O — MJ340 - Transport/Customes METERING PUMPS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ37S — MJ340 - Marshaling METERING PUMPS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ71I — Eval Bids & Issue Recmd MJ731 | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ71J — Final Negotiate/Interim Award - MJ731 | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ71P — Issue Formal P.O. for MJ731 | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ75O — MJ750 - Transport/Customes SURFACE CONDENSORS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MJ75S — MJ750 - Marshaling SURFACE CONDENSORS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000ML33O — ML330 - Transport/Customes 2101-L | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000ML33S — ML330 - Marshaling 2101-L | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000ML42O — ML420 - Transpor/Customes CARTRIDGE FILTERS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000ML43O — ML430 - Transport/Customes 110-L BENFIELD MIXER | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000ML51O — ML512 - Transport/Customs 2102-L LOADING ARM | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000ML51S — ML512 - Marshaling 2102-L LOADING ARM | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU11S — 05B MU311 - Marshaling HYDROCHLORIC ACID STORAGE | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU21O — MU221 - Transport/Customs LIFT STATION | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU21S — MU221 - Marshaling LIFT STATION | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU22O — MU222 - Transport/Customes .2401-U | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU22S — MU222 - Marshaling 2401-U | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU25K — MU225 - 02G Fabricate/PO Promise LIFT STATION | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU25P — 02G MU225 Issue Formal P.O. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU311 — 05B MU311 Transport/Customes BULK CHEM. STORAGE TANKS | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU35O — MU350 - Transport/Customes 101-U DEAERATOR | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU41O — MU410 - Transport/Customes 2002-U PKG BOILER | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU41S — MU410 - Marshaling 2002-U PKG BOILER | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000MU61O — MU611 - Transport/Customes 2101-U, 2101-UJA Thru UJG CW TWR & Fans | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000PIA1J — Bulk Piping A/G & U/G - Receive at Site FIRST (CS,SS,U/G) | 27-Dec-26 | Not Started PK000PIA1L — Bulk Piping A/G - Transport / Delivery (CROME) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000PIA1M — Bulk Piping A/G - Receive at Site (CHROME) | 27-Dec-26 | Not Started PK000PIA4H — Product Line Piping - Transport / Delivery to Insulation Shop | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000PIA4I — Product Line Piping - Insulation Fab/Exworks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000PIA4J — Product Line Piping - Receive at Site | 27-Dec-26 | Not Started PK000PIA4K — Product Line Piping - Transport / Delivery | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000PIA4L — Product Line Piping - Fab/Exworks Remaining +/- 1500 Mts. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK000PS00F — 000 SP Items - Issue Formal Blanket P.O. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010E008F — 540-SG Admin. Area Pwr Supply - Eval Bids/Issue Recmd | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010E008G — 540-SG Admin. Area Pwr Supply - Interim Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010E008H — 540-SG Admin. Area Pwr Supply - Formal Award | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010E008J — 540-SG Admin. Area Pwr Supply - Planning V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010E008L — 540-SG Admin. Area Pwr Supply - Production V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010I1103 — 010 Orific Plates - Transport & Deliver | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK010I1105 — 010 Orific Plates - Recv on Site | 27-Dec-26 | Not Started PK01DMU61Z — 01D Recv. at Site - 2101-U, 2101-UJA Thru UJG CW TWR & Fans | 27-Dec-26 | Not Started PK01FMU21Z — 01E Recv. at Site - 2402-L Lift Station | 27-Dec-26 | Not Started PK01GMU21Z — 01E Recv. at Site - Lift Station | 27-Dec-26 | Not Started PK020I131H — Fabricate / Exworks - Transmitters -Press. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK020IC214 — 020 Control Valves - Transport & Deliver | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK020IC220 — 020 Control Valves - Recv on Site | 27-Dec-26 | Not Started PK02AMC21Z — 02A Recv. at Site - 160-C Ammonia Distl Column Reboiler | 27-Dec-26 | Not Started PK02AMC61Z — 02A Recv. at Site - 161-C Aqua Ammonia Interchanger | 27-Dec-26 | Not Started PK02AMD22D — 02A Recv. at Site - 104-E Tower | 27-Dec-26 | Not Started PK02AMD22Z — 02A Recv. at Site - 103-E, 105-E Towers | 27-Dec-26 | Not Started PK02AMJ37Z — 02A Recv. at Site - 130-J/JA, 131-J/JA Metering Pumps | 27-Dec-26 | Not Started PK02CMC21Z — 02C Recv. at Site - 128-C, 134-C, 167-C Exchangers | 27-Dec-26 | Not Started PK02CMJ21Z — 02C Recv. at Site - 103-J & 105-J | 27-Dec-26 | Not Started PK02CMJ75Z — 02C Recv. at Site - 103-JTC Surface Condenser | 27-Dec-26 | Not Started PK02DMC21Z — 02D Recv. at Site - 127-C Refrigerant Condenser | 27-Dec-26 | Not Started PK02DMD44Z — 02D Recv. at Site - 109-F Refrigerant Receiver | 27-Dec-26 | Not Started PK02EMC21Z — 02E Recv. at Site - 115-C & 130-C Exchangers | 27-Dec-26 | Not Started PK02EMC23S — 02E Recv. at Site - 114-C Exchangers | 27-Dec-26 | Not Started PK02EMC23Z — 02E Recv. at Site - 172-C, 183-C Exchangers | 27-Dec-26 | Not Started PK02EMD42Z — 02E Recv. at Site - 104-F Syn Gas Compr Suction Drum | 27-Dec-26 | Not Started PK02EMD45Z — 02E Recv. at Site - 157-F Mole Sieve Regen HP Cond Drum | 27-Dec-26 | Not Started PK02FMU11Z — 05B MU311 Recv. at Site - 2109-LA HYDROCHLORIC ACID STORAGE TANK A | 27-Dec-26 | Not Started PK02GMC21Z — 02G Recv. at Site - 133-C Fd Gas Compr. Kickback Cooler | 27-Dec-26 | Not Started PK02GMJ21Z — 02G Recv. at Site - 102-J/JL Fd Gas Compr. & Aux. | 27-Dec-26 | Not Started PK02GMJ75Z — 02G Recv. at Site - 101-JTC Surface Condenser | 27-Dec-26 | Not Started PK02GMLV04 — 02G MU225 2104-L - Piping Prod. V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK02GMLV05 — 02G MU225 2104-L - Civil Prod. V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK02GMLV06 — 02G MU225 2104-L - E&I Prod. V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK02GMU11Z — 05B MU311 Recv. at Site - 2109-LB HYDROCHLORIC ACID STORAGE TANK B | 27-Dec-26 | Not Started PK02HMB21Z — 02H Recv. at Site - 101-B Siding | 27-Dec-26 | Not Started PK02HMB42Z — 02H Recv. at Vendor - 101-B Cast Peep Sites | 27-Dec-26 | Not Started PK02HMB61Z — 02H Recv. at Site - 101-B Burners | 27-Dec-26 | Not Started PK02HMB63Z — 02H Recv. at Site - 101-B Air Preheater | 27-Dec-26 | Not Started PK02HMB64Z — 02H Recv. at Site - 101-B Springs & Hangers | 27-Dec-26 | Not Started PK02HMB65Z — 02H Recv. at Site - 101-B Penthouse Circ Fans | 27-Dec-26 | Not Started PK02HMB66Z — 02H Recv. at Site - 101-B Dampers & Air Doors | 27-Dec-26 | Not Started PK02HMB68Z — 02H Recv. at Site - 101-B Cat Vacuum Equip | 27-Dec-26 | Not Started PK02HMB69Z — 02H Recv. at Site - 101-B Expansion Joints | 27-Dec-26 | Not Started PK02HMBP1K — 02H Recv. at Site - 101-B Radiant Steel Panels | 27-Dec-26 | Not Started PK02HMBP1Q — 02H Recv. at Site - 101-B Radiant Harps | 27-Dec-26 | Not Started PK02HMBP1R — 02H Recv. at Site - 101-B Convection Modules | 27-Dec-26 | Not Started PK02HMBP1S — 02H Recv. at Site - 101-B Radiant Ducting | 27-Dec-26 | Not Started PK02HMBP1T — 02H Recv. at Site - 101-B Crossover | 27-Dec-26 | Not Started PK02HMD45Z — 02H Recv. at Site - 156-F Steam Blowdown Drum | 27-Dec-26 | Not Started PK02HMD51Z — 02H Recv. at Site - 107-D Primary Reformer Tranfer Line | 27-Dec-26 | Not Started PK02JMC21Z — 02J Recv. at Site - 173-C Startup Cooler | 27-Dec-26 | Not Started PK02KMC21Z — 02K Recv. at Site - 174-C Stripped Condensate Cooler | 27-Dec-26 | Not Started PK02KMC61Z — 02K Recv. at Site - 188-CA/ CB/ CC Exchangers | 27-Dec-26 | Not Started PK02KMD45A — 02K Recv. at Site - Equip. 115-F | 27-Dec-26 | Not Started PK02KMD45Z — 02K Recv. at Site - Equip. 118-F | 27-Dec-26 | Not Started PK02KML42Z — 02K Recv. at Site - 115-L Benfeild Sump Filter | 27-Dec-26 | Not Started PK02KML43Z — 02K Recv. at Site - 110-L Benfeild Mixer | 27-Dec-26 | Not Started PK02LMC21Z — 02L Recv. at Site - 110-C Lean Solution Cooler | 27-Dec-26 | Not Started PK02LMC23A — 02L Recv. at Site - 106-C & 109-C Exchangers | 27-Dec-26 | Not Started PK02LMC23Z — 02L Recv. at Site - 105-C Exchanger | 27-Dec-26 | Not Started PK02LMD47Z — 02L Recv. at Site - 103-F CO2 Stripper Cond KO Drum | 27-Dec-26 | Not Started PK02LML42Z — 02L Recv. at Site - 104-L Benfeild Solution Filter | 27-Dec-26 | Not Started PK02LMU11Z — 05B MU311 Recv. at Site - 2110-L SODIUM HYDROCHLORITE STORAGE | 27-Dec-26 | Not Started PK02MMB81Z — 02M Recv. at Site - 102-B Startup Heater | 27-Dec-26 | Not Started PK02MMC21Z — 02M Recv. at Site - 124-C Ammonia Convr. Effluent Cooler | 27-Dec-26 | Not Started PK02MMD42Z — 02M Recv. at Site - 144-F Feed Gas KO Drum | 27-Dec-26 | Not Started PK02PMU35Z — 02P Recv. at Site - 101-U Deaerator | 27-Dec-26 | Not Started PK030I1100 — Orific Plates - Fabricate/Exworks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK030IC214 — 030 Control Valves - Transport & Delivery | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK030IC220 — 030 Control Valves - Recv on Site | 27-Dec-26 | Not Started PK03BMU22Z — 03B Recv. at Site - 2401-U Sanitary Treatment Pkg | 27-Dec-26 | Not Started PK03CMD46Z — 03C Recv. at Site - 2203-F & 2204-F Caustic Tank/ Acid Drum | 27-Dec-26 | Not Started PK03FMD46Z — 03F Recv. at Site - 2006-F Boiler Blowdown Drum | 27-Dec-26 | Not Started PK03FMU11Z — 05B MU311 Recv. at Site - 2109-L HYDROCHLORIC ACID STORAGE | 27-Dec-26 | Not Started PK03FMU41Z — 03F Recv. at Site - 2002-U Package Boiler | 27-Dec-26 | Not Started PK050I1105 — 050 Orfice Plates - Recv on Site Dock/Storage Area | 27-Dec-26 | Not Started PK05AMF25 — 05A MF311 2101/2102-F Ammonia Storage Tanks - Prod. V. Data (Subcontract) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK05AMJV10 — 05A MJ731 2108-J - Civil Prod. V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK05AMJV11 — 05A MJ731 2108-J - E&I Prod. V. Data | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PK05AML33Z — 05A Recv. at Site - 2101-L Ammonia Refrigeration Pkg | 27-Dec-26 | Not Started PK05BML51Z — 05B Recv. at Site - 2102-L Loading Arm | 27-Dec-26 | Not Started PO000P0015 — Purch/Fab/Delv - Temporary Testing Materials | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PO000P0020 — Receive at Site - Temporary Testing Materials | 27-Dec-26 | Not Started PO000V1000 — Purch/Fab/Delv - Painting Materials | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — PO000V1005 — Receive at Site - Painting Materials | 27-Dec-26 | Not Started PO020EL155 — 020 Issue E&I Cable/Bulks/JB Reqn (OCI) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — XE000OW305 — (EBIC) Permit - Free Zone Status (SIDC) | 27-Dec-26 | Not Started XE000OW310 — (EBIC) Arrange For Solid Waste Collection/Disposal | 27-Dec-26 | Not Started XE000OW325 — (EBIC) Tie-In Construction Elec Power Supply | 27-Dec-26 | Not Started XE000OW373 — (EBIC) Permit - Free Zone Status (SPDC) | 27-Dec-26 | Not Started XE05AOW340 — (EBIC) Clear & Level Site For Ammonia Storage | 27-Dec-26 | Not Started ZZ1020 — 01D Recv. at Site - 2101-UJA Thru UJGM CW Motors | 27-Dec-26 | Not Started ZZ1040 — MU611 - Transport/Customes 2101-UJA Thru UJGM CW Motors | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CK000P0110 — 000 Pipe Fabrication | 28-Dec-26 → 31-May-27 | Not Started 0% | float 49.0d CK000P0110 CK000U4110 — Start Pipe Fab | 28-Dec-26 | Not Started CK01AP0110 — 01A A/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01BU4110 — 01B U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01CU4110 — 01C U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01DP0110 — 01D A/G Pipe Spool Fabrication | 28-Dec-26 → 22-Mar-27 | Not Started 0% | float 104.0d CK01DP0110 CK01DU4110 — 01D U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01EU4120 — 01E/F/G U/G Pipe Spool Fabrication (to Blg Stub Outs) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK01YP0110 — 01Y A/G Pipe Spool Fabrication | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 117.0d CK01YP0110 CK02AU4110 — 02A U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02BP0110 — 02B A/G Pipe Spool Fabrication | 28-Dec-26 → 24-May-27 | Not Started 0% | float 55.0d CK02BP0110 CK02BU4110 — 02B U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02CU4110 — 02C U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02DP0110 — 02D A/G Pipe Spool Fabrication | 28-Dec-26 → 30-Apr-27 | Not Started 0% | float 75.0d CK02DP0110 CK02DU4110 — 02D U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02EP0110 — 02E A/G Pipe Spool Fabrication | 28-Dec-26 → 25-Feb-27 | Not Started 0% | float 130.0d CK02EP0110 CK02EU4110 — 02E U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02FP0110 — 02F A/G Pipe Spool Fabrication | 28-Dec-26 → 20-Apr-27 | Not Started 0% | float 84.0d CK02FP0110 CK02FU4110 — 02F U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02GU4110 — 02G U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02HU4110 — 02H U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02JU4110 — 02J U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02KU4110 — 02K U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02LU4110 — 02L U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02MU4110 — 02M U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02NP0110 — 02N A/G Pipe Spool Fabrication | 28-Dec-26 → 27-Mar-27 | Not Started 0% | float 104.0d CK02NP0110 CK02PP0110 — 02P A/G Pipe Spool Fabrication | 28-Dec-26 → 21-Apr-27 | Not Started 0% | float 83.0d CK02PP0110 CK02UU4110 — 02U U/G Pipe Spool Fabrication (CW & Misc Headers) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK02YP0110 — 02Y A/G Pipe Spool Fabrication | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 27.0d CK02YP0110 CK03AU4110 — 03A U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03BU4110 — 03B U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03CP0110 — 03C A/G Pipe Spool Fabrication | 28-Dec-26 → 17-Feb-27 | Not Started 0% | float 137.0d CK03CP0110 CK03CU4110 — 03C U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03DU4110 — 03D U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03EU4110 — 03E U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03FU4110 — 03F U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CK03YP0110 — 03Y A/G Pipe Spool Fabrication | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 80.0d CK03YP0110 CK05AU4110 — 05A U/G Pipe Spool Fabrication | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO01AC0120 — 01A Form, Pour, Strip Fnds - Misc Fnds & Sumps... | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float 247.0d CO01AC0120 CO01BC0120 — 01B Form, Pour, Strip Fnds - Misc Fnds | 28-Dec-26 → 06-Jan-27 | Not Started 0% | float 210.0d CO01BC0120 CO01BC0140 — 01B Form Pour Strip Fnds - Sleepers to Evap Pond | 28-Dec-26 → 27-Jan-27 | Not Started 0% | float 148.0d CO01BC0140 CO01BM0130 — 01B Tank Erection 2001-FA (Water Storage Tank) | 28-Dec-26 → 21-Apr-27 | Not Started 0% | float 9.0d CO01BM0130 CO01BM0140 — 01B Tank Erection 2001-FB (Water Storage Tank) | 28-Dec-26 → 25-Mar-27 | Not Started 0% | float 32.0d CO01BM0140 CO01DM0130 — 01D Erect 2101-U Cooling Tower | 28-Dec-26 → 04-May-27 | Not Started 0% | float 61.0d CO01DM0130 CO01GA0110 — 01G Erect Control Building (Continuation w/ Design Rev) | 28-Dec-26 → 24-Jun-27 | Not Started 0% | float -14.0d CO01GA0110 CO01HC0110 — 01H Form, Pour, Strip Piers - Substation Building | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 112.0d CO01HC0110 CO01YU3110 — 01Y U/G Earthing Installation - Pipe Rack | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 134.0d CO01YU3110 CO02AU4120 — 02A U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 222.0d CO02AU4120 CO02BU4120 — 02B U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 219.0d CO02BU4120 CO02CC0110 — 02C Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 26-Jan-27 | Not Started 0% | float 165.0d CO02CC0110 CO02CC0150 — 02C Form, Pour, Strip Fnd - 103/105-J & Table Tops | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02CM0110 — 02C Set Static Equipment - 128/167-C | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02CU4120 — 02C U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 162.0d CO02CU4120 CO02DC0110 — 02D Form, Pour, Strip Fnds - Major Fnds | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float 252.0d CO02DC0110 CO02DU4120 — 02D U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 248.0d CO02DU4120 CO02EU4120 — 02E U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 227.0d CO02EU4120 CO02FC0110 — 02F Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 234.0d CO02FC0110 CO02FU4120 — 02F U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 234.0d CO02FU4120 CO02GC0150 — 02G Form, Pour, Strip Fnd - 101-J/JT & 2ea. Table Tops | 28-Dec-26 → 01-Feb-27 | Not Started 0% | float 134.0d CO02GC0150 CO02GM0140 — 02G Set/Install - 102-J Fd Gas Compr. & Aux. | 28-Dec-26 → 22-Apr-27 | Not Started 0% | float 188.0d CO02GM0140 CO02HU4120 — 02H U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 162.0d CO02HU4120 CO02JU4120 — 02J U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 211.0d CO02JU4120 CO02KC0110 — 02K Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 192.0d CO02KC0110 CO02KM0130 — 02K Tank Erection 114-F (Benfield Solution Tank) | 28-Dec-26 → 08-Jan-27 | Not Started 0% | float 97.0d CO02KM0130 CO02KU4120 — 02K U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 214.0d CO02KU4120 CO02LC0110 — 02L Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 123.0d CO02LC0110 CO02LC0140 — 02L Form Pour Strip Fnds - 02L Structure | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 45.0d CO02LC0140 CO02MU4120 — 02M U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 239.0d CO02MU4120 CO02UP0130 — 02U LB Pipe Erection (CW & Misc Headers) | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 71.0d CO02UP0130 CO02UV1110 — 02U Paint Fabricated Pipe Spools (CW & Misc Headers) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02YU3110 — 02Y U/G Earthing Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 100.0d CO02YU3110 CO03AC0110 — 03A Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 16-Jan-27 | Not Started 0% | float 155.0d CO03AC0110 CO03BC0110 — 03B Form, Pour, Strip Fnds - Major Fnds (N/A) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO03BC0140 — 03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump | 28-Dec-26 → 30-Dec-26 | Not Started 0% | float 266.0d CO03DM0145 — 03D Tank Erection 2002-F (Demin Water Tank) | 28-Dec-26 → 12-Jan-27 | Not Started 0% | float 105.0d CO03DM0145 CO03DU4120 — 03D U/G Piping Installation | 28-Dec-26 → 05-Jan-27 | Not Started 0% | float 199.0d CO03DU4120 CO03EC0110 — 03E Form, Pour, Strip Fnds - 2001-U Water Treatment | 28-Dec-26 → 20-Feb-27 | Not Started 0% | float 126.0d CO03EC0110 CO03FM0110 — 03F Erect 2002-U Package Boiler | 28-Dec-26 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0110 CO03YC0110 — 03Y Form, Pour, Strip Fnds - Sleeper Fnds | 28-Dec-26 → 01-Jan-27 | Not Started 0% | float 98.0d CO03YC0110 CO03YC0120 — 03Y Form, Pour, Strip Fnds - Pipe Rack Fnds | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO04AV1100 — 04A Paint | 28-Dec-26 → 25-May-27 | Not Started 0% | float 148.0d CO04AV1100 CO05AC0175 — 05A Test Piles (Load Test) | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float -51.0d CO05AC0175 EK000YA500 — Issue ISBL Paint & Insulation Work Package | 28-Dec-26 → 08-Mar-27 | Not Started 0% | float 750.0d EK000YA500 EK000YA845 — (PC-08) Complete >10% - ISBL -Unit 02 - Pipe Spool Fabrication,>2 Inch Diameter | 28-Dec-26 | Not Started P002YS0010 — 02Y Recv at Site - Structural Steel (First Shipment) | 28-Dec-26 | Not Started PO000E0000 — Purch/Fab/Deliver - A/G Electrical Bulks (First) | 28-Dec-26 → 10-Apr-27 | Not Started 0% | float 20.0d PO000E0000 PO000V2000 — Purch/Fab/Delv - Insulation Materials | 28-Dec-26 → 15-May-27 | Not Started 0% | float 98.0d PO000V2000 PO01BS0130 — 01B Fab & Ship Miscellaneous Steel | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 86.0d PO01BS0130 PO01DS0120 — 01D Fab & Ship Structural Steel | 28-Dec-26 → 19-Feb-27 | Not Started 0% | float 94.0d PO01DS0120 PO01DS0130 — 01D Fab & Ship Miscellaneous Steel | 28-Dec-26 → 19-Feb-27 | Not Started 0% | float 94.0d PO01DS0130 PO01EA0135 — 01E Guard House Design Drawings - Submit to KBR | 28-Dec-26 → 02-Jan-27 | Not Started 0% | float 200.0d PO01EA0135 PO01FA0135 — 01F Mosque Design Drawings - Submit to KBR | 28-Dec-26 → 02-Jan-27 | Not Started 0% | float 143.0d PO01FA0135 PO01HS0130 — 01H Fab & Ship Miscellaneous Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 51.0d PO01HS0130 PO01YS0120 — 01Y Fab & Ship Structural Steel | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 39.0d PO01YS0120 PO02AS0120 — 02A Fab & Ship Structural Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 103.0d PO02AS0120 PO02AS0130 — 02A Fab & Ship Miscellaneous Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 115.0d PO02AS0130 PO02CS0130 — 02C Fab & Ship Miscellaneous Steel | 28-Dec-26 → 26-Mar-27 | Not Started 0% | float 83.0d PO02CS0130 PO02DS0120 — 02D Fab & Ship Structural Steel | 28-Dec-26 → 02-Apr-27 | Not Started 0% | float 93.0d PO02DS0120 PO02DS0130 — 02D Fab & Ship Miscellaneous Steel | 28-Dec-26 → 02-Apr-27 | Not Started 0% | float 105.0d PO02DS0130 PO02ES0120 — 02E Fab & Ship Structural Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 127.0d PO02ES0120 PO02ES0130 — 02E Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 67.0d PO02ES0130 PO02FS0130 — 02F Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 133.0d PO02FS0130 PO02HS0120 — 02H Fab & Ship Structural Steel | 28-Dec-26 → 26-Mar-27 | Not Started 0% | float 92.0d PO02HS0120 PO02HS0130 — 02H Fab & Ship Miscellaneous Steel | 28-Dec-26 → 26-Mar-27 | Not Started 0% | float 78.0d PO02HS0130 PO02JS0120 — 02J Fab & Ship Structural Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 98.0d PO02JS0120 PO02JS0130 — 02J Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 110.0d PO02JS0130 PO02LS0120 — 02L Fab & Ship Structural Steel | 28-Dec-26 → 05-Mar-27 | Not Started 0% | float -15.0d PO02LS0120 PO02LS0130 — 02L Fab & Ship Miscellaneous Steel | 28-Dec-26 → 05-Mar-27 | Not Started 0% | float 93.0d PO02LS0130 PO02MS0120 — 02M Fab & Ship Structural Steel | 28-Dec-26 → 19-Mar-27 | Not Started 0% | float 123.0d PO02MS0120 PO02MS0130 — 02M Fab & Ship Miscellaneous Steel | 28-Dec-26 → 19-Mar-27 | Not Started 0% | float 147.0d PO02MS0130 PO02NMS100 — 02N Fab & Ship Miscellaneous Steel | 28-Dec-26 → 30-Apr-27 | Not Started 0% | float 67.0d PO02NMS100 PO02QMS100 — 02Q Fab & Ship Miscellaneous Steel | 28-Dec-26 → 23-Apr-27 | Not Started 0% | float 121.0d PO02QMS100 PO02YS0120 — 02Y Fab & Ship Structural Steel | 28-Dec-26 → 05-Mar-27 | Not Started 0% | float -22.0d PO02YS0120 PO03AS0130 — 03A Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 56.0d PO03AS0130 PO03BS0130 — 03B Fab & Ship Miscellaneous Steel | 28-Dec-26 → 09-Apr-27 | Not Started 0% | float 169.0d PO03BS0130 PO03CS0130 — 03C Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 87.0d PO03CS0130 PO03DS0130 — 03D Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 98.0d PO03DS0130 PO03ES0130 — 03E Fab & Ship Miscellaneous Steel | 28-Dec-26 → 16-Apr-27 | Not Started 0% | float 58.0d PO03ES0130 PO03YS0120 — 03Y Fab & Ship Structural Steel | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 39.0d PO03YS0120 WK000P0100 — 000 A/G Pipe Spool Fabrication | 28-Dec-26 → 31-May-27 | Not Started 0% | float 49.0d WK000P0100 WO010A0100 — 010 Buildings | 28-Dec-26 → 24-Jun-27 | Not Started 0% | float 94.0d WO010A0100 WO010M0100 — 010 Major Equipment | 28-Dec-26 → 01-Sep-27 | Not Started 0% | float 54.0d WO010M0100 WO010U3100 — 010 Install U/G Electrical | 28-Dec-26 → 27-Mar-27 | Not Started 0% | float 170.0d WO010U3100 WO020M0100 — 020 Major Equipment | 28-Dec-26 → 16-Aug-27 | Not Started 0% | float 156.0d WO020M0100 WO020U3100 — 020 Install U/G Electrical | 28-Dec-26 → 12-Mar-27 | Not Started 0% | float 265.0d WO020U3100 WO020U4100 — 020 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 224.0d WO020U4100 WO030M0100 — 030 Major Equipment | 28-Dec-26 → 26-Apr-27 | Not Started 0% | float 192.0d WO030M0100 WO030U4100 — 030 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 229.0d WO030U4100 WO04AV1100 — 04A Paint | 28-Dec-26 → 25-May-27 | Not Started 0% | float 148.0d WO04AV1100 WO050C0110 — 050 Concrete Paving | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float 0.0d WT010M0100 — 010 Tank Erection | 28-Dec-26 → 21-Apr-27 | Not Started 0% | float 9.0d WT010M0100 WT020M0100 — 020 Tank Erection | 28-Dec-26 → 08-Jan-27 | Not Started 0% | float 97.0d WT020M0100 WT030M0100 — 030 Tank Erection | 28-Dec-26 → 12-Jan-27 | Not Started 0% | float 105.0d WT030M0100 EK000YA843 — (PC-18) Complete >90% Bldg No. 2604-K Workshop / Warehouse Erection | 28-Dec-26 | Not Started SC01JT0120 — 01J RFSU | 28-Dec-26 | Not Started XE000OW335 — (EBIC) Permit - Land Easement (SIDC Assistance) | 28-Dec-26 | Not Started XE000OW340 — (EBIC) Permit - Tanks (SIDC) | 28-Dec-26 | Not Started XE000OW345 — (EBIC) Purchase Chemicals For Operation | 28-Dec-26 | Not Started XE000OW355 — (EBIC) Tie-In Municipal Water To Site | 28-Dec-26 | Not Started XE000OW370 — (EBIC) Permit - Tanks (SPDC) | 28-Dec-26 | Not Started XE000OW375 — (EBIC) Tie-In Site Electrical Power Supply | 28-Dec-26 | Not Started XE000OW405 — (EBIC) Tie-In Port Elec Power Supply To Substation | 28-Dec-26 | Not Started EK000CS040 — Issue Operation & Maintenance Manuals for Review | 30-Dec-26 → 21-Mar-27 | Not Started 0% | float 215.0d EK000CS040 EK000ELEGP — Electrical Heat Tracing - Design & BOM by Consultant | 30-Dec-26 → 30-Jan-27 | Not Started 0% | float 91.0d EK000ELEGP EK000ELEN1 — 01,03,04 LV Wiring Diagrams - IFC | 30-Dec-26 → 03-Feb-27 | Not Started 0% | float 509.0d EK000ELEN1 EK000ELEN2 — 01,03,04 LV//MV WIRING DIAGRAMS & CTL SCHEMATICS - IFC | 30-Dec-26 → 03-Feb-27 | Not Started 0% | float 509.0d EK000ELEN2 EK000ELEN3 — 01,03, Equipment Interconnection Diagrams - IFC | 30-Dec-26 → 30-Jan-27 | Not Started 0% | float 511.0d EK000ELEN3 EK020EL130 — Overall One line Diagrams - IFC | 30-Dec-26 → 01-Jan-27 | Not Started 0% | float 82.0d EK020EL165 — Switchgear One line Diagrams - IFC | 30-Dec-26 → 29-Jan-27 | Not Started 0% | float 231.0d EK020EL165 EK020EL185 — MCC One line Diagrams - IFC | 30-Dec-26 → 30-Jan-27 | Not Started 0% | float 231.0d EK020EL185 EK020ELEG6 — Cathodic Protection - Material Supply (By Consultant) | 30-Dec-26 → 02-May-27 | Not Started 0% | float 6.0d EK020ELEG6 EK020ELEN1 — 02 LV Wiring Diagrams - IFC | 30-Dec-26 → 16-Jan-27 | Not Started 0% | float 296.0d EK020ELEN1 EK020ELEN2 — 02 MV WIRING DIAGRAMS & CTL SCHEMATICS - IFC | 30-Dec-26 → 26-Feb-27 | Not Started 0% | float 306.0d EK020ELEN2 EK020ELEN3 — 02 Equipment Interconnection Diagrams - IFC | 30-Dec-26 → 30-Jan-27 | Not Started 0% | float 511.0d EK020ELEN3 EK020IC131 — Instrument Loop Diagrams FF - IFC | 30-Dec-26 → 03-Jan-27 | Not Started 0% | float 530.0d EK020IC131 EK05ACV200 — 05A Redesign Piling & Ammonia Tank Foundations | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float -44.0d EK05ACV200 EK05BIC120 — 05B Instrument Model | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 110.0d EM000ELEN3 — 01,03 Equipment Interconnection Diagrams | 30-Dec-26 → 30-Jan-27 | Not Started 0% | float 511.0d EM000ELEN3 EM020ELEN1 — 02 LV WIRING DIAGRAMS & CTL SCHEMATICS | 30-Dec-26 → 29-Jan-27 | Not Started 0% | float 512.0d EM020ELEN1 EM020ELEN2 — 02 MV WIRING DIAGRAMS & CTL SCHEMATICS | 30-Dec-26 → 29-Jan-27 | Not Started 0% | float 512.0d EM020ELEN2 EM020ELEN3 — 02 Equipment Interconnection Diagrams | 30-Dec-26 → 30-Jan-27 | Not Started 0% | float 511.0d EM020ELEN3 EM02GPI143 — 02G OP's & Serv. Model Review Comments Resolution | 30-Dec-26 → 03-Jan-27 | Not Started 0% | float 88.0d EM02GPI143 EM02KCV127 — 02K Model Misc. Steel & Issue Dwgs - IFC | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 100.0d EM02KCV127 EM02KCV167 — 02K Update Model Misc Fdns & Issue Dwgs - IFC | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 207.0d EM02KCV167 EM05ACV122 — 05A Update Model PR Struct Steel & Issue Dwgs - IFC | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 21.0d EM05ACV122 EM05ACV127 — 05A Model Misc. Steel & Issue Dwgs - IFC | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 25.0d EM05ACV127 EM05ACV164 — 05A Update Model Major Eq. Fdns & Issue Dwgs-IFC | 30-Dec-26 → 27-Jan-27 | Not Started 0% | float -14.0d EM05ACV164 EM05API135 — 05A A/G Piping Iso's - Issue IFC | 30-Dec-26 → 03-Jan-27 | Not Started 0% | float 90.0d EM05API135 EM05API138 — 05A Design / Issue Pipe Supports IFC | 30-Dec-26 → 03-Jan-27 | Not Started 0% | float 162.0d EM05API138 EM05BCV122 — 05B Design / Model / IFC - Sleeper Steel & FDN's | 30-Dec-26 → 24-Jan-27 | Not Started 0% | float 71.0d EM05BCV122 EM05BCV133 — 05B Design / Model / IFC - S/S at Jetty | 30-Dec-26 → 24-Jan-27 | Not Started 0% | float 71.0d EM05BCV133 EM05BPI141 — 05B Model Review Comment Resolution | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 75.0d EM05BPI141 PK000E001H — Sub Stations - Fab / Exworks | 30-Dec-26 → 28-Feb-27 | Not Started 0% | float 62.0d PK000E001H PK000E002H — Transformer - Fab / Exworks | 30-Dec-26 → 04-Feb-27 | Not Started 0% | float 28.0d PK000E002H PK000E004H — UPS System - Fab / Exworks | 30-Dec-26 → 05-Feb-27 | Not Started 0% | float 27.0d PK000E004H PK000I1121 — 020 Venturis - Fabricate/Exworks | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 509.0d PK000I2300 — On/Off Valves - Fabricate/Exworks | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 460.0d PK000I2300 PK000I3524 — SIS - Packing / Exworks | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 55.0d PK000I3524 PK000I3545 — ITCC - Packing / Exworks | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 55.0d PK000I3545 PK000I4440 — FAT Test - Shelters/ Analyzers | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 161.0d PK000I4440 PK000I611N — Transport & Deliver - Pressure Gauges - ISBL | 30-Dec-26 → 03-Jan-27 | Not Started 0% | float 110.0d PK000I611N PK000I612H — Fabricate / Exworks - Differential Pressure Gauges | 30-Dec-26 → 18-Feb-27 | Not Started 0% | float 28.0d PK000I612H PK000I617N — Transport & Deliver - Magnetic Lvl Gauges | 30-Dec-26 → 13-Jan-27 | Not Started 0% | float 104.0d PK000I617N PK000I621H — Fabricate / Exworks - Temperature Elements | 30-Dec-26 → 13-Mar-27 | Not Started 0% | float 31.0d PK000I621H PK000I623H — Fabricate / Exworks - Multi-Point Thermocouples | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 84.0d PK000IC354 — DCS - Packing / Exworks | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 85.0d PK000IC35N — DCS - Transport (Hold for Field Request) | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 85.0d PK000IC35N PK000MB62S — MB621 - Marshaling 101-B ID & FD Fans | 30-Dec-26 → 14-Feb-27 | Not Started 0% | float 215.0d PK000MB62S PK000MB71S — MB710 - Marshaling 2202-B/BL Storage Flare & Flame FRT Gen. | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 240.0d PK000MB71S PK000MD34T — MD304 - Marshaling 108-DA/B | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 162.0d PK000MD34T PK000MD41S — MD401 - Marshaling 101-F | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 175.0d PK000MD41S PK000MD44U — MD404 - Marshaling 132-F | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 65.0d PK000MD44U PK000MJ35S — MJ305 - Marshaling ISBL ANSI/API PUMPS | 30-Dec-26 → 11-Feb-27 | Not Started 0% | float 153.0d PK000MJ35S PK000MJ71K — MJ731 - Fabricate/PO Promise EMERG PWR GENERATOR | 30-Dec-26 → 21-Feb-27 | Not Started 0% | float 70.0d PK000MJ71K PK000ML31S — ML313 - Marshaling 160-L | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 261.0d PK000ML90S — 01A ML900 - Marshaling Evap. Pond Spray Nzl. | 30-Dec-26 → 10-Jan-27 | Not Started 0% | float 103.0d PK000ML90S PK000MU25S — 02G MU225 - Marshaling LIFT STATION | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 215.0d PK000MU25S PK000MU29S — MU292 - Marshaling 2404-L | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 195.0d PK000MU29S PK000MU30S — MU300 - Marshaling 2102-U | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 76.0d PK000MU30S PK000MU31S — MU310 - Marshaling Injection System & Chlorination Unit | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 59.0d PK000MU31S PK000MU32S — MU322 - Marshaling COOLING WTR FILTER & CLARIFIER | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 71.0d PK000MU32S PK000MU33S — MU330 - Marshaling 2001-U | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 111.0d PK000MU33S PK000PIA1N — Bulk Piping A/G - Fab/Exworks (FINAL) | 30-Dec-26 → 07-Mar-27 | Not Started 0% | float 45.0d PK000PIA1N PK000PS00G — 000 SP Items - Fabricate/Exworks | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 247.0d PK000PSA8H — 000 Relief Valves - Transport & Deliver | 30-Dec-26 → 24-Feb-27 | Not Started 0% | float 257.0d PK000PSA8H PK000PTA0J — Engineered Pipe Supports - Transport | 30-Dec-26 → 10-Feb-27 | Not Started 0% | float 58.0d PK000PTA0J PK010E008K — 540-SG Admin. Area Pwr Supply - Fab / Exworks | 30-Dec-26 → 11-Feb-27 | Not Started 0% | float 70.0d PK010E008K PK010I1211 — Vortex Meters - Transport & Deliver | 30-Dec-26 → 31-Dec-26 | Not Started 0% | float 533.0d PK010I1241 — Rotameters - Transport & Deliver | 30-Dec-26 → 14-Jan-27 | Not Started 0% | float 523.0d PK010I1241 PK010IC214 — 010 Control Valves - Transport & Deliver | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 535.0d PK010IC220 — 010 Control Valves - Recv on Site | 30-Dec-26 | Not Started PK010IC252 — MOV Valves - Fabricate/Exworks | 30-Dec-26 → 27-Jan-27 | Not Started 0% | float 475.0d PK010IC252 PK020I131N — Transport & Deliver - Transmitters -Press. | 30-Dec-26 → 20-Feb-27 | Not Started 0% | float 76.0d PK020I131N PK030I1103 — Orific Plates -Transport & Deliver | 30-Dec-26 → 27-Jan-27 | Not Started 0% | float 514.0d PK030I1103 PK030I131H — Fabricate / Exworks - Transmitters - Temp. | 30-Dec-26 → 16-Jan-27 | Not Started 0% | float 71.0d PK030I131H PK030I611H — Fabricate / Exworks - Pressure Gauges - OSBL | 30-Dec-26 → 04-Feb-27 | Not Started 0% | float 58.0d PK030I611H ZZ2080 — MJ305 - Transport/Customes OSBL ANSI/API PUMPS | 30-Dec-26 → 07-Feb-27 | Not Started 0% | float 190.0d ZZ2080 ZZ2090 — MJ305 - Marshaling OSBL ANSI/API PUMPS | 30-Dec-26 → 30-Dec-26 | Not Started 0% | float 190.0d CK01BP0110 — 01B A/G Pipe Spool Fabrication | 31-Dec-26 → 23-Mar-27 | Not Started 0% | float 101.0d CK01BP0110 CO01AV1110 — 01A Paint Fabricated Pipe Spools | 31-Dec-26 → 02-Jan-27 | Not Started 0% | float 253.0d PK000I1131 — Venturis - Transport & Deliver | 31-Dec-26 → 03-Feb-27 | Not Started 0% | float 509.0d PK000I1131 PK000I221N — 000 Everest Control Valves - Transport & Deliver | 31-Dec-26 → 10-Feb-27 | Not Started 0% | float 504.0d PK000I221N PK000MB51S — MB511 - Marshaling 101-B Insulation | 31-Dec-26 → 20-Jan-27 | Not Started 0% | float 204.0d PK000MB51S PK000ML31O — ML313 - Transport/Customs 160-L | 31-Dec-26 → 24-Jan-27 | Not Started 0% | float 365.0d PK000ML31O PK000PS00H — 000 SP Items - Transport & Deliver | 31-Dec-26 → 10-Mar-27 | Not Started 0% | float 247.0d PK000PS00H PK010I1151 — Annubars - Transport & Deliver | 31-Dec-26 → 03-Feb-27 | Not Started 0% | float 509.0d PK010I1151 WO010V1100 — 010 Paint | 31-Dec-26 → 05-Oct-27 | Not Started 0% | float 131.0d WO010V1100 PK010I1212 — Vortex Meters - Recv on Site | 31-Dec-26 | Not Started EM05ACV133 — 05A Update Model Structural Piperack Fdns & Issue Dwgs - IFC | 01-Jan-27 → 10-Jan-27 | Not Started 0% | float 121.0d EM05ACV133 XE000OW230 — (EBIC) Permit - Operating Permit (SPDC) | 01-Jan-27 | Not Started XE000OW374 — (EBIC) Permit - Operating Permit (SIDC) | 01-Jan-27 | Not Started EM5ASY272 — 05A P&IDs & Line List Issue - IFC | 01-Jan-27 | Not Started EM5BSY272 — 05B P&IDs & Line List Issue - IFC | 01-Jan-27 | Not Started CO02HM0200 — 02H Start Primary Reformer Erection (101-B) | 02-Jan-27 | Not Started CO02HM0210 — 02H Erect Radiant Section Shell (101-B) | 02-Jan-27 → 02-Apr-27 | Not Started 0% | float 108.0d CO02HM0210 CO02LU4120 — 02L U/G Piping Installation | 02-Jan-27 → 29-Jan-27 | Not Started 0% | float 123.0d CO02LU4120 PK000MD21S — MD201- Marshaling 101-E | 02-Jan-27 → 07-Feb-27 | Not Started 0% | float 93.0d PK000MD21S PO03FS0130 — 03F Fab & Ship Miscellaneous Steel | 02-Jan-27 → 09-Apr-27 | Not Started 0% | float 88.0d PO03FS0130 EK01EA0140 — 01E Guard House Design Drawings - Approval | 03-Jan-27 → 16-Jan-27 | Not Started 0% | float 175.0d EK01EA0140 EK01FA0140 — 01F Mosque Design Drawings - Approval | 03-Jan-27 → 16-Jan-27 | Not Started 0% | float 119.0d EK01FA0140 EK000PI200 — Final Delta Piping Bulk Quanities for Purchase | 03-Jan-27 | Not Started EK000YA838 — (EP-34) Issue >90% ISBL P&ID's For Construction (IFC) | 03-Jan-27 | Not Started EK02GPI144 — 02G OP's & Serv. Model Comments Resolution Approval | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GCV122 — 02G Update Model Struct Steel & Issue Dwgs - IFC | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GCV126 — 02G Conceptual Misc. Steel Design/ Model | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GCV127 — 02G Model Misc. Steel & Issue Dwgs - IFC | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GCV128 — 02G Update Model Structural Fdns & Issue Dwgs - IFC | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GCV166 — 02G Conceptual Misc. Foundations Design/ Model | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GCV167 — 02G Update Model Misc Fdns & Issue Dwgs - IFC | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GPI135 — 02G A/G Piping Iso's - Issue IFC | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GPI136 — 02G IDP - Detail Design | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GPI138 — 02G Design / Issue Pipe Supports IFC | 03-Jan-27 → 03-Jan-27 | Not Started 0% | float — EM02GSY272 — 02G P&IDs & Line List Issue - IFC | 03-Jan-27 | Not Started PK000I611L — Recv at Site - Pressure Gauges - ISBL | 04-Jan-27 | Not Started PO01CS0130 — 01C Fab & Ship Miscellaneous Steel | 04-Jan-27 → 09-Apr-27 | Not Started 0% | float 106.0d PO01CS0130 PO02GS0130 — 02G Fab & Ship Miscellaneous Steel | 04-Jan-27 → 26-Mar-27 | Not Started 0% | float 107.0d PO02GS0130 CO01UP0150 — 01U LB Pipe Erection (Firewater Piping) | 05-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO01UP0150 WO010U4100 — 010 U/G Piping Installation | 05-Jan-27 → 26-Mar-27 | Not Started 0% | float 171.0d WO010U4100 CO02GU4120 — 02G U/G Piping Installation | 06-Jan-27 → 26-Feb-27 | Not Started 0% | float 159.0d CO02GU4120 CO03DC0120 — 03D Form, Pour, Strip Fnds - Misc Fnds | 06-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03DC0120 EM000IC100 — Instrument Index - IFC | 06-Jan-27 → 06-Jan-27 | Not Started 0% | float 530.0d CK02QP0110 — 02Q A/G Pipe Spool Fabrication | 11-Jan-27 → 13-Apr-27 | Not Started 0% | float 90.0d CK02QP0110 EK05ACV210 — 05A COSMO Design Approval (Assuming No Change) | 11-Jan-27 → 16-Jan-27 | Not Started 0% | float -51.0d EK05ACV210 CO02CM0125 — 02C Set - 103/105-J Compressors | 12-Jan-27 → 16-Jan-27 | Not Started 0% | float 167.0d CO02CM0125 CO02YS0110 — 02Y Erect Structural Steel - Pipe Rack | 12-Jan-27 → 14-Jun-27 | Not Started 0% | float -35.0d CO02YS0110 WO020S0100 — 020 Erect Steel | 12-Jan-27 → 07-Oct-27 | Not Started 0% | float 69.0d WO020S0100 CO02HU3110 — 02H U/G Earthing Installation | 13-Jan-27 → 12-Feb-27 | Not Started 0% | float 162.0d CO02HU3110 CO03YV1110 — 03Y Paint Fabricated Pipe Spools | 13-Jan-27 → 13-Feb-27 | Not Started 0% | float 154.0d CO03YV1110 EM05BPI133 — 05B IDP - Plant Layout | 13-Jan-27 → 14-Jan-27 | Not Started 0% | float 75.0d PK000I352N — SIS - Transport & Delivery | 13-Jan-27 → 21-Mar-27 | Not Started 0% | float 55.0d PK000I352N PK000I354N — ITCC - Transport & Delivery | 13-Jan-27 → 21-Mar-27 | Not Started 0% | float 55.0d PK000I354N PK000I4441 — Cleanup / Changes - Shelters/ Analyzers | 13-Jan-27 → 24-Jan-27 | Not Started 0% | float 161.0d PK000I4441 PK000MD32S — MD302 - Marshaling 104-D1/2 | 13-Jan-27 → 07-Feb-27 | Not Started 0% | float 85.0d PK000MD32S PK000MJ22S — MJ201 - Marshaling 101-J | 13-Jan-27 → 31-Jan-27 | Not Started 0% | float 86.0d PK000MJ22S PK000MJ36S — MJ305 - Marshaling OSBL PUMPS | 13-Jan-27 → 31-Jan-27 | Not Started 0% | float 60.0d PK000MJ36S PK000MJ38V — MJ308 - Marshaling ISBL ANSI/API PUMPS | 13-Jan-27 → 31-Jan-27 | Not Started 0% | float 198.0d PK000MJ38V PK000MJ39S — Marshaling FIREWATER PUMPS | 13-Jan-27 → 31-Jan-27 | Not Started 0% | float 60.0d PK000MJ39S PK000ML90O — 01A ML900 - Transport/Customes Evap. Pond Spray Nzl. | 13-Jan-27 → 21-Feb-27 | Not Started 0% | float 103.0d PK000ML90O WO030V1100 — 030 Paint | 13-Jan-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030V1100 CO02CU3110 — 02C U/G Earthing Installation | 14-Jan-27 → 12-Feb-27 | Not Started 0% | float 168.0d CO02CU3110 PK000I617L — Recv at Site - Magnetic Lvl Gauges | 14-Jan-27 | Not Started PK010I1242 — Rotameters - Recv on Site | 14-Jan-27 | Not Started CO03DU3110 — 03D U/G Earthing Installation | 15-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03DU3110 EK05BPI050 — 05B Model Comment Resolution Approval | 15-Jan-27 → 17-Jan-27 | Not Started 0% | float 75.0d EM05ACV167 — 05A Update Model Misc Fdns & Issue Dwgs - IFC | 15-Jan-27 → 24-Jan-27 | Not Started 0% | float 111.0d EM05ACV167 WO030U3100 — 030 Install U/G Electrical | 15-Jan-27 → 12-Mar-27 | Not Started 0% | float 229.0d WO030U3100 PO05AS0120 — 05A Fab & Ship Structural Steel | 15-Jan-27 → 04-Jun-27 | Not Started 0% | float 23.0d PO05AS0120 PO05AS0130 — 05A Fab & Ship Miscellaneous Steel | 15-Jan-27 → 04-Jun-27 | Not Started 0% | float 27.0d PO05AS0130 CO02HC0120 — 02H Form, Pour, Strip Fnds - Misc Fnds | 16-Jan-27 → 05-Feb-27 | Not Started 0% | float 174.0d CO02HC0120 CO02LU3110 — 02L U/G Earthing Installation | 16-Jan-27 → 12-Feb-27 | Not Started 0% | float 129.0d CO02LU3110 CO02UP0150 — 02U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO02UP0150 CO03UP0150 — 03U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO03UP0150 PK000MC32S — MC311 - Marshaling KBR S&T EXCH | 17-Jan-27 → 06-Mar-27 | Not Started 0% | float 76.0d PK000MC32S PK000MJ34S — MJ304 - Marshaling MP BFW PUMPS | 17-Jan-27 → 06-Feb-27 | Not Started 0% | float 186.0d PK000MJ34S PK030I131N — Transport & Deliver - Transmitters - Temp. | 17-Jan-27 → 30-Jan-27 | Not Started 0% | float 91.0d PK030I131N CO02CM0130 — 02C Install - 103/105-J Compressors & Aux. Equip. | 18-Jan-27 → 13-May-27 | Not Started 0% | float 167.0d CO02CM0130 CO05AC0185 — 05A Procure Material & Mob Piling Contractor | 18-Jan-27 → 30-Jan-27 | Not Started 0% | float -51.0d CO05AC0185 CO02AU3110 — 02A U/G Earthing Installation | 20-Jan-27 → 05-Feb-27 | Not Started 0% | float 228.0d CO02AU3110 CO02CV1110 — 02C Paint Fabricated Pipe Spools | 20-Jan-27 → 27-Feb-27 | Not Started 0% | float 245.0d CO02CV1110 EM05BCV167 — 05B Design / Model / IFC - Equip. Fdn's. | 20-Jan-27 → 20-Jan-27 | Not Started 0% | float 221.0d EM05BPI132 — 05B Planning Release | 20-Jan-27 → 24-Jan-27 | Not Started 0% | float 75.0d EM05BPI132 EM05BPI200 — 05B Equipment Location Plans | 20-Jan-27 → 24-Jan-27 | Not Started 0% | float 221.0d EM05BPI200 PK000MJ32S — MJ302 - Marshaling 107-JA/JB/JC | 20-Jan-27 → 07-Feb-27 | Not Started 0% | float 175.0d PK000MJ32S WO020V1100 — 020 Paint | 20-Jan-27 → 14-Feb-28 | Not Started 0% | float 23.0d WO020V1100