Projects
EBCF-4

EBIC Construction Forecast (27-Jan-07)

Data Date: 23-Apr-26
Plan: 22-Jan-25 – 27-Mar-29
Legend: Not Started In Progress Complete Critical Milestone Showing 438 activities in 02 Ammonia Plant × clear
Code
Activity
Start
Finish
Flt
%
CO02HC0140
02H Form Pour Strip Fnds - Structure
21-Mar-26
27-Dec-26
12%
WO020C0100
020 Concrete & Excavation
21-Mar-26
23-Mar-27
215.0d
9%
CO02JC0150
02J Form, Pour, Strip Fnd - 104-D2 (Low Temp Shift Converter)
30-Mar-26
27-Dec-26
9%
CO02JC0160
02J Form, Pour, Strip Fnd - 104-D1 (High Temp Shift Converter)
30-Mar-26
27-Dec-26
9%
CO02JC0110
02J Form, Pour, Strip Fnds - Major Fnds Gen'l
01-Apr-26
27-Dec-26
9%
CO02LC0150
02L Form, Pour, Strip Fnd - 101-E (CO2 Absorber)
03-Apr-26
27-Dec-26
8%
CO02MC0110
02M Form, Pour, Strip Fnds - Major Fnds Gen'l
03-Apr-26
27-Dec-26
8%
CO02MC0140
02M Form Pour Strip Fnds - Structure
03-Apr-26
27-Dec-26
8%
CO02KC0150
02K Form, Pour, Strip Fnd - 114-F (Benfield Solution Tank)
04-Apr-26
27-Dec-26
7%
CO02BC0110
02B Form, Pour, Strip Fnds - Major Fnds
09-Apr-26
27-Dec-26
6%
CO02AC0110
02A Form, Pour, Strip Fnds - Major Fnds
15-Apr-26
09-Mar-27
189.0d
5%
CO02HC0150
02H Form, Pour, Strip Fnd - 103-D (Secondary Reformer)
21-Apr-26
27-Dec-26
5%
CO02CC0160
02C Form, Pour, Strip Fnd - 103-JTC
27-Dec-26
27-Dec-26
0%
CO02CM0140
02C Set - 103-JTC Surface Condenser
27-Dec-26
27-Dec-26
0%
CO02EC0110
02E Form, Pour, Strip Fnds - Major Fnds Gen'l
27-Dec-26
27-Dec-26
0%
CO02EC0140
02E Form Pour Strip Fnds - Structure
27-Dec-26
27-Dec-26
0%
CO02GC0160
02G Form, Pour, Strip Fnd - 102-J Fd Gas Compr. & Aux.
27-Dec-26
27-Dec-26
0%
CO02HC0110
02H Form, Pour, Strip Fnds - 101B (Primary Reformer)
27-Dec-26
27-Dec-26
0%
CO02HC0160
02H Form, Pour, Strip Fnd - 156-F (Steam Blowdown Drum)
27-Dec-26
27-Dec-26
0%
CO02HM0140
02H Set - 156-F Steam Blowdown Drum
27-Dec-26
27-Dec-26
0%
CO02LC0160
02L Form, Pour, Strip Fnd - 102-E (CO2 Stripper)
27-Dec-26
27-Dec-26
0%
CO02MC0150
02M Form, Pour, Strip Fnd - 105-D (Ammonia Synthesis Converter)
27-Dec-26
27-Dec-26
0%
CO02NC0110
02N Form, Pour, Strip Fnds - Major Fnds
27-Dec-26
27-Dec-26
0%
CO02YC0140
02Y Form Pour Strip Fnds - Pipe Rack
27-Dec-26
27-Dec-26
0%
CO02AU4120
02A U/G Piping Installation
28-Dec-26
29-Jan-27
222.0d
0%
CO02BU4120
02B U/G Piping Installation
28-Dec-26
29-Jan-27
219.0d
0%
CO02CC0110
02C Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
26-Jan-27
165.0d
0%
CO02CC0150
02C Form, Pour, Strip Fnd - 103/105-J & Table Tops
28-Dec-26
28-Dec-26
0%
CO02CM0110
02C Set Static Equipment - 128/167-C
28-Dec-26
28-Dec-26
0%
CO02CU4120
02C U/G Piping Installation
28-Dec-26
29-Jan-27
162.0d
0%
CO02DC0110
02D Form, Pour, Strip Fnds - Major Fnds
28-Dec-26
09-Jan-27
252.0d
0%
CO02DU4120
02D U/G Piping Installation
28-Dec-26
29-Jan-27
248.0d
0%
CO02EU4120
02E U/G Piping Installation
28-Dec-26
29-Jan-27
227.0d
0%
CO02FC0110
02F Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
234.0d
0%
CO02FU4120
02F U/G Piping Installation
28-Dec-26
29-Jan-27
234.0d
0%
CO02GC0150
02G Form, Pour, Strip Fnd - 101-J/JT & 2ea. Table Tops
28-Dec-26
01-Feb-27
134.0d
0%
CO02GM0140
02G Set/Install - 102-J Fd Gas Compr. & Aux.
28-Dec-26
22-Apr-27
188.0d
0%
CO02HU4120
02H U/G Piping Installation
28-Dec-26
29-Jan-27
162.0d
0%
CO02JU4120
02J U/G Piping Installation
28-Dec-26
29-Jan-27
211.0d
0%
CO02KC0110
02K Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
192.0d
0%
CO02KU4120
02K U/G Piping Installation
28-Dec-26
29-Jan-27
214.0d
0%
CO02LC0110
02L Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
29-Jan-27
123.0d
0%
CO02LC0140
02L Form Pour Strip Fnds - 02L Structure
28-Dec-26
29-Jan-27
45.0d
0%
CO02MU4120
02M U/G Piping Installation
28-Dec-26
29-Jan-27
239.0d
0%
CO02UP0130
02U LB Pipe Erection (CW & Misc Headers)
28-Dec-26
29-Jan-27
71.0d
0%
CO02UV1110
02U Paint Fabricated Pipe Spools (CW & Misc Headers)
28-Dec-26
28-Dec-26
0%
CO02YU3110
02Y U/G Earthing Installation
28-Dec-26
29-Jan-27
100.0d
0%
WO020M0100
020 Major Equipment
28-Dec-26
16-Aug-27
156.0d
0%
WO020U3100
020 Install U/G Electrical
28-Dec-26
12-Mar-27
265.0d
0%
WO020U4100
020 U/G Piping Installation
28-Dec-26
26-Feb-27
224.0d
0%
CO02HM0200
02H Start Primary Reformer Erection (101-B)
02-Jan-27
02-Jan-27
108.0d
0%
CO02HM0210
02H Erect Radiant Section Shell (101-B)
02-Jan-27
02-Apr-27
108.0d
0%
CO02LU4120
02L U/G Piping Installation
02-Jan-27
29-Jan-27
123.0d
0%
CO02GU4120
02G U/G Piping Installation
06-Jan-27
26-Feb-27
159.0d
0%
CO02CM0125
02C Set - 103/105-J Compressors
12-Jan-27
16-Jan-27
167.0d
0%
CO02YS0110
02Y Erect Structural Steel - Pipe Rack
12-Jan-27
14-Jun-27
-35.0d
0%
WO020S0100
020 Erect Steel
12-Jan-27
07-Oct-27
69.0d
0%
CO02HU3110
02H U/G Earthing Installation
13-Jan-27
12-Feb-27
162.0d
0%
CO02CU3110
02C U/G Earthing Installation
14-Jan-27
12-Feb-27
168.0d
0%
CO02HC0120
02H Form, Pour, Strip Fnds - Misc Fnds
16-Jan-27
05-Feb-27
174.0d
0%
CO02LU3110
02L U/G Earthing Installation
16-Jan-27
12-Feb-27
129.0d
0%
CO02UP0150
02U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
CO02CM0130
02C Install - 103/105-J Compressors & Aux. Equip.
18-Jan-27
13-May-27
167.0d
0%
CO02AU3110
02A U/G Earthing Installation
20-Jan-27
05-Feb-27
228.0d
0%
CO02CV1110
02C Paint Fabricated Pipe Spools
20-Jan-27
27-Feb-27
245.0d
0%
WO020V1100
020 Paint
20-Jan-27
14-Feb-28
23.0d
0%
CO02GC0110
02G Form, Pour, Strip Fnds - Major Fnds Gen'l
23-Jan-27
26-Feb-27
159.0d
0%
CO02JU3110
02J U/G Earthing Installation
25-Jan-27
12-Feb-27
211.0d
0%
CO02BM0110
02B Set Static Equipment
25-Jan-27
25-Jan-27
0%
CO02BV1130
02B Paint Touch-up - Equipment
25-Jan-27
01-Feb-27
300.0d
0%
CO02KU3110
02K U/G Earthing Installation
26-Jan-27
12-Feb-27
214.0d
0%
CO02EU3110
02E U/G Earthing Installation
28-Jan-27
12-Feb-27
227.0d
0%
CO02FU3110
02F U/G Earthing Installation
29-Jan-27
12-Feb-27
234.0d
0%
CO02BC0120
02B Form, Pour, Strip Fnds - Misc Fnds
29-Jan-27
29-Jan-27
0%
CO02CC0120
02C Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
19-Feb-27
162.0d
0%
CO02DC0120
02D Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
30-Jan-27
260.0d
0%
CO02EC0120
02E Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
227.0d
0%
CO02FC0120
02F Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
234.0d
0%
CO02FM0110
02F Set Static Equipment
30-Jan-27
26-Feb-27
241.0d
0%
CO02JC0120
02J Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
211.0d
0%
CO02KC0120
02K Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
214.0d
0%
CO02LC0120
02L Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
19-Feb-27
123.0d
0%
CO02MC0120
02M Form, Pour, Strip Fnds - Misc Fnds
30-Jan-27
12-Feb-27
239.0d
0%
CO02MU3110
02M U/G Earthing Installation
30-Jan-27
12-Feb-27
239.0d
0%
CO02YC0130
02Y Install Paving
30-Jan-27
17-Mar-27
71.0d
0%
WO020C0110
020 Concrete Paving
30-Jan-27
22-May-27
210.0d
0%
CO02DU3110
02D U/G Earthing Installation
02-Feb-27
12-Feb-27
248.0d
0%
CO02YV1110
02Y Paint Fabricated Pipe Spools
05-Feb-27
19-Feb-27
131.0d
0%
CO02BU3110
02B U/G Earthing Installation
10-Feb-27
12-Feb-27
289.0d
0%
CO02EV1110
02E Paint Fabricated Pipe Spools
12-Feb-27
04-Mar-27
250.0d
0%
CO02GU3110
02G U/G Earthing Installation
15-Feb-27
12-Mar-27
159.0d
0%
CO02GV1110
02G Paint Fabricated Pipe Spools
16-Feb-27
22-Mar-27
230.0d
0%
CO02CC0130
02C Install Paving
20-Feb-27
05-Mar-27
162.0d
0%
CO02LC0130
02L Install Paving
20-Feb-27
05-Mar-27
123.0d
0%
CO02HM0220
02H Erect Radiant Ducting / Burners (101-B)
22-Feb-27
20-Mar-27
151.0d
0%
CO02UDT110
02U Mechanical Completion
26-Feb-27
26-Feb-27
301.0d
0%
SC02UT0120
02U RFSU
26-Feb-27
26-Feb-27
380.0d
0%
CO02GC0120
02G Form, Pour, Strip Fnds - Misc Fnds
27-Feb-27
19-Mar-27
165.0d
0%
CO02GM0110
02G Set Static Equipment - Gen'l
27-Feb-27
31-Mar-27
208.0d
0%
CO02JS0130
02J Pre-Install Misc Steel - 104-D2
01-Mar-27
15-Mar-27
103.0d
0%
CO02JS0140
02J Pre-Install Misc Steel - 104-D1
01-Mar-27
15-Mar-27
108.0d
0%
CO02LS0130
02L Pre-Install Misc Steel - 101-E
01-Mar-27
15-Mar-27
113.0d
0%
CO02GM0125
02G Set - 101-J/JT Air Compr.
08-Mar-27
05-Apr-27
105.0d
0%
CO02AC0120
02A Form, Pour, Strip Fnds - Misc Fnds
10-Mar-27
23-Mar-27
189.0d
0%
CO02AM0150
02A Set Rotating Equipment
10-Mar-27
06-Apr-27
207.0d
0%
CO02GC0130
02G Install Paving
13-Mar-27
26-Mar-27
159.0d
0%
CO02HM0250
02H Set Forced Draft Fan (101-B)
15-Mar-27
12-Apr-27
234.0d
0%
CO02YS0120
02Y Erect Misc Steel - Pipe Rack
19-Mar-27
14-Jun-27
102.0d
0%
CO02HM0246
02H Install Radiant Sect Coils (101-B)
22-Mar-27
17-Apr-27
151.0d
0%
CO02HM0255
02H Set Induced Draft Fan (101-B)
22-Mar-27
19-Apr-27
234.0d
0%
CO02KV1130
02K Paint Touch-up - Equipment
23-Mar-27
15-Apr-27
236.0d
0%
CO02AC0130
02A Install Paving
24-Mar-27
30-Mar-27
189.0d
0%
CO02CM0150
02C Set Rotating Equipment - 112-J/JA/JM
26-Mar-27
30-Mar-27
205.0d
0%
CO02GM0150
02G Set Rotating Equipment
26-Mar-27
10-Apr-27
199.0d
0%
CO02KM0150
02K Set Rotating Equipment
26-Mar-27
01-Apr-27
163.0d
0%
CO02LM0150
02L Set Rotating Equipment
26-Mar-27
27-Apr-27
170.0d
0%
CO02HS0140
02H Install Misc Steel - 156-F
27-Mar-27
09-Apr-27
102.0d
0%
CO02JV1110
02J Paint Fabricated Pipe Spools
27-Mar-27
27-Mar-27
164.0d
0%
CO02AV1130
02A Paint Touch-up - Equipment
30-Mar-27
20-Apr-27
232.0d
0%
CO02MV1110
02M Paint Fabricated Pipe Spools
01-Apr-27
14-Apr-27
215.0d
0%
CO02NV1110
02N Paint Fabricated Pipe Spools
01-Apr-27
03-Apr-27
216.0d
0%
CO02DM0150
02D Set Rotating Equipment
02-Apr-27
15-Apr-27
182.0d
0%
CO02HC0130
02H Install Paving
03-Apr-27
16-Apr-27
120.0d
0%
CO02HM0230
02H Set Convection Sections (101-B)
03-Apr-27
30-Apr-27
108.0d
0%
CO02HM0240
02H Set Stack for (101-B)
03-Apr-27
30-Apr-27
223.0d
0%
CO02JC0130
02J Install Paving
05-Apr-27
10-Apr-27
168.0d
0%
CO02GM0130
02G Install - 101-J/JT Air Compr. & Gen. Turb. & Aux.
05-Apr-27
30-Jul-27
105.0d
0%
CO02HS0130
02H Pre-Install Misc Steel - 103-D
05-Apr-27
19-Apr-27
68.0d
0%
CO02FV1110
02F Paint Fabricated Pipe Spools
09-Apr-27
27-Apr-27
204.0d
0%
CO02LV1110
02L Paint Fabricated Pipe Spools
09-Apr-27
29-May-27
162.0d
0%
CO02KV1110
02K Paint Fabricated Pipe Spools
10-Apr-27
04-May-27
181.0d
0%
CO02LS0110
02L Erect Structure
10-Apr-27
18-Jun-27
-15.0d
0%
CO02KC0130
02K Install Paving
12-Apr-27
17-Apr-27
165.0d
0%
CO02YP0130
02Y LB Pipe Erection
13-Apr-27
05-Oct-27
-35.0d
0%
WO020P0100
020 Above Ground Pipe
13-Apr-27
14-Feb-28
-1.0d
0%
CO02DV1130
02D Paint Touch-up - Equipment
15-Apr-27
29-Apr-27
224.0d
0%
CO02FM0150
02F Set Rotating Equipment
16-Apr-27
13-May-27
176.0d
0%
CO02QV1110
02Q Paint Fabricated Pipe Spools
16-Apr-27
20-Apr-27
210.0d
0%
CO020M0110
Mobilize / Assemble / Test Heavy Lift Crane
19-Apr-27
01-May-27
56.0d
0%
CO02EC0130
02E Install Paving
19-Apr-27
24-Apr-27
172.0d
0%
CO02HM0248
02H Install Effluent Transfer Line (107-D)
19-Apr-27
01-May-27
151.0d
0%
CO02LS0140
02L Pre-Install Misc Steel - 102-E
19-Apr-27
03-May-27
76.0d
0%
CO02DV1110
02D Paint Fabricated Pipe Spools
23-Apr-27
07-May-27
177.0d
0%
CO02MS0110
02M Erect Structural Steel - Structure
24-Apr-27
14-May-27
123.0d
0%
CO02PV1110
02P Paint Fabricated Pipe Spools
24-Apr-27
28-Apr-27
199.0d
0%
CO02FC0130
02F Install Paving
26-Apr-27
01-May-27
173.0d
0%
CO02HV1110
02H Paint Fabricated Pipe Spools
26-Apr-27
05-Jun-27
54.0d
0%
CO02CS0120
02C Erect Misc. Steel (Platforms)
01-May-27
02-Aug-27
83.0d
0%
CO02GS0130
02G Erect Misc. Steel (Platforms)
01-May-27
02-Aug-27
107.0d
0%
CO02HM0235
02H Erect Preheater (101-B)
01-May-27
25-Jun-27
175.0d
0%
CO020M0120
Heavy Lift Crane Useage
03-May-27
04-Aug-27
56.0d
0%
CO02HM0130
02H Set (Heavy Lift) - 103-D (Secondary Reformer)
03-May-27
07-May-27
56.0d
0%
CO02HM0225
02H Erect Penthouse Roof, & Siding (101-B)
03-May-27
29-May-27
151.0d
0%
CO02MC0130
02M Install Paving
03-May-27
08-May-27
172.0d
0%
CO02KS0130
02K Pre-Install Misc Steel - Static Equipment
03-May-27
17-May-27
101.0d
0%
CO02GP0130
02G LB Pipe Erection
04-May-27
10-Sep-27
105.0d
0%
CO02CP0130
02C LB Pipe Erection
08-May-27
08-Oct-27
83.0d
0%
CO02DS0110
02D Erect Structural Steel
08-May-27
28-May-27
93.0d
0%
CO02JM0130
02J Set (Heavy Lift) - 104-D2 (Low Temp Shift Converter)
08-May-27
13-May-27
56.0d
0%
CO02LS0120
02L Erect Misc Steel
08-May-27
04-Jun-27
39.0d
0%
CO02DC0130
02D Install Paving
10-May-27
15-May-27
175.0d
0%
CO02FV1130
02F Paint Touch-up - Equipment
10-May-27
27-May-27
200.0d
0%
CO02MS0130
02M Pre-Install Misc Steel - 105-D
10-May-27
24-May-27
63.0d
0%
CO02YP0140
02Y SB Pipe Erection
11-May-27
02-Nov-27
-29.0d
0%
CO02GP0140
02G SB Pipe Erection
11-May-27
25-Sep-27
105.0d
0%
CO02CV1130
02C Paint Touch-up - Equipment
14-May-27
22-Jun-27
190.0d
0%
CO02JM0140
02J Set (Heavy Lift) - 104-D1 (High Temp Shift Converter)
14-May-27
19-May-27
56.0d
0%
CO02AS0110
02A Erect Structural Steel
15-May-27
04-Jun-27
103.0d
0%
CO02CP0140
02C SB Pipe Erection
15-May-27
15-Oct-27
83.0d
0%
CO02MM0110
02M Set Static Equipment - Gen'l
15-May-27
16-Jun-27
147.0d
0%
CO02BC0130
02B Install Paving
17-May-27
22-May-27
210.0d
0%
CO02KM0110
02K Set Static Equipment - Gen'l
17-May-27
07-Jun-27
101.0d
0%
CO02AV1110
02A Paint Fabricated Pipe Spools
20-May-27
02-Jun-27
172.0d
0%
CO02LM0130
02L Set (Heavy Lift) - 101-E (CO2 Absorber)
20-May-27
25-May-27
56.0d
0%
CO02ES0110
02E Erect Structural Steel
22-May-27
11-Jun-27
127.0d
0%
CO02ES0120
02E Erect Misc Steel
22-May-27
11-Jun-27
67.0d
0%
CO02FS0120
02F Erect Misc Steel
22-May-27
11-Jun-27
133.0d
0%
CO02JS0110
02J Erect Structural Steel - Structure
22-May-27
04-Jun-27
98.0d
0%
CO02MS0120
02M Erect Misc Steel - Structure
22-May-27
11-Jun-27
123.0d
0%
CO02BV1110
02B Paint Fabricated Pipe Spools
25-May-27
31-May-27
175.0d
0%
CO02LM0140
02L Set (Heavy Lift) - 102-E (CO2 Stripper)
26-May-27
31-May-27
56.0d
0%
CO02GE0130
02G Power/Control JB's, Tray, Cable, Termination
26-May-27
02-Oct-27
108.0d
0%
CO02GI0120
02G Instrument JB's, Field Instr, Tray, Cable
26-May-27
02-Oct-27
108.0d
0%
WO020E0100
020 Above Ground Electrical
26-May-27
14-Feb-28
23.0d
0%
WO020I0100
020 Install Instruments & Test
26-May-27
01-Mar-28
9.0d
0%
CO02CV2110
02C Insulate - Equipment
28-May-27
06-Jul-27
190.0d
0%
WO020V2100
020 Insulation
28-May-27
13-Mar-28
-1.0d
0%
CO02DM0110
02D Set Static Equipment
29-May-27
11-Jun-27
133.0d
0%
CO02DS0120
02D Erect Misc Steel
29-May-27
18-Jun-27
93.0d
0%
CO02EP0130
02E LB Pipe Erection
29-May-27
06-Nov-27
67.0d
0%
CO02HM0260
02H Compete Installation of Ducts (101-B)
29-May-27
23-Jul-27
175.0d
0%
CO02HM0215
02H Erect Fuel Gas Lines (101-B)
31-May-27
26-Jun-27
151.0d
0%
CO02HM0227
02H Install Spring Hangers & Align (101-B)
31-May-27
10-Jul-27
186.0d
0%
CO02HM0245
02H Install Insulation (101-B)
31-May-27
24-Jul-27
174.0d
0%
CO02CE0130
02C Power/Control JB's, Tray, Cable, Termination
01-Jun-27
22-Oct-27
88.0d
0%
CO02CI0120
02C Instrument JB's, Field Instr, Tray, Cable
01-Jun-27
22-Oct-27
88.0d
0%
CO02JM0110
02J Set Static Equipment - Gen'l
01-Jun-27
11-Jun-27
98.0d
0%
CO02MM0130
02M Set (Heavy Lift) - 105-D (Ammonia Converter)
01-Jun-27
05-Jun-27
56.0d
0%
CO02AM0110
02A Set Static Equipment
05-Jun-27
18-Jun-27
144.0d
0%
CO02JS0120
02J Erect Misc Steel - Structure
05-Jun-27
11-Jun-27
98.0d
0%
CO02LE0110
02L Lighting JB's, Stands, Tray & Cable
05-Jun-27
16-Jul-27
163.0d
0%
CO02FV2110
02F Insulate - Equipment
07-Jun-27
24-Jun-27
200.0d
0%
CO02MM0140
02M Set (Heavy Lift) - 121-C (Ammonia Conv./ Effl Exch.)
07-Jun-27
11-Jun-27
56.0d
0%
CO02KS0120
02K Erect Misc Steel
07-Jun-27
28-Jun-27
101.0d
0%
CO02KV2110
02K Insulate - Equipment
10-Jun-27
05-Jul-27
192.0d
0%
CO02AS0120
02A Erect Misc Steel
12-Jun-27
02-Jul-27
103.0d
0%
CO02BE0110
02B Lighting JB's, Stands, Tray & Cable
12-Jun-27
25-Jun-27
193.0d
0%
CO02EE0110
02E Lighting JB's, Stands, Tray & Cable
12-Jun-27
09-Jul-27
175.0d
0%
CO02EM0110
02E Set Static Equipment
12-Jun-27
09-Jul-27
127.0d
0%
CO02FE0110
02F Lighting JB's, Stands, Tray & Cable
12-Jun-27
09-Jul-27
175.0d
0%
CO02JE0110
02J Lighting JB's, Stands, Tray & Cable
12-Jun-27
23-Jul-27
157.0d
0%
CO02JP0130
02J LB Pipe Erection
12-Jun-27
27-Sep-27
98.0d
0%
CO02ME0110
02M Lighting JB's, Stands, Tray & Cable
12-Jun-27
09-Jul-27
175.0d
0%
CO02MV1130
02M Paint Touch-up - Equipment
12-Jun-27
29-Jun-27
172.0d
0%
CO02NM0110
02N Set (Heavy Lift) - 120-C (Ammonia Unitized Chiller)
12-Jun-27
17-Jun-27
56.0d
0%
CO02BV2110
02B Insulate - Equipment
14-Jun-27
19-Jun-27
204.0d
0%
CO02PM0110
02P Set 101-U Dearator
15-Jun-27
28-Jun-27
103.0d
0%
CO02QM0110
02Q Set 101-F Steam Drum
15-Jun-27
21-Jun-27
101.0d
0%
CO02NS0120
02N Erect Misc Steel
18-Jun-27
22-Jul-27
56.0d
0%
CO02DE0110
02D Lighting JB's, Stands, Tray & Cable
19-Jun-27
16-Jul-27
169.0d
0%
CO02JP0140
02J SB Pipe Erection
19-Jun-27
04-Oct-27
98.0d
0%
CO02LM0110
02L Set Static Equipment - Gen'l
19-Jun-27
21-Jul-27
103.0d
0%
CO02LM0120
02L Set Static Equipment - 02L Structure
19-Jun-27
30-Jul-27
-15.0d
0%
CO02QS0120
02Q Erect Misc Steel
22-Jun-27
12-Jul-27
101.0d
0%
CO02AV2110
02A Insulate - Equipment
25-Jun-27
16-Jul-27
181.0d
0%
CO02DV2110
02D Insulate - Equipment
25-Jun-27
09-Jul-27
187.0d
0%
CO02NP0130
02N LB Pipe Erection
25-Jun-27
10-Nov-27
56.0d
0%
CO02BE0120
02B Lighting Fixture Installation/Termination
26-Jun-27
02-Jul-27
193.0d
0%
CO02MP0130
02M LB Pipe Erection
28-Jun-27
08-Oct-27
92.0d
0%
CO02KE0110
02K Lighting JB's, Stands, Tray & Cable
28-Jun-27
09-Aug-27
144.0d
0%
CO02PS0120
02P Erect Misc Steel
29-Jun-27
26-Jul-27
103.0d
0%
CO02QP0130
02Q LB Pipe Erection
29-Jun-27
28-Sep-27
101.0d
0%
CO02YE0110
02Y Lighting JB's, Stands, Tray & Cable
29-Jun-27
12-Oct-27
90.0d
0%
CO02JE0130
02J Power/Control JB's, Tray, Cable, Termination
02-Jul-27
11-Oct-27
98.0d
0%
CO02JI0120
02J Instrument JB's, Field Instr, Tray, Cable
02-Jul-27
11-Oct-27
98.0d
0%
CO02AE0110
02A Lighting JB's, Stands, Tray & Cable
03-Jul-27
30-Jul-27
157.0d
0%
CO02EV1130
02E Paint Touch-up - Equipment
03-Jul-27
23-Jul-27
151.0d
0%
CO02FP0130
02F LB Pipe Erection
05-Jul-27
27-Sep-27
102.0d
0%
CO02GE0110
02G Lighting JB's, Stands, Tray & Cable
06-Jul-27
18-Aug-27
149.0d
0%
CO02PP0130
02P LB Pipe Erection
06-Jul-27
21-Sep-27
103.0d
0%
CO02EE0120
02E Lighting Fixture Installation/Termination
10-Jul-27
23-Jul-27
175.0d
0%
CO02FE0120
02F Lighting Fixture Installation/Termination
10-Jul-27
23-Jul-27
175.0d
0%
CO02ME0120
02M Lighting Fixture Installation/Termination
10-Jul-27
23-Jul-27
175.0d
0%
CO02MV2110
02M Insulate - Equipment
10-Jul-27
27-Jul-27
172.0d
0%
CO02DP0130
02D LB Pipe Erection
12-Jul-27
22-Oct-27
62.0d
0%
CO02FP0140
02F SB Pipe Erection
12-Jul-27
04-Oct-27
102.0d
0%
CO02KP0130
02K LB Pipe Erection
12-Jul-27
23-Oct-27
77.0d
0%
CO02QE0110
02Q Lighting JB's, Stands, Tray & Cable
13-Jul-27
19-Jul-27
162.0d
0%
CO02GP0150
02G Punchlist / Test Piping
16-Jul-27
02-Oct-27
105.0d
0%
CO02DE0120
02D Lighting Fixture Installation/Termination
17-Jul-27
30-Jul-27
169.0d
0%
CO02LE0120
02L Lighting Fixture Installation/Termination
17-Jul-27
06-Aug-27
163.0d
0%
CO02LP0130
02L LB Pipe Erection
17-Jul-27
31-Jan-28
-15.0d
0%
CO02LV1130
02L Paint Touch-up - Equipment
17-Jul-27
28-Sep-27
69.0d
0%
CO02AP0130
02A LB Pipe Erection
19-Jul-27
23-Oct-27
78.0d
0%
CO02BP0130
02B LB Pipe Erection
19-Jul-27
16-Aug-27
120.0d
0%
CO02KP0140
02K SB Pipe Erection
19-Jul-27
30-Oct-27
77.0d
0%
CO02QE0120
02Q Lighting Fixture Installation/Termination
20-Jul-27
26-Jul-27
173.0d
0%
CO02YE0130
02Y Power/Control JB's, Tray, Cable, Termination
20-Jul-27
16-Nov-27
-35.0d
0%
CO02YI0120
02Y Instrument JB's, Field Instr, Tray, Cable
20-Jul-27
16-Nov-27
-35.0d
0%
CO02FE0130
02F Power/Control JB's, Tray, Cable, Termination
22-Jul-27
11-Oct-27
104.0d
0%
CO02FI0120
02F Instrument JB's, Field Instr, Tray, Cable
22-Jul-27
11-Oct-27
104.0d
0%
CO02NE0110
02N Lighting JB's, Stands, Tray & Cable
23-Jul-27
12-Aug-27
152.0d
0%
CO02NV1130
02N Paint Touch-up - Equipment
23-Jul-27
29-Jul-27
146.0d
0%
CO02JE0120
02J Lighting Fixture Installation/Termination
24-Jul-27
13-Aug-27
157.0d
0%
CO02LP0140
02L SB Pipe Erection
24-Jul-27
07-Feb-28
-15.0d
0%
CO02HM0275
02H Complete Primary Reformer Erection (101-B)
24-Jul-27
24-Jul-27
174.0d
0%
CO02AP0140
02A SB Pipe Erection
26-Jul-27
30-Oct-27
78.0d
0%
CO02HP0130
02H LB Pipe Erection
27-Jul-27
05-Jan-28
10.0d
0%
CO02MP0140
02M SB Pipe Erection
27-Jul-27
15-Oct-27
92.0d
0%
CO02PE0110
02P Lighting JB's, Stands, Tray & Cable
27-Jul-27
02-Aug-27
150.0d
0%
CO02YV1120
02Y Paint Touch-up - Piping
27-Jul-27
09-Nov-27
101.0d
0%
CO02YV1130
02Y Paint Touch-up - Pipe Rack
27-Jul-27
09-Nov-27
101.0d
0%
CO02CP0150
02C Punchlist / Test Piping
28-Jul-27
22-Oct-27
83.0d
0%
CO02HM0120
02H Set (Heavey Lift) - 101-C & 102-C
30-Jul-27
04-Aug-27
10.0d
0%
CO02GV1130
02G Paint Touch-up - Equipment
30-Jul-27
25-Sep-27
116.0d
0%
CO02KE0130
02K Power/Control JB's, Tray, Cable, Termination
30-Jul-27
06-Nov-27
77.0d
0%
CO02KI0120
02K Instrument JB's, Field Instr, Tray, Cable
30-Jul-27
06-Nov-27
77.0d
0%
CO02AE0120
02A Lighting Fixture Installation/Termination
31-Jul-27
13-Aug-27
157.0d
0%
CO02EV2110
02E Insulate - Equipment
31-Jul-27
27-Aug-27
151.0d
0%
CO02CE0110
02C Lighting JB's, Stands, Tray & Cable
03-Aug-27
05-Oct-27
113.0d
0%
CO02GE0120
02G Lighting Fixture Installation/Termination
03-Aug-27
01-Sep-27
149.0d
0%
CO02HP0140
02H SB Pipe Erection
03-Aug-27
12-Jan-28
10.0d
0%
CO02PE0120
02P Lighting Fixture Installation/Termination
03-Aug-27
09-Aug-27
161.0d
0%
CO020M0130
Demobilize Heavy Lift Crane
05-Aug-27
16-Aug-27
56.0d
0%
CO02HS0110
02H Erect Structural Steel - Structure
05-Aug-27
07-Oct-27
10.0d
0%
CO02GV1120
02G Paint Touch-up - Piping
06-Aug-27
02-Oct-27
134.0d
0%
CO02AE0130
02A Power/Control JB's, Tray, Cable, Termination
07-Aug-27
06-Nov-27
78.0d
0%
CO02AI0120
02A Instrument JB's, Field Instr, Tray, Cable
07-Aug-27
06-Nov-27
78.0d
0%
CO02ME0130
02M Power/Control JB's, Tray, Cable, Termination
07-Aug-27
22-Oct-27
95.0d
0%
CO02MI0120
02M Instrument JB's, Field Instr, Tray, Cable
07-Aug-27
22-Oct-27
95.0d
0%
CO02BP0140
02B SB Pipe Erection
09-Aug-27
30-Aug-27
120.0d
0%
CO02JP0150
02J Punchlist / Test Piping
09-Aug-27
11-Oct-27
102.0d
0%
CO02KE0120
02K Lighting Fixture Installation/Termination
09-Aug-27
21-Sep-27
144.0d
0%
CO02YP0150
02Y Punchlist / Test Piping
10-Aug-27
09-Nov-27
65.0d
0%
CO02LE0130
02L Power/Control JB's, Tray, Cable, Termination
11-Aug-27
14-Feb-28
-12.0d
0%
CO02LI0120
02L Instrument JB's, Field Instr, Tray, Cable
11-Aug-27
14-Feb-28
-12.0d
0%
CO02NE0120
02N Lighting Fixture Installation/Termination
13-Aug-27
25-Aug-27
152.0d
0%
CO02NV2110
02N Insulate - Equipment
13-Aug-27
08-Sep-27
146.0d
0%
CO02EP0140
02E SB Pipe Erection
16-Aug-27
13-Nov-27
67.0d
0%
CO02LV2110
02L Insulate - Equipment
16-Aug-27
26-Oct-27
69.0d
0%
CO02HE0130
02H Power/Control JB's, Tray, Cable, Termination
23-Aug-27
19-Jan-28
15.0d
0%
CO02HI0120
02H Instrument JB's, Field Instr, Tray, Cable
23-Aug-27
19-Jan-28
15.0d
0%
CO02FP0150
02F Punchlist / Test Piping
25-Aug-27
11-Oct-27
102.0d
0%
CO02BE0130
02B Power/Control JB's, Tray, Cable, Termination
30-Aug-27
20-Sep-27
136.0d
0%
CO02BI0120
02B Instrument JB's, Field Instr, Tray, Cable
30-Aug-27
20-Sep-27
136.0d
0%
CO02PP0140
02P SB Pipe Erection
30-Aug-27
28-Sep-27
103.0d
0%
CO02BP0150
02B Punchlist / Test Piping
01-Sep-27
20-Sep-27
120.0d
0%
CO02BV1120
02B Paint Touch-up - Piping
01-Sep-27
20-Sep-27
144.0d
0%
CO02CV1120
02C Paint Touch-up - Piping
01-Sep-27
22-Oct-27
116.0d
0%
CO02GV2120
02G Insulate - Piping
03-Sep-27
30-Oct-27
110.0d
0%
CO02JV1120
02J Paint Touch-up - Piping
06-Sep-27
11-Oct-27
102.0d
0%
CO02JV1130
02J Paint Touch-up - Equipment
06-Sep-27
11-Oct-27
102.0d
0%
CO02EE0130
02E Power/Control JB's, Tray, Cable, Termination
08-Sep-27
26-Nov-27
67.0d
0%
CO02EI0120
02E Instrument JB's, Field Instr, Tray, Cable
08-Sep-27
26-Nov-27
67.0d
0%
CO02HV1130
02H Paint Touch-up - Equipment
10-Sep-27
28-Oct-27
52.0d
0%
CO02GV2110
02G Insulate - Equipment
10-Sep-27
23-Oct-27
116.0d
0%
CO02QP0140
02Q SB Pipe Erection
20-Sep-27
05-Oct-27
101.0d
0%
CO02BI0130
02B Install In Line Instruments
21-Sep-27
22-Sep-27
130.0d
0%
CO02PI0120
02P Instrument JB's, Field Instr, Tray, Cable
21-Sep-27
05-Oct-27
121.0d
0%
CO02FV1120
02F Paint Touch-up - Piping
23-Sep-27
11-Oct-27
126.0d
0%
CO02HE0110
02H Lighting JB's, Stands, Tray & Cable
24-Sep-27
04-Nov-27
87.0d
0%
CO02MP0150
02M Punchlist / Test Piping
24-Sep-27
22-Oct-27
92.0d
0%
CO02KP0150
02K Punchlist / Test Piping
27-Sep-27
06-Nov-27
80.0d
0%
CO02PP0150
02P Punchlist / Test Piping
28-Sep-27
05-Oct-27
107.0d
0%
CO02QI0120
02Q Instrument JB's, Field Instr, Tray, Cable
28-Sep-27
12-Oct-27
115.0d
0%
CO02CV2120
02C Insulate - Piping
29-Sep-27
25-Nov-27
92.0d
0%
CO02PV1130
02P Paint Touch-up - Equipment
29-Sep-27
02-Oct-27
103.0d
0%
CO02YV2120
02Y Insulate - Piping
29-Sep-27
27-Dec-27
65.0d
0%
CO02DP0140
02D SB Pipe Erection
30-Sep-27
25-Nov-27
62.0d
0%
CO02AP0150
02A Punchlist / Test Piping
01-Oct-27
06-Nov-27
79.0d
0%
CO02PV1120
02P Paint Touch-up - Piping
01-Oct-27
05-Oct-27
125.0d
0%
CO02GI0130
02G Install In Line Instruments
02-Oct-27
13-Oct-27
105.0d
0%
CO02QP0150
02Q Punchlist / Test Piping
05-Oct-27
12-Oct-27
101.0d
0%
CO02CE0120
02C Lighting Fixture Installation/Termination
06-Oct-27
26-Oct-27
113.0d
0%
CO02JV2120
02J Insulate - Piping
06-Oct-27
08-Nov-27
102.0d
0%
CO02MV1120
02M Paint Touch-up - Piping
06-Oct-27
22-Oct-27
116.0d
0%
CO02PI0130
02P Install In Line Instruments
06-Oct-27
06-Oct-27
118.0d
0%
CO02QV1120
02Q Paint Touch-up - Piping
06-Oct-27
09-Oct-27
121.0d
0%
CO02QV1130
02Q Paint Touch-up - Equipment
06-Oct-27
09-Oct-27
121.0d
0%
CO02DE0130
02D Power/Control JB's, Tray, Cable, Termination
11-Oct-27
02-Dec-27
68.0d
0%
CO02DI0120
02D Instrument JB's, Field Instr, Tray, Cable
11-Oct-27
02-Dec-27
68.0d
0%
CO02QV2110
02Q Insulate - Equipment
11-Oct-27
16-Oct-27
121.0d
0%
CO02BV2120
02B Insulate - Piping
12-Oct-27
18-Oct-27
120.0d
0%
CO02FI0130
02F Install In Line Instruments
12-Oct-27
16-Oct-27
109.0d
0%
CO02JI0130
02J Install In Line Instruments
12-Oct-27
19-Oct-27
104.0d
0%
CO02QI0130
02Q Install In Line Instruments
13-Oct-27
13-Oct-27
112.0d
0%
CO02YE0120
02Y Lighting Fixture Installation/Termination
13-Oct-27
27-Nov-27
90.0d
0%
CO02KV1120
02K Paint Touch-up - Piping
13-Oct-27
06-Nov-27
104.0d
0%
CO02FV2120
02F Insulate - Piping
14-Oct-27
08-Nov-27
102.0d
0%
CO02JV2110
02J Insulate - Equipment
14-Oct-27
08-Nov-27
102.0d
0%
CO02AV1120
02A Paint Touch-up - Piping
16-Oct-27
06-Nov-27
103.0d
0%
CO02HV2110
02H Insulate - Equipment
16-Oct-27
01-Dec-27
52.0d
0%
CO02EP0150
02E Punchlist / Test Piping
18-Oct-27
26-Nov-27
67.0d
0%
CO02CI0130
02C Install In Line Instruments
23-Oct-27
04-Nov-27
83.0d
0%
CO02MI0130
02M Install In Line Instruments
23-Oct-27
28-Oct-27
99.0d
0%
CO02PV2120
02P Insulate - Piping
27-Oct-27
02-Nov-27
107.0d
0%
CO02MV2120
02M Insulate - Piping
28-Oct-27
25-Nov-27
92.0d
0%
CO020K0100
020 Site Prep - Guard Posts & Gravel
01-Nov-27
01-Mar-28
9.0d
0%
CO02EV1120
02E Paint Touch-up - Piping
01-Nov-27
26-Nov-27
91.0d
0%
CO02PV2110
02P Insulate - Equipment
01-Nov-27
06-Nov-27
103.0d
0%
WO020K0100
020 Site Prep
01-Nov-27
01-Mar-28
9.0d
0%
CO02DP0150
02D Punchlist / Test Piping
02-Nov-27
02-Dec-27
62.0d
0%
CO02KV2120
02K Insulate - Piping
02-Nov-27
10-Dec-27
80.0d
0%
CO02QV2120
02Q Insulate - Piping
03-Nov-27
09-Nov-27
101.0d
0%
CO02AV2120
02A Insulate - Piping
05-Nov-27
10-Dec-27
79.0d
0%
CO02HE0120
02H Lighting Fixture Installation/Termination
05-Nov-27
01-Dec-27
87.0d
0%
CO02KI0130
02K Install In Line Instruments
06-Nov-27
15-Nov-27
83.0d
0%
CO02AI0130
02A Install In Line Instruments
08-Nov-27
13-Nov-27
84.0d
0%
CO02NP0140
02N SB Pipe Erection
08-Nov-27
17-Nov-27
56.0d
0%
CO02YI0130
02Y Install In Line Instruments
10-Nov-27
13-Dec-27
65.0d
0%
CO02HP0150
02H Punchlist / Test Piping
11-Nov-27
19-Jan-28
10.0d
0%
CO02DV1120
02D Paint Touch-up - Piping
12-Nov-27
02-Dec-27
86.0d
0%
CO02NE0130
02N Power/Control JB's, Tray, Cable, Termination
15-Nov-27
30-Nov-27
80.0d
0%
CO02NI0120
02N Instrument JB's, Field Instr, Tray, Cable
15-Nov-27
30-Nov-27
80.0d
0%
CO02LP0150
02L Punchlist / Test Piping
16-Nov-27
14-Feb-28
-15.0d
0%
CO02NV1120
02N Paint Touch-up - Piping
18-Nov-27
30-Nov-27
88.0d
0%
CO02NP0150
02N Punchlist / Test Piping
26-Nov-27
30-Nov-27
56.0d
0%
CO02EI0130
02E Install In Line Instruments
27-Nov-27
03-Dec-27
73.0d
0%
CO02EV2120
02E Insulate - Piping
27-Nov-27
24-Dec-27
67.0d
0%
CO02NI0130
02N Install In Line Instruments
01-Dec-27
01-Dec-27
75.0d
0%
CO02DI0130
02D Install In Line Instruments
03-Dec-27
07-Dec-27
70.0d
0%
CO02GI0140
02G Continuity Testing
07-Dec-27
16-Dec-27
54.0d
0%
CO02YI0140
02Y Continuity Testing
07-Dec-27
03-Jan-28
53.0d
0%
CO02DV2120
02D Insulate - Piping
10-Dec-27
30-Dec-27
62.0d
0%
CO02HV1120
02H Paint Touch-up - Piping
10-Dec-27
19-Jan-28
45.0d
0%
CO02AI0140
02A Continuity Testing
14-Dec-27
20-Dec-27
52.0d
0%
CO02BI0140
02B Continuity Testing
14-Dec-27
15-Dec-27
73.0d
0%
CO02KI0140
02K Continuity Testing
15-Dec-27
22-Dec-27
48.0d
0%
CO02BT0110
02B Mechanical Completion
15-Dec-27
15-Dec-27
75.0d
0%
CO02DI0140
02D Continuity Testing
16-Dec-27
20-Dec-27
59.0d
0%
CO02GT0110
02G Mechanical Completion
16-Dec-27
16-Dec-27
74.0d
0%
CO02CI0140
02C Continuity Testing
17-Dec-27
29-Dec-27
41.0d
0%
SC02BT0120
02B RFSU
18-Dec-27
18-Dec-27
85.0d
0%
CO02AT0110
02A Mechanical Completion
20-Dec-27
20-Dec-27
71.0d
0%
CO02DT0110
02D Mechanical Completion
20-Dec-27
20-Dec-27
71.0d
0%
CO02EI0140
02E Continuity Testing
21-Dec-27
27-Dec-27
47.0d
0%
CO02JI0140
02J Continuity Testing
21-Dec-27
28-Dec-27
42.0d
0%
CO02MI0140
02M Continuity Testing
21-Dec-27
25-Dec-27
51.0d
0%
CO02NI0140
02N Continuity Testing
22-Dec-27
22-Dec-27
67.0d
0%
CO02KT0110
02K Mechanical Completion
22-Dec-27
22-Dec-27
69.0d
0%
CO02NT0110
02N Mechanical Completion
22-Dec-27
22-Dec-27
69.0d
0%
CO02PI0140
02P Continuity Testing
23-Dec-27
23-Dec-27
64.0d
0%
CO02PT0110
02P Mechanical Completion
23-Dec-27
23-Dec-27
68.0d
0%
CO02HV2120
02H Insulate - Piping
24-Dec-27
16-Feb-28
21.0d
0%
CO02NV2120
02N Insulate - Piping
24-Dec-27
06-Jan-28
56.0d
0%
CO02QI0140
02Q Continuity Testing
24-Dec-27
24-Dec-27
63.0d
0%
CO02QT0110
02Q Mechanical Completion
24-Dec-27
24-Dec-27
67.0d
0%
CO02LV1120
02L Paint Touch-up - Piping
25-Dec-27
14-Feb-28
23.0d
0%
CO02MT0110
02M Mechanical Completion
25-Dec-27
25-Dec-27
66.0d
0%
CO02ET0110
02E Mechanical Completion
27-Dec-27
27-Dec-27
65.0d
0%
CO02FI0140
02F Continuity Testing
28-Dec-27
01-Jan-28
44.0d
0%
CO02JT0110
02J Mechanical Completion
28-Dec-27
28-Dec-27
64.0d
0%
SC02PT0120
02P RFSU
28-Dec-27
28-Dec-27
75.0d
0%
CO02CT0110
02C Mechanical Completion
29-Dec-27
29-Dec-27
63.0d
0%
SC02QT0120
02Q RFSU
29-Dec-27
29-Dec-27
74.0d
0%
CO02FT0110
02F Mechanical Completion
01-Jan-28
01-Jan-28
60.0d
0%
CO02YT0110
02Y Mechanical Completion
03-Jan-28
03-Jan-28
59.0d
0%
SC02DT0120
02D RFSU
04-Jan-28
04-Jan-28
68.0d
0%
CO02LV2120
02L Insulate - Piping
05-Jan-28
13-Mar-28
-1.0d
0%
SC02NT0120
02N RFSU
06-Jan-28
06-Jan-28
66.0d
0%
SC02GT0120
02G RFSU
09-Jan-28
09-Jan-28
63.0d
0%
SC02YT0120
02Y RFSU
10-Jan-28
10-Jan-28
62.0d
0%
SC02AT0120
02A RFSU
12-Jan-28
12-Jan-28
60.0d
0%
SC02MT0120
02M RFSU
12-Jan-28
12-Jan-28
60.0d
0%
CO02HI0140
02H Continuity Testing
14-Jan-28
26-Jan-28
15.0d
0%
SC02KT0120
02K RFSU
16-Jan-28
16-Jan-28
56.0d
0%
SC02ET0120
02E RFSU
17-Jan-28
17-Jan-28
55.0d
0%
CO02HI0130
02H Install In Line Instruments
20-Jan-28
01-Feb-28
10.0d
0%
SC02FT0120
02F RFSU
20-Jan-28
20-Jan-28
52.0d
0%
SC02JT0120
02J RFSU
23-Jan-28
23-Jan-28
49.0d
0%
SC02CT0120
02C RFSU
24-Jan-28
24-Jan-28
48.0d
0%
CO02HI0145
02H Contingency (101-B)
27-Jan-28
23-Feb-28
15.0d
0%
CO02LI0140
02L Continuity Testing
05-Feb-28
21-Feb-28
-12.0d
0%
CO02LI0130
02L Install In Line Instruments
15-Feb-28
01-Mar-28
-15.0d
0%
CO02LT0110
02L Mechanical Completion
21-Feb-28
21-Feb-28
17.0d
0%
CO02HT0110
02H Mechanical Completion
23-Feb-28
23-Feb-28
15.0d
0%
SC02HT0120
02H RFSU
29-Feb-28
29-Feb-28
12.0d
0%
SC02LT0120
02L RFSU
29-Mar-28
29-Mar-28
-17.0d
0%
Mar 2026 Apr 2026 May 2026 Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Data Date
CO02HC0140 — 02H Form Pour Strip Fnds - Structure | 21-Mar-26 → 27-Dec-26 | In Progress 12% | float — CO02HC0140 WO020C0100 — 020 Concrete & Excavation | 21-Mar-26 → 23-Mar-27 | In Progress 9% | float 215.0d WO020C0100 CO02JC0150 — 02J Form, Pour, Strip Fnd - 104-D2 (Low Temp Shift Converter) | 30-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0150 CO02JC0160 — 02J Form, Pour, Strip Fnd - 104-D1 (High Temp Shift Converter) | 30-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0160 CO02JC0110 — 02J Form, Pour, Strip Fnds - Major Fnds Gen'l | 01-Apr-26 → 27-Dec-26 | In Progress 9% | float — CO02JC0110 CO02LC0150 — 02L Form, Pour, Strip Fnd - 101-E (CO2 Absorber) | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02LC0150 CO02MC0110 — 02M Form, Pour, Strip Fnds - Major Fnds Gen'l | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02MC0110 CO02MC0140 — 02M Form Pour Strip Fnds - Structure | 03-Apr-26 → 27-Dec-26 | In Progress 8% | float — CO02MC0140 CO02KC0150 — 02K Form, Pour, Strip Fnd - 114-F (Benfield Solution Tank) | 04-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO02KC0150 CO02BC0110 — 02B Form, Pour, Strip Fnds - Major Fnds | 09-Apr-26 → 27-Dec-26 | In Progress 6% | float — CO02BC0110 CO02AC0110 — 02A Form, Pour, Strip Fnds - Major Fnds | 15-Apr-26 → 09-Mar-27 | In Progress 5% | float 189.0d CO02AC0110 CO02HC0150 — 02H Form, Pour, Strip Fnd - 103-D (Secondary Reformer) | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO02HC0150 CO02CC0160 — 02C Form, Pour, Strip Fnd - 103-JTC | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02CM0140 — 02C Set - 103-JTC Surface Condenser | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02EC0110 — 02E Form, Pour, Strip Fnds - Major Fnds Gen'l | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02EC0140 — 02E Form Pour Strip Fnds - Structure | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02GC0160 — 02G Form, Pour, Strip Fnd - 102-J Fd Gas Compr. & Aux. | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HC0110 — 02H Form, Pour, Strip Fnds - 101B (Primary Reformer) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HC0160 — 02H Form, Pour, Strip Fnd - 156-F (Steam Blowdown Drum) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02HM0140 — 02H Set - 156-F Steam Blowdown Drum | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02LC0160 — 02L Form, Pour, Strip Fnd - 102-E (CO2 Stripper) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02MC0150 — 02M Form, Pour, Strip Fnd - 105-D (Ammonia Synthesis Converter) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02NC0110 — 02N Form, Pour, Strip Fnds - Major Fnds | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02YC0140 — 02Y Form Pour Strip Fnds - Pipe Rack | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO02AU4120 — 02A U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 222.0d CO02AU4120 CO02BU4120 — 02B U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 219.0d CO02BU4120 CO02CC0110 — 02C Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 26-Jan-27 | Not Started 0% | float 165.0d CO02CC0110 CO02CC0150 — 02C Form, Pour, Strip Fnd - 103/105-J & Table Tops | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02CM0110 — 02C Set Static Equipment - 128/167-C | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02CU4120 — 02C U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 162.0d CO02CU4120 CO02DC0110 — 02D Form, Pour, Strip Fnds - Major Fnds | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float 252.0d CO02DC0110 CO02DU4120 — 02D U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 248.0d CO02DU4120 CO02EU4120 — 02E U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 227.0d CO02EU4120 CO02FC0110 — 02F Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 234.0d CO02FC0110 CO02FU4120 — 02F U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 234.0d CO02FU4120 CO02GC0150 — 02G Form, Pour, Strip Fnd - 101-J/JT & 2ea. Table Tops | 28-Dec-26 → 01-Feb-27 | Not Started 0% | float 134.0d CO02GC0150 CO02GM0140 — 02G Set/Install - 102-J Fd Gas Compr. & Aux. | 28-Dec-26 → 22-Apr-27 | Not Started 0% | float 188.0d CO02GM0140 CO02HU4120 — 02H U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 162.0d CO02HU4120 CO02JU4120 — 02J U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 211.0d CO02JU4120 CO02KC0110 — 02K Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 192.0d CO02KC0110 CO02KU4120 — 02K U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 214.0d CO02KU4120 CO02LC0110 — 02L Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 123.0d CO02LC0110 CO02LC0140 — 02L Form Pour Strip Fnds - 02L Structure | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 45.0d CO02LC0140 CO02MU4120 — 02M U/G Piping Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 239.0d CO02MU4120 CO02UP0130 — 02U LB Pipe Erection (CW & Misc Headers) | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 71.0d CO02UP0130 CO02UV1110 — 02U Paint Fabricated Pipe Spools (CW & Misc Headers) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO02YU3110 — 02Y U/G Earthing Installation | 28-Dec-26 → 29-Jan-27 | Not Started 0% | float 100.0d CO02YU3110 WO020M0100 — 020 Major Equipment | 28-Dec-26 → 16-Aug-27 | Not Started 0% | float 156.0d WO020M0100 WO020U3100 — 020 Install U/G Electrical | 28-Dec-26 → 12-Mar-27 | Not Started 0% | float 265.0d WO020U3100 WO020U4100 — 020 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 224.0d WO020U4100 CO02HM0200 — 02H Start Primary Reformer Erection (101-B) | 02-Jan-27 | Not Started CO02HM0210 — 02H Erect Radiant Section Shell (101-B) | 02-Jan-27 → 02-Apr-27 | Not Started 0% | float 108.0d CO02HM0210 CO02LU4120 — 02L U/G Piping Installation | 02-Jan-27 → 29-Jan-27 | Not Started 0% | float 123.0d CO02LU4120 CO02GU4120 — 02G U/G Piping Installation | 06-Jan-27 → 26-Feb-27 | Not Started 0% | float 159.0d CO02GU4120 CO02CM0125 — 02C Set - 103/105-J Compressors | 12-Jan-27 → 16-Jan-27 | Not Started 0% | float 167.0d CO02CM0125 CO02YS0110 — 02Y Erect Structural Steel - Pipe Rack | 12-Jan-27 → 14-Jun-27 | Not Started 0% | float -35.0d CO02YS0110 WO020S0100 — 020 Erect Steel | 12-Jan-27 → 07-Oct-27 | Not Started 0% | float 69.0d WO020S0100 CO02HU3110 — 02H U/G Earthing Installation | 13-Jan-27 → 12-Feb-27 | Not Started 0% | float 162.0d CO02HU3110 CO02CU3110 — 02C U/G Earthing Installation | 14-Jan-27 → 12-Feb-27 | Not Started 0% | float 168.0d CO02CU3110 CO02HC0120 — 02H Form, Pour, Strip Fnds - Misc Fnds | 16-Jan-27 → 05-Feb-27 | Not Started 0% | float 174.0d CO02HC0120 CO02LU3110 — 02L U/G Earthing Installation | 16-Jan-27 → 12-Feb-27 | Not Started 0% | float 129.0d CO02LU3110 CO02UP0150 — 02U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO02UP0150 CO02CM0130 — 02C Install - 103/105-J Compressors & Aux. Equip. | 18-Jan-27 → 13-May-27 | Not Started 0% | float 167.0d CO02CM0130 CO02AU3110 — 02A U/G Earthing Installation | 20-Jan-27 → 05-Feb-27 | Not Started 0% | float 228.0d CO02AU3110 CO02CV1110 — 02C Paint Fabricated Pipe Spools | 20-Jan-27 → 27-Feb-27 | Not Started 0% | float 245.0d CO02CV1110 WO020V1100 — 020 Paint | 20-Jan-27 → 14-Feb-28 | Not Started 0% | float 23.0d WO020V1100 CO02GC0110 — 02G Form, Pour, Strip Fnds - Major Fnds Gen'l | 23-Jan-27 → 26-Feb-27 | Not Started 0% | float 159.0d CO02GC0110 CO02JU3110 — 02J U/G Earthing Installation | 25-Jan-27 → 12-Feb-27 | Not Started 0% | float 211.0d CO02JU3110 CO02BM0110 — 02B Set Static Equipment | 25-Jan-27 → 25-Jan-27 | Not Started 0% | float — CO02BV1130 — 02B Paint Touch-up - Equipment | 25-Jan-27 → 01-Feb-27 | Not Started 0% | float 300.0d CO02BV1130 CO02KU3110 — 02K U/G Earthing Installation | 26-Jan-27 → 12-Feb-27 | Not Started 0% | float 214.0d CO02KU3110 CO02EU3110 — 02E U/G Earthing Installation | 28-Jan-27 → 12-Feb-27 | Not Started 0% | float 227.0d CO02EU3110 CO02FU3110 — 02F U/G Earthing Installation | 29-Jan-27 → 12-Feb-27 | Not Started 0% | float 234.0d CO02FU3110 CO02BC0120 — 02B Form, Pour, Strip Fnds - Misc Fnds | 29-Jan-27 → 29-Jan-27 | Not Started 0% | float — CO02CC0120 — 02C Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 19-Feb-27 | Not Started 0% | float 162.0d CO02CC0120 CO02DC0120 — 02D Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 30-Jan-27 | Not Started 0% | float 260.0d CO02EC0120 — 02E Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 227.0d CO02EC0120 CO02FC0120 — 02F Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 234.0d CO02FC0120 CO02FM0110 — 02F Set Static Equipment | 30-Jan-27 → 26-Feb-27 | Not Started 0% | float 241.0d CO02FM0110 CO02JC0120 — 02J Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 211.0d CO02JC0120 CO02KC0120 — 02K Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 214.0d CO02KC0120 CO02LC0120 — 02L Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 19-Feb-27 | Not Started 0% | float 123.0d CO02LC0120 CO02MC0120 — 02M Form, Pour, Strip Fnds - Misc Fnds | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 239.0d CO02MC0120 CO02MU3110 — 02M U/G Earthing Installation | 30-Jan-27 → 12-Feb-27 | Not Started 0% | float 239.0d CO02MU3110 CO02YC0130 — 02Y Install Paving | 30-Jan-27 → 17-Mar-27 | Not Started 0% | float 71.0d CO02YC0130 WO020C0110 — 020 Concrete Paving | 30-Jan-27 → 22-May-27 | Not Started 0% | float 210.0d WO020C0110 CO02DU3110 — 02D U/G Earthing Installation | 02-Feb-27 → 12-Feb-27 | Not Started 0% | float 248.0d CO02DU3110 CO02YV1110 — 02Y Paint Fabricated Pipe Spools | 05-Feb-27 → 19-Feb-27 | Not Started 0% | float 131.0d CO02YV1110 CO02BU3110 — 02B U/G Earthing Installation | 10-Feb-27 → 12-Feb-27 | Not Started 0% | float 289.0d CO02EV1110 — 02E Paint Fabricated Pipe Spools | 12-Feb-27 → 04-Mar-27 | Not Started 0% | float 250.0d CO02EV1110 CO02GU3110 — 02G U/G Earthing Installation | 15-Feb-27 → 12-Mar-27 | Not Started 0% | float 159.0d CO02GU3110 CO02GV1110 — 02G Paint Fabricated Pipe Spools | 16-Feb-27 → 22-Mar-27 | Not Started 0% | float 230.0d CO02GV1110 CO02CC0130 — 02C Install Paving | 20-Feb-27 → 05-Mar-27 | Not Started 0% | float 162.0d CO02CC0130 CO02LC0130 — 02L Install Paving | 20-Feb-27 → 05-Mar-27 | Not Started 0% | float 123.0d CO02LC0130 CO02HM0220 — 02H Erect Radiant Ducting / Burners (101-B) | 22-Feb-27 → 20-Mar-27 | Not Started 0% | float 151.0d CO02HM0220 CO02UDT110 — 02U Mechanical Completion | 26-Feb-27 | Not Started SC02UT0120 — 02U RFSU | 26-Feb-27 | Not Started CO02GC0120 — 02G Form, Pour, Strip Fnds - Misc Fnds | 27-Feb-27 → 19-Mar-27 | Not Started 0% | float 165.0d CO02GC0120 CO02GM0110 — 02G Set Static Equipment - Gen'l | 27-Feb-27 → 31-Mar-27 | Not Started 0% | float 208.0d CO02GM0110 CO02JS0130 — 02J Pre-Install Misc Steel - 104-D2 | 01-Mar-27 → 15-Mar-27 | Not Started 0% | float 103.0d CO02JS0130 CO02JS0140 — 02J Pre-Install Misc Steel - 104-D1 | 01-Mar-27 → 15-Mar-27 | Not Started 0% | float 108.0d CO02JS0140 CO02LS0130 — 02L Pre-Install Misc Steel - 101-E | 01-Mar-27 → 15-Mar-27 | Not Started 0% | float 113.0d CO02LS0130 CO02GM0125 — 02G Set - 101-J/JT Air Compr. | 08-Mar-27 → 05-Apr-27 | Not Started 0% | float 105.0d CO02GM0125 CO02AC0120 — 02A Form, Pour, Strip Fnds - Misc Fnds | 10-Mar-27 → 23-Mar-27 | Not Started 0% | float 189.0d CO02AC0120 CO02AM0150 — 02A Set Rotating Equipment | 10-Mar-27 → 06-Apr-27 | Not Started 0% | float 207.0d CO02AM0150 CO02GC0130 — 02G Install Paving | 13-Mar-27 → 26-Mar-27 | Not Started 0% | float 159.0d CO02GC0130 CO02HM0250 — 02H Set Forced Draft Fan (101-B) | 15-Mar-27 → 12-Apr-27 | Not Started 0% | float 234.0d CO02HM0250 CO02YS0120 — 02Y Erect Misc Steel - Pipe Rack | 19-Mar-27 → 14-Jun-27 | Not Started 0% | float 102.0d CO02YS0120 CO02HM0246 — 02H Install Radiant Sect Coils (101-B) | 22-Mar-27 → 17-Apr-27 | Not Started 0% | float 151.0d CO02HM0246 CO02HM0255 — 02H Set Induced Draft Fan (101-B) | 22-Mar-27 → 19-Apr-27 | Not Started 0% | float 234.0d CO02HM0255 CO02KV1130 — 02K Paint Touch-up - Equipment | 23-Mar-27 → 15-Apr-27 | Not Started 0% | float 236.0d CO02KV1130 CO02AC0130 — 02A Install Paving | 24-Mar-27 → 30-Mar-27 | Not Started 0% | float 189.0d CO02AC0130 CO02CM0150 — 02C Set Rotating Equipment - 112-J/JA/JM | 26-Mar-27 → 30-Mar-27 | Not Started 0% | float 205.0d CO02CM0150 CO02GM0150 — 02G Set Rotating Equipment | 26-Mar-27 → 10-Apr-27 | Not Started 0% | float 199.0d CO02GM0150 CO02KM0150 — 02K Set Rotating Equipment | 26-Mar-27 → 01-Apr-27 | Not Started 0% | float 163.0d CO02KM0150 CO02LM0150 — 02L Set Rotating Equipment | 26-Mar-27 → 27-Apr-27 | Not Started 0% | float 170.0d CO02LM0150 CO02HS0140 — 02H Install Misc Steel - 156-F | 27-Mar-27 → 09-Apr-27 | Not Started 0% | float 102.0d CO02HS0140 CO02JV1110 — 02J Paint Fabricated Pipe Spools | 27-Mar-27 → 27-Mar-27 | Not Started 0% | float 164.0d CO02AV1130 — 02A Paint Touch-up - Equipment | 30-Mar-27 → 20-Apr-27 | Not Started 0% | float 232.0d CO02AV1130 CO02MV1110 — 02M Paint Fabricated Pipe Spools | 01-Apr-27 → 14-Apr-27 | Not Started 0% | float 215.0d CO02MV1110 CO02NV1110 — 02N Paint Fabricated Pipe Spools | 01-Apr-27 → 03-Apr-27 | Not Started 0% | float 216.0d CO02DM0150 — 02D Set Rotating Equipment | 02-Apr-27 → 15-Apr-27 | Not Started 0% | float 182.0d CO02DM0150 CO02HC0130 — 02H Install Paving | 03-Apr-27 → 16-Apr-27 | Not Started 0% | float 120.0d CO02HC0130 CO02HM0230 — 02H Set Convection Sections (101-B) | 03-Apr-27 → 30-Apr-27 | Not Started 0% | float 108.0d CO02HM0230 CO02HM0240 — 02H Set Stack for (101-B) | 03-Apr-27 → 30-Apr-27 | Not Started 0% | float 223.0d CO02HM0240 CO02JC0130 — 02J Install Paving | 05-Apr-27 → 10-Apr-27 | Not Started 0% | float 168.0d CO02JC0130 CO02GM0130 — 02G Install - 101-J/JT Air Compr. & Gen. Turb. & Aux. | 05-Apr-27 → 30-Jul-27 | Not Started 0% | float 105.0d CO02GM0130 CO02HS0130 — 02H Pre-Install Misc Steel - 103-D | 05-Apr-27 → 19-Apr-27 | Not Started 0% | float 68.0d CO02HS0130 CO02FV1110 — 02F Paint Fabricated Pipe Spools | 09-Apr-27 → 27-Apr-27 | Not Started 0% | float 204.0d CO02FV1110 CO02LV1110 — 02L Paint Fabricated Pipe Spools | 09-Apr-27 → 29-May-27 | Not Started 0% | float 162.0d CO02LV1110 CO02KV1110 — 02K Paint Fabricated Pipe Spools | 10-Apr-27 → 04-May-27 | Not Started 0% | float 181.0d CO02KV1110 CO02LS0110 — 02L Erect Structure | 10-Apr-27 → 18-Jun-27 | Not Started 0% | float -15.0d CO02LS0110 CO02KC0130 — 02K Install Paving | 12-Apr-27 → 17-Apr-27 | Not Started 0% | float 165.0d CO02KC0130 CO02YP0130 — 02Y LB Pipe Erection | 13-Apr-27 → 05-Oct-27 | Not Started 0% | float -35.0d CO02YP0130 WO020P0100 — 020 Above Ground Pipe | 13-Apr-27 → 14-Feb-28 | Not Started 0% | float -1.0d WO020P0100 CO02DV1130 — 02D Paint Touch-up - Equipment | 15-Apr-27 → 29-Apr-27 | Not Started 0% | float 224.0d CO02DV1130 CO02FM0150 — 02F Set Rotating Equipment | 16-Apr-27 → 13-May-27 | Not Started 0% | float 176.0d CO02FM0150 CO02QV1110 — 02Q Paint Fabricated Pipe Spools | 16-Apr-27 → 20-Apr-27 | Not Started 0% | float 210.0d CO02QV1110 CO020M0110 — Mobilize / Assemble / Test Heavy Lift Crane | 19-Apr-27 → 01-May-27 | Not Started 0% | float 56.0d CO020M0110 CO02EC0130 — 02E Install Paving | 19-Apr-27 → 24-Apr-27 | Not Started 0% | float 172.0d CO02EC0130 CO02HM0248 — 02H Install Effluent Transfer Line (107-D) | 19-Apr-27 → 01-May-27 | Not Started 0% | float 151.0d CO02HM0248 CO02LS0140 — 02L Pre-Install Misc Steel - 102-E | 19-Apr-27 → 03-May-27 | Not Started 0% | float 76.0d CO02LS0140 CO02DV1110 — 02D Paint Fabricated Pipe Spools | 23-Apr-27 → 07-May-27 | Not Started 0% | float 177.0d CO02DV1110 CO02MS0110 — 02M Erect Structural Steel - Structure | 24-Apr-27 → 14-May-27 | Not Started 0% | float 123.0d CO02MS0110 CO02PV1110 — 02P Paint Fabricated Pipe Spools | 24-Apr-27 → 28-Apr-27 | Not Started 0% | float 199.0d CO02PV1110 CO02FC0130 — 02F Install Paving | 26-Apr-27 → 01-May-27 | Not Started 0% | float 173.0d CO02FC0130 CO02HV1110 — 02H Paint Fabricated Pipe Spools | 26-Apr-27 → 05-Jun-27 | Not Started 0% | float 54.0d CO02HV1110 CO02CS0120 — 02C Erect Misc. Steel (Platforms) | 01-May-27 → 02-Aug-27 | Not Started 0% | float 83.0d CO02CS0120 CO02GS0130 — 02G Erect Misc. Steel (Platforms) | 01-May-27 → 02-Aug-27 | Not Started 0% | float 107.0d CO02GS0130 CO02HM0235 — 02H Erect Preheater (101-B) | 01-May-27 → 25-Jun-27 | Not Started 0% | float 175.0d CO02HM0235 CO020M0120 — Heavy Lift Crane Useage | 03-May-27 → 04-Aug-27 | Not Started 0% | float 56.0d CO020M0120 CO02HM0130 — 02H Set (Heavy Lift) - 103-D (Secondary Reformer) | 03-May-27 → 07-May-27 | Not Started 0% | float 56.0d CO02HM0130 CO02HM0225 — 02H Erect Penthouse Roof, & Siding (101-B) | 03-May-27 → 29-May-27 | Not Started 0% | float 151.0d CO02HM0225 CO02MC0130 — 02M Install Paving | 03-May-27 → 08-May-27 | Not Started 0% | float 172.0d CO02MC0130 CO02KS0130 — 02K Pre-Install Misc Steel - Static Equipment | 03-May-27 → 17-May-27 | Not Started 0% | float 101.0d CO02KS0130 CO02GP0130 — 02G LB Pipe Erection | 04-May-27 → 10-Sep-27 | Not Started 0% | float 105.0d CO02GP0130 CO02CP0130 — 02C LB Pipe Erection | 08-May-27 → 08-Oct-27 | Not Started 0% | float 83.0d CO02CP0130 CO02DS0110 — 02D Erect Structural Steel | 08-May-27 → 28-May-27 | Not Started 0% | float 93.0d CO02DS0110 CO02JM0130 — 02J Set (Heavy Lift) - 104-D2 (Low Temp Shift Converter) | 08-May-27 → 13-May-27 | Not Started 0% | float 56.0d CO02JM0130 CO02LS0120 — 02L Erect Misc Steel | 08-May-27 → 04-Jun-27 | Not Started 0% | float 39.0d CO02LS0120 CO02DC0130 — 02D Install Paving | 10-May-27 → 15-May-27 | Not Started 0% | float 175.0d CO02DC0130 CO02FV1130 — 02F Paint Touch-up - Equipment | 10-May-27 → 27-May-27 | Not Started 0% | float 200.0d CO02FV1130 CO02MS0130 — 02M Pre-Install Misc Steel - 105-D | 10-May-27 → 24-May-27 | Not Started 0% | float 63.0d CO02MS0130 CO02YP0140 — 02Y SB Pipe Erection | 11-May-27 → 02-Nov-27 | Not Started 0% | float -29.0d CO02YP0140 CO02GP0140 — 02G SB Pipe Erection | 11-May-27 → 25-Sep-27 | Not Started 0% | float 105.0d CO02GP0140 CO02CV1130 — 02C Paint Touch-up - Equipment | 14-May-27 → 22-Jun-27 | Not Started 0% | float 190.0d CO02CV1130 CO02JM0140 — 02J Set (Heavy Lift) - 104-D1 (High Temp Shift Converter) | 14-May-27 → 19-May-27 | Not Started 0% | float 56.0d CO02JM0140 CO02AS0110 — 02A Erect Structural Steel | 15-May-27 → 04-Jun-27 | Not Started 0% | float 103.0d CO02AS0110 CO02CP0140 — 02C SB Pipe Erection | 15-May-27 → 15-Oct-27 | Not Started 0% | float 83.0d CO02CP0140 CO02MM0110 — 02M Set Static Equipment - Gen'l | 15-May-27 → 16-Jun-27 | Not Started 0% | float 147.0d CO02MM0110 CO02BC0130 — 02B Install Paving | 17-May-27 → 22-May-27 | Not Started 0% | float 210.0d CO02BC0130 CO02KM0110 — 02K Set Static Equipment - Gen'l | 17-May-27 → 07-Jun-27 | Not Started 0% | float 101.0d CO02KM0110 CO02AV1110 — 02A Paint Fabricated Pipe Spools | 20-May-27 → 02-Jun-27 | Not Started 0% | float 172.0d CO02AV1110 CO02LM0130 — 02L Set (Heavy Lift) - 101-E (CO2 Absorber) | 20-May-27 → 25-May-27 | Not Started 0% | float 56.0d CO02LM0130 CO02ES0110 — 02E Erect Structural Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 127.0d CO02ES0110 CO02ES0120 — 02E Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 67.0d CO02ES0120 CO02FS0120 — 02F Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 133.0d CO02FS0120 CO02JS0110 — 02J Erect Structural Steel - Structure | 22-May-27 → 04-Jun-27 | Not Started 0% | float 98.0d CO02JS0110 CO02MS0120 — 02M Erect Misc Steel - Structure | 22-May-27 → 11-Jun-27 | Not Started 0% | float 123.0d CO02MS0120 CO02BV1110 — 02B Paint Fabricated Pipe Spools | 25-May-27 → 31-May-27 | Not Started 0% | float 175.0d CO02BV1110 CO02LM0140 — 02L Set (Heavy Lift) - 102-E (CO2 Stripper) | 26-May-27 → 31-May-27 | Not Started 0% | float 56.0d CO02LM0140 CO02GE0130 — 02G Power/Control JB's, Tray, Cable, Termination | 26-May-27 → 02-Oct-27 | Not Started 0% | float 108.0d CO02GE0130 CO02GI0120 — 02G Instrument JB's, Field Instr, Tray, Cable | 26-May-27 → 02-Oct-27 | Not Started 0% | float 108.0d CO02GI0120 WO020E0100 — 020 Above Ground Electrical | 26-May-27 → 14-Feb-28 | Not Started 0% | float 23.0d WO020E0100 WO020I0100 — 020 Install Instruments & Test | 26-May-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO020I0100 CO02CV2110 — 02C Insulate - Equipment | 28-May-27 → 06-Jul-27 | Not Started 0% | float 190.0d CO02CV2110 WO020V2100 — 020 Insulation | 28-May-27 → 13-Mar-28 | Not Started 0% | float -1.0d WO020V2100 CO02DM0110 — 02D Set Static Equipment | 29-May-27 → 11-Jun-27 | Not Started 0% | float 133.0d CO02DM0110 CO02DS0120 — 02D Erect Misc Steel | 29-May-27 → 18-Jun-27 | Not Started 0% | float 93.0d CO02DS0120 CO02EP0130 — 02E LB Pipe Erection | 29-May-27 → 06-Nov-27 | Not Started 0% | float 67.0d CO02EP0130 CO02HM0260 — 02H Compete Installation of Ducts (101-B) | 29-May-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02HM0260 CO02HM0215 — 02H Erect Fuel Gas Lines (101-B) | 31-May-27 → 26-Jun-27 | Not Started 0% | float 151.0d CO02HM0215 CO02HM0227 — 02H Install Spring Hangers & Align (101-B) | 31-May-27 → 10-Jul-27 | Not Started 0% | float 186.0d CO02HM0227 CO02HM0245 — 02H Install Insulation (101-B) | 31-May-27 → 24-Jul-27 | Not Started 0% | float 174.0d CO02HM0245 CO02CE0130 — 02C Power/Control JB's, Tray, Cable, Termination | 01-Jun-27 → 22-Oct-27 | Not Started 0% | float 88.0d CO02CE0130 CO02CI0120 — 02C Instrument JB's, Field Instr, Tray, Cable | 01-Jun-27 → 22-Oct-27 | Not Started 0% | float 88.0d CO02CI0120 CO02JM0110 — 02J Set Static Equipment - Gen'l | 01-Jun-27 → 11-Jun-27 | Not Started 0% | float 98.0d CO02JM0110 CO02MM0130 — 02M Set (Heavy Lift) - 105-D (Ammonia Converter) | 01-Jun-27 → 05-Jun-27 | Not Started 0% | float 56.0d CO02MM0130 CO02AM0110 — 02A Set Static Equipment | 05-Jun-27 → 18-Jun-27 | Not Started 0% | float 144.0d CO02AM0110 CO02JS0120 — 02J Erect Misc Steel - Structure | 05-Jun-27 → 11-Jun-27 | Not Started 0% | float 98.0d CO02JS0120 CO02LE0110 — 02L Lighting JB's, Stands, Tray & Cable | 05-Jun-27 → 16-Jul-27 | Not Started 0% | float 163.0d CO02LE0110 CO02FV2110 — 02F Insulate - Equipment | 07-Jun-27 → 24-Jun-27 | Not Started 0% | float 200.0d CO02FV2110 CO02MM0140 — 02M Set (Heavy Lift) - 121-C (Ammonia Conv./ Effl Exch.) | 07-Jun-27 → 11-Jun-27 | Not Started 0% | float 56.0d CO02MM0140 CO02KS0120 — 02K Erect Misc Steel | 07-Jun-27 → 28-Jun-27 | Not Started 0% | float 101.0d CO02KS0120 CO02KV2110 — 02K Insulate - Equipment | 10-Jun-27 → 05-Jul-27 | Not Started 0% | float 192.0d CO02KV2110 CO02AS0120 — 02A Erect Misc Steel | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 103.0d CO02AS0120 CO02BE0110 — 02B Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 25-Jun-27 | Not Started 0% | float 193.0d CO02BE0110 CO02EE0110 — 02E Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 175.0d CO02EE0110 CO02EM0110 — 02E Set Static Equipment | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 127.0d CO02EM0110 CO02FE0110 — 02F Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 175.0d CO02FE0110 CO02JE0110 — 02J Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 23-Jul-27 | Not Started 0% | float 157.0d CO02JE0110 CO02JP0130 — 02J LB Pipe Erection | 12-Jun-27 → 27-Sep-27 | Not Started 0% | float 98.0d CO02JP0130 CO02ME0110 — 02M Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 09-Jul-27 | Not Started 0% | float 175.0d CO02ME0110 CO02MV1130 — 02M Paint Touch-up - Equipment | 12-Jun-27 → 29-Jun-27 | Not Started 0% | float 172.0d CO02MV1130 CO02NM0110 — 02N Set (Heavy Lift) - 120-C (Ammonia Unitized Chiller) | 12-Jun-27 → 17-Jun-27 | Not Started 0% | float 56.0d CO02NM0110 CO02BV2110 — 02B Insulate - Equipment | 14-Jun-27 → 19-Jun-27 | Not Started 0% | float 204.0d CO02BV2110 CO02PM0110 — 02P Set 101-U Dearator | 15-Jun-27 → 28-Jun-27 | Not Started 0% | float 103.0d CO02PM0110 CO02QM0110 — 02Q Set 101-F Steam Drum | 15-Jun-27 → 21-Jun-27 | Not Started 0% | float 101.0d CO02QM0110 CO02NS0120 — 02N Erect Misc Steel | 18-Jun-27 → 22-Jul-27 | Not Started 0% | float 56.0d CO02NS0120 CO02DE0110 — 02D Lighting JB's, Stands, Tray & Cable | 19-Jun-27 → 16-Jul-27 | Not Started 0% | float 169.0d CO02DE0110 CO02JP0140 — 02J SB Pipe Erection | 19-Jun-27 → 04-Oct-27 | Not Started 0% | float 98.0d CO02JP0140 CO02LM0110 — 02L Set Static Equipment - Gen'l | 19-Jun-27 → 21-Jul-27 | Not Started 0% | float 103.0d CO02LM0110 CO02LM0120 — 02L Set Static Equipment - 02L Structure | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float -15.0d CO02LM0120 CO02QS0120 — 02Q Erect Misc Steel | 22-Jun-27 → 12-Jul-27 | Not Started 0% | float 101.0d CO02QS0120 CO02AV2110 — 02A Insulate - Equipment | 25-Jun-27 → 16-Jul-27 | Not Started 0% | float 181.0d CO02AV2110 CO02DV2110 — 02D Insulate - Equipment | 25-Jun-27 → 09-Jul-27 | Not Started 0% | float 187.0d CO02DV2110 CO02NP0130 — 02N LB Pipe Erection | 25-Jun-27 → 10-Nov-27 | Not Started 0% | float 56.0d CO02NP0130 CO02BE0120 — 02B Lighting Fixture Installation/Termination | 26-Jun-27 → 02-Jul-27 | Not Started 0% | float 193.0d CO02BE0120 CO02MP0130 — 02M LB Pipe Erection | 28-Jun-27 → 08-Oct-27 | Not Started 0% | float 92.0d CO02MP0130 CO02KE0110 — 02K Lighting JB's, Stands, Tray & Cable | 28-Jun-27 → 09-Aug-27 | Not Started 0% | float 144.0d CO02KE0110 CO02PS0120 — 02P Erect Misc Steel | 29-Jun-27 → 26-Jul-27 | Not Started 0% | float 103.0d CO02PS0120 CO02QP0130 — 02Q LB Pipe Erection | 29-Jun-27 → 28-Sep-27 | Not Started 0% | float 101.0d CO02QP0130 CO02YE0110 — 02Y Lighting JB's, Stands, Tray & Cable | 29-Jun-27 → 12-Oct-27 | Not Started 0% | float 90.0d CO02YE0110 CO02JE0130 — 02J Power/Control JB's, Tray, Cable, Termination | 02-Jul-27 → 11-Oct-27 | Not Started 0% | float 98.0d CO02JE0130 CO02JI0120 — 02J Instrument JB's, Field Instr, Tray, Cable | 02-Jul-27 → 11-Oct-27 | Not Started 0% | float 98.0d CO02JI0120 CO02AE0110 — 02A Lighting JB's, Stands, Tray & Cable | 03-Jul-27 → 30-Jul-27 | Not Started 0% | float 157.0d CO02AE0110 CO02EV1130 — 02E Paint Touch-up - Equipment | 03-Jul-27 → 23-Jul-27 | Not Started 0% | float 151.0d CO02EV1130 CO02FP0130 — 02F LB Pipe Erection | 05-Jul-27 → 27-Sep-27 | Not Started 0% | float 102.0d CO02FP0130 CO02GE0110 — 02G Lighting JB's, Stands, Tray & Cable | 06-Jul-27 → 18-Aug-27 | Not Started 0% | float 149.0d CO02GE0110 CO02PP0130 — 02P LB Pipe Erection | 06-Jul-27 → 21-Sep-27 | Not Started 0% | float 103.0d CO02PP0130 CO02EE0120 — 02E Lighting Fixture Installation/Termination | 10-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02EE0120 CO02FE0120 — 02F Lighting Fixture Installation/Termination | 10-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02FE0120 CO02ME0120 — 02M Lighting Fixture Installation/Termination | 10-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO02ME0120 CO02MV2110 — 02M Insulate - Equipment | 10-Jul-27 → 27-Jul-27 | Not Started 0% | float 172.0d CO02MV2110 CO02DP0130 — 02D LB Pipe Erection | 12-Jul-27 → 22-Oct-27 | Not Started 0% | float 62.0d CO02DP0130 CO02FP0140 — 02F SB Pipe Erection | 12-Jul-27 → 04-Oct-27 | Not Started 0% | float 102.0d CO02FP0140 CO02KP0130 — 02K LB Pipe Erection | 12-Jul-27 → 23-Oct-27 | Not Started 0% | float 77.0d CO02KP0130 CO02QE0110 — 02Q Lighting JB's, Stands, Tray & Cable | 13-Jul-27 → 19-Jul-27 | Not Started 0% | float 162.0d CO02QE0110 CO02GP0150 — 02G Punchlist / Test Piping | 16-Jul-27 → 02-Oct-27 | Not Started 0% | float 105.0d CO02GP0150 CO02DE0120 — 02D Lighting Fixture Installation/Termination | 17-Jul-27 → 30-Jul-27 | Not Started 0% | float 169.0d CO02DE0120 CO02LE0120 — 02L Lighting Fixture Installation/Termination | 17-Jul-27 → 06-Aug-27 | Not Started 0% | float 163.0d CO02LE0120 CO02LP0130 — 02L LB Pipe Erection | 17-Jul-27 → 31-Jan-28 | Not Started 0% | float -15.0d CO02LP0130 CO02LV1130 — 02L Paint Touch-up - Equipment | 17-Jul-27 → 28-Sep-27 | Not Started 0% | float 69.0d CO02LV1130 CO02AP0130 — 02A LB Pipe Erection | 19-Jul-27 → 23-Oct-27 | Not Started 0% | float 78.0d CO02AP0130 CO02BP0130 — 02B LB Pipe Erection | 19-Jul-27 → 16-Aug-27 | Not Started 0% | float 120.0d CO02BP0130 CO02KP0140 — 02K SB Pipe Erection | 19-Jul-27 → 30-Oct-27 | Not Started 0% | float 77.0d CO02KP0140 CO02QE0120 — 02Q Lighting Fixture Installation/Termination | 20-Jul-27 → 26-Jul-27 | Not Started 0% | float 173.0d CO02QE0120 CO02YE0130 — 02Y Power/Control JB's, Tray, Cable, Termination | 20-Jul-27 → 16-Nov-27 | Not Started 0% | float -35.0d CO02YE0130 CO02YI0120 — 02Y Instrument JB's, Field Instr, Tray, Cable | 20-Jul-27 → 16-Nov-27 | Not Started 0% | float -35.0d CO02YI0120 CO02FE0130 — 02F Power/Control JB's, Tray, Cable, Termination | 22-Jul-27 → 11-Oct-27 | Not Started 0% | float 104.0d CO02FE0130 CO02FI0120 — 02F Instrument JB's, Field Instr, Tray, Cable | 22-Jul-27 → 11-Oct-27 | Not Started 0% | float 104.0d CO02FI0120 CO02NE0110 — 02N Lighting JB's, Stands, Tray & Cable | 23-Jul-27 → 12-Aug-27 | Not Started 0% | float 152.0d CO02NE0110 CO02NV1130 — 02N Paint Touch-up - Equipment | 23-Jul-27 → 29-Jul-27 | Not Started 0% | float 146.0d CO02NV1130 CO02JE0120 — 02J Lighting Fixture Installation/Termination | 24-Jul-27 → 13-Aug-27 | Not Started 0% | float 157.0d CO02JE0120 CO02LP0140 — 02L SB Pipe Erection | 24-Jul-27 → 07-Feb-28 | Not Started 0% | float -15.0d CO02LP0140 CO02HM0275 — 02H Complete Primary Reformer Erection (101-B) | 24-Jul-27 | Not Started CO02AP0140 — 02A SB Pipe Erection | 26-Jul-27 → 30-Oct-27 | Not Started 0% | float 78.0d CO02AP0140 CO02HP0130 — 02H LB Pipe Erection | 27-Jul-27 → 05-Jan-28 | Not Started 0% | float 10.0d CO02HP0130 CO02MP0140 — 02M SB Pipe Erection | 27-Jul-27 → 15-Oct-27 | Not Started 0% | float 92.0d CO02MP0140 CO02PE0110 — 02P Lighting JB's, Stands, Tray & Cable | 27-Jul-27 → 02-Aug-27 | Not Started 0% | float 150.0d CO02PE0110 CO02YV1120 — 02Y Paint Touch-up - Piping | 27-Jul-27 → 09-Nov-27 | Not Started 0% | float 101.0d CO02YV1120 CO02YV1130 — 02Y Paint Touch-up - Pipe Rack | 27-Jul-27 → 09-Nov-27 | Not Started 0% | float 101.0d CO02YV1130 CO02CP0150 — 02C Punchlist / Test Piping | 28-Jul-27 → 22-Oct-27 | Not Started 0% | float 83.0d CO02CP0150 CO02HM0120 — 02H Set (Heavey Lift) - 101-C & 102-C | 30-Jul-27 → 04-Aug-27 | Not Started 0% | float 10.0d CO02HM0120 CO02GV1130 — 02G Paint Touch-up - Equipment | 30-Jul-27 → 25-Sep-27 | Not Started 0% | float 116.0d CO02GV1130 CO02KE0130 — 02K Power/Control JB's, Tray, Cable, Termination | 30-Jul-27 → 06-Nov-27 | Not Started 0% | float 77.0d CO02KE0130 CO02KI0120 — 02K Instrument JB's, Field Instr, Tray, Cable | 30-Jul-27 → 06-Nov-27 | Not Started 0% | float 77.0d CO02KI0120 CO02AE0120 — 02A Lighting Fixture Installation/Termination | 31-Jul-27 → 13-Aug-27 | Not Started 0% | float 157.0d CO02AE0120 CO02EV2110 — 02E Insulate - Equipment | 31-Jul-27 → 27-Aug-27 | Not Started 0% | float 151.0d CO02EV2110 CO02CE0110 — 02C Lighting JB's, Stands, Tray & Cable | 03-Aug-27 → 05-Oct-27 | Not Started 0% | float 113.0d CO02CE0110 CO02GE0120 — 02G Lighting Fixture Installation/Termination | 03-Aug-27 → 01-Sep-27 | Not Started 0% | float 149.0d CO02GE0120 CO02HP0140 — 02H SB Pipe Erection | 03-Aug-27 → 12-Jan-28 | Not Started 0% | float 10.0d CO02HP0140 CO02PE0120 — 02P Lighting Fixture Installation/Termination | 03-Aug-27 → 09-Aug-27 | Not Started 0% | float 161.0d CO02PE0120 CO020M0130 — Demobilize Heavy Lift Crane | 05-Aug-27 → 16-Aug-27 | Not Started 0% | float 56.0d CO020M0130 CO02HS0110 — 02H Erect Structural Steel - Structure | 05-Aug-27 → 07-Oct-27 | Not Started 0% | float 10.0d CO02HS0110 CO02GV1120 — 02G Paint Touch-up - Piping | 06-Aug-27 → 02-Oct-27 | Not Started 0% | float 134.0d CO02GV1120 CO02AE0130 — 02A Power/Control JB's, Tray, Cable, Termination | 07-Aug-27 → 06-Nov-27 | Not Started 0% | float 78.0d CO02AE0130 CO02AI0120 — 02A Instrument JB's, Field Instr, Tray, Cable | 07-Aug-27 → 06-Nov-27 | Not Started 0% | float 78.0d CO02AI0120 CO02ME0130 — 02M Power/Control JB's, Tray, Cable, Termination | 07-Aug-27 → 22-Oct-27 | Not Started 0% | float 95.0d CO02ME0130 CO02MI0120 — 02M Instrument JB's, Field Instr, Tray, Cable | 07-Aug-27 → 22-Oct-27 | Not Started 0% | float 95.0d CO02MI0120 CO02BP0140 — 02B SB Pipe Erection | 09-Aug-27 → 30-Aug-27 | Not Started 0% | float 120.0d CO02BP0140 CO02JP0150 — 02J Punchlist / Test Piping | 09-Aug-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02JP0150 CO02KE0120 — 02K Lighting Fixture Installation/Termination | 09-Aug-27 → 21-Sep-27 | Not Started 0% | float 144.0d CO02KE0120 CO02YP0150 — 02Y Punchlist / Test Piping | 10-Aug-27 → 09-Nov-27 | Not Started 0% | float 65.0d CO02YP0150 CO02LE0130 — 02L Power/Control JB's, Tray, Cable, Termination | 11-Aug-27 → 14-Feb-28 | Not Started 0% | float -12.0d CO02LE0130 CO02LI0120 — 02L Instrument JB's, Field Instr, Tray, Cable | 11-Aug-27 → 14-Feb-28 | Not Started 0% | float -12.0d CO02LI0120 CO02NE0120 — 02N Lighting Fixture Installation/Termination | 13-Aug-27 → 25-Aug-27 | Not Started 0% | float 152.0d CO02NE0120 CO02NV2110 — 02N Insulate - Equipment | 13-Aug-27 → 08-Sep-27 | Not Started 0% | float 146.0d CO02NV2110 CO02EP0140 — 02E SB Pipe Erection | 16-Aug-27 → 13-Nov-27 | Not Started 0% | float 67.0d CO02EP0140 CO02LV2110 — 02L Insulate - Equipment | 16-Aug-27 → 26-Oct-27 | Not Started 0% | float 69.0d CO02LV2110 CO02HE0130 — 02H Power/Control JB's, Tray, Cable, Termination | 23-Aug-27 → 19-Jan-28 | Not Started 0% | float 15.0d CO02HE0130 CO02HI0120 — 02H Instrument JB's, Field Instr, Tray, Cable | 23-Aug-27 → 19-Jan-28 | Not Started 0% | float 15.0d CO02HI0120 CO02FP0150 — 02F Punchlist / Test Piping | 25-Aug-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02FP0150 CO02BE0130 — 02B Power/Control JB's, Tray, Cable, Termination | 30-Aug-27 → 20-Sep-27 | Not Started 0% | float 136.0d CO02BE0130 CO02BI0120 — 02B Instrument JB's, Field Instr, Tray, Cable | 30-Aug-27 → 20-Sep-27 | Not Started 0% | float 136.0d CO02BI0120 CO02PP0140 — 02P SB Pipe Erection | 30-Aug-27 → 28-Sep-27 | Not Started 0% | float 103.0d CO02PP0140 CO02BP0150 — 02B Punchlist / Test Piping | 01-Sep-27 → 20-Sep-27 | Not Started 0% | float 120.0d CO02BP0150 CO02BV1120 — 02B Paint Touch-up - Piping | 01-Sep-27 → 20-Sep-27 | Not Started 0% | float 144.0d CO02BV1120 CO02CV1120 — 02C Paint Touch-up - Piping | 01-Sep-27 → 22-Oct-27 | Not Started 0% | float 116.0d CO02CV1120 CO02GV2120 — 02G Insulate - Piping | 03-Sep-27 → 30-Oct-27 | Not Started 0% | float 110.0d CO02GV2120 CO02JV1120 — 02J Paint Touch-up - Piping | 06-Sep-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02JV1120 CO02JV1130 — 02J Paint Touch-up - Equipment | 06-Sep-27 → 11-Oct-27 | Not Started 0% | float 102.0d CO02JV1130 CO02EE0130 — 02E Power/Control JB's, Tray, Cable, Termination | 08-Sep-27 → 26-Nov-27 | Not Started 0% | float 67.0d CO02EE0130 CO02EI0120 — 02E Instrument JB's, Field Instr, Tray, Cable | 08-Sep-27 → 26-Nov-27 | Not Started 0% | float 67.0d CO02EI0120 CO02HV1130 — 02H Paint Touch-up - Equipment | 10-Sep-27 → 28-Oct-27 | Not Started 0% | float 52.0d CO02HV1130 CO02GV2110 — 02G Insulate - Equipment | 10-Sep-27 → 23-Oct-27 | Not Started 0% | float 116.0d CO02GV2110 CO02QP0140 — 02Q SB Pipe Erection | 20-Sep-27 → 05-Oct-27 | Not Started 0% | float 101.0d CO02QP0140 CO02BI0130 — 02B Install In Line Instruments | 21-Sep-27 → 22-Sep-27 | Not Started 0% | float 130.0d CO02PI0120 — 02P Instrument JB's, Field Instr, Tray, Cable | 21-Sep-27 → 05-Oct-27 | Not Started 0% | float 121.0d CO02PI0120 CO02FV1120 — 02F Paint Touch-up - Piping | 23-Sep-27 → 11-Oct-27 | Not Started 0% | float 126.0d CO02FV1120 CO02HE0110 — 02H Lighting JB's, Stands, Tray & Cable | 24-Sep-27 → 04-Nov-27 | Not Started 0% | float 87.0d CO02HE0110 CO02MP0150 — 02M Punchlist / Test Piping | 24-Sep-27 → 22-Oct-27 | Not Started 0% | float 92.0d CO02MP0150 CO02KP0150 — 02K Punchlist / Test Piping | 27-Sep-27 → 06-Nov-27 | Not Started 0% | float 80.0d CO02KP0150 CO02PP0150 — 02P Punchlist / Test Piping | 28-Sep-27 → 05-Oct-27 | Not Started 0% | float 107.0d CO02PP0150 CO02QI0120 — 02Q Instrument JB's, Field Instr, Tray, Cable | 28-Sep-27 → 12-Oct-27 | Not Started 0% | float 115.0d CO02QI0120 CO02CV2120 — 02C Insulate - Piping | 29-Sep-27 → 25-Nov-27 | Not Started 0% | float 92.0d CO02CV2120 CO02PV1130 — 02P Paint Touch-up - Equipment | 29-Sep-27 → 02-Oct-27 | Not Started 0% | float 103.0d CO02YV2120 — 02Y Insulate - Piping | 29-Sep-27 → 27-Dec-27 | Not Started 0% | float 65.0d CO02YV2120 CO02DP0140 — 02D SB Pipe Erection | 30-Sep-27 → 25-Nov-27 | Not Started 0% | float 62.0d CO02DP0140 CO02AP0150 — 02A Punchlist / Test Piping | 01-Oct-27 → 06-Nov-27 | Not Started 0% | float 79.0d CO02AP0150 CO02PV1120 — 02P Paint Touch-up - Piping | 01-Oct-27 → 05-Oct-27 | Not Started 0% | float 125.0d CO02PV1120 CO02GI0130 — 02G Install In Line Instruments | 02-Oct-27 → 13-Oct-27 | Not Started 0% | float 105.0d CO02GI0130 CO02QP0150 — 02Q Punchlist / Test Piping | 05-Oct-27 → 12-Oct-27 | Not Started 0% | float 101.0d CO02QP0150 CO02CE0120 — 02C Lighting Fixture Installation/Termination | 06-Oct-27 → 26-Oct-27 | Not Started 0% | float 113.0d CO02CE0120 CO02JV2120 — 02J Insulate - Piping | 06-Oct-27 → 08-Nov-27 | Not Started 0% | float 102.0d CO02JV2120 CO02MV1120 — 02M Paint Touch-up - Piping | 06-Oct-27 → 22-Oct-27 | Not Started 0% | float 116.0d CO02MV1120 CO02PI0130 — 02P Install In Line Instruments | 06-Oct-27 → 06-Oct-27 | Not Started 0% | float 118.0d CO02QV1120 — 02Q Paint Touch-up - Piping | 06-Oct-27 → 09-Oct-27 | Not Started 0% | float 121.0d CO02QV1130 — 02Q Paint Touch-up - Equipment | 06-Oct-27 → 09-Oct-27 | Not Started 0% | float 121.0d CO02DE0130 — 02D Power/Control JB's, Tray, Cable, Termination | 11-Oct-27 → 02-Dec-27 | Not Started 0% | float 68.0d CO02DE0130 CO02DI0120 — 02D Instrument JB's, Field Instr, Tray, Cable | 11-Oct-27 → 02-Dec-27 | Not Started 0% | float 68.0d CO02DI0120 CO02QV2110 — 02Q Insulate - Equipment | 11-Oct-27 → 16-Oct-27 | Not Started 0% | float 121.0d CO02QV2110 CO02BV2120 — 02B Insulate - Piping | 12-Oct-27 → 18-Oct-27 | Not Started 0% | float 120.0d CO02BV2120 CO02FI0130 — 02F Install In Line Instruments | 12-Oct-27 → 16-Oct-27 | Not Started 0% | float 109.0d CO02FI0130 CO02JI0130 — 02J Install In Line Instruments | 12-Oct-27 → 19-Oct-27 | Not Started 0% | float 104.0d CO02JI0130 CO02QI0130 — 02Q Install In Line Instruments | 13-Oct-27 → 13-Oct-27 | Not Started 0% | float 112.0d CO02YE0120 — 02Y Lighting Fixture Installation/Termination | 13-Oct-27 → 27-Nov-27 | Not Started 0% | float 90.0d CO02YE0120 CO02KV1120 — 02K Paint Touch-up - Piping | 13-Oct-27 → 06-Nov-27 | Not Started 0% | float 104.0d CO02KV1120 CO02FV2120 — 02F Insulate - Piping | 14-Oct-27 → 08-Nov-27 | Not Started 0% | float 102.0d CO02FV2120 CO02JV2110 — 02J Insulate - Equipment | 14-Oct-27 → 08-Nov-27 | Not Started 0% | float 102.0d CO02JV2110 CO02AV1120 — 02A Paint Touch-up - Piping | 16-Oct-27 → 06-Nov-27 | Not Started 0% | float 103.0d CO02AV1120 CO02HV2110 — 02H Insulate - Equipment | 16-Oct-27 → 01-Dec-27 | Not Started 0% | float 52.0d CO02HV2110 CO02EP0150 — 02E Punchlist / Test Piping | 18-Oct-27 → 26-Nov-27 | Not Started 0% | float 67.0d CO02EP0150 CO02CI0130 — 02C Install In Line Instruments | 23-Oct-27 → 04-Nov-27 | Not Started 0% | float 83.0d CO02CI0130 CO02MI0130 — 02M Install In Line Instruments | 23-Oct-27 → 28-Oct-27 | Not Started 0% | float 99.0d CO02MI0130 CO02PV2120 — 02P Insulate - Piping | 27-Oct-27 → 02-Nov-27 | Not Started 0% | float 107.0d CO02PV2120 CO02MV2120 — 02M Insulate - Piping | 28-Oct-27 → 25-Nov-27 | Not Started 0% | float 92.0d CO02MV2120 CO020K0100 — 020 Site Prep - Guard Posts & Gravel | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d CO020K0100 CO02EV1120 — 02E Paint Touch-up - Piping | 01-Nov-27 → 26-Nov-27 | Not Started 0% | float 91.0d CO02EV1120 CO02PV2110 — 02P Insulate - Equipment | 01-Nov-27 → 06-Nov-27 | Not Started 0% | float 103.0d CO02PV2110 WO020K0100 — 020 Site Prep | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO020K0100 CO02DP0150 — 02D Punchlist / Test Piping | 02-Nov-27 → 02-Dec-27 | Not Started 0% | float 62.0d CO02DP0150 CO02KV2120 — 02K Insulate - Piping | 02-Nov-27 → 10-Dec-27 | Not Started 0% | float 80.0d CO02KV2120 CO02QV2120 — 02Q Insulate - Piping | 03-Nov-27 → 09-Nov-27 | Not Started 0% | float 101.0d CO02QV2120 CO02AV2120 — 02A Insulate - Piping | 05-Nov-27 → 10-Dec-27 | Not Started 0% | float 79.0d CO02AV2120 CO02HE0120 — 02H Lighting Fixture Installation/Termination | 05-Nov-27 → 01-Dec-27 | Not Started 0% | float 87.0d CO02HE0120 CO02KI0130 — 02K Install In Line Instruments | 06-Nov-27 → 15-Nov-27 | Not Started 0% | float 83.0d CO02KI0130 CO02AI0130 — 02A Install In Line Instruments | 08-Nov-27 → 13-Nov-27 | Not Started 0% | float 84.0d CO02AI0130 CO02NP0140 — 02N SB Pipe Erection | 08-Nov-27 → 17-Nov-27 | Not Started 0% | float 56.0d CO02NP0140 CO02YI0130 — 02Y Install In Line Instruments | 10-Nov-27 → 13-Dec-27 | Not Started 0% | float 65.0d CO02YI0130 CO02HP0150 — 02H Punchlist / Test Piping | 11-Nov-27 → 19-Jan-28 | Not Started 0% | float 10.0d CO02HP0150 CO02DV1120 — 02D Paint Touch-up - Piping | 12-Nov-27 → 02-Dec-27 | Not Started 0% | float 86.0d CO02DV1120 CO02NE0130 — 02N Power/Control JB's, Tray, Cable, Termination | 15-Nov-27 → 30-Nov-27 | Not Started 0% | float 80.0d CO02NE0130 CO02NI0120 — 02N Instrument JB's, Field Instr, Tray, Cable | 15-Nov-27 → 30-Nov-27 | Not Started 0% | float 80.0d CO02NI0120 CO02LP0150 — 02L Punchlist / Test Piping | 16-Nov-27 → 14-Feb-28 | Not Started 0% | float -15.0d CO02LP0150 CO02NV1120 — 02N Paint Touch-up - Piping | 18-Nov-27 → 30-Nov-27 | Not Started 0% | float 88.0d CO02NV1120 CO02NP0150 — 02N Punchlist / Test Piping | 26-Nov-27 → 30-Nov-27 | Not Started 0% | float 56.0d CO02NP0150 CO02EI0130 — 02E Install In Line Instruments | 27-Nov-27 → 03-Dec-27 | Not Started 0% | float 73.0d CO02EI0130 CO02EV2120 — 02E Insulate - Piping | 27-Nov-27 → 24-Dec-27 | Not Started 0% | float 67.0d CO02EV2120 CO02NI0130 — 02N Install In Line Instruments | 01-Dec-27 → 01-Dec-27 | Not Started 0% | float 75.0d CO02DI0130 — 02D Install In Line Instruments | 03-Dec-27 → 07-Dec-27 | Not Started 0% | float 70.0d CO02DI0130 CO02GI0140 — 02G Continuity Testing | 07-Dec-27 → 16-Dec-27 | Not Started 0% | float 54.0d CO02GI0140 CO02YI0140 — 02Y Continuity Testing | 07-Dec-27 → 03-Jan-28 | Not Started 0% | float 53.0d CO02YI0140 CO02DV2120 — 02D Insulate - Piping | 10-Dec-27 → 30-Dec-27 | Not Started 0% | float 62.0d CO02DV2120 CO02HV1120 — 02H Paint Touch-up - Piping | 10-Dec-27 → 19-Jan-28 | Not Started 0% | float 45.0d CO02HV1120 CO02AI0140 — 02A Continuity Testing | 14-Dec-27 → 20-Dec-27 | Not Started 0% | float 52.0d CO02AI0140 CO02BI0140 — 02B Continuity Testing | 14-Dec-27 → 15-Dec-27 | Not Started 0% | float 73.0d CO02KI0140 — 02K Continuity Testing | 15-Dec-27 → 22-Dec-27 | Not Started 0% | float 48.0d CO02KI0140 CO02BT0110 — 02B Mechanical Completion | 15-Dec-27 | Not Started CO02DI0140 — 02D Continuity Testing | 16-Dec-27 → 20-Dec-27 | Not Started 0% | float 59.0d CO02DI0140 CO02GT0110 — 02G Mechanical Completion | 16-Dec-27 | Not Started CO02CI0140 — 02C Continuity Testing | 17-Dec-27 → 29-Dec-27 | Not Started 0% | float 41.0d CO02CI0140 SC02BT0120 — 02B RFSU | 18-Dec-27 | Not Started CO02AT0110 — 02A Mechanical Completion | 20-Dec-27 | Not Started CO02DT0110 — 02D Mechanical Completion | 20-Dec-27 | Not Started CO02EI0140 — 02E Continuity Testing | 21-Dec-27 → 27-Dec-27 | Not Started 0% | float 47.0d CO02EI0140 CO02JI0140 — 02J Continuity Testing | 21-Dec-27 → 28-Dec-27 | Not Started 0% | float 42.0d CO02JI0140 CO02MI0140 — 02M Continuity Testing | 21-Dec-27 → 25-Dec-27 | Not Started 0% | float 51.0d CO02MI0140 CO02NI0140 — 02N Continuity Testing | 22-Dec-27 → 22-Dec-27 | Not Started 0% | float 67.0d CO02KT0110 — 02K Mechanical Completion | 22-Dec-27 | Not Started CO02NT0110 — 02N Mechanical Completion | 22-Dec-27 | Not Started CO02PI0140 — 02P Continuity Testing | 23-Dec-27 → 23-Dec-27 | Not Started 0% | float 64.0d CO02PT0110 — 02P Mechanical Completion | 23-Dec-27 | Not Started CO02HV2120 — 02H Insulate - Piping | 24-Dec-27 → 16-Feb-28 | Not Started 0% | float 21.0d CO02HV2120 CO02NV2120 — 02N Insulate - Piping | 24-Dec-27 → 06-Jan-28 | Not Started 0% | float 56.0d CO02NV2120 CO02QI0140 — 02Q Continuity Testing | 24-Dec-27 → 24-Dec-27 | Not Started 0% | float 63.0d CO02QT0110 — 02Q Mechanical Completion | 24-Dec-27 | Not Started CO02LV1120 — 02L Paint Touch-up - Piping | 25-Dec-27 → 14-Feb-28 | Not Started 0% | float 23.0d CO02LV1120 CO02MT0110 — 02M Mechanical Completion | 25-Dec-27 | Not Started CO02ET0110 — 02E Mechanical Completion | 27-Dec-27 | Not Started CO02FI0140 — 02F Continuity Testing | 28-Dec-27 → 01-Jan-28 | Not Started 0% | float 44.0d CO02FI0140 CO02JT0110 — 02J Mechanical Completion | 28-Dec-27 | Not Started SC02PT0120 — 02P RFSU | 28-Dec-27 | Not Started CO02CT0110 — 02C Mechanical Completion | 29-Dec-27 | Not Started SC02QT0120 — 02Q RFSU | 29-Dec-27 | Not Started CO02FT0110 — 02F Mechanical Completion | 01-Jan-28 | Not Started CO02YT0110 — 02Y Mechanical Completion | 03-Jan-28 | Not Started SC02DT0120 — 02D RFSU | 04-Jan-28 | Not Started CO02LV2120 — 02L Insulate - Piping | 05-Jan-28 → 13-Mar-28 | Not Started 0% | float -1.0d CO02LV2120 SC02NT0120 — 02N RFSU | 06-Jan-28 | Not Started SC02GT0120 — 02G RFSU | 09-Jan-28 | Not Started SC02YT0120 — 02Y RFSU | 10-Jan-28 | Not Started SC02AT0120 — 02A RFSU | 12-Jan-28 | Not Started SC02MT0120 — 02M RFSU | 12-Jan-28 | Not Started CO02HI0140 — 02H Continuity Testing | 14-Jan-28 → 26-Jan-28 | Not Started 0% | float 15.0d CO02HI0140 SC02KT0120 — 02K RFSU | 16-Jan-28 | Not Started SC02ET0120 — 02E RFSU | 17-Jan-28 | Not Started CO02HI0130 — 02H Install In Line Instruments | 20-Jan-28 → 01-Feb-28 | Not Started 0% | float 10.0d CO02HI0130 SC02FT0120 — 02F RFSU | 20-Jan-28 | Not Started SC02JT0120 — 02J RFSU | 23-Jan-28 | Not Started SC02CT0120 — 02C RFSU | 24-Jan-28 | Not Started CO02HI0145 — 02H Contingency (101-B) | 27-Jan-28 → 23-Feb-28 | Not Started 0% | float 15.0d CO02HI0145 CO02LI0140 — 02L Continuity Testing | 05-Feb-28 → 21-Feb-28 | Not Started 0% | float -12.0d CO02LI0140 CO02LI0130 — 02L Install In Line Instruments | 15-Feb-28 → 01-Mar-28 | Not Started 0% | float -15.0d CO02LI0130 CO02LT0110 — 02L Mechanical Completion | 21-Feb-28 | Not Started CO02HT0110 — 02H Mechanical Completion | 23-Feb-28 | Not Started SC02HT0120 — 02H RFSU | 29-Feb-28 | Not Started SC02LT0120 — 02L RFSU | 29-Mar-28 | Not Started