EBCF-4

EBIC Construction Forecast (27-Jan-07)

Data Date: 23-Apr-26
Plan: 22-Jan-25 – 27-Mar-29
Legend: Not Started In Progress Complete Critical Milestone Showing 174 activities in 01 Offsites × clear
Code
Activity
Start
Finish
Flt
%
CO000C0150
Perimeter Wall
15-Dec-25
29-Mar-27
27.0d
28%
WO010K0110
010 Site Prep - Perimeter Wall
15-Dec-25
29-Mar-27
27.0d
28%
WO010C0100
010 Concrete & Excavation
27-Mar-26
04-May-27
149.0d
7%
CO01GC0150
01G Form, Pour, Strip Fnd - Control Building
27-Mar-26
01-Apr-26
100%
CO01DC0150
01D Form, Pour, Strip Fnd - 2101-U (Cooling Tower)
31-Mar-26
27-Dec-26
9%
CO01BC0160
01B Form, Pour, Strip Fnd - 2001-FB (Water Storage Tank)
20-Apr-26
27-Dec-26
5%
CO01BC0110
01B Form, Pour, Strip Fnds - Major Fnds Gen'l
27-Dec-26
27-Dec-26
0%
CO01BC0150
01B Form, Pour, Strip Fnd - 2001-FA (Water Storage Tank)
27-Dec-26
27-Dec-26
0%
CO01DC0140
01D Form Pour Strip Fnds - Sleepers
27-Dec-26
27-Dec-26
0%
CO01YC0140
01Y Form Pour Strip Fnds - Pipe Rack
27-Dec-26
27-Dec-26
0%
CO01AC0120
01A Form, Pour, Strip Fnds - Misc Fnds & Sumps...
28-Dec-26
09-Jan-27
247.0d
0%
CO01BC0120
01B Form, Pour, Strip Fnds - Misc Fnds
28-Dec-26
06-Jan-27
210.0d
0%
CO01BC0140
01B Form Pour Strip Fnds - Sleepers to Evap Pond
28-Dec-26
27-Jan-27
148.0d
0%
CO01DM0130
01D Erect 2101-U Cooling Tower
28-Dec-26
04-May-27
61.0d
0%
CO01GA0110
01G Erect Control Building (Continuation w/ Design Rev)
28-Dec-26
24-Jun-27
-14.0d
0%
CO01HC0110
01H Form, Pour, Strip Piers - Substation Building
28-Dec-26
06-Feb-27
112.0d
0%
CO01YU3110
01Y U/G Earthing Installation - Pipe Rack
28-Dec-26
06-Feb-27
134.0d
0%
WO010A0100
010 Buildings
28-Dec-26
24-Jun-27
94.0d
0%
WO010M0100
010 Major Equipment
28-Dec-26
01-Sep-27
54.0d
0%
WO010U3100
010 Install U/G Electrical
28-Dec-26
27-Mar-27
170.0d
0%
SC01JT0120
01J RFSU
28-Dec-26
28-Dec-26
441.0d
0%
CO01AV1110
01A Paint Fabricated Pipe Spools
31-Dec-26
02-Jan-27
253.0d
0%
WO010V1100
010 Paint
31-Dec-26
05-Oct-27
131.0d
0%
CO01UP0150
01U LB Pipe Erection (Firewater Piping)
05-Jan-27
06-Feb-27
212.0d
0%
WO010U4100
010 U/G Piping Installation
05-Jan-27
26-Mar-27
171.0d
0%
CO01HU3110
01H U/G Earthing Installation
25-Jan-27
06-Feb-27
134.0d
0%
CO01YV1110
01Y Paint Fabricated Pipe Spools
28-Jan-27
05-Feb-27
149.0d
0%
CO01JP0230
01J U/G Pipe Erection - Piping to Corridor
29-Jan-27
26-Feb-27
160.0d
0%
CO01BU4120
01B U/G Piping Installation
30-Jan-27
10-Mar-27
173.0d
0%
CO01DU4120
01D U/G Piping Installation
30-Jan-27
02-Mar-27
49.0d
0%
CO01EU4130
01E/F/G U/G Piping Installation (to Bldg Stub Outs)
30-Jan-27
26-Mar-27
147.0d
0%
CO01HC0140
01H Form Pour Strip Fnds - Transformers & Generator
01-Feb-27
27-Feb-27
116.0d
0%
CO01EA0130
01E Erect Guard House
04-Feb-27
03-Mar-27
191.0d
0%
CO01FA0130
01F Erect Mosque
04-Feb-27
28-Apr-27
143.0d
0%
CO01CC0110
01C Form, Pour, Strip Fnds - Major Fnds Gen'l
08-Feb-27
06-Mar-27
117.0d
0%
CO01YC0130
01Y Install Paving
08-Feb-27
27-Feb-27
134.0d
0%
WO010C0110
010 Concrete Paving
08-Feb-27
08-Jul-27
188.0d
0%
CO01CU4120
01C U/G Piping Installation
22-Feb-27
06-Mar-27
160.0d
0%
CO01HC0120
01H Form, Pour, Strip Fnds - Misc Fnds
01-Mar-27
13-Mar-27
176.0d
0%
CO01DC0110
01D Form, Pour, Strip Fnds - Major Fnds Gen'l
03-Mar-27
13-Apr-27
49.0d
0%
CO01DU3110
01D U/G Earthing Installation
03-Mar-27
17-Mar-27
113.0d
0%
CO01EC0135
01E Install Paving - Guard House
04-Mar-27
17-Mar-27
285.0d
0%
CO01BU3110
01B U/G Earthing Installation
05-Mar-27
24-Mar-27
173.0d
0%
CO01YS0110
01Y Erect Structural Steel - Pipe Rack
06-Mar-27
30-Apr-27
39.0d
0%
WO010S0100
010 Erect Steel
06-Mar-27
11-Jun-27
94.0d
0%
CO01CV1110
01C Paint Fabricated Pipe Spools
06-Mar-27
13-Mar-27
174.0d
0%
CO01BV1110
01B Paint Fabricated Pipe Spools
08-Mar-27
30-Mar-27
153.0d
0%
CO01CC0120
01C Form, Pour, Strip Fnds - Misc Fnds
08-Mar-27
27-Mar-27
160.0d
0%
CO01DV1110
01D Paint Fabricated Pipe Spools
11-Mar-27
29-Mar-27
142.0d
0%
CO01CU3110
01C U/G Earthing Installation
15-Mar-27
20-Mar-27
166.0d
0%
CO01GU3110
01G U/G Earthing Installation
15-Mar-27
27-Mar-27
146.0d
0%
CO01UDT110
01U Mechanical Completion
26-Mar-27
26-Mar-27
277.0d
0%
SC01UT0120
01U RFSU
26-Mar-27
26-Mar-27
352.0d
0%
CO01CC0130
01C Install Paving
29-Mar-27
10-Apr-27
160.0d
0%
CO01BM0110
01B Set Static Equipment
31-Mar-27
27-Apr-27
71.0d
0%
CO01BS0120
01B Erect Misc Steel
03-Apr-27
30-Apr-27
86.0d
0%
CO01CM0110
01C Set Static Equipment - EDR Equipment
05-Apr-27
31-May-27
93.0d
0%
CO01CM0115
01C Set Rotating Equipment - EDR Equipment
05-Apr-27
31-May-27
99.0d
0%
CO01HA0110
01H Set 2610-K Electrical Power House
12-Apr-27
03-May-27
76.0d
0%
CO01DC0120
01D Form, Pour, Strip Fnds - Misc Fnds
14-Apr-27
04-May-27
72.0d
0%
CO01DM0110
01D Set Static Equipment
14-Apr-27
25-May-27
49.0d
0%
CO01HM0110
01H Set Static Equipment - 2303-J Emergency Pwr Gen.
19-Apr-27
31-May-27
86.0d
0%
CO01YS0120
01Y Erect Misc Steel - Pipe Rack
24-Apr-27
21-May-27
39.0d
0%
CO01FC0135
01F Install Paving - Mosque
29-Apr-27
19-May-27
203.0d
0%
CO01BM0150
01B Set Rotating Equipment
01-May-27
11-Jun-27
32.0d
0%
CO01DM0150
01D Set Rotating Equipment
01-May-27
11-Jun-27
34.0d
0%
CO01YP0130
01Y LB Pipe Erection - Pipe Rack
01-May-27
25-Jun-27
39.0d
0%
WO010P0100
010 Above Ground Pipe
01-May-27
05-Oct-27
95.0d
0%
CO01DC0130
01D Install Paving
05-May-27
18-May-27
72.0d
0%
CO01DS0120
01D Erect Misc Steel
05-May-27
01-Jun-27
61.0d
0%
CO01CS0120
01C Erect Misc Steel
15-May-27
28-May-27
106.0d
0%
CO01HS0110
01H Erect Structural Steel - Stairs & Platform
15-May-27
11-Jun-27
51.0d
0%
CO01BE0110
01B Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO01EE0110
01E Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
180.0d
0%
CO01FE0110
01F Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
152.0d
0%
CO01GE0130
01G Power Tray, Cable, Terminations
17-May-27
12-Jun-27
92.0d
0%
WO010E0100
010 Above Ground Electrical
17-May-27
05-Oct-27
131.0d
0%
CO01YE0110
01Y Lighting JB's, Stands, Tray & Cable
22-May-27
02-Jul-27
175.0d
0%
CO01CE0110
01C Lighting JB's, Stands, Tray & Cable
29-May-27
18-Jun-27
124.0d
0%
CO01YP0140
01Y SB Pipe Erection - Pipe Rack
29-May-27
23-Jul-27
39.0d
0%
CO01CA0110
01C Erect - EDR Shelter
31-May-27
21-Jun-27
98.0d
0%
CO01AK0150
01A Excavate Evaporation Pond
01-Jun-27
12-Jul-27
54.0d
0%
WO010K0100
010 Site Prep
01-Jun-27
28-Jan-28
37.0d
0%
CO01DE0110
01D Lighting JB's, Stands, Tray & Cable
02-Jun-27
13-Jul-27
66.0d
0%
CO01BV1130
01B Paint Touch-up - Equipment
03-Jun-27
25-Jun-27
100.0d
0%
CO01CP0130
01C LB Pipe Erection
07-Jun-27
28-Jun-27
93.0d
0%
CO01DV1130
01D Paint Touch-up - Equipment
08-Jun-27
25-Jun-27
88.0d
0%
CO01BP0130
01B LB Pipe Erection
12-Jun-27
21-Sep-27
32.0d
0%
CO01DP0130
01D LB Pipe Erection
12-Jun-27
13-Aug-27
34.0d
0%
CO01HE0110
01H Lighting JB's, Stands, Tray & Cable
12-Jun-27
02-Jul-27
69.0d
0%
CO01CP0140
01C SB Pipe Erection
14-Jun-27
05-Jul-27
93.0d
0%
CO01BP0140
01B SB Pipe Erection
19-Jun-27
28-Sep-27
32.0d
0%
CO01CE0120
01C Lighting Fixture Installation/Termination
19-Jun-27
25-Jun-27
124.0d
0%
CO01DP0140
01D SB Pipe Erection
19-Jun-27
27-Aug-27
34.0d
0%
CO01HE0140
01H Set Transformers TR-100/ 103/ 104/ 105
19-Jun-27
02-Jul-27
33.0d
0%
CO01YE0130
01Y Power/Control JB's, Tray, Cable, Termination
19-Jun-27
30-Jul-27
39.0d
0%
CO01YI0120
01Y Instrument JB's, Field Instr, Tray, Cable
19-Jun-27
30-Jul-27
39.0d
0%
CO01YV1120
01Y Paint Touch-up - Piping
19-Jun-27
30-Jul-27
169.0d
0%
WO010I0100
010 Install Instruments & Test
19-Jun-27
03-Jan-28
53.0d
0%
CO01CE0130
01C Power/Control JB's, Tray, Cable, Termination
21-Jun-27
12-Jul-27
100.0d
0%
CO01CI0120
01C Instrument JB's, Field Instr, Tray, Cable
21-Jun-27
12-Jul-27
100.0d
0%
CO01CV1120
01C Paint Touch-up - Piping
21-Jun-27
12-Jul-27
93.0d
0%
CO01CV1130
01C Paint Touch-up - Equipment
21-Jun-27
12-Jul-27
93.0d
0%
CO01GC0130
01G Install Paving - Control Building
25-Jun-27
08-Jul-27
70.0d
0%
CO01GE0110
01G Lighting JB's, Stands, Tray & Cable
25-Jun-27
05-Aug-27
28.0d
0%
CO01GE0140
01G Install UPS in Control Building
25-Jun-27
15-Jul-27
-8.0d
0%
CO01GI0150
01G Install DCS
25-Jun-27
25-Aug-27
-14.0d
0%
CO01BE0130
01B Power/Control JB's, Tray, Cable, Termination
26-Jun-27
05-Oct-27
32.0d
0%
CO01BI0120
01B Instrument JB's, Field Instr, Tray, Cable
26-Jun-27
05-Oct-27
32.0d
0%
CO01DE0130
01D Power/Control JB's, Tray, Cable, Termination
26-Jun-27
10-Sep-27
39.0d
0%
CO01DI0120
01D Instrument JB's, Field Instr, Tray, Cable
26-Jun-27
10-Sep-27
39.0d
0%
CO01BE0120
01B Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO01EE0120
01E Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
180.0d
0%
CO01FE0120
01F Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
152.0d
0%
CO01BV2110
01B Insulate - Equipment
01-Jul-27
23-Jul-27
100.0d
0%
WO010V2100
010 Insulation
01-Jul-27
02-Nov-27
107.0d
0%
CO01CP0150
01C Punchlist / Test Piping
01-Jul-27
12-Jul-27
96.0d
0%
CO01HE0120
01H Lighting Fixture Installation/Termination
03-Jul-27
16-Jul-27
69.0d
0%
CO01HE0130
01H Power/Control JB's, Tray, Cable, Termination
03-Jul-27
10-Sep-27
33.0d
0%
CO01YE0120
01Y Lighting Fixture Installation/Termination
03-Jul-27
23-Jul-27
175.0d
0%
CO01YP0150
01Y Punchlist / Test Piping - Pipe Rack
03-Jul-27
30-Jul-27
133.0d
0%
CO01DV2110
01D Insulate - Equipment
06-Jul-27
23-Jul-27
88.0d
0%
CO01CV2120
01C Insulate - Piping
08-Jul-27
29-Jul-27
96.0d
0%
CO01CI0130
01C Install In Line Instruments
12-Jul-27
15-Jul-27
96.0d
0%
CO01CV2110
01C Insulate - Equipment
12-Jul-27
02-Aug-27
93.0d
0%
CO01AE0110
01A Lighting JB's, Stands, Tray & Cable
13-Jul-27
26-Jul-27
91.0d
0%
CO01AK0160
01A Install Liner at Evaporation Pond
13-Jul-27
18-Aug-27
54.0d
0%
CO01JC0150
01K Excavate Pond
13-Jul-27
09-Aug-27
55.0d
0%
CO01DE0120
01D Lighting Fixture Installation/Termination
14-Jul-27
03-Aug-27
66.0d
0%
CO01ET0110
01E Mechanical Completion
17-Jul-27
17-Jul-27
180.0d
0%
CO01FT0110
01F Mechanical Completion
17-Jul-27
17-Jul-27
152.0d
0%
SC01ET0120
01E RFSU
17-Jul-27
17-Jul-27
239.0d
0%
SC01FT0120
01F RFSU
17-Jul-27
17-Jul-27
239.0d
0%
CO01AE0120
01A Lighting Fixture Installation/Termination
27-Jul-27
02-Aug-27
91.0d
0%
CO01DP0150
01D Punchlist / Test Piping
28-Jul-27
10-Sep-27
34.0d
0%
CO01YI0130
01Y Install In Line Instruments
31-Jul-27
27-Aug-27
139.0d
0%
CO01YV2120
01Y Insulate - Piping
31-Jul-27
02-Oct-27
133.0d
0%
CO01BP0150
01B Punchlist / Test Piping
05-Aug-27
05-Oct-27
32.0d
0%
CO01GE0120
01G Lighting Fixture Installation/Termination
06-Aug-27
08-Sep-27
28.0d
0%
CO01DV1120
01D Paint Touch-up - Piping
10-Aug-27
10-Sep-27
45.0d
0%
CO01AM0150
01A Install Spray Devices
20-Aug-27
01-Sep-27
54.0d
0%
CO01BV1120
01B Paint Touch-up - Piping
30-Aug-27
05-Oct-27
56.0d
0%
CO01AE0130
01A Power/Control JB's, Tray, Cable, Termination
03-Sep-27
21-Sep-27
66.0d
0%
CO01AP0130
01A LB Pipe Erection
03-Sep-27
28-Sep-27
54.0d
0%
CO01HT0110
01H Mechanical Completion
10-Sep-27
10-Sep-27
33.0d
0%
CO01DI0130
01D Install In Line Instruments
20-Sep-27
24-Sep-27
41.0d
0%
CO01DV2120
01D Insulate - Piping
23-Sep-27
16-Oct-27
34.0d
0%
CO01AI0120
01A Instrument JB's, Field Instr, Tray, Cable
29-Sep-27
05-Oct-27
54.0d
0%
CO01AP0150
01A Punchlist / Test Piping
29-Sep-27
01-Oct-27
57.0d
0%
CO01AV1120
01A Paint Touch-up - Piping
29-Sep-27
01-Oct-27
58.0d
0%
CO01AI0130
01A Install In Line Instruments
02-Oct-27
02-Oct-27
57.0d
0%
CO01BV2120
01B Insulate - Piping
02-Oct-27
02-Nov-27
32.0d
0%
CO01BI0130
01B Install In Line Instruments
06-Oct-27
13-Oct-27
37.0d
0%
CO01GI0120
01G DCS Cable Terminations
06-Oct-27
06-Dec-27
-35.0d
0%
SC01HT0120
01H RFSU
17-Oct-27
17-Oct-27
10.0d
0%
CO010K0130
010 Compl Roads, Ditches, Paving, & Rock Surfacing
01-Nov-27
28-Jan-28
9.0d
0%
CO010K0140
010 Finish Grading
01-Nov-27
28-Jan-28
37.0d
0%
CO01GT0110
01G Mechanical Completion
06-Dec-27
06-Dec-27
-35.0d
0%
SC01GT0120
01G RFSU
06-Dec-27
06-Dec-27
-47.0d
0%
CO01DI0140
01D Continuity Testing
07-Dec-27
11-Dec-27
-22.0d
0%
CO01DT0110
01D Mechanical Completion
11-Dec-27
11-Dec-27
-22.0d
0%
CO01YI0140
01Y Continuity Testing
14-Dec-27
03-Jan-28
53.0d
0%
CO01BI0140
01B Continuity Testing
21-Dec-27
28-Dec-27
-29.0d
0%
CO01CI0140
01C Continuity Testing
21-Dec-27
23-Dec-27
-12.0d
0%
CO01CT0110
01C Mechanical Completion
23-Dec-27
23-Dec-27
-7.0d
0%
CO01AI0140
01A Continuity Testing
28-Dec-27
28-Dec-27
-12.0d
0%
CO01AT0110
01A Mechanical Completion
28-Dec-27
28-Dec-27
-12.0d
0%
CO01BT0110
01B Mechanical Completion
28-Dec-27
28-Dec-27
-11.0d
0%
SC01AT0120
01A RFSU
29-Dec-27
29-Dec-27
-14.0d
0%
SC01CT0120
01C RFSU
29-Dec-27
29-Dec-27
-14.0d
0%
SC01DT0120
01D RFSU
29-Dec-27
29-Dec-27
-28.0d
0%
CO01YT0110
01Y Mechanical Completion
03-Jan-28
03-Jan-28
59.0d
0%
SC01YT0120
01Y RFSU
10-Jan-28
10-Jan-28
62.0d
0%
SC01BT0120
01B RFSU
19-Jan-28
19-Jan-28
-35.0d
0%
01-Dec 08-Dec 15-Dec 22-Dec 29-Dec 05-Jan 12-Jan 19-Jan 26-Jan 02-Feb 09-Feb 16-Feb 23-Feb 02-Mar 09-Mar 16-Mar 23-Mar 30-Mar 06-Apr 13-Apr 20-Apr 27-Apr 04-May 11-May 18-May 25-May 01-Jun 08-Jun 15-Jun 22-Jun 29-Jun 06-Jul 13-Jul 20-Jul 27-Jul 03-Aug 10-Aug 17-Aug 24-Aug 31-Aug 07-Sep 14-Sep 21-Sep 28-Sep 05-Oct 12-Oct 19-Oct 26-Oct 02-Nov 09-Nov 16-Nov 23-Nov 30-Nov 07-Dec 14-Dec 21-Dec 28-Dec 04-Jan 11-Jan 18-Jan 25-Jan 01-Feb 08-Feb 15-Feb 22-Feb 01-Mar 08-Mar 15-Mar 22-Mar 29-Mar 05-Apr 12-Apr 19-Apr 26-Apr 03-May 10-May 17-May 24-May 31-May 07-Jun 14-Jun 21-Jun 28-Jun 05-Jul 12-Jul 19-Jul 26-Jul 02-Aug 09-Aug 16-Aug 23-Aug 30-Aug 06-Sep 13-Sep 20-Sep 27-Sep 04-Oct 11-Oct 18-Oct 25-Oct 01-Nov 08-Nov 15-Nov 22-Nov 29-Nov 06-Dec 13-Dec 20-Dec 27-Dec 03-Jan 10-Jan 17-Jan 24-Jan 31-Jan Data Date
CO000C0150 — Perimeter Wall | 15-Dec-25 → 29-Mar-27 | In Progress 28% | float 27.0d CO000C0150 WO010K0110 — 010 Site Prep - Perimeter Wall | 15-Dec-25 → 29-Mar-27 | In Progress 28% | float 27.0d WO010K0110 WO010C0100 — 010 Concrete & Excavation | 27-Mar-26 → 04-May-27 | In Progress 7% | float 149.0d WO010C0100 CO01GC0150 — 01G Form, Pour, Strip Fnd - Control Building | 27-Mar-26 → 01-Apr-26 | Complete 100% | float — CO01GC0150 CO01DC0150 — 01D Form, Pour, Strip Fnd - 2101-U (Cooling Tower) | 31-Mar-26 → 27-Dec-26 | In Progress 9% | float — CO01DC0150 CO01BC0160 — 01B Form, Pour, Strip Fnd - 2001-FB (Water Storage Tank) | 20-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO01BC0160 CO01BC0110 — 01B Form, Pour, Strip Fnds - Major Fnds Gen'l | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01BC0150 — 01B Form, Pour, Strip Fnd - 2001-FA (Water Storage Tank) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01DC0140 — 01D Form Pour Strip Fnds - Sleepers | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01YC0140 — 01Y Form Pour Strip Fnds - Pipe Rack | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO01AC0120 — 01A Form, Pour, Strip Fnds - Misc Fnds & Sumps... | 28-Dec-26 → 09-Jan-27 | Not Started 0% | float 247.0d CO01AC0120 CO01BC0120 — 01B Form, Pour, Strip Fnds - Misc Fnds | 28-Dec-26 → 06-Jan-27 | Not Started 0% | float 210.0d CO01BC0120 CO01BC0140 — 01B Form Pour Strip Fnds - Sleepers to Evap Pond | 28-Dec-26 → 27-Jan-27 | Not Started 0% | float 148.0d CO01BC0140 CO01DM0130 — 01D Erect 2101-U Cooling Tower | 28-Dec-26 → 04-May-27 | Not Started 0% | float 61.0d CO01DM0130 CO01GA0110 — 01G Erect Control Building (Continuation w/ Design Rev) | 28-Dec-26 → 24-Jun-27 | Not Started 0% | float -14.0d CO01GA0110 CO01HC0110 — 01H Form, Pour, Strip Piers - Substation Building | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 112.0d CO01HC0110 CO01YU3110 — 01Y U/G Earthing Installation - Pipe Rack | 28-Dec-26 → 06-Feb-27 | Not Started 0% | float 134.0d CO01YU3110 WO010A0100 — 010 Buildings | 28-Dec-26 → 24-Jun-27 | Not Started 0% | float 94.0d WO010A0100 WO010M0100 — 010 Major Equipment | 28-Dec-26 → 01-Sep-27 | Not Started 0% | float 54.0d WO010M0100 WO010U3100 — 010 Install U/G Electrical | 28-Dec-26 → 27-Mar-27 | Not Started 0% | float 170.0d WO010U3100 SC01JT0120 — 01J RFSU | 28-Dec-26 | Not Started CO01AV1110 — 01A Paint Fabricated Pipe Spools | 31-Dec-26 → 02-Jan-27 | Not Started 0% | float 253.0d CO01AV1110 WO010V1100 — 010 Paint | 31-Dec-26 → 05-Oct-27 | Not Started 0% | float 131.0d WO010V1100 CO01UP0150 — 01U LB Pipe Erection (Firewater Piping) | 05-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO01UP0150 WO010U4100 — 010 U/G Piping Installation | 05-Jan-27 → 26-Mar-27 | Not Started 0% | float 171.0d WO010U4100 CO01HU3110 — 01H U/G Earthing Installation | 25-Jan-27 → 06-Feb-27 | Not Started 0% | float 134.0d CO01HU3110 CO01YV1110 — 01Y Paint Fabricated Pipe Spools | 28-Jan-27 → 05-Feb-27 | Not Started 0% | float 149.0d CO01YV1110 CO01JP0230 — 01J U/G Pipe Erection - Piping to Corridor | 29-Jan-27 → 26-Feb-27 | Not Started 0% | float 160.0d CO01JP0230 CO01BU4120 — 01B U/G Piping Installation | 30-Jan-27 → 10-Mar-27 | Not Started 0% | float 173.0d CO01BU4120 CO01DU4120 — 01D U/G Piping Installation | 30-Jan-27 → 02-Mar-27 | Not Started 0% | float 49.0d CO01DU4120 CO01EU4130 — 01E/F/G U/G Piping Installation (to Bldg Stub Outs) | 30-Jan-27 → 26-Mar-27 | Not Started 0% | float 147.0d CO01EU4130 CO01HC0140 — 01H Form Pour Strip Fnds - Transformers & Generator | 01-Feb-27 → 27-Feb-27 | Not Started 0% | float 116.0d CO01HC0140 CO01EA0130 — 01E Erect Guard House | 04-Feb-27 → 03-Mar-27 | Not Started 0% | float 191.0d CO01EA0130 CO01FA0130 — 01F Erect Mosque | 04-Feb-27 → 28-Apr-27 | Not Started 0% | float 143.0d CO01FA0130 CO01CC0110 — 01C Form, Pour, Strip Fnds - Major Fnds Gen'l | 08-Feb-27 → 06-Mar-27 | Not Started 0% | float 117.0d CO01CC0110 CO01YC0130 — 01Y Install Paving | 08-Feb-27 → 27-Feb-27 | Not Started 0% | float 134.0d CO01YC0130 WO010C0110 — 010 Concrete Paving | 08-Feb-27 → 08-Jul-27 | Not Started 0% | float 188.0d WO010C0110 CO01CU4120 — 01C U/G Piping Installation | 22-Feb-27 → 06-Mar-27 | Not Started 0% | float 160.0d CO01CU4120 CO01HC0120 — 01H Form, Pour, Strip Fnds - Misc Fnds | 01-Mar-27 → 13-Mar-27 | Not Started 0% | float 176.0d CO01HC0120 CO01DC0110 — 01D Form, Pour, Strip Fnds - Major Fnds Gen'l | 03-Mar-27 → 13-Apr-27 | Not Started 0% | float 49.0d CO01DC0110 CO01DU3110 — 01D U/G Earthing Installation | 03-Mar-27 → 17-Mar-27 | Not Started 0% | float 113.0d CO01DU3110 CO01EC0135 — 01E Install Paving - Guard House | 04-Mar-27 → 17-Mar-27 | Not Started 0% | float 285.0d CO01EC0135 CO01BU3110 — 01B U/G Earthing Installation | 05-Mar-27 → 24-Mar-27 | Not Started 0% | float 173.0d CO01BU3110 CO01YS0110 — 01Y Erect Structural Steel - Pipe Rack | 06-Mar-27 → 30-Apr-27 | Not Started 0% | float 39.0d CO01YS0110 WO010S0100 — 010 Erect Steel | 06-Mar-27 → 11-Jun-27 | Not Started 0% | float 94.0d WO010S0100 CO01CV1110 — 01C Paint Fabricated Pipe Spools | 06-Mar-27 → 13-Mar-27 | Not Started 0% | float 174.0d CO01CV1110 CO01BV1110 — 01B Paint Fabricated Pipe Spools | 08-Mar-27 → 30-Mar-27 | Not Started 0% | float 153.0d CO01BV1110 CO01CC0120 — 01C Form, Pour, Strip Fnds - Misc Fnds | 08-Mar-27 → 27-Mar-27 | Not Started 0% | float 160.0d CO01CC0120 CO01DV1110 — 01D Paint Fabricated Pipe Spools | 11-Mar-27 → 29-Mar-27 | Not Started 0% | float 142.0d CO01DV1110 CO01CU3110 — 01C U/G Earthing Installation | 15-Mar-27 → 20-Mar-27 | Not Started 0% | float 166.0d CO01CU3110 CO01GU3110 — 01G U/G Earthing Installation | 15-Mar-27 → 27-Mar-27 | Not Started 0% | float 146.0d CO01GU3110 CO01UDT110 — 01U Mechanical Completion | 26-Mar-27 | Not Started SC01UT0120 — 01U RFSU | 26-Mar-27 | Not Started CO01CC0130 — 01C Install Paving | 29-Mar-27 → 10-Apr-27 | Not Started 0% | float 160.0d CO01CC0130 CO01BM0110 — 01B Set Static Equipment | 31-Mar-27 → 27-Apr-27 | Not Started 0% | float 71.0d CO01BM0110 CO01BS0120 — 01B Erect Misc Steel | 03-Apr-27 → 30-Apr-27 | Not Started 0% | float 86.0d CO01BS0120 CO01CM0110 — 01C Set Static Equipment - EDR Equipment | 05-Apr-27 → 31-May-27 | Not Started 0% | float 93.0d CO01CM0110 CO01CM0115 — 01C Set Rotating Equipment - EDR Equipment | 05-Apr-27 → 31-May-27 | Not Started 0% | float 99.0d CO01CM0115 CO01HA0110 — 01H Set 2610-K Electrical Power House | 12-Apr-27 → 03-May-27 | Not Started 0% | float 76.0d CO01HA0110 CO01DC0120 — 01D Form, Pour, Strip Fnds - Misc Fnds | 14-Apr-27 → 04-May-27 | Not Started 0% | float 72.0d CO01DC0120 CO01DM0110 — 01D Set Static Equipment | 14-Apr-27 → 25-May-27 | Not Started 0% | float 49.0d CO01DM0110 CO01HM0110 — 01H Set Static Equipment - 2303-J Emergency Pwr Gen. | 19-Apr-27 → 31-May-27 | Not Started 0% | float 86.0d CO01HM0110 CO01YS0120 — 01Y Erect Misc Steel - Pipe Rack | 24-Apr-27 → 21-May-27 | Not Started 0% | float 39.0d CO01YS0120 CO01FC0135 — 01F Install Paving - Mosque | 29-Apr-27 → 19-May-27 | Not Started 0% | float 203.0d CO01FC0135 CO01BM0150 — 01B Set Rotating Equipment | 01-May-27 → 11-Jun-27 | Not Started 0% | float 32.0d CO01BM0150 CO01DM0150 — 01D Set Rotating Equipment | 01-May-27 → 11-Jun-27 | Not Started 0% | float 34.0d CO01DM0150 CO01YP0130 — 01Y LB Pipe Erection - Pipe Rack | 01-May-27 → 25-Jun-27 | Not Started 0% | float 39.0d CO01YP0130 WO010P0100 — 010 Above Ground Pipe | 01-May-27 → 05-Oct-27 | Not Started 0% | float 95.0d WO010P0100 CO01DC0130 — 01D Install Paving | 05-May-27 → 18-May-27 | Not Started 0% | float 72.0d CO01DC0130 CO01DS0120 — 01D Erect Misc Steel | 05-May-27 → 01-Jun-27 | Not Started 0% | float 61.0d CO01DS0120 CO01CS0120 — 01C Erect Misc Steel | 15-May-27 → 28-May-27 | Not Started 0% | float 106.0d CO01CS0120 CO01HS0110 — 01H Erect Structural Steel - Stairs & Platform | 15-May-27 → 11-Jun-27 | Not Started 0% | float 51.0d CO01HS0110 CO01BE0110 — 01B Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO01BE0110 CO01EE0110 — 01E Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 180.0d CO01EE0110 CO01FE0110 — 01F Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 152.0d CO01FE0110 CO01GE0130 — 01G Power Tray, Cable, Terminations | 17-May-27 → 12-Jun-27 | Not Started 0% | float 92.0d CO01GE0130 WO010E0100 — 010 Above Ground Electrical | 17-May-27 → 05-Oct-27 | Not Started 0% | float 131.0d WO010E0100 CO01YE0110 — 01Y Lighting JB's, Stands, Tray & Cable | 22-May-27 → 02-Jul-27 | Not Started 0% | float 175.0d CO01YE0110 CO01CE0110 — 01C Lighting JB's, Stands, Tray & Cable | 29-May-27 → 18-Jun-27 | Not Started 0% | float 124.0d CO01CE0110 CO01YP0140 — 01Y SB Pipe Erection - Pipe Rack | 29-May-27 → 23-Jul-27 | Not Started 0% | float 39.0d CO01YP0140 CO01CA0110 — 01C Erect - EDR Shelter | 31-May-27 → 21-Jun-27 | Not Started 0% | float 98.0d CO01CA0110 CO01AK0150 — 01A Excavate Evaporation Pond | 01-Jun-27 → 12-Jul-27 | Not Started 0% | float 54.0d CO01AK0150 WO010K0100 — 010 Site Prep | 01-Jun-27 → 28-Jan-28 | Not Started 0% | float 37.0d WO010K0100 CO01DE0110 — 01D Lighting JB's, Stands, Tray & Cable | 02-Jun-27 → 13-Jul-27 | Not Started 0% | float 66.0d CO01DE0110 CO01BV1130 — 01B Paint Touch-up - Equipment | 03-Jun-27 → 25-Jun-27 | Not Started 0% | float 100.0d CO01BV1130 CO01CP0130 — 01C LB Pipe Erection | 07-Jun-27 → 28-Jun-27 | Not Started 0% | float 93.0d CO01CP0130 CO01DV1130 — 01D Paint Touch-up - Equipment | 08-Jun-27 → 25-Jun-27 | Not Started 0% | float 88.0d CO01DV1130 CO01BP0130 — 01B LB Pipe Erection | 12-Jun-27 → 21-Sep-27 | Not Started 0% | float 32.0d CO01BP0130 CO01DP0130 — 01D LB Pipe Erection | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 34.0d CO01DP0130 CO01HE0110 — 01H Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 69.0d CO01HE0110 CO01CP0140 — 01C SB Pipe Erection | 14-Jun-27 → 05-Jul-27 | Not Started 0% | float 93.0d CO01CP0140 CO01BP0140 — 01B SB Pipe Erection | 19-Jun-27 → 28-Sep-27 | Not Started 0% | float 32.0d CO01BP0140 CO01CE0120 — 01C Lighting Fixture Installation/Termination | 19-Jun-27 → 25-Jun-27 | Not Started 0% | float 124.0d CO01CE0120 CO01DP0140 — 01D SB Pipe Erection | 19-Jun-27 → 27-Aug-27 | Not Started 0% | float 34.0d CO01DP0140 CO01HE0140 — 01H Set Transformers TR-100/ 103/ 104/ 105 | 19-Jun-27 → 02-Jul-27 | Not Started 0% | float 33.0d CO01HE0140 CO01YE0130 — 01Y Power/Control JB's, Tray, Cable, Termination | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float 39.0d CO01YE0130 CO01YI0120 — 01Y Instrument JB's, Field Instr, Tray, Cable | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float 39.0d CO01YI0120 CO01YV1120 — 01Y Paint Touch-up - Piping | 19-Jun-27 → 30-Jul-27 | Not Started 0% | float 169.0d CO01YV1120 WO010I0100 — 010 Install Instruments & Test | 19-Jun-27 → 03-Jan-28 | Not Started 0% | float 53.0d WO010I0100 CO01CE0130 — 01C Power/Control JB's, Tray, Cable, Termination | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO01CE0130 CO01CI0120 — 01C Instrument JB's, Field Instr, Tray, Cable | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO01CI0120 CO01CV1120 — 01C Paint Touch-up - Piping | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 93.0d CO01CV1120 CO01CV1130 — 01C Paint Touch-up - Equipment | 21-Jun-27 → 12-Jul-27 | Not Started 0% | float 93.0d CO01CV1130 CO01GC0130 — 01G Install Paving - Control Building | 25-Jun-27 → 08-Jul-27 | Not Started 0% | float 70.0d CO01GC0130 CO01GE0110 — 01G Lighting JB's, Stands, Tray & Cable | 25-Jun-27 → 05-Aug-27 | Not Started 0% | float 28.0d CO01GE0110 CO01GE0140 — 01G Install UPS in Control Building | 25-Jun-27 → 15-Jul-27 | Not Started 0% | float -8.0d CO01GE0140 CO01GI0150 — 01G Install DCS | 25-Jun-27 → 25-Aug-27 | Not Started 0% | float -14.0d CO01GI0150 CO01BE0130 — 01B Power/Control JB's, Tray, Cable, Termination | 26-Jun-27 → 05-Oct-27 | Not Started 0% | float 32.0d CO01BE0130 CO01BI0120 — 01B Instrument JB's, Field Instr, Tray, Cable | 26-Jun-27 → 05-Oct-27 | Not Started 0% | float 32.0d CO01BI0120 CO01DE0130 — 01D Power/Control JB's, Tray, Cable, Termination | 26-Jun-27 → 10-Sep-27 | Not Started 0% | float 39.0d CO01DE0130 CO01DI0120 — 01D Instrument JB's, Field Instr, Tray, Cable | 26-Jun-27 → 10-Sep-27 | Not Started 0% | float 39.0d CO01DI0120 CO01BE0120 — 01B Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO01BE0120 CO01EE0120 — 01E Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 180.0d CO01EE0120 CO01FE0120 — 01F Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 152.0d CO01FE0120 CO01BV2110 — 01B Insulate - Equipment | 01-Jul-27 → 23-Jul-27 | Not Started 0% | float 100.0d CO01BV2110 WO010V2100 — 010 Insulation | 01-Jul-27 → 02-Nov-27 | Not Started 0% | float 107.0d WO010V2100 CO01CP0150 — 01C Punchlist / Test Piping | 01-Jul-27 → 12-Jul-27 | Not Started 0% | float 96.0d CO01CP0150 CO01HE0120 — 01H Lighting Fixture Installation/Termination | 03-Jul-27 → 16-Jul-27 | Not Started 0% | float 69.0d CO01HE0120 CO01HE0130 — 01H Power/Control JB's, Tray, Cable, Termination | 03-Jul-27 → 10-Sep-27 | Not Started 0% | float 33.0d CO01HE0130 CO01YE0120 — 01Y Lighting Fixture Installation/Termination | 03-Jul-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO01YE0120 CO01YP0150 — 01Y Punchlist / Test Piping - Pipe Rack | 03-Jul-27 → 30-Jul-27 | Not Started 0% | float 133.0d CO01YP0150 CO01DV2110 — 01D Insulate - Equipment | 06-Jul-27 → 23-Jul-27 | Not Started 0% | float 88.0d CO01DV2110 CO01CV2120 — 01C Insulate - Piping | 08-Jul-27 → 29-Jul-27 | Not Started 0% | float 96.0d CO01CV2120 CO01CI0130 — 01C Install In Line Instruments | 12-Jul-27 → 15-Jul-27 | Not Started 0% | float 96.0d CO01CI0130 CO01CV2110 — 01C Insulate - Equipment | 12-Jul-27 → 02-Aug-27 | Not Started 0% | float 93.0d CO01CV2110 CO01AE0110 — 01A Lighting JB's, Stands, Tray & Cable | 13-Jul-27 → 26-Jul-27 | Not Started 0% | float 91.0d CO01AE0110 CO01AK0160 — 01A Install Liner at Evaporation Pond | 13-Jul-27 → 18-Aug-27 | Not Started 0% | float 54.0d CO01AK0160 CO01JC0150 — 01K Excavate Pond | 13-Jul-27 → 09-Aug-27 | Not Started 0% | float 55.0d CO01JC0150 CO01DE0120 — 01D Lighting Fixture Installation/Termination | 14-Jul-27 → 03-Aug-27 | Not Started 0% | float 66.0d CO01DE0120 CO01ET0110 — 01E Mechanical Completion | 17-Jul-27 | Not Started CO01FT0110 — 01F Mechanical Completion | 17-Jul-27 | Not Started SC01ET0120 — 01E RFSU | 17-Jul-27 | Not Started SC01FT0120 — 01F RFSU | 17-Jul-27 | Not Started CO01AE0120 — 01A Lighting Fixture Installation/Termination | 27-Jul-27 → 02-Aug-27 | Not Started 0% | float 91.0d CO01AE0120 CO01DP0150 — 01D Punchlist / Test Piping | 28-Jul-27 → 10-Sep-27 | Not Started 0% | float 34.0d CO01DP0150 CO01YI0130 — 01Y Install In Line Instruments | 31-Jul-27 → 27-Aug-27 | Not Started 0% | float 139.0d CO01YI0130 CO01YV2120 — 01Y Insulate - Piping | 31-Jul-27 → 02-Oct-27 | Not Started 0% | float 133.0d CO01YV2120 CO01BP0150 — 01B Punchlist / Test Piping | 05-Aug-27 → 05-Oct-27 | Not Started 0% | float 32.0d CO01BP0150 CO01GE0120 — 01G Lighting Fixture Installation/Termination | 06-Aug-27 → 08-Sep-27 | Not Started 0% | float 28.0d CO01GE0120 CO01DV1120 — 01D Paint Touch-up - Piping | 10-Aug-27 → 10-Sep-27 | Not Started 0% | float 45.0d CO01DV1120 CO01AM0150 — 01A Install Spray Devices | 20-Aug-27 → 01-Sep-27 | Not Started 0% | float 54.0d CO01AM0150 CO01BV1120 — 01B Paint Touch-up - Piping | 30-Aug-27 → 05-Oct-27 | Not Started 0% | float 56.0d CO01BV1120 CO01AE0130 — 01A Power/Control JB's, Tray, Cable, Termination | 03-Sep-27 → 21-Sep-27 | Not Started 0% | float 66.0d CO01AE0130 CO01AP0130 — 01A LB Pipe Erection | 03-Sep-27 → 28-Sep-27 | Not Started 0% | float 54.0d CO01AP0130 CO01HT0110 — 01H Mechanical Completion | 10-Sep-27 | Not Started CO01DI0130 — 01D Install In Line Instruments | 20-Sep-27 → 24-Sep-27 | Not Started 0% | float 41.0d CO01DI0130 CO01DV2120 — 01D Insulate - Piping | 23-Sep-27 → 16-Oct-27 | Not Started 0% | float 34.0d CO01DV2120 CO01AI0120 — 01A Instrument JB's, Field Instr, Tray, Cable | 29-Sep-27 → 05-Oct-27 | Not Started 0% | float 54.0d CO01AI0120 CO01AP0150 — 01A Punchlist / Test Piping | 29-Sep-27 → 01-Oct-27 | Not Started 0% | float 57.0d CO01AP0150 CO01AV1120 — 01A Paint Touch-up - Piping | 29-Sep-27 → 01-Oct-27 | Not Started 0% | float 58.0d CO01AV1120 CO01AI0130 — 01A Install In Line Instruments | 02-Oct-27 → 02-Oct-27 | Not Started 0% | float 57.0d CO01BV2120 — 01B Insulate - Piping | 02-Oct-27 → 02-Nov-27 | Not Started 0% | float 32.0d CO01BV2120 CO01BI0130 — 01B Install In Line Instruments | 06-Oct-27 → 13-Oct-27 | Not Started 0% | float 37.0d CO01BI0130 CO01GI0120 — 01G DCS Cable Terminations | 06-Oct-27 → 06-Dec-27 | Not Started 0% | float -35.0d CO01GI0120 SC01HT0120 — 01H RFSU | 17-Oct-27 | Not Started CO010K0130 — 010 Compl Roads, Ditches, Paving, & Rock Surfacing | 01-Nov-27 → 28-Jan-28 | Not Started 0% | float 9.0d CO010K0130 CO010K0140 — 010 Finish Grading | 01-Nov-27 → 28-Jan-28 | Not Started 0% | float 37.0d CO010K0140 CO01GT0110 — 01G Mechanical Completion | 06-Dec-27 | Not Started SC01GT0120 — 01G RFSU | 06-Dec-27 | Not Started CO01DI0140 — 01D Continuity Testing | 07-Dec-27 → 11-Dec-27 | Not Started 0% | float -22.0d CO01DI0140 CO01DT0110 — 01D Mechanical Completion | 11-Dec-27 | Not Started CO01YI0140 — 01Y Continuity Testing | 14-Dec-27 → 03-Jan-28 | Not Started 0% | float 53.0d CO01YI0140 CO01BI0140 — 01B Continuity Testing | 21-Dec-27 → 28-Dec-27 | Not Started 0% | float -29.0d CO01BI0140 CO01CI0140 — 01C Continuity Testing | 21-Dec-27 → 23-Dec-27 | Not Started 0% | float -12.0d CO01CI0140 CO01CT0110 — 01C Mechanical Completion | 23-Dec-27 | Not Started CO01AI0140 — 01A Continuity Testing | 28-Dec-27 → 28-Dec-27 | Not Started 0% | float -12.0d CO01AT0110 — 01A Mechanical Completion | 28-Dec-27 | Not Started CO01BT0110 — 01B Mechanical Completion | 28-Dec-27 | Not Started SC01AT0120 — 01A RFSU | 29-Dec-27 | Not Started SC01CT0120 — 01C RFSU | 29-Dec-27 | Not Started SC01DT0120 — 01D RFSU | 29-Dec-27 | Not Started CO01YT0110 — 01Y Mechanical Completion | 03-Jan-28 | Not Started SC01YT0120 — 01Y RFSU | 10-Jan-28 | Not Started SC01BT0120 — 01B RFSU | 19-Jan-28 | Not Started