EBIC Construction Forecast (27-Jan-07)

Data Date: 23-Apr-26
Plan: 22-Jan-25 – 27-Mar-29
Legend: Not Started In Progress Complete Critical Milestone Showing 169 activities in 03 Utility Plant × clear
Code
Activity
Start
Finish
Flt
%
CO03DC0110
03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank)
06-Apr-26
27-Dec-26
7%
WO030C0100
030 Concrete & Excavation
06-Apr-26
19-Mar-27
229.0d
5%
CO03CC0110
03C Form, Pour, Strip Fnds - Major Fnds
21-Apr-26
27-Dec-26
5%
CO03CM0110
03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks
27-Dec-26
27-Dec-26
0%
CO03DC0150
03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps)
27-Dec-26
27-Dec-26
0%
CO03FC0110
03F Form, Pour, Strip Fnds - Package Boiler
27-Dec-26
27-Dec-26
0%
CO03AC0110
03A Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
16-Jan-27
155.0d
0%
CO03BC0110
03B Form, Pour, Strip Fnds - Major Fnds (N/A)
28-Dec-26
28-Dec-26
0%
CO03BC0140
03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump
28-Dec-26
30-Dec-26
266.0d
0%
CO03DU4120
03D U/G Piping Installation
28-Dec-26
05-Jan-27
199.0d
0%
CO03EC0110
03E Form, Pour, Strip Fnds - 2001-U Water Treatment
28-Dec-26
20-Feb-27
126.0d
0%
CO03FM0110
03F Erect 2002-U Package Boiler
28-Dec-26
13-Mar-27
159.0d
0%
CO03YC0110
03Y Form, Pour, Strip Fnds - Sleeper Fnds
28-Dec-26
01-Jan-27
98.0d
0%
CO03YC0120
03Y Form, Pour, Strip Fnds - Pipe Rack Fnds
28-Dec-26
28-Dec-26
0%
WO030M0100
030 Major Equipment
28-Dec-26
26-Apr-27
192.0d
0%
WO030U4100
030 U/G Piping Installation
28-Dec-26
26-Feb-27
229.0d
0%
CO03DC0120
03D Form, Pour, Strip Fnds - Misc Fnds
06-Jan-27
19-Jan-27
199.0d
0%
CO03YV1110
03Y Paint Fabricated Pipe Spools
13-Jan-27
13-Feb-27
154.0d
0%
WO030V1100
030 Paint
13-Jan-27
23-Aug-27
153.0d
0%
CO03DU3110
03D U/G Earthing Installation
15-Jan-27
19-Jan-27
199.0d
0%
WO030U3100
030 Install U/G Electrical
15-Jan-27
12-Mar-27
229.0d
0%
CO03UP0150
03U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
CO03AU4120
03A U/G Piping Installation
30-Jan-27
18-Feb-27
135.0d
0%
CO03BU4120
03B U/G Piping Installation
30-Jan-27
17-Feb-27
237.0d
0%
CO03CU4120
03C U/G Piping Installation
30-Jan-27
18-Feb-27
166.0d
0%
CO03EU4120
03E U/G Piping Installation
30-Jan-27
26-Feb-27
121.0d
0%
CO03FU4120
03F U/G Piping Installation
30-Jan-27
18-Feb-27
155.0d
0%
CO03DC0130
03D Install Paving
01-Feb-27
06-Feb-27
189.0d
0%
CO03FM0150
03F Install Chemical Injection System
01-Feb-27
13-Mar-27
159.0d
0%
WO030C0110
030 Concrete Paving
01-Feb-27
17-Apr-27
210.0d
0%
CO03AC0120
03A Form, Pour, Strip Fnds - Misc Fnds
12-Feb-27
25-Feb-27
141.0d
0%
CO03CV1110
03C Paint Fabricated Pipe Spools
13-Feb-27
24-Feb-27
191.0d
0%
CO03BC0120
03B Form, Pour, Strip Fnds - Misc Fnds
18-Feb-27
03-Mar-27
243.0d
0%
CO03CC0120
03C Form, Pour, Strip Fnds - Misc Fnds
19-Feb-27
04-Mar-27
166.0d
0%
CO03EV1110
03E Paint Fabricated Pipe Spools
19-Feb-27
09-Mar-27
171.0d
0%
CO03FC0120
03F Form, Pour, Strip Fnds - Misc Fnds
19-Feb-27
11-Mar-27
155.0d
0%
CO03FV1110
03F Paint Fabricated Pipe Spools
19-Feb-27
02-Mar-27
183.0d
0%
CO03BU3110
03B U/G Earthing Installation
23-Feb-27
03-Mar-27
237.0d
0%
CO03CU3110
03C U/G Earthing Installation
24-Feb-27
04-Mar-27
166.0d
0%
CO03FU3110
03F U/G Earthing Installation
24-Feb-27
04-Mar-27
161.0d
0%
CO03AU3110
03A U/G Earthing Installation
26-Feb-27
04-Mar-27
135.0d
0%
CO03UDT110
03U Mechanical Completion
26-Feb-27
26-Feb-27
301.0d
0%
SC03UT0120
03U RFSU
26-Feb-27
26-Feb-27
380.0d
0%
CO03AV1110
03A Paint Fabricated Pipe Spools
27-Feb-27
10-Mar-27
148.0d
0%
CO03EC0120
03E Form, Pour, Strip Fnds - Misc Fnds
27-Feb-27
19-Mar-27
121.0d
0%
CO03EU3110
03E U/G Earthing Installation
27-Feb-27
12-Mar-27
127.0d
0%
CO03BM0110
03B Set Static Equipment - Gen'l
01-Mar-27
02-Apr-27
212.0d
0%
CO03EM0110
03E Set Static Equipment - Gen'l
01-Mar-27
05-Apr-27
135.0d
0%
CO03BC0130
03B Install Paving
04-Mar-27
17-Mar-27
237.0d
0%
CO03DV1110
03D Paint Fabricated Pipe Spools
06-Mar-27
11-Mar-27
172.0d
0%
CO03YS0110
03Y Erect Structural Steel
06-Mar-27
26-Mar-27
39.0d
0%
WO030S0100
030 Erect Steel
06-Mar-27
25-Jun-27
157.0d
0%
CO03AC0130
03A Install Paving
08-Mar-27
13-Mar-27
133.0d
0%
CO03CC0130
03C Install Paving
15-Mar-27
20-Mar-27
158.0d
0%
CO03CM0150
03C Set Rotating Equipment
15-Mar-27
22-Mar-27
146.0d
0%
CO03DM0150
03D Set Rotating Equipment
15-Mar-27
29-Mar-27
158.0d
0%
CO03FV1130
03F Paint Touch-up - Equipment
17-Mar-27
27-Mar-27
183.0d
0%
CO03FC0130
03F Install Paving
22-Mar-27
03-Apr-27
147.0d
0%
CO03CV1130
03C Paint Touch-up - Equipment
24-Mar-27
05-Apr-27
195.0d
0%
CO03BM0150
03B Set Rotating Equipment
26-Mar-27
15-Apr-27
200.0d
0%
CO03YP0130
03Y LB Pipe Erection
27-Mar-27
09-Jul-27
39.0d
0%
WO030P0100
030 Above Ground Pipe
27-Mar-27
23-Aug-27
138.0d
0%
CO03AM0110
03A Set Static Equipment
29-Mar-27
26-Apr-27
95.0d
0%
CO03YP0140
03Y SB Pipe Erection
03-Apr-27
16-Jul-27
45.0d
0%
CO03BV1110
03B Paint Fabricated Pipe Spools
05-Apr-27
15-Apr-27
223.0d
0%
CO03EC0130
03E Install Paving
05-Apr-27
17-Apr-27
108.0d
0%
CO03DV1130
03D Paint Touch-up - Equipment (& 2002-F Tank)
06-Apr-27
12-Apr-27
189.0d
0%
CO03BV1130
03B Paint Touch-up - Equipment
19-Apr-27
29-Apr-27
248.0d
0%
CO03BS0120
03B Erect Misc Steel - Structure
15-May-27
11-Jun-27
169.0d
0%
CO03FS0120
03F Erect Misc Steel
15-May-27
25-Jun-27
88.0d
0%
CO03CE0110
03C Lighting JB's, Stands, Tray & Cable
17-May-27
12-Jun-27
123.0d
0%
CO03DE0110
03D Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO03DE0130
03D Power/Control JB's, Tray, Cable, Termination
17-May-27
04-Jun-27
131.0d
0%
CO03EE0110
03E Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO03FE0110
03F Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
111.0d
0%
CO03YE0110
03Y Lighting JB's, Stands, Tray & Cable
17-May-27
07-Aug-27
162.0d
0%
CO03YE0130
03Y Power/Control JB's, Tray, Cable, Termination
17-May-27
07-Aug-27
32.0d
0%
CO03YI0120
03Y Instrument JB's, Field Instr, Tray, Cable
17-May-27
07-Aug-27
32.0d
0%
WO030E0100
030 Above Ground Electrical
17-May-27
23-Aug-27
153.0d
0%
WO030I0100
030 Install Instruments & Test
17-May-27
17-Jan-28
41.0d
0%
CO03AS0120
03A Erect Misc Steel - Structure
22-May-27
18-Jun-27
56.0d
0%
CO03CS0120
03C Erect Misc Steel
22-May-27
11-Jun-27
87.0d
0%
CO03DS0120
03D Erect Misc Steel
22-May-27
18-Jun-27
98.0d
0%
CO03ES0120
03E Erect Misc Steel - Structure
22-May-27
18-Jun-27
58.0d
0%
CO03FP0130
03F LB Pipe Erection
25-May-27
02-Jul-27
88.0d
0%
CO03AP0130
03A LB Pipe Erection
29-May-27
07-Jul-27
56.0d
0%
CO03CP0130
03C LB Pipe Erection
29-May-27
07-Jul-27
87.0d
0%
CO03EP0130
03E LB Pipe Erection
29-May-27
30-Jul-27
58.0d
0%
CO03YV1120
03Y Paint Touch-up - Piping
29-May-27
23-Jul-27
175.0d
0%
CO03FP0140
03F SB Pipe Erection
01-Jun-27
09-Jul-27
88.0d
0%
CO03YP0150
03Y Punchlist / Test Piping
02-Jun-27
23-Jul-27
139.0d
0%
CO03AP0140
03A SB Pipe Erection
05-Jun-27
14-Jul-27
56.0d
0%
CO03CP0140
03C SB Pipe Erection
05-Jun-27
14-Jul-27
87.0d
0%
CO03EP0140
03E SB Pipe Erection
05-Jun-27
06-Aug-27
58.0d
0%
CO03FV2110
03F Insulate - Equipment
05-Jun-27
19-Jun-27
135.0d
0%
WO030V2100
030 Insulation
05-Jun-27
02-Oct-27
133.0d
0%
CO03DP0130
03D LB Pipe Erection
07-Jun-27
25-Jun-27
98.0d
0%
CO03FE0130
03F Power/Control JB's, Tray, Cable, Termination
08-Jun-27
16-Jul-27
97.0d
0%
CO03FI0120
03F Instrument JB's, Field Instr, Tray, Cable
08-Jun-27
16-Jul-27
97.0d
0%
CO03AE0130
03A Power/Control JB's, Tray, Cable, Termination
12-Jun-27
21-Jul-27
56.0d
0%
CO03AI0120
03A Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
21-Jul-27
56.0d
0%
CO03BE0110
03B Lighting JB's, Stands, Tray & Cable
12-Jun-27
02-Jul-27
187.0d
0%
CO03CE0130
03C Power/Control JB's, Tray, Cable, Termination
12-Jun-27
21-Jul-27
87.0d
0%
CO03CI0120
03C Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
21-Jul-27
87.0d
0%
CO03EE0130
03E Power/Control JB's, Tray, Cable, Termination
12-Jun-27
13-Aug-27
61.0d
0%
CO03EI0120
03E Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
13-Aug-27
61.0d
0%
CO03CE0120
03C Lighting Fixture Installation/Termination
14-Jun-27
26-Jun-27
123.0d
0%
CO03DP0140
03D SB Pipe Erection
15-Jun-27
05-Jul-27
97.0d
0%
CO03AE0110
03A Lighting JB's, Stands, Tray & Cable
19-Jun-27
09-Jul-27
75.0d
0%
CO03DI0120
03D Instrument JB's, Field Instr, Tray, Cable
22-Jun-27
12-Jul-27
100.0d
0%
CO03BP0130
03B LB Pipe Erection
28-Jun-27
04-Aug-27
138.0d
0%
CO03DE0120
03D Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO03EE0120
03E Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO03FE0120
03F Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
111.0d
0%
CO03FP0150
03F Punchlist / Test Piping
28-Jun-27
16-Jul-27
88.0d
0%
CO03YV2120
03Y Insulate - Piping
30-Jun-27
03-Sep-27
148.0d
0%
CO03AP0150
03A Punchlist / Test Piping
02-Jul-27
21-Jul-27
62.0d
0%
CO03CP0150
03C Punchlist / Test Piping
02-Jul-27
21-Jul-27
87.0d
0%
CO03DP0150
03D Punchlist / Test Piping
02-Jul-27
12-Jul-27
97.0d
0%
CO03BE0120
03B Lighting Fixture Installation/Termination
03-Jul-27
09-Jul-27
187.0d
0%
CO03BP0140
03B SB Pipe Erection
05-Jul-27
11-Aug-27
138.0d
0%
CO03FV1120
03F Paint Touch-up - Piping
06-Jul-27
16-Jul-27
112.0d
0%
CO03DV1120
03D Paint Touch-up - Piping
06-Jul-27
12-Jul-27
111.0d
0%
CO03AE0120
03A Lighting Fixture Installation/Termination
10-Jul-27
16-Jul-27
75.0d
0%
CO03AV1120
03A Paint Touch-up - Piping
10-Jul-27
21-Jul-27
58.0d
0%
CO03AV1130
03A Paint Touch-up - Equipment
10-Jul-27
21-Jul-27
58.0d
0%
CO03CV1120
03C Paint Touch-up - Piping
10-Jul-27
21-Jul-27
102.0d
0%
CO03BE0130
03B Power/Control JB's, Tray, Cable, Termination
12-Jul-27
23-Aug-27
138.0d
0%
CO03BI0120
03B Instrument JB's, Field Instr, Tray, Cable
12-Jul-27
23-Aug-27
138.0d
0%
CO03DI0130
03D Install In Line Instruments
12-Jul-27
14-Jul-27
97.0d
0%
CO03EP0150
03E Punchlist / Test Piping
14-Jul-27
13-Aug-27
58.0d
0%
CO03AV2120
03A Insulate - Piping
16-Jul-27
30-Jul-27
63.0d
0%
CO03FI0130
03F Install In Line Instruments
17-Jul-27
20-Jul-27
97.0d
0%
CO03AI0130
03A Install In Line Instruments
22-Jul-27
24-Jul-27
62.0d
0%
CO03AV2110
03A Insulate - Equipment
22-Jul-27
05-Aug-27
58.0d
0%
CO03CI0130
03C Install In Line Instruments
22-Jul-27
24-Jul-27
87.0d
0%
CO03YI0130
03Y Install In Line Instruments
24-Jul-27
27-Aug-27
139.0d
0%
CO03EV1120
03E Paint Touch-up - Piping
27-Jul-27
13-Aug-27
58.0d
0%
CO03EV1130
03E Paint Touch-up - Equipment
27-Jul-27
13-Aug-27
58.0d
0%
CO03FV2120
03F Insulate - Piping
30-Jul-27
13-Aug-27
88.0d
0%
CO03BP0150
03B Punchlist / Test Piping
31-Jul-27
23-Aug-27
138.0d
0%
CO03BV1120
03B Paint Touch-up - Piping
07-Aug-27
23-Aug-27
153.0d
0%
CO03EI0130
03E Install In Line Instruments
16-Aug-27
25-Aug-27
65.0d
0%
CO03EV2110
03E Insulate - Equipment
20-Aug-27
02-Oct-27
58.0d
0%
CO03EV2120
03E Insulate - Piping
20-Aug-27
02-Oct-27
58.0d
0%
CO03BI0130
03B Install In Line Instruments
25-Aug-27
30-Aug-27
138.0d
0%
CO030K0100
030 Site Prep - Guard Posts & Gravel
01-Nov-27
01-Mar-28
9.0d
0%
WO030K0100
030 Site Prep
01-Nov-27
01-Mar-28
9.0d
0%
CO03AI0140
03A Continuity Testing
07-Dec-27
09-Dec-27
-35.0d
0%
CO03YI0140
03Y Continuity Testing
07-Dec-27
17-Jan-28
41.0d
0%
CO03AT0110
03A Mechanical Completion
09-Dec-27
09-Dec-27
-26.0d
0%
CO03FI0140
03F Continuity Testing
10-Dec-27
13-Dec-27
-1.0d
0%
CO03FT0110
03F Mechanical Completion
13-Dec-27
13-Dec-27
8.0d
0%
SC03AT0120
03A RFSU
20-Dec-27
20-Dec-27
-47.0d
0%
CO03BI0140
03B Continuity Testing
21-Dec-27
23-Dec-27
59.0d
0%
CO03BT0110
03B Mechanical Completion
23-Dec-27
23-Dec-27
68.0d
0%
CO03CI0140
03C Continuity Testing
24-Dec-27
27-Dec-27
-19.0d
0%
SC03FT0120
03F RFSU
24-Dec-27
24-Dec-27
-2.0d
0%
CO03CT0110
03C Mechanical Completion
27-Dec-27
27-Dec-27
-10.0d
0%
CO03DI0140
03D Continuity Testing
28-Dec-27
29-Dec-27
-17.0d
0%
CO03DT0110
03D Mechanical Completion
29-Dec-27
29-Dec-27
-12.0d
0%
CO03EI0140
03E Continuity Testing
30-Dec-27
04-Jan-28
-32.0d
0%
SC03BT0120
03B RFSU
03-Jan-28
03-Jan-28
69.0d
0%
CO03ET0110
03E Mechanical Completion
04-Jan-28
04-Jan-28
-17.0d
0%
SC03DT0120
03D RFSU
04-Jan-28
04-Jan-28
-20.0d
0%
SC03CT0120
03C RFSU
07-Jan-28
07-Jan-28
-23.0d
0%
CO03YT0110
03Y Mechanical Completion
17-Jan-28
17-Jan-28
47.0d
0%
SC03ET0120
03E RFSU
22-Jan-28
22-Jan-28
-38.0d
0%
SC03YT0120
03Y RFSU
24-Jan-28
24-Jan-28
48.0d
0%
Q2 2026 Q3 2026 Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Q1 2028 Data Date
CO03DC0110 — 03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank) | 06-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO03DC0110 WO030C0100 — 030 Concrete & Excavation | 06-Apr-26 → 19-Mar-27 | In Progress 5% | float 229.0d WO030C0100 CO03CC0110 — 03C Form, Pour, Strip Fnds - Major Fnds | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO03CC0110 CO03CM0110 — 03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03DC0150 — 03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03FC0110 — 03F Form, Pour, Strip Fnds - Package Boiler | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03AC0110 — 03A Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 16-Jan-27 | Not Started 0% | float 155.0d CO03BC0110 — 03B Form, Pour, Strip Fnds - Major Fnds (N/A) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO03BC0140 — 03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump | 28-Dec-26 → 30-Dec-26 | Not Started 0% | float 266.0d CO03DU4120 — 03D U/G Piping Installation | 28-Dec-26 → 05-Jan-27 | Not Started 0% | float 199.0d CO03EC0110 — 03E Form, Pour, Strip Fnds - 2001-U Water Treatment | 28-Dec-26 → 20-Feb-27 | Not Started 0% | float 126.0d CO03EC0110 CO03FM0110 — 03F Erect 2002-U Package Boiler | 28-Dec-26 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0110 CO03YC0110 — 03Y Form, Pour, Strip Fnds - Sleeper Fnds | 28-Dec-26 → 01-Jan-27 | Not Started 0% | float 98.0d CO03YC0120 — 03Y Form, Pour, Strip Fnds - Pipe Rack Fnds | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — WO030M0100 — 030 Major Equipment | 28-Dec-26 → 26-Apr-27 | Not Started 0% | float 192.0d WO030M0100 WO030U4100 — 030 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 229.0d WO030U4100 CO03DC0120 — 03D Form, Pour, Strip Fnds - Misc Fnds | 06-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03YV1110 — 03Y Paint Fabricated Pipe Spools | 13-Jan-27 → 13-Feb-27 | Not Started 0% | float 154.0d WO030V1100 — 030 Paint | 13-Jan-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030V1100 CO03DU3110 — 03D U/G Earthing Installation | 15-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d WO030U3100 — 030 Install U/G Electrical | 15-Jan-27 → 12-Mar-27 | Not Started 0% | float 229.0d WO030U3100 CO03UP0150 — 03U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO03AU4120 — 03A U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 135.0d CO03BU4120 — 03B U/G Piping Installation | 30-Jan-27 → 17-Feb-27 | Not Started 0% | float 237.0d CO03CU4120 — 03C U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 166.0d CO03EU4120 — 03E U/G Piping Installation | 30-Jan-27 → 26-Feb-27 | Not Started 0% | float 121.0d CO03FU4120 — 03F U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 155.0d CO03DC0130 — 03D Install Paving | 01-Feb-27 → 06-Feb-27 | Not Started 0% | float 189.0d CO03FM0150 — 03F Install Chemical Injection System | 01-Feb-27 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0150 WO030C0110 — 030 Concrete Paving | 01-Feb-27 → 17-Apr-27 | Not Started 0% | float 210.0d WO030C0110 CO03AC0120 — 03A Form, Pour, Strip Fnds - Misc Fnds | 12-Feb-27 → 25-Feb-27 | Not Started 0% | float 141.0d CO03CV1110 — 03C Paint Fabricated Pipe Spools | 13-Feb-27 → 24-Feb-27 | Not Started 0% | float 191.0d CO03BC0120 — 03B Form, Pour, Strip Fnds - Misc Fnds | 18-Feb-27 → 03-Mar-27 | Not Started 0% | float 243.0d CO03CC0120 — 03C Form, Pour, Strip Fnds - Misc Fnds | 19-Feb-27 → 04-Mar-27 | Not Started 0% | float 166.0d CO03EV1110 — 03E Paint Fabricated Pipe Spools | 19-Feb-27 → 09-Mar-27 | Not Started 0% | float 171.0d CO03FC0120 — 03F Form, Pour, Strip Fnds - Misc Fnds | 19-Feb-27 → 11-Mar-27 | Not Started 0% | float 155.0d CO03FV1110 — 03F Paint Fabricated Pipe Spools | 19-Feb-27 → 02-Mar-27 | Not Started 0% | float 183.0d CO03BU3110 — 03B U/G Earthing Installation | 23-Feb-27 → 03-Mar-27 | Not Started 0% | float 237.0d CO03CU3110 — 03C U/G Earthing Installation | 24-Feb-27 → 04-Mar-27 | Not Started 0% | float 166.0d CO03FU3110 — 03F U/G Earthing Installation | 24-Feb-27 → 04-Mar-27 | Not Started 0% | float 161.0d CO03AU3110 — 03A U/G Earthing Installation | 26-Feb-27 → 04-Mar-27 | Not Started 0% | float 135.0d CO03UDT110 — 03U Mechanical Completion | 26-Feb-27 | Not Started SC03UT0120 — 03U RFSU | 26-Feb-27 | Not Started CO03AV1110 — 03A Paint Fabricated Pipe Spools | 27-Feb-27 → 10-Mar-27 | Not Started 0% | float 148.0d CO03EC0120 — 03E Form, Pour, Strip Fnds - Misc Fnds | 27-Feb-27 → 19-Mar-27 | Not Started 0% | float 121.0d CO03EU3110 — 03E U/G Earthing Installation | 27-Feb-27 → 12-Mar-27 | Not Started 0% | float 127.0d CO03BM0110 — 03B Set Static Equipment - Gen'l | 01-Mar-27 → 02-Apr-27 | Not Started 0% | float 212.0d CO03EM0110 — 03E Set Static Equipment - Gen'l | 01-Mar-27 → 05-Apr-27 | Not Started 0% | float 135.0d CO03BC0130 — 03B Install Paving | 04-Mar-27 → 17-Mar-27 | Not Started 0% | float 237.0d CO03DV1110 — 03D Paint Fabricated Pipe Spools | 06-Mar-27 → 11-Mar-27 | Not Started 0% | float 172.0d CO03YS0110 — 03Y Erect Structural Steel | 06-Mar-27 → 26-Mar-27 | Not Started 0% | float 39.0d WO030S0100 — 030 Erect Steel | 06-Mar-27 → 25-Jun-27 | Not Started 0% | float 157.0d WO030S0100 CO03AC0130 — 03A Install Paving | 08-Mar-27 → 13-Mar-27 | Not Started 0% | float 133.0d CO03CC0130 — 03C Install Paving | 15-Mar-27 → 20-Mar-27 | Not Started 0% | float 158.0d CO03CM0150 — 03C Set Rotating Equipment | 15-Mar-27 → 22-Mar-27 | Not Started 0% | float 146.0d CO03DM0150 — 03D Set Rotating Equipment | 15-Mar-27 → 29-Mar-27 | Not Started 0% | float 158.0d CO03FV1130 — 03F Paint Touch-up - Equipment | 17-Mar-27 → 27-Mar-27 | Not Started 0% | float 183.0d CO03FC0130 — 03F Install Paving | 22-Mar-27 → 03-Apr-27 | Not Started 0% | float 147.0d CO03CV1130 — 03C Paint Touch-up - Equipment | 24-Mar-27 → 05-Apr-27 | Not Started 0% | float 195.0d CO03BM0150 — 03B Set Rotating Equipment | 26-Mar-27 → 15-Apr-27 | Not Started 0% | float 200.0d CO03YP0130 — 03Y LB Pipe Erection | 27-Mar-27 → 09-Jul-27 | Not Started 0% | float 39.0d CO03YP0130 WO030P0100 — 030 Above Ground Pipe | 27-Mar-27 → 23-Aug-27 | Not Started 0% | float 138.0d WO030P0100 CO03AM0110 — 03A Set Static Equipment | 29-Mar-27 → 26-Apr-27 | Not Started 0% | float 95.0d CO03YP0140 — 03Y SB Pipe Erection | 03-Apr-27 → 16-Jul-27 | Not Started 0% | float 45.0d CO03YP0140 CO03BV1110 — 03B Paint Fabricated Pipe Spools | 05-Apr-27 → 15-Apr-27 | Not Started 0% | float 223.0d CO03EC0130 — 03E Install Paving | 05-Apr-27 → 17-Apr-27 | Not Started 0% | float 108.0d CO03DV1130 — 03D Paint Touch-up - Equipment (& 2002-F Tank) | 06-Apr-27 → 12-Apr-27 | Not Started 0% | float 189.0d CO03BV1130 — 03B Paint Touch-up - Equipment | 19-Apr-27 → 29-Apr-27 | Not Started 0% | float 248.0d CO03BS0120 — 03B Erect Misc Steel - Structure | 15-May-27 → 11-Jun-27 | Not Started 0% | float 169.0d CO03FS0120 — 03F Erect Misc Steel | 15-May-27 → 25-Jun-27 | Not Started 0% | float 88.0d CO03FS0120 CO03CE0110 — 03C Lighting JB's, Stands, Tray & Cable | 17-May-27 → 12-Jun-27 | Not Started 0% | float 123.0d CO03DE0110 — 03D Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO03DE0110 CO03DE0130 — 03D Power/Control JB's, Tray, Cable, Termination | 17-May-27 → 04-Jun-27 | Not Started 0% | float 131.0d CO03EE0110 — 03E Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO03EE0110 CO03FE0110 — 03F Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 111.0d CO03FE0110 CO03YE0110 — 03Y Lighting JB's, Stands, Tray & Cable | 17-May-27 → 07-Aug-27 | Not Started 0% | float 162.0d CO03YE0110 CO03YE0130 — 03Y Power/Control JB's, Tray, Cable, Termination | 17-May-27 → 07-Aug-27 | Not Started 0% | float 32.0d CO03YE0130 CO03YI0120 — 03Y Instrument JB's, Field Instr, Tray, Cable | 17-May-27 → 07-Aug-27 | Not Started 0% | float 32.0d CO03YI0120 WO030E0100 — 030 Above Ground Electrical | 17-May-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030E0100 WO030I0100 — 030 Install Instruments & Test | 17-May-27 → 17-Jan-28 | Not Started 0% | float 41.0d WO030I0100 CO03AS0120 — 03A Erect Misc Steel - Structure | 22-May-27 → 18-Jun-27 | Not Started 0% | float 56.0d CO03CS0120 — 03C Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 87.0d CO03DS0120 — 03D Erect Misc Steel | 22-May-27 → 18-Jun-27 | Not Started 0% | float 98.0d CO03ES0120 — 03E Erect Misc Steel - Structure | 22-May-27 → 18-Jun-27 | Not Started 0% | float 58.0d CO03FP0130 — 03F LB Pipe Erection | 25-May-27 → 02-Jul-27 | Not Started 0% | float 88.0d CO03FP0130 CO03AP0130 — 03A LB Pipe Erection | 29-May-27 → 07-Jul-27 | Not Started 0% | float 56.0d CO03AP0130 CO03CP0130 — 03C LB Pipe Erection | 29-May-27 → 07-Jul-27 | Not Started 0% | float 87.0d CO03CP0130 CO03EP0130 — 03E LB Pipe Erection | 29-May-27 → 30-Jul-27 | Not Started 0% | float 58.0d CO03EP0130 CO03YV1120 — 03Y Paint Touch-up - Piping | 29-May-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO03YV1120 CO03FP0140 — 03F SB Pipe Erection | 01-Jun-27 → 09-Jul-27 | Not Started 0% | float 88.0d CO03FP0140 CO03YP0150 — 03Y Punchlist / Test Piping | 02-Jun-27 → 23-Jul-27 | Not Started 0% | float 139.0d CO03YP0150 CO03AP0140 — 03A SB Pipe Erection | 05-Jun-27 → 14-Jul-27 | Not Started 0% | float 56.0d CO03AP0140 CO03CP0140 — 03C SB Pipe Erection | 05-Jun-27 → 14-Jul-27 | Not Started 0% | float 87.0d CO03CP0140 CO03EP0140 — 03E SB Pipe Erection | 05-Jun-27 → 06-Aug-27 | Not Started 0% | float 58.0d CO03EP0140 CO03FV2110 — 03F Insulate - Equipment | 05-Jun-27 → 19-Jun-27 | Not Started 0% | float 135.0d WO030V2100 — 030 Insulation | 05-Jun-27 → 02-Oct-27 | Not Started 0% | float 133.0d WO030V2100 CO03DP0130 — 03D LB Pipe Erection | 07-Jun-27 → 25-Jun-27 | Not Started 0% | float 98.0d CO03FE0130 — 03F Power/Control JB's, Tray, Cable, Termination | 08-Jun-27 → 16-Jul-27 | Not Started 0% | float 97.0d CO03FE0130 CO03FI0120 — 03F Instrument JB's, Field Instr, Tray, Cable | 08-Jun-27 → 16-Jul-27 | Not Started 0% | float 97.0d CO03FI0120 CO03AE0130 — 03A Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 56.0d CO03AE0130 CO03AI0120 — 03A Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 56.0d CO03AI0120 CO03BE0110 — 03B Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 187.0d CO03CE0130 — 03C Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CE0130 CO03CI0120 — 03C Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CI0120 CO03EE0130 — 03E Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 61.0d CO03EE0130 CO03EI0120 — 03E Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 61.0d CO03EI0120 CO03CE0120 — 03C Lighting Fixture Installation/Termination | 14-Jun-27 → 26-Jun-27 | Not Started 0% | float 123.0d CO03DP0140 — 03D SB Pipe Erection | 15-Jun-27 → 05-Jul-27 | Not Started 0% | float 97.0d CO03AE0110 — 03A Lighting JB's, Stands, Tray & Cable | 19-Jun-27 → 09-Jul-27 | Not Started 0% | float 75.0d CO03DI0120 — 03D Instrument JB's, Field Instr, Tray, Cable | 22-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO03BP0130 — 03B LB Pipe Erection | 28-Jun-27 → 04-Aug-27 | Not Started 0% | float 138.0d CO03DE0120 — 03D Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO03EE0120 — 03E Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO03FE0120 — 03F Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 111.0d CO03FP0150 — 03F Punchlist / Test Piping | 28-Jun-27 → 16-Jul-27 | Not Started 0% | float 88.0d CO03YV2120 — 03Y Insulate - Piping | 30-Jun-27 → 03-Sep-27 | Not Started 0% | float 148.0d CO03YV2120 CO03AP0150 — 03A Punchlist / Test Piping | 02-Jul-27 → 21-Jul-27 | Not Started 0% | float 62.0d CO03CP0150 — 03C Punchlist / Test Piping | 02-Jul-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03DP0150 — 03D Punchlist / Test Piping | 02-Jul-27 → 12-Jul-27 | Not Started 0% | float 97.0d CO03BE0120 — 03B Lighting Fixture Installation/Termination | 03-Jul-27 → 09-Jul-27 | Not Started 0% | float 187.0d CO03BP0140 — 03B SB Pipe Erection | 05-Jul-27 → 11-Aug-27 | Not Started 0% | float 138.0d CO03FV1120 — 03F Paint Touch-up - Piping | 06-Jul-27 → 16-Jul-27 | Not Started 0% | float 112.0d CO03DV1120 — 03D Paint Touch-up - Piping | 06-Jul-27 → 12-Jul-27 | Not Started 0% | float 111.0d CO03AE0120 — 03A Lighting Fixture Installation/Termination | 10-Jul-27 → 16-Jul-27 | Not Started 0% | float 75.0d CO03AV1120 — 03A Paint Touch-up - Piping | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 58.0d CO03AV1130 — 03A Paint Touch-up - Equipment | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 58.0d CO03CV1120 — 03C Paint Touch-up - Piping | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 102.0d CO03BE0130 — 03B Power/Control JB's, Tray, Cable, Termination | 12-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BE0130 CO03BI0120 — 03B Instrument JB's, Field Instr, Tray, Cable | 12-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BI0120 CO03DI0130 — 03D Install In Line Instruments | 12-Jul-27 → 14-Jul-27 | Not Started 0% | float 97.0d CO03EP0150 — 03E Punchlist / Test Piping | 14-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03AV2120 — 03A Insulate - Piping | 16-Jul-27 → 30-Jul-27 | Not Started 0% | float 63.0d CO03FI0130 — 03F Install In Line Instruments | 17-Jul-27 → 20-Jul-27 | Not Started 0% | float 97.0d CO03AI0130 — 03A Install In Line Instruments | 22-Jul-27 → 24-Jul-27 | Not Started 0% | float 62.0d CO03AV2110 — 03A Insulate - Equipment | 22-Jul-27 → 05-Aug-27 | Not Started 0% | float 58.0d CO03CI0130 — 03C Install In Line Instruments | 22-Jul-27 → 24-Jul-27 | Not Started 0% | float 87.0d CO03YI0130 — 03Y Install In Line Instruments | 24-Jul-27 → 27-Aug-27 | Not Started 0% | float 139.0d CO03EV1120 — 03E Paint Touch-up - Piping | 27-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EV1130 — 03E Paint Touch-up - Equipment | 27-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03FV2120 — 03F Insulate - Piping | 30-Jul-27 → 13-Aug-27 | Not Started 0% | float 88.0d CO03BP0150 — 03B Punchlist / Test Piping | 31-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BV1120 — 03B Paint Touch-up - Piping | 07-Aug-27 → 23-Aug-27 | Not Started 0% | float 153.0d CO03EI0130 — 03E Install In Line Instruments | 16-Aug-27 → 25-Aug-27 | Not Started 0% | float 65.0d CO03EV2110 — 03E Insulate - Equipment | 20-Aug-27 → 02-Oct-27 | Not Started 0% | float 58.0d CO03EV2110 CO03EV2120 — 03E Insulate - Piping | 20-Aug-27 → 02-Oct-27 | Not Started 0% | float 58.0d CO03EV2120 CO03BI0130 — 03B Install In Line Instruments | 25-Aug-27 → 30-Aug-27 | Not Started 0% | float 138.0d CO030K0100 — 030 Site Prep - Guard Posts & Gravel | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d CO030K0100 WO030K0100 — 030 Site Prep | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO030K0100 CO03AI0140 — 03A Continuity Testing | 07-Dec-27 → 09-Dec-27 | Not Started 0% | float -35.0d CO03YI0140 — 03Y Continuity Testing | 07-Dec-27 → 17-Jan-28 | Not Started 0% | float 41.0d CO03YI0140 CO03AT0110 — 03A Mechanical Completion | 09-Dec-27 | Not Started CO03FI0140 — 03F Continuity Testing | 10-Dec-27 → 13-Dec-27 | Not Started 0% | float -1.0d CO03FT0110 — 03F Mechanical Completion | 13-Dec-27 | Not Started SC03AT0120 — 03A RFSU | 20-Dec-27 | Not Started CO03BI0140 — 03B Continuity Testing | 21-Dec-27 → 23-Dec-27 | Not Started 0% | float 59.0d CO03BT0110 — 03B Mechanical Completion | 23-Dec-27 | Not Started CO03CI0140 — 03C Continuity Testing | 24-Dec-27 → 27-Dec-27 | Not Started 0% | float -19.0d SC03FT0120 — 03F RFSU | 24-Dec-27 | Not Started CO03CT0110 — 03C Mechanical Completion | 27-Dec-27 | Not Started CO03DI0140 — 03D Continuity Testing | 28-Dec-27 → 29-Dec-27 | Not Started 0% | float -17.0d CO03DT0110 — 03D Mechanical Completion | 29-Dec-27 | Not Started CO03EI0140 — 03E Continuity Testing | 30-Dec-27 → 04-Jan-28 | Not Started 0% | float -32.0d SC03BT0120 — 03B RFSU | 03-Jan-28 | Not Started CO03ET0110 — 03E Mechanical Completion | 04-Jan-28 | Not Started SC03DT0120 — 03D RFSU | 04-Jan-28 | Not Started SC03CT0120 — 03C RFSU | 07-Jan-28 | Not Started CO03YT0110 — 03Y Mechanical Completion | 17-Jan-28 | Not Started SC03ET0120 — 03E RFSU | 22-Jan-28 | Not Started SC03YT0120 — 03Y RFSU | 24-Jan-28 | Not Started