Projects
EBCF-4

EBIC Construction Forecast (27-Jan-07)

Data Date: 23-Apr-26
Plan: 22-Jan-25 – 27-Mar-29
Legend: Not Started In Progress Complete Critical Milestone Showing 169 activities in 03 Utility Plant × clear
Code
Activity
Start
Finish
Flt
%
CO03DC0110
03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank)
06-Apr-26
27-Dec-26
7%
WO030C0100
030 Concrete & Excavation
06-Apr-26
19-Mar-27
229.0d
5%
CO03CC0110
03C Form, Pour, Strip Fnds - Major Fnds
21-Apr-26
27-Dec-26
5%
CO03CM0110
03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks
27-Dec-26
27-Dec-26
0%
CO03DC0150
03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps)
27-Dec-26
27-Dec-26
0%
CO03FC0110
03F Form, Pour, Strip Fnds - Package Boiler
27-Dec-26
27-Dec-26
0%
CO03AC0110
03A Form, Pour, Strip Fnds - Major Fnds Gen'l
28-Dec-26
16-Jan-27
155.0d
0%
CO03BC0110
03B Form, Pour, Strip Fnds - Major Fnds (N/A)
28-Dec-26
28-Dec-26
0%
CO03BC0140
03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump
28-Dec-26
30-Dec-26
266.0d
0%
CO03DU4120
03D U/G Piping Installation
28-Dec-26
05-Jan-27
199.0d
0%
CO03EC0110
03E Form, Pour, Strip Fnds - 2001-U Water Treatment
28-Dec-26
20-Feb-27
126.0d
0%
CO03FM0110
03F Erect 2002-U Package Boiler
28-Dec-26
13-Mar-27
159.0d
0%
CO03YC0110
03Y Form, Pour, Strip Fnds - Sleeper Fnds
28-Dec-26
01-Jan-27
98.0d
0%
CO03YC0120
03Y Form, Pour, Strip Fnds - Pipe Rack Fnds
28-Dec-26
28-Dec-26
0%
WO030M0100
030 Major Equipment
28-Dec-26
26-Apr-27
192.0d
0%
WO030U4100
030 U/G Piping Installation
28-Dec-26
26-Feb-27
229.0d
0%
CO03DC0120
03D Form, Pour, Strip Fnds - Misc Fnds
06-Jan-27
19-Jan-27
199.0d
0%
CO03YV1110
03Y Paint Fabricated Pipe Spools
13-Jan-27
13-Feb-27
154.0d
0%
WO030V1100
030 Paint
13-Jan-27
23-Aug-27
153.0d
0%
CO03DU3110
03D U/G Earthing Installation
15-Jan-27
19-Jan-27
199.0d
0%
WO030U3100
030 Install U/G Electrical
15-Jan-27
12-Mar-27
229.0d
0%
CO03UP0150
03U LB Pipe Erection (Firewater Piping)
16-Jan-27
06-Feb-27
212.0d
0%
CO03AU4120
03A U/G Piping Installation
30-Jan-27
18-Feb-27
135.0d
0%
CO03BU4120
03B U/G Piping Installation
30-Jan-27
17-Feb-27
237.0d
0%
CO03CU4120
03C U/G Piping Installation
30-Jan-27
18-Feb-27
166.0d
0%
CO03EU4120
03E U/G Piping Installation
30-Jan-27
26-Feb-27
121.0d
0%
CO03FU4120
03F U/G Piping Installation
30-Jan-27
18-Feb-27
155.0d
0%
CO03DC0130
03D Install Paving
01-Feb-27
06-Feb-27
189.0d
0%
CO03FM0150
03F Install Chemical Injection System
01-Feb-27
13-Mar-27
159.0d
0%
WO030C0110
030 Concrete Paving
01-Feb-27
17-Apr-27
210.0d
0%
CO03AC0120
03A Form, Pour, Strip Fnds - Misc Fnds
12-Feb-27
25-Feb-27
141.0d
0%
CO03CV1110
03C Paint Fabricated Pipe Spools
13-Feb-27
24-Feb-27
191.0d
0%
CO03BC0120
03B Form, Pour, Strip Fnds - Misc Fnds
18-Feb-27
03-Mar-27
243.0d
0%
CO03CC0120
03C Form, Pour, Strip Fnds - Misc Fnds
19-Feb-27
04-Mar-27
166.0d
0%
CO03EV1110
03E Paint Fabricated Pipe Spools
19-Feb-27
09-Mar-27
171.0d
0%
CO03FC0120
03F Form, Pour, Strip Fnds - Misc Fnds
19-Feb-27
11-Mar-27
155.0d
0%
CO03FV1110
03F Paint Fabricated Pipe Spools
19-Feb-27
02-Mar-27
183.0d
0%
CO03BU3110
03B U/G Earthing Installation
23-Feb-27
03-Mar-27
237.0d
0%
CO03CU3110
03C U/G Earthing Installation
24-Feb-27
04-Mar-27
166.0d
0%
CO03FU3110
03F U/G Earthing Installation
24-Feb-27
04-Mar-27
161.0d
0%
CO03AU3110
03A U/G Earthing Installation
26-Feb-27
04-Mar-27
135.0d
0%
CO03UDT110
03U Mechanical Completion
26-Feb-27
26-Feb-27
301.0d
0%
SC03UT0120
03U RFSU
26-Feb-27
26-Feb-27
380.0d
0%
CO03AV1110
03A Paint Fabricated Pipe Spools
27-Feb-27
10-Mar-27
148.0d
0%
CO03EC0120
03E Form, Pour, Strip Fnds - Misc Fnds
27-Feb-27
19-Mar-27
121.0d
0%
CO03EU3110
03E U/G Earthing Installation
27-Feb-27
12-Mar-27
127.0d
0%
CO03BM0110
03B Set Static Equipment - Gen'l
01-Mar-27
02-Apr-27
212.0d
0%
CO03EM0110
03E Set Static Equipment - Gen'l
01-Mar-27
05-Apr-27
135.0d
0%
CO03BC0130
03B Install Paving
04-Mar-27
17-Mar-27
237.0d
0%
CO03DV1110
03D Paint Fabricated Pipe Spools
06-Mar-27
11-Mar-27
172.0d
0%
CO03YS0110
03Y Erect Structural Steel
06-Mar-27
26-Mar-27
39.0d
0%
WO030S0100
030 Erect Steel
06-Mar-27
25-Jun-27
157.0d
0%
CO03AC0130
03A Install Paving
08-Mar-27
13-Mar-27
133.0d
0%
CO03CC0130
03C Install Paving
15-Mar-27
20-Mar-27
158.0d
0%
CO03CM0150
03C Set Rotating Equipment
15-Mar-27
22-Mar-27
146.0d
0%
CO03DM0150
03D Set Rotating Equipment
15-Mar-27
29-Mar-27
158.0d
0%
CO03FV1130
03F Paint Touch-up - Equipment
17-Mar-27
27-Mar-27
183.0d
0%
CO03FC0130
03F Install Paving
22-Mar-27
03-Apr-27
147.0d
0%
CO03CV1130
03C Paint Touch-up - Equipment
24-Mar-27
05-Apr-27
195.0d
0%
CO03BM0150
03B Set Rotating Equipment
26-Mar-27
15-Apr-27
200.0d
0%
CO03YP0130
03Y LB Pipe Erection
27-Mar-27
09-Jul-27
39.0d
0%
WO030P0100
030 Above Ground Pipe
27-Mar-27
23-Aug-27
138.0d
0%
CO03AM0110
03A Set Static Equipment
29-Mar-27
26-Apr-27
95.0d
0%
CO03YP0140
03Y SB Pipe Erection
03-Apr-27
16-Jul-27
45.0d
0%
CO03BV1110
03B Paint Fabricated Pipe Spools
05-Apr-27
15-Apr-27
223.0d
0%
CO03EC0130
03E Install Paving
05-Apr-27
17-Apr-27
108.0d
0%
CO03DV1130
03D Paint Touch-up - Equipment (& 2002-F Tank)
06-Apr-27
12-Apr-27
189.0d
0%
CO03BV1130
03B Paint Touch-up - Equipment
19-Apr-27
29-Apr-27
248.0d
0%
CO03BS0120
03B Erect Misc Steel - Structure
15-May-27
11-Jun-27
169.0d
0%
CO03FS0120
03F Erect Misc Steel
15-May-27
25-Jun-27
88.0d
0%
CO03CE0110
03C Lighting JB's, Stands, Tray & Cable
17-May-27
12-Jun-27
123.0d
0%
CO03DE0110
03D Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO03DE0130
03D Power/Control JB's, Tray, Cable, Termination
17-May-27
04-Jun-27
131.0d
0%
CO03EE0110
03E Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
105.0d
0%
CO03FE0110
03F Lighting JB's, Stands, Tray & Cable
17-May-27
26-Jun-27
111.0d
0%
CO03YE0110
03Y Lighting JB's, Stands, Tray & Cable
17-May-27
07-Aug-27
162.0d
0%
CO03YE0130
03Y Power/Control JB's, Tray, Cable, Termination
17-May-27
07-Aug-27
32.0d
0%
CO03YI0120
03Y Instrument JB's, Field Instr, Tray, Cable
17-May-27
07-Aug-27
32.0d
0%
WO030E0100
030 Above Ground Electrical
17-May-27
23-Aug-27
153.0d
0%
WO030I0100
030 Install Instruments & Test
17-May-27
17-Jan-28
41.0d
0%
CO03AS0120
03A Erect Misc Steel - Structure
22-May-27
18-Jun-27
56.0d
0%
CO03CS0120
03C Erect Misc Steel
22-May-27
11-Jun-27
87.0d
0%
CO03DS0120
03D Erect Misc Steel
22-May-27
18-Jun-27
98.0d
0%
CO03ES0120
03E Erect Misc Steel - Structure
22-May-27
18-Jun-27
58.0d
0%
CO03FP0130
03F LB Pipe Erection
25-May-27
02-Jul-27
88.0d
0%
CO03AP0130
03A LB Pipe Erection
29-May-27
07-Jul-27
56.0d
0%
CO03CP0130
03C LB Pipe Erection
29-May-27
07-Jul-27
87.0d
0%
CO03EP0130
03E LB Pipe Erection
29-May-27
30-Jul-27
58.0d
0%
CO03YV1120
03Y Paint Touch-up - Piping
29-May-27
23-Jul-27
175.0d
0%
CO03FP0140
03F SB Pipe Erection
01-Jun-27
09-Jul-27
88.0d
0%
CO03YP0150
03Y Punchlist / Test Piping
02-Jun-27
23-Jul-27
139.0d
0%
CO03AP0140
03A SB Pipe Erection
05-Jun-27
14-Jul-27
56.0d
0%
CO03CP0140
03C SB Pipe Erection
05-Jun-27
14-Jul-27
87.0d
0%
CO03EP0140
03E SB Pipe Erection
05-Jun-27
06-Aug-27
58.0d
0%
CO03FV2110
03F Insulate - Equipment
05-Jun-27
19-Jun-27
135.0d
0%
WO030V2100
030 Insulation
05-Jun-27
02-Oct-27
133.0d
0%
CO03DP0130
03D LB Pipe Erection
07-Jun-27
25-Jun-27
98.0d
0%
CO03FE0130
03F Power/Control JB's, Tray, Cable, Termination
08-Jun-27
16-Jul-27
97.0d
0%
CO03FI0120
03F Instrument JB's, Field Instr, Tray, Cable
08-Jun-27
16-Jul-27
97.0d
0%
CO03AE0130
03A Power/Control JB's, Tray, Cable, Termination
12-Jun-27
21-Jul-27
56.0d
0%
CO03AI0120
03A Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
21-Jul-27
56.0d
0%
CO03BE0110
03B Lighting JB's, Stands, Tray & Cable
12-Jun-27
02-Jul-27
187.0d
0%
CO03CE0130
03C Power/Control JB's, Tray, Cable, Termination
12-Jun-27
21-Jul-27
87.0d
0%
CO03CI0120
03C Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
21-Jul-27
87.0d
0%
CO03EE0130
03E Power/Control JB's, Tray, Cable, Termination
12-Jun-27
13-Aug-27
61.0d
0%
CO03EI0120
03E Instrument JB's, Field Instr, Tray, Cable
12-Jun-27
13-Aug-27
61.0d
0%
CO03CE0120
03C Lighting Fixture Installation/Termination
14-Jun-27
26-Jun-27
123.0d
0%
CO03DP0140
03D SB Pipe Erection
15-Jun-27
05-Jul-27
97.0d
0%
CO03AE0110
03A Lighting JB's, Stands, Tray & Cable
19-Jun-27
09-Jul-27
75.0d
0%
CO03DI0120
03D Instrument JB's, Field Instr, Tray, Cable
22-Jun-27
12-Jul-27
100.0d
0%
CO03BP0130
03B LB Pipe Erection
28-Jun-27
04-Aug-27
138.0d
0%
CO03DE0120
03D Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO03EE0120
03E Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
105.0d
0%
CO03FE0120
03F Lighting Fixture Installation/Termination
28-Jun-27
17-Jul-27
111.0d
0%
CO03FP0150
03F Punchlist / Test Piping
28-Jun-27
16-Jul-27
88.0d
0%
CO03YV2120
03Y Insulate - Piping
30-Jun-27
03-Sep-27
148.0d
0%
CO03AP0150
03A Punchlist / Test Piping
02-Jul-27
21-Jul-27
62.0d
0%
CO03CP0150
03C Punchlist / Test Piping
02-Jul-27
21-Jul-27
87.0d
0%
CO03DP0150
03D Punchlist / Test Piping
02-Jul-27
12-Jul-27
97.0d
0%
CO03BE0120
03B Lighting Fixture Installation/Termination
03-Jul-27
09-Jul-27
187.0d
0%
CO03BP0140
03B SB Pipe Erection
05-Jul-27
11-Aug-27
138.0d
0%
CO03FV1120
03F Paint Touch-up - Piping
06-Jul-27
16-Jul-27
112.0d
0%
CO03DV1120
03D Paint Touch-up - Piping
06-Jul-27
12-Jul-27
111.0d
0%
CO03AE0120
03A Lighting Fixture Installation/Termination
10-Jul-27
16-Jul-27
75.0d
0%
CO03AV1120
03A Paint Touch-up - Piping
10-Jul-27
21-Jul-27
58.0d
0%
CO03AV1130
03A Paint Touch-up - Equipment
10-Jul-27
21-Jul-27
58.0d
0%
CO03CV1120
03C Paint Touch-up - Piping
10-Jul-27
21-Jul-27
102.0d
0%
CO03BE0130
03B Power/Control JB's, Tray, Cable, Termination
12-Jul-27
23-Aug-27
138.0d
0%
CO03BI0120
03B Instrument JB's, Field Instr, Tray, Cable
12-Jul-27
23-Aug-27
138.0d
0%
CO03DI0130
03D Install In Line Instruments
12-Jul-27
14-Jul-27
97.0d
0%
CO03EP0150
03E Punchlist / Test Piping
14-Jul-27
13-Aug-27
58.0d
0%
CO03AV2120
03A Insulate - Piping
16-Jul-27
30-Jul-27
63.0d
0%
CO03FI0130
03F Install In Line Instruments
17-Jul-27
20-Jul-27
97.0d
0%
CO03AI0130
03A Install In Line Instruments
22-Jul-27
24-Jul-27
62.0d
0%
CO03AV2110
03A Insulate - Equipment
22-Jul-27
05-Aug-27
58.0d
0%
CO03CI0130
03C Install In Line Instruments
22-Jul-27
24-Jul-27
87.0d
0%
CO03YI0130
03Y Install In Line Instruments
24-Jul-27
27-Aug-27
139.0d
0%
CO03EV1120
03E Paint Touch-up - Piping
27-Jul-27
13-Aug-27
58.0d
0%
CO03EV1130
03E Paint Touch-up - Equipment
27-Jul-27
13-Aug-27
58.0d
0%
CO03FV2120
03F Insulate - Piping
30-Jul-27
13-Aug-27
88.0d
0%
CO03BP0150
03B Punchlist / Test Piping
31-Jul-27
23-Aug-27
138.0d
0%
CO03BV1120
03B Paint Touch-up - Piping
07-Aug-27
23-Aug-27
153.0d
0%
CO03EI0130
03E Install In Line Instruments
16-Aug-27
25-Aug-27
65.0d
0%
CO03EV2110
03E Insulate - Equipment
20-Aug-27
02-Oct-27
58.0d
0%
CO03EV2120
03E Insulate - Piping
20-Aug-27
02-Oct-27
58.0d
0%
CO03BI0130
03B Install In Line Instruments
25-Aug-27
30-Aug-27
138.0d
0%
CO030K0100
030 Site Prep - Guard Posts & Gravel
01-Nov-27
01-Mar-28
9.0d
0%
WO030K0100
030 Site Prep
01-Nov-27
01-Mar-28
9.0d
0%
CO03AI0140
03A Continuity Testing
07-Dec-27
09-Dec-27
-35.0d
0%
CO03YI0140
03Y Continuity Testing
07-Dec-27
17-Jan-28
41.0d
0%
CO03AT0110
03A Mechanical Completion
09-Dec-27
09-Dec-27
-26.0d
0%
CO03FI0140
03F Continuity Testing
10-Dec-27
13-Dec-27
-1.0d
0%
CO03FT0110
03F Mechanical Completion
13-Dec-27
13-Dec-27
8.0d
0%
SC03AT0120
03A RFSU
20-Dec-27
20-Dec-27
-47.0d
0%
CO03BI0140
03B Continuity Testing
21-Dec-27
23-Dec-27
59.0d
0%
CO03BT0110
03B Mechanical Completion
23-Dec-27
23-Dec-27
68.0d
0%
CO03CI0140
03C Continuity Testing
24-Dec-27
27-Dec-27
-19.0d
0%
SC03FT0120
03F RFSU
24-Dec-27
24-Dec-27
-2.0d
0%
CO03CT0110
03C Mechanical Completion
27-Dec-27
27-Dec-27
-10.0d
0%
CO03DI0140
03D Continuity Testing
28-Dec-27
29-Dec-27
-17.0d
0%
CO03DT0110
03D Mechanical Completion
29-Dec-27
29-Dec-27
-12.0d
0%
CO03EI0140
03E Continuity Testing
30-Dec-27
04-Jan-28
-32.0d
0%
SC03BT0120
03B RFSU
03-Jan-28
03-Jan-28
69.0d
0%
CO03ET0110
03E Mechanical Completion
04-Jan-28
04-Jan-28
-17.0d
0%
SC03DT0120
03D RFSU
04-Jan-28
04-Jan-28
-20.0d
0%
SC03CT0120
03C RFSU
07-Jan-28
07-Jan-28
-23.0d
0%
CO03YT0110
03Y Mechanical Completion
17-Jan-28
17-Jan-28
47.0d
0%
SC03ET0120
03E RFSU
22-Jan-28
22-Jan-28
-38.0d
0%
SC03YT0120
03Y RFSU
24-Jan-28
24-Jan-28
48.0d
0%
Apr 2026 May 2026 Jun 2026 Jul 2026 Aug 2026 Sep 2026 Oct 2026 Nov 2026 Dec 2026 Jan 2027 Feb 2027 Mar 2027 Apr 2027 May 2027 Jun 2027 Jul 2027 Aug 2027 Sep 2027 Oct 2027 Nov 2027 Dec 2027 Jan 2028 Feb 2028 Mar 2028 Data Date
CO03DC0110 — 03D Form, Pour, Strip Fnds - 2002-F (Demin Water Tank) | 06-Apr-26 → 27-Dec-26 | In Progress 7% | float — CO03DC0110 WO030C0100 — 030 Concrete & Excavation | 06-Apr-26 → 19-Mar-27 | In Progress 5% | float 229.0d WO030C0100 CO03CC0110 — 03C Form, Pour, Strip Fnds - Major Fnds | 21-Apr-26 → 27-Dec-26 | In Progress 5% | float — CO03CC0110 CO03CM0110 — 03C Set Static Equipment - 2203/4-F Caustic, Sulfuric Acid Tanks | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03DC0150 — 03D Form, Pour, Strip Fnd - 2002J/JA (Fresh Cooling Water Pumps) | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03FC0110 — 03F Form, Pour, Strip Fnds - Package Boiler | 27-Dec-26 → 27-Dec-26 | Not Started 0% | float — CO03AC0110 — 03A Form, Pour, Strip Fnds - Major Fnds Gen'l | 28-Dec-26 → 16-Jan-27 | Not Started 0% | float 155.0d CO03AC0110 CO03BC0110 — 03B Form, Pour, Strip Fnds - Major Fnds (N/A) | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — CO03BC0140 — 03B Form, Pour, Strip Fnds - 2401-A Wastewater Sump | 28-Dec-26 → 30-Dec-26 | Not Started 0% | float 266.0d CO03DU4120 — 03D U/G Piping Installation | 28-Dec-26 → 05-Jan-27 | Not Started 0% | float 199.0d CO03DU4120 CO03EC0110 — 03E Form, Pour, Strip Fnds - 2001-U Water Treatment | 28-Dec-26 → 20-Feb-27 | Not Started 0% | float 126.0d CO03EC0110 CO03FM0110 — 03F Erect 2002-U Package Boiler | 28-Dec-26 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0110 CO03YC0110 — 03Y Form, Pour, Strip Fnds - Sleeper Fnds | 28-Dec-26 → 01-Jan-27 | Not Started 0% | float 98.0d CO03YC0110 CO03YC0120 — 03Y Form, Pour, Strip Fnds - Pipe Rack Fnds | 28-Dec-26 → 28-Dec-26 | Not Started 0% | float — WO030M0100 — 030 Major Equipment | 28-Dec-26 → 26-Apr-27 | Not Started 0% | float 192.0d WO030M0100 WO030U4100 — 030 U/G Piping Installation | 28-Dec-26 → 26-Feb-27 | Not Started 0% | float 229.0d WO030U4100 CO03DC0120 — 03D Form, Pour, Strip Fnds - Misc Fnds | 06-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03DC0120 CO03YV1110 — 03Y Paint Fabricated Pipe Spools | 13-Jan-27 → 13-Feb-27 | Not Started 0% | float 154.0d CO03YV1110 WO030V1100 — 030 Paint | 13-Jan-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030V1100 CO03DU3110 — 03D U/G Earthing Installation | 15-Jan-27 → 19-Jan-27 | Not Started 0% | float 199.0d CO03DU3110 WO030U3100 — 030 Install U/G Electrical | 15-Jan-27 → 12-Mar-27 | Not Started 0% | float 229.0d WO030U3100 CO03UP0150 — 03U LB Pipe Erection (Firewater Piping) | 16-Jan-27 → 06-Feb-27 | Not Started 0% | float 212.0d CO03UP0150 CO03AU4120 — 03A U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 135.0d CO03AU4120 CO03BU4120 — 03B U/G Piping Installation | 30-Jan-27 → 17-Feb-27 | Not Started 0% | float 237.0d CO03BU4120 CO03CU4120 — 03C U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 166.0d CO03CU4120 CO03EU4120 — 03E U/G Piping Installation | 30-Jan-27 → 26-Feb-27 | Not Started 0% | float 121.0d CO03EU4120 CO03FU4120 — 03F U/G Piping Installation | 30-Jan-27 → 18-Feb-27 | Not Started 0% | float 155.0d CO03FU4120 CO03DC0130 — 03D Install Paving | 01-Feb-27 → 06-Feb-27 | Not Started 0% | float 189.0d CO03DC0130 CO03FM0150 — 03F Install Chemical Injection System | 01-Feb-27 → 13-Mar-27 | Not Started 0% | float 159.0d CO03FM0150 WO030C0110 — 030 Concrete Paving | 01-Feb-27 → 17-Apr-27 | Not Started 0% | float 210.0d WO030C0110 CO03AC0120 — 03A Form, Pour, Strip Fnds - Misc Fnds | 12-Feb-27 → 25-Feb-27 | Not Started 0% | float 141.0d CO03AC0120 CO03CV1110 — 03C Paint Fabricated Pipe Spools | 13-Feb-27 → 24-Feb-27 | Not Started 0% | float 191.0d CO03CV1110 CO03BC0120 — 03B Form, Pour, Strip Fnds - Misc Fnds | 18-Feb-27 → 03-Mar-27 | Not Started 0% | float 243.0d CO03BC0120 CO03CC0120 — 03C Form, Pour, Strip Fnds - Misc Fnds | 19-Feb-27 → 04-Mar-27 | Not Started 0% | float 166.0d CO03CC0120 CO03EV1110 — 03E Paint Fabricated Pipe Spools | 19-Feb-27 → 09-Mar-27 | Not Started 0% | float 171.0d CO03EV1110 CO03FC0120 — 03F Form, Pour, Strip Fnds - Misc Fnds | 19-Feb-27 → 11-Mar-27 | Not Started 0% | float 155.0d CO03FC0120 CO03FV1110 — 03F Paint Fabricated Pipe Spools | 19-Feb-27 → 02-Mar-27 | Not Started 0% | float 183.0d CO03FV1110 CO03BU3110 — 03B U/G Earthing Installation | 23-Feb-27 → 03-Mar-27 | Not Started 0% | float 237.0d CO03BU3110 CO03CU3110 — 03C U/G Earthing Installation | 24-Feb-27 → 04-Mar-27 | Not Started 0% | float 166.0d CO03CU3110 CO03FU3110 — 03F U/G Earthing Installation | 24-Feb-27 → 04-Mar-27 | Not Started 0% | float 161.0d CO03FU3110 CO03AU3110 — 03A U/G Earthing Installation | 26-Feb-27 → 04-Mar-27 | Not Started 0% | float 135.0d CO03AU3110 CO03UDT110 — 03U Mechanical Completion | 26-Feb-27 | Not Started SC03UT0120 — 03U RFSU | 26-Feb-27 | Not Started CO03AV1110 — 03A Paint Fabricated Pipe Spools | 27-Feb-27 → 10-Mar-27 | Not Started 0% | float 148.0d CO03AV1110 CO03EC0120 — 03E Form, Pour, Strip Fnds - Misc Fnds | 27-Feb-27 → 19-Mar-27 | Not Started 0% | float 121.0d CO03EC0120 CO03EU3110 — 03E U/G Earthing Installation | 27-Feb-27 → 12-Mar-27 | Not Started 0% | float 127.0d CO03EU3110 CO03BM0110 — 03B Set Static Equipment - Gen'l | 01-Mar-27 → 02-Apr-27 | Not Started 0% | float 212.0d CO03BM0110 CO03EM0110 — 03E Set Static Equipment - Gen'l | 01-Mar-27 → 05-Apr-27 | Not Started 0% | float 135.0d CO03EM0110 CO03BC0130 — 03B Install Paving | 04-Mar-27 → 17-Mar-27 | Not Started 0% | float 237.0d CO03BC0130 CO03DV1110 — 03D Paint Fabricated Pipe Spools | 06-Mar-27 → 11-Mar-27 | Not Started 0% | float 172.0d CO03DV1110 CO03YS0110 — 03Y Erect Structural Steel | 06-Mar-27 → 26-Mar-27 | Not Started 0% | float 39.0d CO03YS0110 WO030S0100 — 030 Erect Steel | 06-Mar-27 → 25-Jun-27 | Not Started 0% | float 157.0d WO030S0100 CO03AC0130 — 03A Install Paving | 08-Mar-27 → 13-Mar-27 | Not Started 0% | float 133.0d CO03AC0130 CO03CC0130 — 03C Install Paving | 15-Mar-27 → 20-Mar-27 | Not Started 0% | float 158.0d CO03CC0130 CO03CM0150 — 03C Set Rotating Equipment | 15-Mar-27 → 22-Mar-27 | Not Started 0% | float 146.0d CO03CM0150 CO03DM0150 — 03D Set Rotating Equipment | 15-Mar-27 → 29-Mar-27 | Not Started 0% | float 158.0d CO03DM0150 CO03FV1130 — 03F Paint Touch-up - Equipment | 17-Mar-27 → 27-Mar-27 | Not Started 0% | float 183.0d CO03FV1130 CO03FC0130 — 03F Install Paving | 22-Mar-27 → 03-Apr-27 | Not Started 0% | float 147.0d CO03FC0130 CO03CV1130 — 03C Paint Touch-up - Equipment | 24-Mar-27 → 05-Apr-27 | Not Started 0% | float 195.0d CO03CV1130 CO03BM0150 — 03B Set Rotating Equipment | 26-Mar-27 → 15-Apr-27 | Not Started 0% | float 200.0d CO03BM0150 CO03YP0130 — 03Y LB Pipe Erection | 27-Mar-27 → 09-Jul-27 | Not Started 0% | float 39.0d CO03YP0130 WO030P0100 — 030 Above Ground Pipe | 27-Mar-27 → 23-Aug-27 | Not Started 0% | float 138.0d WO030P0100 CO03AM0110 — 03A Set Static Equipment | 29-Mar-27 → 26-Apr-27 | Not Started 0% | float 95.0d CO03AM0110 CO03YP0140 — 03Y SB Pipe Erection | 03-Apr-27 → 16-Jul-27 | Not Started 0% | float 45.0d CO03YP0140 CO03BV1110 — 03B Paint Fabricated Pipe Spools | 05-Apr-27 → 15-Apr-27 | Not Started 0% | float 223.0d CO03BV1110 CO03EC0130 — 03E Install Paving | 05-Apr-27 → 17-Apr-27 | Not Started 0% | float 108.0d CO03EC0130 CO03DV1130 — 03D Paint Touch-up - Equipment (& 2002-F Tank) | 06-Apr-27 → 12-Apr-27 | Not Started 0% | float 189.0d CO03DV1130 CO03BV1130 — 03B Paint Touch-up - Equipment | 19-Apr-27 → 29-Apr-27 | Not Started 0% | float 248.0d CO03BV1130 CO03BS0120 — 03B Erect Misc Steel - Structure | 15-May-27 → 11-Jun-27 | Not Started 0% | float 169.0d CO03BS0120 CO03FS0120 — 03F Erect Misc Steel | 15-May-27 → 25-Jun-27 | Not Started 0% | float 88.0d CO03FS0120 CO03CE0110 — 03C Lighting JB's, Stands, Tray & Cable | 17-May-27 → 12-Jun-27 | Not Started 0% | float 123.0d CO03CE0110 CO03DE0110 — 03D Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO03DE0110 CO03DE0130 — 03D Power/Control JB's, Tray, Cable, Termination | 17-May-27 → 04-Jun-27 | Not Started 0% | float 131.0d CO03DE0130 CO03EE0110 — 03E Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 105.0d CO03EE0110 CO03FE0110 — 03F Lighting JB's, Stands, Tray & Cable | 17-May-27 → 26-Jun-27 | Not Started 0% | float 111.0d CO03FE0110 CO03YE0110 — 03Y Lighting JB's, Stands, Tray & Cable | 17-May-27 → 07-Aug-27 | Not Started 0% | float 162.0d CO03YE0110 CO03YE0130 — 03Y Power/Control JB's, Tray, Cable, Termination | 17-May-27 → 07-Aug-27 | Not Started 0% | float 32.0d CO03YE0130 CO03YI0120 — 03Y Instrument JB's, Field Instr, Tray, Cable | 17-May-27 → 07-Aug-27 | Not Started 0% | float 32.0d CO03YI0120 WO030E0100 — 030 Above Ground Electrical | 17-May-27 → 23-Aug-27 | Not Started 0% | float 153.0d WO030E0100 WO030I0100 — 030 Install Instruments & Test | 17-May-27 → 17-Jan-28 | Not Started 0% | float 41.0d WO030I0100 CO03AS0120 — 03A Erect Misc Steel - Structure | 22-May-27 → 18-Jun-27 | Not Started 0% | float 56.0d CO03AS0120 CO03CS0120 — 03C Erect Misc Steel | 22-May-27 → 11-Jun-27 | Not Started 0% | float 87.0d CO03CS0120 CO03DS0120 — 03D Erect Misc Steel | 22-May-27 → 18-Jun-27 | Not Started 0% | float 98.0d CO03DS0120 CO03ES0120 — 03E Erect Misc Steel - Structure | 22-May-27 → 18-Jun-27 | Not Started 0% | float 58.0d CO03ES0120 CO03FP0130 — 03F LB Pipe Erection | 25-May-27 → 02-Jul-27 | Not Started 0% | float 88.0d CO03FP0130 CO03AP0130 — 03A LB Pipe Erection | 29-May-27 → 07-Jul-27 | Not Started 0% | float 56.0d CO03AP0130 CO03CP0130 — 03C LB Pipe Erection | 29-May-27 → 07-Jul-27 | Not Started 0% | float 87.0d CO03CP0130 CO03EP0130 — 03E LB Pipe Erection | 29-May-27 → 30-Jul-27 | Not Started 0% | float 58.0d CO03EP0130 CO03YV1120 — 03Y Paint Touch-up - Piping | 29-May-27 → 23-Jul-27 | Not Started 0% | float 175.0d CO03YV1120 CO03FP0140 — 03F SB Pipe Erection | 01-Jun-27 → 09-Jul-27 | Not Started 0% | float 88.0d CO03FP0140 CO03YP0150 — 03Y Punchlist / Test Piping | 02-Jun-27 → 23-Jul-27 | Not Started 0% | float 139.0d CO03YP0150 CO03AP0140 — 03A SB Pipe Erection | 05-Jun-27 → 14-Jul-27 | Not Started 0% | float 56.0d CO03AP0140 CO03CP0140 — 03C SB Pipe Erection | 05-Jun-27 → 14-Jul-27 | Not Started 0% | float 87.0d CO03CP0140 CO03EP0140 — 03E SB Pipe Erection | 05-Jun-27 → 06-Aug-27 | Not Started 0% | float 58.0d CO03EP0140 CO03FV2110 — 03F Insulate - Equipment | 05-Jun-27 → 19-Jun-27 | Not Started 0% | float 135.0d CO03FV2110 WO030V2100 — 030 Insulation | 05-Jun-27 → 02-Oct-27 | Not Started 0% | float 133.0d WO030V2100 CO03DP0130 — 03D LB Pipe Erection | 07-Jun-27 → 25-Jun-27 | Not Started 0% | float 98.0d CO03DP0130 CO03FE0130 — 03F Power/Control JB's, Tray, Cable, Termination | 08-Jun-27 → 16-Jul-27 | Not Started 0% | float 97.0d CO03FE0130 CO03FI0120 — 03F Instrument JB's, Field Instr, Tray, Cable | 08-Jun-27 → 16-Jul-27 | Not Started 0% | float 97.0d CO03FI0120 CO03AE0130 — 03A Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 56.0d CO03AE0130 CO03AI0120 — 03A Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 56.0d CO03AI0120 CO03BE0110 — 03B Lighting JB's, Stands, Tray & Cable | 12-Jun-27 → 02-Jul-27 | Not Started 0% | float 187.0d CO03BE0110 CO03CE0130 — 03C Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CE0130 CO03CI0120 — 03C Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CI0120 CO03EE0130 — 03E Power/Control JB's, Tray, Cable, Termination | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 61.0d CO03EE0130 CO03EI0120 — 03E Instrument JB's, Field Instr, Tray, Cable | 12-Jun-27 → 13-Aug-27 | Not Started 0% | float 61.0d CO03EI0120 CO03CE0120 — 03C Lighting Fixture Installation/Termination | 14-Jun-27 → 26-Jun-27 | Not Started 0% | float 123.0d CO03CE0120 CO03DP0140 — 03D SB Pipe Erection | 15-Jun-27 → 05-Jul-27 | Not Started 0% | float 97.0d CO03DP0140 CO03AE0110 — 03A Lighting JB's, Stands, Tray & Cable | 19-Jun-27 → 09-Jul-27 | Not Started 0% | float 75.0d CO03AE0110 CO03DI0120 — 03D Instrument JB's, Field Instr, Tray, Cable | 22-Jun-27 → 12-Jul-27 | Not Started 0% | float 100.0d CO03DI0120 CO03BP0130 — 03B LB Pipe Erection | 28-Jun-27 → 04-Aug-27 | Not Started 0% | float 138.0d CO03BP0130 CO03DE0120 — 03D Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO03DE0120 CO03EE0120 — 03E Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 105.0d CO03EE0120 CO03FE0120 — 03F Lighting Fixture Installation/Termination | 28-Jun-27 → 17-Jul-27 | Not Started 0% | float 111.0d CO03FE0120 CO03FP0150 — 03F Punchlist / Test Piping | 28-Jun-27 → 16-Jul-27 | Not Started 0% | float 88.0d CO03FP0150 CO03YV2120 — 03Y Insulate - Piping | 30-Jun-27 → 03-Sep-27 | Not Started 0% | float 148.0d CO03YV2120 CO03AP0150 — 03A Punchlist / Test Piping | 02-Jul-27 → 21-Jul-27 | Not Started 0% | float 62.0d CO03AP0150 CO03CP0150 — 03C Punchlist / Test Piping | 02-Jul-27 → 21-Jul-27 | Not Started 0% | float 87.0d CO03CP0150 CO03DP0150 — 03D Punchlist / Test Piping | 02-Jul-27 → 12-Jul-27 | Not Started 0% | float 97.0d CO03DP0150 CO03BE0120 — 03B Lighting Fixture Installation/Termination | 03-Jul-27 → 09-Jul-27 | Not Started 0% | float 187.0d CO03BE0120 CO03BP0140 — 03B SB Pipe Erection | 05-Jul-27 → 11-Aug-27 | Not Started 0% | float 138.0d CO03BP0140 CO03FV1120 — 03F Paint Touch-up - Piping | 06-Jul-27 → 16-Jul-27 | Not Started 0% | float 112.0d CO03FV1120 CO03DV1120 — 03D Paint Touch-up - Piping | 06-Jul-27 → 12-Jul-27 | Not Started 0% | float 111.0d CO03DV1120 CO03AE0120 — 03A Lighting Fixture Installation/Termination | 10-Jul-27 → 16-Jul-27 | Not Started 0% | float 75.0d CO03AE0120 CO03AV1120 — 03A Paint Touch-up - Piping | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 58.0d CO03AV1120 CO03AV1130 — 03A Paint Touch-up - Equipment | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 58.0d CO03AV1130 CO03CV1120 — 03C Paint Touch-up - Piping | 10-Jul-27 → 21-Jul-27 | Not Started 0% | float 102.0d CO03CV1120 CO03BE0130 — 03B Power/Control JB's, Tray, Cable, Termination | 12-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BE0130 CO03BI0120 — 03B Instrument JB's, Field Instr, Tray, Cable | 12-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BI0120 CO03DI0130 — 03D Install In Line Instruments | 12-Jul-27 → 14-Jul-27 | Not Started 0% | float 97.0d CO03EP0150 — 03E Punchlist / Test Piping | 14-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EP0150 CO03AV2120 — 03A Insulate - Piping | 16-Jul-27 → 30-Jul-27 | Not Started 0% | float 63.0d CO03AV2120 CO03FI0130 — 03F Install In Line Instruments | 17-Jul-27 → 20-Jul-27 | Not Started 0% | float 97.0d CO03AI0130 — 03A Install In Line Instruments | 22-Jul-27 → 24-Jul-27 | Not Started 0% | float 62.0d CO03AV2110 — 03A Insulate - Equipment | 22-Jul-27 → 05-Aug-27 | Not Started 0% | float 58.0d CO03AV2110 CO03CI0130 — 03C Install In Line Instruments | 22-Jul-27 → 24-Jul-27 | Not Started 0% | float 87.0d CO03YI0130 — 03Y Install In Line Instruments | 24-Jul-27 → 27-Aug-27 | Not Started 0% | float 139.0d CO03YI0130 CO03EV1120 — 03E Paint Touch-up - Piping | 27-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EV1120 CO03EV1130 — 03E Paint Touch-up - Equipment | 27-Jul-27 → 13-Aug-27 | Not Started 0% | float 58.0d CO03EV1130 CO03FV2120 — 03F Insulate - Piping | 30-Jul-27 → 13-Aug-27 | Not Started 0% | float 88.0d CO03FV2120 CO03BP0150 — 03B Punchlist / Test Piping | 31-Jul-27 → 23-Aug-27 | Not Started 0% | float 138.0d CO03BP0150 CO03BV1120 — 03B Paint Touch-up - Piping | 07-Aug-27 → 23-Aug-27 | Not Started 0% | float 153.0d CO03BV1120 CO03EI0130 — 03E Install In Line Instruments | 16-Aug-27 → 25-Aug-27 | Not Started 0% | float 65.0d CO03EI0130 CO03EV2110 — 03E Insulate - Equipment | 20-Aug-27 → 02-Oct-27 | Not Started 0% | float 58.0d CO03EV2110 CO03EV2120 — 03E Insulate - Piping | 20-Aug-27 → 02-Oct-27 | Not Started 0% | float 58.0d CO03EV2120 CO03BI0130 — 03B Install In Line Instruments | 25-Aug-27 → 30-Aug-27 | Not Started 0% | float 138.0d CO03BI0130 CO030K0100 — 030 Site Prep - Guard Posts & Gravel | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d CO030K0100 WO030K0100 — 030 Site Prep | 01-Nov-27 → 01-Mar-28 | Not Started 0% | float 9.0d WO030K0100 CO03AI0140 — 03A Continuity Testing | 07-Dec-27 → 09-Dec-27 | Not Started 0% | float -35.0d CO03YI0140 — 03Y Continuity Testing | 07-Dec-27 → 17-Jan-28 | Not Started 0% | float 41.0d CO03YI0140 CO03AT0110 — 03A Mechanical Completion | 09-Dec-27 | Not Started CO03FI0140 — 03F Continuity Testing | 10-Dec-27 → 13-Dec-27 | Not Started 0% | float -1.0d CO03FT0110 — 03F Mechanical Completion | 13-Dec-27 | Not Started SC03AT0120 — 03A RFSU | 20-Dec-27 | Not Started CO03BI0140 — 03B Continuity Testing | 21-Dec-27 → 23-Dec-27 | Not Started 0% | float 59.0d CO03BT0110 — 03B Mechanical Completion | 23-Dec-27 | Not Started CO03CI0140 — 03C Continuity Testing | 24-Dec-27 → 27-Dec-27 | Not Started 0% | float -19.0d SC03FT0120 — 03F RFSU | 24-Dec-27 | Not Started CO03CT0110 — 03C Mechanical Completion | 27-Dec-27 | Not Started CO03DI0140 — 03D Continuity Testing | 28-Dec-27 → 29-Dec-27 | Not Started 0% | float -17.0d CO03DT0110 — 03D Mechanical Completion | 29-Dec-27 | Not Started CO03EI0140 — 03E Continuity Testing | 30-Dec-27 → 04-Jan-28 | Not Started 0% | float -32.0d CO03EI0140 SC03BT0120 — 03B RFSU | 03-Jan-28 | Not Started CO03ET0110 — 03E Mechanical Completion | 04-Jan-28 | Not Started SC03DT0120 — 03D RFSU | 04-Jan-28 | Not Started SC03CT0120 — 03C RFSU | 07-Jan-28 | Not Started CO03YT0110 — 03Y Mechanical Completion | 17-Jan-28 | Not Started SC03ET0120 — 03E RFSU | 22-Jan-28 | Not Started SC03YT0120 — 03Y RFSU | 24-Jan-28 | Not Started